HomeMy WebLinkAboutSPRINGDALE - PCN STREAM IMPACT TABLE 7-2-23
PCN Stream Impact Table
Reason for
impact
Impact
type
Type of
impact
Stream
name
Stream
type
Type of
jurisdiction
Stream
width
(inches)
Impact
length
(feet)
Stream
1
Pipe Section
of stream
underground
Permanent
Culvert
UT1
Perennial
Both
20
295
Stream
2
Stream
restoration of
UT2
Permanent
Restoration/
Enhancement
UT2
Perennial
Both
16
360
Stream
3
UT1 pump
around
diversion
Temporary
Temporary
stream
diversion
UT1
Pump
Around
Perennial
Both
20
10
Stream
4
UT2 pump
around
diversion
Temporary
Temporary
stream
diversion
UT2
Pump
Around
Perennial
Both
16
20
*Stream
5
(Inside
Extents
of Old
Pond)
Remove Old
Impoundment
(Non-JD per
ACOE)
Permanent
Culvert
UT1
Perennial
Non-JD
20
125.5
*Not included in mitigation threshold per NCDEQ-DWR and USACE (email dated 6-30-2023)