HomeMy WebLinkAboutBR-0165_Start of Study_Package_signed STATE OF NORTH CAROLINA
DEPARTMENT OF TRANSPORTATION
ROY COOPER J. ERIC BOYETTE
GOVERNOR SECRETARY
Mailing Address:
NC DEPARTMENT OF TRANSPORTATION
PROJECT MANAGEMENT UNIT
1582 MAIL SERVICE CENTER
RALEIGH, NC 27699-1582
Telephone: (919) 707-6048
Customer Service: 1-877-368-4968
Website: www.ncdot.gov
Location:
1000 BIRCH RIDGE DRIVE
RALEIGH, NC 27610
MEMORANDUM
June 30, 2023
FROM: George Boules, PE
NCDOT Project Management Unit – Project Manager
SUBJECT: Replace Bridge No. 13 on NC 119 over Reedy Fork Creek in Caswell County, North
Carolina, Project No. BR-0165
NCDOT Project Management Unit is beginning the project development, environmental, and engineering
studies for the proposed replacement of Bridge No. 13 on NC 119 over Reedy Fork Creek in Caswell
County. Right of way acquisition is scheduled for fiscal year 2025, and construction is scheduled for
fiscal year 2028. The attached figures show the vicinity, study area and topography maps for the proposed
project. The project is currently state funded; however, NCDOT is preparing a Categorical Exclusion
document and has made a preliminary determination that the project will not proceed through the
NEPA/404 Merger Process.
NCDOT staff or their consultants may contact you to request project-specific information. We welcome
your input on the proposed project, and we would appreciate any information that may be helpful in
evaluating the potential environmental effects. If applicable, please identify any permits or approvals
which may be required by your organization. Please provide your input by July 31, 2023.
If you have any questions concerning the project, please contact me at (919) 707-6620 or by email at
gmboules@ncdot.gov. Please include the Project Number BR-0165 in all correspondence and comments.
Thank you for your cooperation.
Sincerely,
George M. Boules, PE
Attachments
Project Data Sheet & maps
DocuSign Envelope ID: 333B50DC-52E5-4A83-934E-2B9F08711936
7/2022
North Carolina Department of Transportation
Project Data Sheet
Essential Project Information
STIP Project Name Bridge No. 13 on NC 119 over Reedy Fork Creek
STIP Number BR-0165
WBS No. 67165.1
County Caswell
NCDOT Division 7
ROW Date 2025
LET Date 2028
Schedule Considerations
Cost Estimates
ROW: $500,000
LET: $2,600,000
Total: $3,100,000
Funding Type State
Proposed Project Details
Project Description Replacement of Bridge No. 13 on NC 119 over Reedy Fork Creek
Project Limits
Study area is 1950 feet long (about 915 feet north from the northern
bridge limit and about 915 south from the southern bridge limit), and
800 feet wide (around 385 feet on either side of the bridge).
Typical Section Two lane
Access Control Full control of access
Design Speed 60 mph
Right-of-Way Width Varies (60’ min.)
Physical or Engineering
Constraints Wetland/stream
Other Considerations Offsite detour would be ~10 miles (Solomon Road)
Survey Request Date PMU to order survey
Design Plan Bridge Replacement investigating off site detour, staged construction,
and on-site detour.
Construction
Recommendation TBD
Consultant Involvement
Volkert – project management, roadway, structures, signing &
striping, utilities, Traffic Management Plans
Three Oaks Engineering – planning, hydraulic design
Project History
Planning Studies Type I Ground Disturbing CE
SPOT Description Unknown
Feasibility Studies Unknown
Problem Statement Bridge is structurally deficient due to superstructure rating of 4;
sufficiency rating is 68.74.
Alternatives Previously
Dismissed and Why
All alternatives will be considered until feedback from FSM &
stakeholders
DocuSign Envelope ID: 333B50DC-52E5-4A83-934E-2B9F08711936
7/2022
Purpose & Need
Purpose Replace Bridge No. 13
Need(s) Bridge is structurally deficient and needs to be replaced.
