Loading...
HomeMy WebLinkAbout20230477 Ver 1_More Info Received_20230602hdrinc.com June 2, 2023 Mr. Andrew Moore Division of Water Resources North Carolina Department of Environmental Quality 2090 U.S. 70 Highway Swannanoa, NC 28778-8211 RE: RESPONSE TO INCOMPLETE 401 WATER QUALITY CERTIFICATION APPLICATION NOTIFICATION — DWR PROJECT #20230477 METROPOLITAN SEWERAGE DISTRICT OF BUNCOMBE COUNTY— CARRIER BRIDGE PUMP STATION REPLACEMENT PROJECT Received via email: Andrew.w.moore@ncdenr.gov Dear Mr. Moore, On behalf of the Metropolitan Sewerage District of Buncombe County (MSD; Applicant), this letter and the appendices provided herein address the incomplete information notification received from the Division of Water Resources (Division) via email dated May 3, 2023, for the above reference project in Buncombe County, North Carolina. The requested information includes the Applicant's responses to questions received in the notification email as well as questions presented during a site visit between the Applicant, the Division, North Carolina Wildlife Resources Commission (NCWRC), and HDR Engineering, Inc. (HDR) on April 27, 2023. This information is included in the following appendices: - Appendix A — Applicant's Responses to Division Notification - Appendix B — Preliminary Conceptual Plans for Referenced Future Project - Appendix C — Updated Figures / Maps - Appendix D — Stream Stabilization Details - Appendix E — Additional Photographs Collected During the April 27, 2023, Site Meeting - Appendix F — Meeting Minutes from April 27, 2023 Site Meeting Based on the cumulative discussion, it is our opinion that the Applicant's responses contained within this letter fully address questions and requests received from the Division regarding the proposed Section 401 Water Quality Certification application — DWR Project No. 20230477. Please review the responses and additional project information included in the attached appendices. On behalf of MSD, the information provided in this response should provide the 440 S. Church Street, Suite 1200; Charlotte, NC 28202 704.338.6700 Metropolitan Sewerage District of Buncombe County I DWR Project No. 20230477 ��� Response to the Division of Water Resources Request for Additional Information Division a complete application submittal and we respectfully request the continued processing of DWR Project No. 20230477 as expeditiously as practicable. If you have any questions, please contact me by email at Eric.Mularski@hdrinc.com or by phone at (704) 973-6878. Thank you for your time and attention to this important planned utility project to accommodate the regional growth for the project area. Sincerely, HDR ENGINEERING, INC. Eric Mularski, PWS, PMP Environmental Project Manager Cc: Darin Prosser — MSD (dprosser(@_msdbc.org) Amanda Jones — USACE (Amanda.Jones(a)usace.army.mil) Andrea Leslie — NCWRC(andrea.leslie(@�ncwiIdlife. org) Byron Hamstead — USFWS (boron hamstead(a)fws.gov) Crystal Allgood, CEP, CPESC, CISEC — HDR (crystal.allgood(c)-hdrinc.com) Matthew Shultz, PE — HDR (matthew.shultz(o)hdrinc.com) hdrinc.com 440 S. Church Street, Suite 1200; Charlotte, NC 28202 704.338.6700 Metropolitan Sewerage District of Buncombe County I DWR Project No. 20230477 ��� Response to the Division of Water Resources Request for Additional Information Appendix A Applicant's Responses to Division's Email Reauest hdrinc.com 440 S. Church Street, Suite 1200; Charlotte, NC 28202 704.338.6700 Metropolitan Sewerage District of Buncombe County I DWR Project No. 20230477 ��� Response to the Division of Water Resources Request for Additional Information The following outlines the inquiries made by the Division and MSD responses. Additional maps and project documentation is attached where applicable and is noted in the following responses. 1. Please provide a figure that depicts the future extension of the 60-inch diameter gravity sewer interceptor pipe from the South River Crossing and extending upgradient/south. The Division understands these plans may not be finalized at this time, so conceptual plans are acceptable. [15A NCAC 02H .0502(a)(9) and 15A NCAC 02H .0506(b)(1)]. Preliminary conceptual plans of the proposed future 60-inch gravity sewer interceptor extension are provided in Appendix B of this response. 