Loading...
HomeMy WebLinkAboutSPRINGDALE - PCN STREAM IMPACT TABLE 7-2-23 PCN Stream Impact Table Reason for impact Impact type Type of impact Stream name Stream type Type of jurisdiction Stream width (inches) Impact length (feet) Stream 1 Pipe Section of stream underground Permanent Culvert UT1 Perennial Both 20 295 Stream 2 Stream restoration of UT2 Permanent Restoration/ Enhancement UT2 Perennial Both 16 360 Stream 3 UT1 pump around diversion Temporary Temporary stream diversion UT1 Pump Around Perennial Both 20 10 Stream 4 UT2 pump around diversion Temporary Temporary stream diversion UT2 Pump Around Perennial Both 16 20 *Stream 5 (Inside Extents of Old Pond) Remove Old Impoundment (Non-JD per ACOE) Permanent Culvert UT1 Perennial Non-JD 20 125.5 *Not included in mitigation threshold per NCDEQ-DWR and USACE (email dated 6-30-2023)