HomeMy WebLinkAboutNCC232184_ESC Approval Submitted_20230724 PITT COUNTY
Q~4 coL,��� PLANNING DEPARTMENT
DEVELOPMENT SERVICES BUILDING
1717 W.5th STREET
GREENVILLE,NORTH CAROLINA 27834-1696 JAMES F.RHODES,AICP
CAP TELEPHONE:(252)902-3250 Assistant County Manager for
FAX:(252)830-2576 Planning and Environment
July 17, 2023
Re: Montevallo Section 2, Phase 1
Project Tracking#/ID: PC SESC 2023-12
Disturbed Acres: 5.5
Montevallo Corporation, LLC
1700 Tottenham Court
Winterville, NC 28590
Dear Sir:
This is to advise you that the Pitt County Technical Review Committee conditionally approved
the soil erosion and sedimentation control plan for Montevallo Section 2, Phase 1 on July 12,
2023, and issued this Certificate of Conditional Approval. Conditions and requirements as a part
of this approval are attached below. Copies of the draft minutes from the meeting will be
available upon request prior to the next Technical Review Committee meeting.
As stipulated on the financial responsibility form, you are responsible for ensuring compliance
with all aspects of the approved plan and the Pitt County Soil Erosion and Sedimentation Control
Ordinance. Your primary objectives include, but are not limited to, preventing offsite
sedimentation, preventing sediment from entering watercourses, and establishing vegetation on
all disturbed areas within 7-14 calendar days, following any completion of a phase of grading.
As of April 1, 2019, all new construction activities are required to complete and submit an
electronic Notice of Intent (NOI) form requesting a Certificate of Coverage (COC) under the
NCG010000 Construction Stormwater General Permit. This form MUST be submitted prior to
the commencement of any land disturbing activity on the above named project. The NOI form
may be accessed at deq.nc.gov/NCG01. Please direct questions about the NOI form to Annette
Lucas at Annette.lucas@ncdenr.gov or Paul Clark at Paul.clark@.ncdenr.gov. After you submit a
complete and correct NOI Form, a COC will be emailed to you within three business days.
Please be aware that your project will be covered by requirements of the NPDES
Construction Stormwater General Permit NCG010000. Please become familiar with all the
requirements and conditions of this permit in order to achieve compliance.
Upon discovery of noncompliance by our office, the following actions may be taken:
1. No further permits for building or other construction will be issued.
2. The authority to continue construction, other than for erosion control measures,
will be terminated.
3. Penalties of up to $5000 per day may begin to accrue. Failure to immediately
comply upon notice of noncompliance will result in injunctive and/or criminal
action.
Other Comments:
4. This erosion control plan shall expire three years following the date of approval if
no land disturbing activity has been undertaken.
5. The Division of Water Quality may pursue legal action against you in order to
enforce requirements of the NPDES, Phase II permit.
6. The Pitt County Soil Erosion and Sedimentation Control Ordinance authorizes
County officials to inspect sites to ensure compliance with the Sedimentation
Pollution Control Act.
Title 15A NCAC 4B .0118(a)requires that a copy of the approved erosion control plan be on file
at the job site. Also, this letter gives the notice required by G.S. 113A-61.1(a) of our right of
periodic inspection to insure compliance with the approved plan.
North Carolina's Sedimentation Pollution Control Act is performance-oriented, requiring
protection of existing natural resources and adjoining properties. If, following the
commencement of this project, the erosion and sedimentation control plan is inadequate to meet
the requirements of the Sedimentation Pollution Control Act of 1973 (North Carolina General
Statute 113A-51 through 66), this office may require revisions to the plan and implementation of
the revisions to insure compliance with the Act. Acceptance and approval of this plan is
conditioned upon your compliance with Federal and State water quality laws, regulations, and
rules. In addition, local city or county ordinances or rules may also apply to this land-disturbing
activity. This approval does not supersede any other permit or approval.
Please note that this approval is based in part on the accuracy of the information provided in the
Financial Responsibility Form, which you provided. You are requested to file an amended form
if there is any change in the information included on the form. Land disturbance shall not
begin until a preconstruction meeting has taken place. An updated approval letter will be
sent once the revised plans have been submitted and reviewed.
Please provide a copy of the certificate of coverage prior to beginning any land disturbance.
If you need further information or assistance, please contact me at(252) 902-3250.
Sincerely,y,
911
540d7
Thomas Shrader
Planner III
CC: Richie Brown, Stroud Engineering
Planning]
1. Parcel number shown on the plans is incorrect.
2. Silt fence shown on plans appears to be outside the limits of disturbance. Is it being
placed on the limits line?
3. Erosion control legend is missing and should be shown on the plans.
4. Show any stockpile locations and necessary protections.
5. Show concrete washout location(s) on the plans.
6. Show wetlands limits on the plans.
7. Velocities and calculations for all FES are needed.
[General Comments]
[Planning]
• Soils located on site include Ly, Os,Pg,Ra, and WaB per the Pitt County Soil
Survey, Sheet 68.
• Swift Creek Watershed
• Soils are prime farmland or have statewide importance for farming.
Development will remove the site from agricultural production.
• The adjacent drainage laterals should be cleaned out to their original
bottom for improved drainage.
• There is a record of sub-surface drain tile. Please see the attached drain tile
map.
[Environmental Health]
1. The site is served by municipal sewer and does not require septic permits.
• The following agencies have reviewed the Revised SESC Plan for Montevallo
Section 1,Phase 2 & Section 2,Phase 1 and have no comments:
• Emergency Management
• NCDOT
• GUC
• Engineering
• The following agencies have reviewed the Revised SESC Plan for Montevallo
Section 1,Phase 2 & Section 2, Phase 1 and have not returned comments:
----Cc.°
_ --
f
-,....
...
• , !,,,,
..- F ..___,...
. -,,
.,
•
....)
,A,„
. -...,....... ,
,
.L.
41, • •adli,.
..-•
11111.7 .
- •:-,r / 1
.....' .
•
...•-•'c!..
..."
itt ' " V I
•
,.
-
..-
,..-
1
1 .
--.,
- I
ILL, t 1 .. ..
--r-
...lip.`....-, ftia.44-."k •o.; • or
•
...
••.-
•• ,-47.
.
. -•
.
•
.../ a p.a... • i 1 e 444-.:ga. ' . '. .
.
°iir,"7•Iti•.1-...-.4.........• -, vi r
,, ....
--lra.tif
8 s
_.. ...‘ . . .
•
1 P IV ...AL isoitaillifr
.W.'. L ..• . r.
. --—
1;.."1 •,„#
I
ear A,A 4
. r...1 I
., •
__ •
, ...."
•
1, ip ,' •
!.
. ,..
--........... in.
. _ .
, - . • -•-• , -
•
. .,
•
I
I .
...„
•
.. ..
l'A
..T
•
..
•
•-• , .i.-..,
I- .,