2. Please clarify if the current proposed plans include upgrading the 48-inch diameter South French Broad interceptor from the South River Crossing to the Amboy Road Bridge (i.e., through Carrier Park, former Edaco junkyard, etc.). The PCN Supplemental Information narrative indicates this is not part of the current plans. However, previous meetings and a number of figures included with the PCN (e.g., Three Oaks PJD, Environmental Management Plan) indicate this upgrade is part of the project scope. [15A NCAC 02H .0502(a)(9)]. The current proposed plans for the Carrier Bridge Pump Station Project do not include upgrading the 48-inch diameter South French Broad interceptor pipe between the proposed South River Crossing to the Amboy Road Bridge. Upgrading this section of the 48-inch diameter South French Broad interceptor was included in MSDs initial project planning meetings and site evaluation efforts, however due to increasing budget associated with the proposed Carrier Bridge Pump Station Project (and another regional pump station slotted to be constructed at the same time) and massive upgrades to solids handling and biological treatment processes at MSD's wastewater treatment plant, inclusion of this proposed upgrade was pushed back several years of the current project plans and will be incorporated as part of MSD's proposed future 60-inch gravity sewer interceptor extension project. Preliminary conceptual plans that include the 48-inch diameter South French Broad interceptor upgrades is provided in the attached documents. 3. During a site meeting conducted on April 27, 2023, with staff from the Division, NCWRC, MSD, and HDR, there we[re] discussions that indicated the rockfill cofferdam was still in consideration for the project. The PCN narrative indicates a sheet pile cofferdam will be implemented for the project. Please clarify if the rockfill cofferdam is still being considered for the project. [15A NCAC 02H .0502(a)(9)]. Yes, that is correct. The option to implement a rockfill cofferdam is still in consideration for the project and will be determined upon selection of a contractor and determination of the feasible option that can be implemented for either of the two river crossings. The proposed sheet pile cofferdam as presented in the PCN was determined to be the preferred option as outlined in the Hydrologic and Hydraulic Analysis Report (Attachment 9 of the PCN package). The impacts proposed within the PCN application for placement of the cofferdam structures account for a worse -case scenario using the largest footprint associated with the evaluated cofferdam options (i.e., the rockfill cofferdam). This worse -case scenario footprint is represented in the figures provided with the application submittal and included in the total impact calculations (Attachment 3 of the PCN package). hdrinc.com 440 S. Church Street, Suite 1200; Charlotte, NC 28202 704.338.6700 Metropolitan Sewerage District of Buncombe County I DWR Project No. 20230477 ��� Response to the Division of Water Resources Request for Additional Information 4. The PCN project narrative indicates either a sheet pile with king piles or the brace box sheet pile construction will be implemented for the cofferdam. a. The Division understands the king piles will require drilling into bedrock along the riverbed prior to setting the sheet piles. Please provide a construction sequence that details how this work will be conducted so that the river flow does not come in contact with the disturbed area and/or how the river will be protected from turbidity during the drilling process. The construction sequence to install the king piles includes the following: - Install the steel casings through the soft soils on the riverbed to sit on top of the rock layer below and form a temporary seal. The soft soils on the outside of the casing help to form the seal to prevent the river flow from coming in contact with the disturbed area inside the casing. The casings will be pushed into the bottom of the riverbed and are not anticipated to generate substantial turbidity or create turbid conditions over an extended period of time beyond that of the installation. Turbidity curtains will be considered if installation and anchoring are viable. - Drill out the inside of the casing into the rock layer to the required depth creating a rock socket. The spoils and water stay contained within the casing. - Set the king pile through the casing into the rock socket created and grout the socket via tremie pour methods to affix the pile (a method to pour grout/concrete through a watertight pipe below the water level to prevent