HomeMy WebLinkAboutNCC205332_NOT Signed Certification_20230719 NCGO1 Notice of Termination (NOT) Certification Form
Directions:
Print this form, complete,scan and upload to the electronic NOT(Rescission)form.
Then, mail the original signed form to the NC DEMLR Stormwater Program at:
Division of Energy, Mineral & Land Resources Stormwater Program
512 N.Salisbury Street, 6th Floor
1612 Mail Service Center
Raleigh, NC 27699-1612
DO NOT MAIL THIS FORM UNTIL YOUR NOT REQUEST HAS BEEN REVIEWED AND APPROVED.
THE FORM YOU MAIL MUST BE COMPLETED WITH AN ORIGINAL SIGNATURE(NOT DIGITAL) [40 CFR 122.22]
General Permit Certificate of Coverage (COC) No.: NCC205332
Name of Project: NCDOT 17 Relocation - Gumbranch/ Drummer Kellum
Per NC General Statute 143-215.6E(i), any person who knowingly makes any false statement, representation, or
certification in any application, record, report,plan, or other document filed or required to be maintained under this
Article or a rule implementing this Article. . .shall be guilty of a Class 2 misdemeanor which may include a fine not
to exceed ten thousand dollars($10,000).
Under penalty of law, I certify that:
I,as an authorized representative, hereby request rescission of coverage under the NPDES Stormwater Permit for
the subject facility. I am familiar with the information contained in this request,and to the best of my knowledge
and belief,such information is true,complete,and accurate.
Legally Responsible Organizational Entity: Piedmont Natural Gas, Inc
*Legally Responsible Person: Joseph Keily
Title of Legally Responsible rsoon: Distribution Project Specialist
*Signature: ! #.% 44/6- Date: 7/19/2023
Print Name and Title of Signed (only if authorized individual signing differs from Legally Responsible Person):
Pc,e ode Senior 1),i r:buk«vn T'ro ec SpCGi ;S�
*IMP TANT NOTE: This form must be signed by a responsible corporate officer that owns or operates the
construction activity,such as a president, secretary, treasurer, or vice president, or a manager that is authorized in
accordance with Part IV,Section B, Item (6)of the NCG010000 permit.
For more information on signatory requirements,see Part IV,Section B, Item (6)of the NCG010000 permit.