Loading...
HomeMy WebLinkAboutRE [External] RE Springdale Driving Range Extension Update (1)1 Winston, Joey From:Preston Gregg <PRengineering@outlook.com> Sent:Wednesday, June 21, 2023 10:52 PM To:Winston, Joey Cc:Davis, Brooke A CIV USARMY CESAW (USA); Davidson, Landon Subject:RE: [External] RE: Springdale Driving Range Extension Update Attachments:PCN Table.pdf CAUTION: External email. Do not click links or open attachments unless verified. Report suspicious emails with the Report Message  button located on your Outlook menu bar on the Home tab.    Hi Joey,    Thanks for the quick reply.  Below are our comments:    1. We have updated the PCN Impact Table (see aƩached).  It has been our understanding from the last two onsite  meeƟngs and phone calls with Brooke that the old impoundment that was blown out by TS Fred would be  treated as an open water impact.  Brooke please chime in here if I am incorrect but that has been the  understanding from Jason and myself in the conversaƟons that we have had with you.  In good faith and in  communicaƟon with Brooke’s predecessor, Springdale contractors rushed to restore the site post TS Fred and  the site was placed back without the pond.    You are correct, only NOVs issued by USACE and Haywood Co. for this site.     Unfortunately, I do not have wriƩen documentaƟon regarding DWR’s posiƟon with not placing the pond  back.  These conversaƟons / meeƟngs occurred during and aŌer the site was restored with your predecessor  and members from USACE.  Everyone’s desire was to see a finished product that did not include another  impoundment.  And here we are haha.  Thanks,       Preston Gregg, PE  Principal  (828) 400‐9353      From: Winston, Joey <joey.winston@deq.nc.gov>   Sent: Tuesday, June 20, 2023 10:32 AM  To: Preston Gregg <PRengineering@outlook.com>  Cc: Davis, Brooke A CIV USARMY CESAW (USA) <Brooke.A.Davis@usace.army.mil>; Davidson, Landon  <landon.davidson@deq.nc.gov>  Subject: RE: [External] RE: Springdale Driving Range Extension Update    Hi Preston,    2 I’m following up with some more comments to hopefully complete what we need.    1. There will need to be some sort of impact included in the PCN Impact Table for the area within the extents of  the former pond. Right now, the PCN Impact Table doesn’t match with the plans on the amount of proposed  impact. The amount of proposed impact always needs to be included on the PCN Impact Table so that when the  cerƟficaƟon is issued, it will cover all impacts that will occur. The type of impact (stream versus open water) is  determined by the JD reviewed by the Corps, and the Corps has determined that the impact within the extents  of the former pond is a stream (green line on graphic below). Also, I’ve been looking through our files on the  project, and I haven’t found some of the documents you’ve referenced in your comments. I haven’t found an  NOV issued by DWR for this locaƟon, just other locaƟons on the property. I also couldn’t find any discussions  with DWR about whether the pond should be restored. Could you provide any files you have on the maƩer?      2. Thanks for the clarificaƟon. Since this impact occurred before June 1, 2000, it will not be included in the  miƟgaƟon amount.    3. Unfortunately, the need for miƟgaƟon hasn’t been resolved. Please see item 1 above for addiƟonal informaƟon  needed.    Please let me know if you have any quesƟons.    Thanks,  Joey    3 Joey Winston  Environmental Specialist I, Division of Water Resources  North Carolina Department of Environmental Quality   Office: (828) 296‐4685 | Cell: (828) 785‐9171   NEW: joey.winston@deq.nc.gov   DEQ is updating its email addresses to @deq.nc.gov in phases from May 1st to June 9th.   Employee email addresses may look different, but email performance will not be impacted.      From: Preston Gregg <PRengineering@outlook.com>   Sent: Monday, June 19, 2023 11:46 PM  To: Winston, Joey <joey.winston@deq.nc.gov>  Cc: Davis, Brooke A CIV USARMY CESAW (USA) <Brooke.A.Davis@usace.army.mil>; Davidson, Landon  <landon.davidson@deq.nc.gov>  Subject: RE: [External] RE: Springdale Driving Range Extension Update    CAUTION: External email. Do not click links or open attachments unless verified. Report suspicious emails with the Report Message  button located on your Outlook menu bar on the Home tab.    Hi Joey,    Thank you for looking into this.  Below are a few comments to your previous email.    1. The most recent aerial photo shows (taken March of this year) the site aŌer emergency erosion control work  was completed as part of the remedial acƟon plan referenced in the NOVs issued by DWR, USACE and Haywood  Co. Erosion Control Department’s.  