intermixing). Grout applied via tremie pour methods does not require pressure, therefore there is no applied force to push the external soils away from the casing and interrupt the temporary seal or push the uncured grout outside of the casing. Contact with the river flow is avoided by this method. Once placed the grout is allowed to cure and set. - Pump out the spoils and contained water from inside the casing after the grout has cured/dried and then dispose/treat off -site. - Lastly, after everything is set, remove the casing leaving the king pile in place. b. Both the sheet pile with king piles and brace box sheet pile construction are likely to require grouting to seal the sheet piles from seepage. Please note that cement that contains lime and comes in contact with water can have detrimental effects on aquatic life due to changes in pH. Please explain how the grouting will occur to preclude contact with the river flow. [15A NCAC 02H .0506(b)(2)]. Once the king piles have been installed the construction sequence to install the sheet piles includes the following: - The sheet piles are installed between the king piles. The sheet piles have tips along the bottom that will penetrate through the soft soils down to the riverbed. The sheet piles will be pushed into the bottom of the riverbed and are not anticipated to generate substantial turbidity or create turbid conditions over an extended period of time beyond that of the installation. Turbidity curtains will be considered if installation and anchoring are viable. - Once all sheet piles are installed to form the cofferdam perimeter, the soft soils inside are excavated. Water inside the cofferdam structure would remain. The hdrinc.com 440 S. Church Street, Suite 1200; Charlotte, NC 28202 704.338.6700 Metropolitan Sewerage District of Buncombe County I DWR Project No. 20230477 ��� Response to the Division of Water Resources Request for Additional Information soils on the outside of the cofferdam form a temporary seal along the base of the sheet piles. Grout is applied via tremie pour methods against the base of the inside of the cofferdam structure to form a seal. Grout applied via tremie pour methods does not require pressure, therefore there is no applied force to push the external soils away from the sheet piles and interrupt the temporary seal or push the uncured grout outside of the cofferdam area. Contact with the river flow is avoided by this method. Once the grout is curried/dried and the seal is created, the water within the cofferdam is pumped out and disposed/treated off -site. The sides of the sheet piles are interlocking and can be further sealed by welding, applying sealant, or placing waterstops in the interlocks during installation to prevent leaks from coming into the cofferdam area after dewatering. 5. Will the proposed South River Crossing cofferdam block or impede flow from stream SA's channel with its confluence with the French Broad River? [15A NCAC 02H .0506(b)(1) and (2)]. No. Installation of the proposed cofferdam for the South River Crossing (60-inch gravity sewer line) would not impede flow from the adjacent unnamed tributary located immediately upstream of the proposed pipeline crossing. Based on the potential cofferdam options presented in the French Broad River Crossing — Hydrologic and Hydraulic Analysis, only the proposed rock slope protection (RSP) cofferdam option would have a wide base footprint that may potentially impede flows from this connecting tributary. However, if the RSP cofferdam option is selected a temporary culvert would be installed at the confluence of the tributary with the river to route flows away from the cofferdam. The sheet pile cofferdams would have a much narrower footprint from that of the RSP cofferdam and therefore would have no impact on flows from the tributary or require a temporary culvert installed to mitigate potential impact to flows. 