Loading...
HomeMy WebLinkAbout20190863 Ver 1_Initial Release_SLKsignedMitigation Project Name DMS ID 100120 Oak Hill Dairy Site DWR Permit USACE Action ID County Gaston Stream/Wet. Service Area River Basin Cataloging Unit 03050102 Catawba Date Project Instituted Date Prepared 1 - For NCDMS, no credits are released during the first milestone (Site Establishment). 2 - For NCDMS projects, the initial credit release milestone occurs when the as-built report (baseline monitoring report) has been approved by the NCIRT and posted to the NCDMS Portal, provided the following criteria are met: 1) Approval of Final Mitigation Plan; 2) Recordation of the preservation mechanism, as well as a title opinion acceptable to the USACE covering the property; 3) Completion of all physical and biological improvements to the mitigation site pursuant to the mitigation plan; 4) Receipt of necessary DA permit authorization or written DA approval for projects where DA permit issuance is not required. 3 - A 10% reserve of credits is to be held back until the bankful event performance standard has been met. Signature of Official Approving Credit Release Credit Release Milestone Warm Stream Credits Project Credits Scheduled Releases % Estimated Scheduled Release # Proposed Released # Not Approved # Releases Approved Credits Anticipated Release Year Approved Release Date N/A N/A N/A 2 - Year 0 / As-Built 30.00%1,385.675 1,385.675 0.000 1,385.675 2023 5/11/2023 1 - Site Establishment N/A N/A N/A N/A 2024 4 - Year 2 Monitoring 10.00%461.894 2025 3 - Year 1 Monitoring 10.00%461.894 2026 6 - Year 4 Monitoring 5.00%230.947 2027 5 - Year 3 Monitoring 10.00%461.894 2028 8 - Year 6 Monitoring 5.00%230.947 2029 7 - Year 5 Monitoring 10.00%461.894 2030 Stream Bankfull Standard 10.00%461.894 2027 9 - Year 7 Monitoring 10.00%461.894 Totals 1,385.675 Total Unrealized Credits to Date 0.000 Total Gross Credits 4,618.933 Total Percentage Released 30.00% Total Released Credits to Date 1,385.675 Remaining Unreleased Credits 3,233.258 Credit Release Milestone Riparian Credits Project Credits Scheduled Releases % Estimated Scheduled Release # Proposed Released # Not Approved # Releases Approved Credits Anticipated Release Year Approved Release Date N/A N/A N/A 2 - Year 0 / As-Built 30.00%2.303 2.303 0.000 2.303 2023 5/11/2023 1 - Site Establishment N/A N/A N/A N/A 2024 4 - Year 2 Monitoring 10.00%0.769 2025 3 - Year 1 Monitoring 10.00%0.769 2026 6 - Year 4 Monitoring 5.00%0.383 2027 5 - Year 3 Monitoring 15.00%1.152 20309 - Year 7 Monitoring 10.00%0.769 2028 8 - Year 6 Monitoring 5.00%0.383 2029 7 - Year 5 Monitoring 15.00%1.152 Totals 2.303 Total Gross Credits 7.680 2019-00833 Catawba 03 ESA Catawba 03050102 5/11/2023 4/23/2019 2019-0863 Page 1 of 2 Oak Hill Dairy Catawba 03050102 / Catawba 03 ESA Mitigation Project Name DMS ID 100120 Oak Hill Dairy Site DWR Permit USACE Action ID County Gaston Stream/Wet. Service Area River Basin Cataloging Unit 03050102 Catawba Date Project Instituted Date Prepared 2019-00833 Catawba 03 ESA Catawba 03050102 5/11/2023 4/23/2019 2019-0863 Owning Program Total Unrealized Credits to Date 0.000 Total Percentage Released 29.99% Total Released Credits to Date 2.303 Notes Remaining Unreleased Credits 5.377 Warm Stream Restoration 4,256.788 Warm Stream Enhancement I 488.527 Contingencies (if any) Project Quantities Mitigation Type Restoration Type Physical Quantity Debits Warm Stream Restoration Credits Riparian Restoration Credits Warm Stream Enhancement II 291.680 Riparian Restoration 9.429 0.000 0.000 Converted Credits 0.000 0.000 Beginning Balance (mitigation credits)4,618.933 7.680 Released Credits 1,385.675 2.303 Remaining Balance (Unreleased credits)3,233.258 5.377 Total Remaining Balance (Released and Unreleased credits)4,618.933 7.680 DCM Permit # Remaining Balance (Released credits)1,385.675 2.303 Req. Id TIP #Project Name USACE Permit # DWR Permit # Unrealized Credits Page 2 of 2 Oak Hill Dairy Catawba 03050102 / Catawba 03 ESA