Supporting Data Superstructure rating of 4; sufficiency rating is 68.74.
Alternatives Currently Under Consideration
Alternative 1 Slight realignment using staged construction
Alternative 2 On existing alignment with onsite detour
Alternative 3 Offsite detour via Stephentown Rd (8 miles)
Public and Agency Coordination
Anticipated Permits Section 404/401 nationwide permit
Federal Agency Involvement USACE
Public Involvement Strategy Landowner notification letters, public input site
Merger Screening Date Project will not enter the Merger Process.
Potential Merger Triggers None
Existing Conditions
Functional Classification Rural major collector
Strategic Highway Corridor No
AADT 2021 ADT = 700 vpd
2040 ADT = 1020 vpd (est. 2% growth)
Access Control Full
Typical Section Two 11ft lanes with 10ft shoulders w/GR
Right-of-Way Width 60’
Posted Speed 55 MPH
Structures (bridges, RCBC,
etc.) One structure, Bridge No. 13
Railroad Involvement No
Other Adjacent STIP Projects N/A
Preliminary Resource Inventory Table
Utilities TBD Spectrum
Hazardous Materials N/A
Known Potentially-Eligible
National Register of Historic
Places Sites/Districts
No
Other Cultural Resources No
Wetlands Freshwater Forested/Shrub Wetland west of bridge
Streams Reedy Fork Creek (including Hyco River and Hyco Lake)
FEMA Floodplain Detailed
Study Area 1% annual chance flood zone
Water Supply Watersheds WS-V
Riparian Buffer Rules No
Active Agriculture No
Parks, Greenways, Game
Lands, Section 4(f) & Section
6(f) Properties
No
DocuSign Envelope ID: 333B50DC-52E5-4A83-934E-2B9F08711936
7/2022
Environmental Justice
Populations Low-income & minority populations present
Other Resources (USFWS
IPaC list)
Tricolored bat, monarch butterfly, Little brown bat, Roanoke logperch,
James spinymussel, Atlantic pigtoe
Project Management Approval
Project Manager
Name George Boules, PE – Project Management Unit
Signature
Date 6/30/23
Supervisor
Name
Signature
Date
DocuSign Envelope ID: 333B50DC-52E5-4A83-934E-2B9F08711936
County:
WBS:
Date:
Div:STIP#NORTH CAROLINADEPARTMENTOF TRANSPORTATIONDIVISION OF HIGHWAYS
Figure1CASWELL COUNTY
NORTH CAROLINA
VICINITY MAPREPLACE BRIDGE NO. 13ON NC 119OVER REEDY FORK CREEK
´
0 0.5 1
Miles
CASWELL
7 BR-0165
67165.1.1
JUNE 2023
Project Location
^_
DocuSign Envelope ID: 333B50DC-52E5-4A83-934E-2B9F08711936
County:
WBS:
Date:
Div:STIP#NORTH CAROLINADEPARTMENTOF TRANSPORTATIONDIVISION OF HIGHWAYS
Figure2")119
Bridge No. 13
Reedy ForkHyco RiverCASWELL COUNTY
NORTH CAROLINA
STUDY AREA MAPREPLACE BRIDGE NO. 13ON NC 119OVER REEDY FORK CREEK
´
0 400 800
Feet
Legend
Project Study Area
CASWELL
7 BR-0165
67165.1.1
JUNE 2023
DocuSign Envelope ID: 333B50DC-52E5-4A83-934E-2B9F08711936
County:
WBS:
Date:
Div:STIP#NORTH CAROLINADEPARTMENTOF TRANSPORTATIONDIVISION OF HIGHWAYS
Figure3CASWELL COUNTY
NORTH CAROLINA
STUDY AREA MAPREPLACE BRIDGE NO. 13ON NC 119OVER REEDY FORK CREEK
´
0 700 1,400
Feet
Legend
Project Study Area
CASWELL
7 BR-0165
67165.1.1
JUNE 2023
USGS Topo Quad - Leasburg
DocuSign Envelope ID: 333B50DC-52E5-4A83-934E-2B9F08711936