6. There is a stream in the vicinity of the North River Crossing that is not depicted on any of the figures or in the PJD request package. Please revise the figures to include the stream. Please also clarify if any impacts, temporary or permanent, to the stream will be required to complete the North River Crossing. [15A NCAC 02H .0502(a)(9)]. Please refer to Appendix C for the updated figures that include the stream immediately downstream of the proposed North River Crossing. The proposed site for the North River Crossing was relocated downstream (i.e., north) after the initial delineation efforts were conducted and inadvertently was moved outside of the delineated study area. As such this stream was unintentionally overlooked in the application submittal. During the site meeting with the Division and NCWRC on April 27, 2023, stream boundaries were sketched by HDR and the associate maps and figures have been updated and included in Appendix C of this response package. The proposed cofferdam footprint for the North River Crossing is located approximately 30-feet upstream of the existing stream (tributary to the French Broad River). Impacts to this surface water feature will be avoided and the top of banks will be clearly identified in the field with bright orange safety fence or similar. Erosion control measures will be installed to encompass the limits of disturbance prior to construction to prevent sedimentation and preserve water quality. hdrinc.com 440 S. Church Street, Suite 1200; Charlotte, NC 28202 704.338.6700 Metropolitan Sewerage District of Buncombe County I DWR Project No. 20230477 ��� Response to the Division of Water Resources Request for Additional Information 7. Based on the April 27, 2023 site meeting, the Division understands that rather than preemptively installing the temporary streambank stabilization measures downstream of the proposed cofferdam locations, which would involve extensive disturbance to the well - established woody riparian buffer, the applicant is considering a contingency bank stabilization plan approach in which permanent bank stabilization measures consisting or rip rap would be installed only after indications of bank instability or degradation were observed. Please provide a narrative description of the contingency bank stabilization plan. The plan should include a qualitative evaluation of the riverbanks downstream of the two river crossing locations as well as a routine assessment of the riverbanks during construction. [15A NCAC 02H .0506(b)(1) an (2)]. MSD is open to the option of implementing a contingency bank stabilization plan of approach for the Project instead of the implementing the proposed temporary streambank stabilization measures as presented in the USACE PCN application and supporting Hydrologic and Hydraulic Analysis Report. MSD would prefer not to remove the existing riparian vegetation and trees beyond the minimum needed for construction access and cofferdam placement and understand the aesthetic and stabilization values the riparian vegetation provides along the French Broad River stream banks. The recent Pratt & Whitney project (USACE Permit No. SAW-2019-01867) constructed upstream for the Turbine Airfoil Production Facility utilized the contingency bank stabilization plan as their project approach for open cutting across the river and as a result the actual erosion impacts were minimal to those originally anticipated and the restoration efforts to mitigate required far less riprap placement that what was originally planned. The company that worked on this project was WGLA Engineering (WGLA). Based on information MSD has received from WGLA, the Pratt & Whitney Project consisted of a river crossing project to install piers for construction of a bridge which required the river width to be damned up with a causeway in order to drill and install the piers. Similar to what MSD is proposing for the Carrier Bridge Pump Station river crossings, WGLA installed the causeway a little over a third of the river width approaching from one side of the river and then repeated the activity to install the causeway from the opposite side of the river to install the piers across the entire width of the French Broad River. The area in which the Pratt & Whitney Project was construction was a relatively straight stretch of the river, both upstream and downstream of the bridge crossing. The in -water work was completed in 8 months. A contingency bank stabilization plan of approach was implemented for the project and there were no pre -construction erosion control measures installed along the riverbanks. During the 8-month in -water construction period there where a few major storms that increased flow volumes and velocity within the river, however by maintaining the existing riparian vegetation in place along the banks only minor erosion occurred from the storm events and these areas were stabilized with rip -rap after the storms. Pre -construction and post -construction visual