So the sediment basin shown, and “new” stream was only placed there  temporarily due to the old pond being blown out by the flood, in addiƟon to; no one (DWR, USACE, Haywood  Co.) desired a pond to be placed back.  It has been our understanding from previous meeƟngs and most current,  that all parƟes agreed that the old pond was an open water impact only and no miƟgaƟon was required;  therefore, this is why no pipe measurement was accounted for within the extents of the former pond.  Below is  a screenshot of the site pre TS Fred.    2. It is our understanding that the culvert was installed at (or as close to) the Ɵme of the course opening in 1968.  I  have edited the Historical Impact Assessment report (page 9 of 23 aƩached) to reflect a more defined date.      3. Hopefully 1 & 2 above clear up pipe in quesƟon.    Please let us know if you need anything further to complete your review. Thanks again,       4     Preston Gregg, PE  Principal  (828) 400‐9353      From: Winston, Joey <joey.winston@deq.nc.gov>   Sent: Thursday, June 15, 2023 12:11 PM  To: Preston Gregg <PRengineering@outlook.com>  Cc: Davis, Brooke A CIV USARMY CESAW (USA) <Brooke.A.Davis@usace.army.mil>; Davidson, Landon  <landon.davidson@deq.nc.gov>  Subject: RE: [External] RE: Springdale Driving Range Extension Update    Hi Preston,    I have some quesƟons and need some more informaƟon about the revised plans, please let me know if you have any  quesƟons about it.    1. The revised PCN Stream Impact Table doesn’t include the proposed impact for piping the stream within the  extents of the former pond. From my understanding of our meeƟng last month, the sediment basin (red circle  5 below) is considered non‐jurisdicƟonal but the stream within the extents of the former pond (green line below)  is considered a jurisdicƟonal stream. The revised PCN Stream Impact Table includes an impact to Open Water 1  for the sediment basin but provides no measurement for the stream within the extents of the former pond.      2. Impact P in the Historical Impacts Assessment says that it was installed as a Tropical Storm Fred Replacement. Is  there an impact that predates TS Fred and the exisƟng culvert was a replacement, or was this a new impact aŌer  TS Fred? If there was an exisƟng impact, do you know when it occurred?    3. The impacts detailed in the Historical Impacts Assessment, along with the proposed new impacts for stream  piping, will cause the need for miƟgaƟon. The important date is June 1, 2000, aŌer which the Division started  requiring miƟgaƟon for projects of this type impacƟng streams of this classificaƟon. All impacts aŌer this date  will be counted towards the miƟgaƟon threshold and will require miƟgaƟon if the threshold is exceeded. I’ve  included a table below that should help.    Impacts requiring miƟgaƟon:  Impact Name Impact Type Feature Type Year Length of  Impact (Ō)  Notes  P Culvert UT TS Fred  Replacement  (post August  2021)  30 See quesƟon 2  above for date— may not need  miƟgaƟon  S1—Piping  exisƟng stream  Culvert UT Proposed 295 Proposed  6 S5—Piping  exisƟng stream  within the  extents of  former pond  Culvert UT Proposed ? Proposed—need  measurement  (see quesƟon 1  above)        Total: 325+S5         Thanks,  Joey    Joey Winston  Environmental Specialist I, Division of Water Resources  North Carolina Department of Environmental Quality   Office: (828) 296‐4685 | Cell: (828) 785‐9171   NEW: joey.winston@deq.nc.gov   DEQ is updating its email addresses to @deq.nc.gov in phases from May 1st to June 9th.   Employee email addresses may look different, but email performance will not be impacted.      From: Davis, Brooke A CIV USARMY CESAW (USA) <Brooke.A.Davis@usace.army.mil>   Sent: Tuesday, June 13, 2023 8:29 AM  To: Preston Gregg <PRengineering@outlook.com>; Winston, Joey <joey.winston@deq.nc.gov>  Subject: [External] RE: Springdale Driving Range Extension Update    CAUTION: External email. Do not click links or open attachments unless verified. Report suspicious emails with the Report Message  button located on your Outlook menu bar on the Home tab.    Hey Preston,    I have all I need.    Thank you.  Brooke     From: Preston Gregg <PRengineering@outlook.com>   Sent: Friday, June 9, 2023 11:04 AM  To: Winston, Joey <joey.winston@deq.nc.gov>; Davis, Brooke A CIV USARMY CESAW (USA)  <Brooke.A.Davis@usace.army.mil>  Subject: [Non‐DoD Source] Springdale Driving Range Extension Update    Good Morning Joey / Brooke,  7   Hope all is well.  Just checking in on the status of this one?  Thanks for your help with it.      Preston Gregg, PE  Principal  (828) 400‐9353        Email correspondence to and from this address may be subject to the North Carolina Public Records Law and may be disclosed to third parties by an authorized state official.