Loading...
HomeMy WebLinkAboutPCN TablePCN Stream Impact Table Reason for impact Impact type Type of impact Stream name Stream type Type of jurisdiction Stream width (inches) Impact length (feet) Stream 1 Pipe Section of stream underground Permanent Culvert UT1 Perennial Both 20 295 Stream 2 Stream restoration of UT2 Permanent Restoration/ Enhancement UT2 Perennial Both 16 360 Stream 3 UT1 pump around diversion Temporary Temporary stream diversion UT1 Pump Around Perennial Both 20 10 Stream 4 UT2 pump around diversion Temporary Temporary stream diversion UT2 Pump Around Perennial Both 16 20 *Open Water 1 Remove Old Impoundment (Non-JD per USACE) Permanent Culvert N/A N/A (Non-JD Per USACE) Non-JD Non-JD 125.5 (Non-JD) *No stream existed through old impoundment.