surveys were conducted for the Pratt & Whitney Project by Clearwater. If all agencies, including USACE and USFWS, are in favor of implementing a contingency bank stabilization plan of approach for the Project instead of the implementing the proposed temporary streambank stabilization measures as presented in the USACE PCN application, then MSD will revise accordingly to reduce the overall impacts along the riverbanks. hdrinc.com 440 S. Church Street, Suite 1200; Charlotte, NC 28202 704.338.6700 Metropolitan Sewerage District of Buncombe County I DWR Project No. 20230477 ��� Response to the Division of Water Resources Request for Additional Information 8. Please provide construction details for the permanent natural bank stabilization that will be installed in the vicinity of the cofferdams after installation of the gravity sewer and force main are installed. [15A NCAC 02H .0502(a)(9)]. Based on the response provided in Item #7, MSD is open to the option of implementing a contingency bank stabilization plan of approach for the Project. If this approach is implemented, permanent natural bank stabilization measures would be determined based on the actual erosional impacts that occur during the construction of the proposed river crossing. MSD will utilize bioengineering techniques to implement permanent natural streambanks stabilization as needed instead of traditional hard armoring approaches. Options implemented may include the installation of vegetative geolifts or utilizing a Filtrexx Edgesaver Streambank Stabilization System. Rip -rap or boulders would be installed at the toe to provide a foundation for additional streambank protection. Standard details for these options are attached in Appendix D of this response submittal. The following is provided for additional comments received from the Division during the April 27, 2023 site meeting. 9. What does the hydraulic/cofferdam model use to calculate the stream flood levels, significant rain events, and potential erosion/scouring effects? The HEC-RAS model was used to evaluate existing conditions of the French Broad River. MSD provided 1 D HEC-RAS model data that was previously developed for a portion of the French Broad River as part of another project. The 1 D HEC-RAS model data was validated, georeferenced, and additional cross sections added to develop a 2D HEC-RAS model for assessing the impacts of installing temporary cofferdams within the French Broad River. The 2D HEC-RAS model conducted for the proposed Carrier Bridge Pump Station Replacement Project incorporated annual frequency events within the vicinity of the proposed river crossings. Available recorded stream data from the USGS flow gauge located immediately downstream of the proposed river crossings was used to model the frequency of events within the river channel (i.e., normal flow levels, rain/flood levels). To provide a conservative assessment of potential flows within the river for the proposed project crossings, adjustments in discharge volumes were not applied for the downstream USGS flow gauge data to account for the anticipated flows for the upstream areas within the evaluated action area. It is anticipated that the flows within the French Broad River would be lower for the action area and the proposed project river crossing locations than those recorded by the USGS flow gauge and incorporated into the 2D HEC-RAS model assessment. 10. What are the baseline studies used to develop the algorithms for the model program and are they equivalent to the French Broad River stream system? The USACE HEC-RAS 2D User's Manual provides a list of the references studies that can be found under this weblink https://www.hec.usace.armV.mil/confluence/rasdocs/r2dum/latest/references. Several references are listed, and it is unclear on which reference(s) may have been used towards the algorithm development used in the program that would closely resemble conditions similar to the French Broad River stream system. Based on the USGS flow gauge data set used for modeling conditions within the river, the 2D HEC-RAS model conducted for the project action area is expected hdrinc.com 440 S. Church Street, Suite 1200; Charlotte, NC 28202 704.338.6700 Metropolitan Sewerage District of Buncombe County I DWR Project No. 20230477 ��� Response to the Division of Water Resources Request for Additional Information to be a conservative assessment of potential impacts associated with cofferdam placement within the river channel. 11. What type of sediment barrier would be used in the stream with the initial construction activities associated with installing the cofferdams (i.e., pilon drilling, placement of rip rap, etc.)? Turbidity curtains are being considered for the project if installation and anchoring are viable. If it is feasible to install and anchor within the river for the proposed crossings, the turbidity curtains would be floated around the cofferdam work area to reduce downstream sedimentation while the cofferdam structure is being installed. The turbidity curtains would not be removed until disturbed sediments floating within the water column could settle out and the disturbed waters within the curtained area returned to normal conditions. If it is not feasible to install and anchor turbidity curtains within the river, the overall expected disturbance to the river substrate would be minimal from the installation of the cofferdam structures as presented in the response to Item #4. Prior to the removal of the cofferdam structures all equipment, construction material(s), and spoils would be removed and disposed of in an appropriate off -site location. Riverbed elevations would be returned to preconstruction elevations. Water would be reintroduced (pumped in from the adjacent river flows) to the completed construction area behind the cofferdam. Once any disturbed sediments have settled within the cofferdam area and conditions are clear, the cofferdam structure would be removed by gentle vibration to reduce generating any substantial turbidity, Removal of the cofferdam structures is not anticipated to create turbid conditions over an extended period of time beyond that of the removal efforts. 12. North Carolina Wildlife Resources Commission (NCWRC) requests a copy of the final mussel survey report if available or a page reference on where this report can be located within the PCN application submittal. The Freshwater Mussel Survey Report prepared by Three Oaks Engineering (dated January 20, 2023) was included in the Biological Assessment Report submitted with the PCN application to the USACE. The Biological Assessment can be found in Attachment 10 of the PCN application submittal (beginning on page 330 of the PCN submittal PDF). The Freshwater Mussel Survey Report can be found in Appendix C of the Biological Assessment and is the third report included in that appendix (beginning on page 485 of the PCN submittal PDF). On May 16, 2023, HDR provided the Division and NCWRC a copy of the Freshwater Mussel Survey Report prepared by Three Oaks Engineering (dated January 20, 2023) via email along with the meeting minutes from the April 27, 2023 site meeting. hdrinc.com 440 S. Church Street, Suite 1200; Charlotte, NC 28202 704.338.6700 Metropolitan Sewerage District of Buncombe County I DWR Project No. 20230477 ��� Response to the Division of Water Resources Request for Additional Information Appendix B PrAliminnry ('.nnr Pnti m1 Planc hdrinc.com 1201 Market Street (423)414-3551 ' CARRIER BRIDGE PUMP STATION L O n` 1000 0 500 1000 2000 GRAPHIC SCALE 3000 1 INCH = 1000FEET ,'� .-� 60 % DESIGN PRELIMINARY PLANS. -�' DO NOT USE FOR CONSTRUCTION. EXHIBIT ONLY. OVERALL SANITARY SEWER PLAN SCALE'. 1"=1000' N.C. GRID NORTH NAD83(2011) NAVD88 w a ❑ II 12Lo o u) a > W U w 0 Ill / O�S�RICT• eN, deb C� cd s w'^ CD J� Z O �13 W Lo / J MH #21 — -� (LOCKDOWN / WATERTIGHT) STA. 56+60.11 LINE "A" W PROVIDE NEW 10' DIA. MH W t GRASS V \ \ S60° 50' 'W 505.55 LF Lu /1 W I 2 \ \ \ GRASS i A S q Ty C \ C \ S\ \ MH 65-21372 INV: 1,963.5' \ Nc6O*11 q NTFp 0�� �tiCFFNT \ \ \ 2010 Q J 199 `+0 —(0— N*k u �U)of 1980 P� 1 INV. IN = 1954.43' (SW) rely 01 IT = 1Qrd AT rnii 1940 1930 ' 56+50 57+00 0 0 O ` 50 s 0 25 50 0 nl C3KANHI(:5(:HLt f i 57+50 60" DIP @ 0.02% AMON N.C. GRID NAD83(2011) COORDS: \` N:680,132.99', E:9340.44 ELEV: 1,98,584.99: \ RIP RAP, TYP. \ \ v SANITARY SCALE: 1 "= 5 0' Q J co � coLn CN co N (.0 1 <2 U) 0� 58+00 58+50 59+00 59+50 60+00 60+50 61+00 61+50 100 150 1 INCH = 50 FEET MH #22 (LOCKDOWN / WATERTIGHT) STA. 61 +65.66 PROVIDE NEW 10' DIA. MH MH #23 VENTED (LOCKDOWN / WATERTIGHT) STA. 64+87.78 PROVIDE NEW 10' DIA. MH \\ N66° 42' 40"W 64.42 LF MH #24 \\ (LOCKDOWN / W) \\ \ \ STA. 65+52.20 LINE "A" \ \ PROVIDE NEW 10' DIA. MH •� PIN:9637944030 \CULTIVATION \ BILTM ORE COMPANY / \ \ \ \ \ D.B. 0244, PG. 0056 \ \ \ \ TBM - 60d NAIL \ \ \\\ \ \ NC GRID NAD83(2011) \ \\ \ \ COORDS: :864.87', E934\ \\ \ \ :934,324.41' ELEV:1,978.83' \ \ \ \\ \ \ IN, Scl IN �. ��•. co •�� \ \ A\ co MH#25 \\�� \ (LOCKDOWN / WATERTIGHT) \ STA. 70+52.20 LINE A PROVIDE NEW 10' DIA. MH \ �- ) SEWER PLAN (STA. 56+50-00 — STA. 71 + 00.00 . 60 % DESIGN PRELIMINARY PLANS. DO NOT UcF FOR CONSTRUCTION _ � �o CY LU Q 0 z O a U U W 0 EXHIBIT ONLY. N� -- RIP RAP, TYP. W of 00 z� o N 6 + M ai > 00 00 + M cc%4 a —1990 + d cn EXISTING GROUND FRENCH BROAD RIVER c) 4 � N II = Q g Q: U) 0-1 � ai Lu Lu l/ — — — — _ _ _ — — —1980 J' cclLu Lu U RIVER BOTTOM —1970 — ELEV .1966.11'± d a _ d a A A a ° d d da a d d ad d ad . d _ a a �60 DIP @ 0.02% CONCRETE ENCASEMENT, 241 LF 60" INV. IN = 1954.54' (SW) 60" INV. OUT = 1954.54' (NE) 62+00 62+50 63+00 63+50 64+00 60" DIP @ 0.20°0 60" DIP @ 0.50% w z W — Z � 0 (o _ M 4 " U-) c� rn � Lo I I LO II � O z II O z zz -- zz o 0 64+50 65+00 65+50 66+00 66+50 67+00 67+50 68+00 SANITARY SEWER PROFILE (STA. 56+50.00 — STA. 71 +00.00) SCALE. HORIZ: 1 "= 50' ; VERT. 1 "=10' 68+50 69+00 69+50 70+00 MI5 N � M Lo N rn � rn Z n O z z �z gin 70+50 950 940 7�0 30 rlocoo\R�CT•biVib0 9 N H- �eb,o C) O �13 W 00*0 000010 0000 0000 m=0006 — MH #26 (LOCKDOWN / WATERTIGHT) MH #27 — PIN:9637944030 T STA. 73+76.20 LINE "A" BILTMORE COMPANY (LOCKDOWN / WATERTIGHT) -L PROVIDE NEW 10' DIA. MH D.B.0244, PG.0056 STA. 78+76.20 LINE "A" MH #28 — `— PROVIDE NEW 10' DIA. MH (LOCKDOWN / WATERTIGHT) CULTIVATION , z _ — — — — — _ _ � � � / PROVIDE NEWSTA. 81+36.20 L10 DINE 11A' MH u _ / / - - — — — — — — CULTIVATION _ 7ii / — — — — . ^ S76° 24' 18" oO LF — — INV=1974.17 �LINEARU,_ W 324 _ — — CULTIVATION Lu — —--------------------------------------------------WETLANDTREAM = — — CULTIVATION — — — — — — _ 35 rn " 500• S61° 25 W 00 LF — — _ S680 06' 04"W `--- W260.00LF _ _— --- — rn ►v — — _ --__---------------------------------------------------------- � - m __----- _ — — — n IL INV=1972.92 �, �\ \ .I_ �- f .� I 1 s 1MM •� ` STREAM / W \\_��� INV=1975.08 0 PROPOSED VARIABLE WIDTH TEMPORARY �" — / �--- ----- CONSTRUCTION EASEMENT LINEAR WETLAND �O F R E N C H B R O A D R I V E R SANITARY SEWER PLAN (STA. 71 +00.00 - STA. 86+00-00) SCALE: 1"=50' 2020 60 % DESIGN PRELIMINARY PLANS. 201d DO NOT USE FOR CONSTRUCTION. f 2010 EXHIBIT ONLY. 200 2000 Q _ J J C O 60 J 199 + CO 00 + rn N (.0 1990 Cfl m r- 0C\j00 — + O N r II Qom_ *k II =H� O 00 N�# II �fn� �fn� 2�� U) 0� 1980 1980 z 1970 1970 v 60" DIP @ 1.05% v 1960 w 60" DIP @ 0.52% w 1960 60" DIP @ 0.50% .. 60" DIP @ 0.50% N M � cq O O O - I I r 195 60" INV. IN = 1958.82' (W) z =O z 1950 n 60" INV. OUT = 1958.82' (E) - zz zz -- c:)0 o0 (0CD 194 1940 71+00 71+50 72+00 72+50 73+00 u 73+50 74+00 74+50 75+00 75+50 76+00 76+50 77+00 77+50 78+00 78+50 79+00 79+50 80+00 80+50 81+00 81+50 82+00 82+50 83+00 83+50 84+00 84+50 85+00 85+50 86+00 0 SANITARY SEWER PROFILE (STA. 71 + 00.00 -STA. 86+00-00) 50 0 25 50 100 150 ° n F SCALE. HORIZ: 1 "= 50' ; VERT. 1 "=10' �I GRAPHIC SCALE 1 INCH = 50 FEET U � � O � 4— Q � o ��� m Lu o0 u �C U VCD N (—' Lu O-1 I z O II L.L —0 C� L.L O a U a--> = W O 0 � .J + ^~ INN r 0 02 O O (n Y 0 W Z Y O U Q ON e�CO ch C9 O �O '13 N w Q 0 z ryo a U U W 0 z Fmm vw\ \ O0A NP�g312�111 �A 1%. \ \ Row MH #29 \\Ro \Row �� (LOCKDOWN / WATERTIGHT)\ \\ 9Ap !' \ STA. 86+36.20 LINE "A" V PROVIDE NEW 10' DIA. MH \RO Row�R�G w\ `\T of �% pR os ZMpoR 110411, Js pROp \ \��^lST \ \\\\\ \ OS \\ R(ic, TiONF BI ILTMORE COMPANY D.B.0244, PG.0056 \PROPOSED COIR MATTINGI�410 \`\ ,1 11� v7y EROSION CONTROL 5 STREAM \ ' \ ���\� \ \ \ \ ` V \ o \ \ '/1041.1 41 0, \ \ \ \ 49 y M H #30 M H #31 \ \ 4�0 \ \ \ I\\ \ \ \ 985�F cuLlv�uo\ \ LOCKDOWN WATERTIGHT) STA. 91+36.05 LINE "A" (LOCKDOWN WATERTIGHT) \Ro I \\ STA. 95+26.20 LINE „A" \\ \ I / /'/� / / �j \/.LO PROVIDE NEW 10' DIA�MH— � i \ i, PROVIDE NEW 10 DIA. MH �qp \\ \, ego�- i :zz i 0000 PROPOSED VARIABLE WIDTH �� �' �_------------ ----— — — — — — — — — — — OA- TEMPORARY CONSTRUCTION EASEMENT ��� \ — �\ ���—�—�\ \ / \ CULTIVATION C S17° 45' 00"W 390.15 LF .. _\ �' \ \ �\ ��_ \ _ ® . ✓ INV=1973.18 —-----------------------— — — — — — — — — — — ;T TBM MAG NAIL _ ^� --f / \ MH #32 EL=1979.75 (LOCKDOWN / WATERTIGHT) \� `J l / \ \ i 1 L / ( \ _� 1 \ _ ` CONIC. ENDWALL = V R y � � \ STA. 97+16.70 LINE "A" ( `/� _ _ NV=1973.38 �_ °w\\ PROVIDE NEW 10' DIA. MH I�40 -77 \ R ow \ R o� SANITARY SEWER PLAN (STA. 86+00.00 - STA. 101 +00.00) SCALE: 1"=50' 2020 60 % DESIGN PRELIMINARY PLANS. '011 DO NOT USE FOR CONSTRUCTION. i 1'010 EXHIBIT ONLY. 200 Q 2000 Q J a� Q = c J o Ln J CD O != O O000) � N 06 J °�° � N � °' 1990 + o + 0)CO II 1990 N� + Z 1— `— II O Q 2 U) 0' Q 2 _ l�v \1~�� — — — � � — 1980 —� -- �. — — — — 1 1980 1970 1970 60" DIP @ 0.02% w 60" DIP @ 0.09% 60" DIP @ 0.25% 60" DIP @ 0.02% w z z z z z Ozo _ e z O o 7 ZO � p °�° N � N 1960— 00 o 1960 u O o rn 06 O 0) 00 ( m 00 O O II o II F- II II F-II Z) o O z O? z O? zZ zz zz zz 195 1950 c O O O O O (0 CDCD O CD CD CD CO g a u c Cfl CO v Y 1940 1940 86+00 86+50 87+00 87+50 88+00 88+50 89+00 89+50 90+00 90+50 91+00 91+50 92+00 92+50 93+00 93+50 94+00 94+50 95+00 95+50 96+00 96+50 97+00 97+50 98+00 98+50 99+00 99+50 100+00 100+50 101+00 �� 50 0 25 50 °n nll GRAPHIC SCALE l00 150 1 INCH = 50 FEET SANITARY SEWER PROFILE (STA. 86+00-00 - STA. 101 +00.00) SCALE. HORIZ: 1 "= 50' ; VERT. 1 "=101 �--' 00 a--' O O 00 + bO O ce � O c� m w u Cie Z W rn N ,wI Ln O (Y Z c o u ILLO ui bi Lu O o 0 O ,—� O W �0 0 cC 00 O O Y Q J Y 2 m w LU w Z Y O 0 U Q Z J O GO w Q 0 U) z lAL 0 z O��\ r11LT• bN�� �z, 9 N IM 0 U � / 1 NADg GR/p NO o 11 3 �2p/1) RD � Q o+ 88 � (�'� lT \I m FENCE 11 -7 �/ W MH #36 1 = U Q M H #33 ( GATE— — — BILTIN: 9637944030 MORE COMPANY 15 LOCKDOWN WATERTIGHT) / l 1 (LOCKDOWN WATERTIGHT) U cle W V) ( ) / _PASTURE _ D.B.0244, PG. / / STA. 114+20.72 LINE "A" 1� / < Z o 0 STA. 101+81.61 LINE "A" / PROVIDE NEW 10 DIA. MH / i W I N , PROVIDE NEW 10' DIA. MH I PASTURE RECONNECT EXISTING SEWER LINE 1/ Q � z 00 � _ MH #35 _ / 1 , (� LL IL PIN: 9637944030 ` 1 �'—''' / - / / / ,n ILL O Q U BILTMORE COMPANY ` (LOCKDOWN WATERTIGHT) — 1 (P = W O ❑ 0 D.B. 0244, PG.0056 MH #34 -� f �_ STA. 110+80.58 LINE "A" — — — — 1 ' / —, + PASTURE WHY DIES TCE END ; PROVIDE NEW 10' DIA. MH — — — �' J (V �/ (LOCKDOWN /WATERTIGHT) W HERE? - STA. 105+80.58 LINE "A" T _ — — — — — / 1 O O O (Y O (�if PROVIDE NEW 10 DIA. MH Y _ j'� / _ _ _ ,' S20° 11' 26"E 340.14 L / , Q -i } � PROPOSED TEMPORARY CONSTRU TC ION EMENT _ / �` m o _ PASTURE I I--- n --- I�------- -- ® --- --- 1 / Vi Y � � PROP ------_ J PASTURE -- ��/- --= N /S � `U INV=1975.77 - / — — / \ / "ft_ _ — ABANDON AND PLUG / '� j o 0 a ftft _ OSEDPERMANENTEASEMENT-------------- __ _ __------ - - — S20° 11' 26"E 500.00 LF EXISTING SEWER LINES 0 -- --- Now --------- _ - - -- f l RO.POS620'WIDE V TEI PORARYEASEMENT 7- ABANDON / I — — — — — — \ " J �r EXISTING MH \ J PROPOSED VARIABLE WIDTH \ _ / --� _�— \_ V MSD SMH #50-45003 TEMPORARY CONSTRUCTION EASEMENT —� _ �\ \ � �--- / �—� I 1 �_�/`/INV OUT=1973.38 INV 73.68 9 ABANDON AND PLUG \ = EXISTING SEWER LINES \ \ \ \ F R E N C H B R O A D R I V E R 2020 201 20 1 1980-T— 1970 Q J T r 00 0 + 00 M O M II co of Q J M 00 00 00 Lo � O M II 2v)Q' SANITARY SEWER PLAN (STA. 101 +00.00 - STA. 115+00.00) SCALE: 1 "= 5 0' 60 % DESIGN PRELIMINARY PLANS. DO NOT USE FOR CONSTRUCTION. EXHIBIT ONLY. 2020 _Q a) J Q 00 - O O C r� 1990 + N Lo _ ti co I I E Oit N fn of O O M II U) � 1980 0 60" DIP @ 0.02% 60" DIP @ 0.02% Z 60" DIP @ 0.02% Z Z W r Z M� irn U) N�Z Ln cn 00- apt o- e M 00 rn CD 06 M cj O O 1960 � co 00 - � 00 Lo m 00 —co II II rn m u F- O II H O II z II II ° Z z 0— z O z Z Z Z Z Z z z Z 1950 z -- z oo (ocoo p oo- Co Co 00 O 1940 n 101+00 101+50 102+00 102+50 103+00 103+50 104+00 104+50 105+00 105+50 106+00 106+50 107+00 107+50 108+00 108+50 109+00 109+50 110+00 110+50 111+00 111+50 112+00 112+50 113+00 113+50 114+00 SANITARY SEWER PROFILE (STA. 101 +00.00 - STA. 115+00.00) ISCALE. HORIZ: 1 "= 50' ; VERT. 1 "=10' GRAPHIC SCALE 1 INCH = 50 FEET 114+50 970 •.1 1950 ' 1940 115+00 w Q ❑ U) z ac-; 0 z o\S-�Ricr. <1 �dJ y �d 9 O 00 W`^ �13 W u ' e 50 0 25 50 100 150 K Lu PASTURE , PRz _ , OP OSED TEMPORARY C NO STRUCr'L —� I'Tl _ N EASEMENT U) W-- \ - rmn c/) S34° 08' 56"E 321.07 LF S46° 11' 28"E 52.43 LF W ___ m Z _S— �=� 8"VCP> PRIVATE — — - m �-S --- ----S� — LLU 5< L TBAIL EL=1981.55 WjEk POSSIBLE CONC. DECK PROPOSED VARIABLE WIDTH TEMPORARY CONSTRUCTION EASEMENT (LOCKDOWN / WATERTIGHT) STA. 117+41.79 LINE "A" PROVIDE NEW 10' DIA. MH SANITARY SEWER PLAN (STA. 115+00-00 - STA. ) SCALE: 1 "= 5 0' 115+00 115+50 116+00 116+50 117+00 2020 2010 2000 1990 60 % DESIGN PRELIMINARY PLANS. 980 DO NOT USE FOR CONSTRUCTION. 1970 1960 1950 1940 117+50117+75 SANITARY SEWER PROFILE (STA. 115+00.00 - STA. ) EXHIBIT ONLY. Q O � '-' o oC 0Oo M clz� =va C U cto �„ N �--1 Oro Z O N LII LL O — O C� LL O Q + �n �O r O O Y o}0 Y 0 W v Z Y O 3:0 of M U Q w Q 0 Z 0 a U W 0 O Z O Q N N Lmm GRAPHIC SCALE 1 INCH = 50 FEET SCALE. HORIZ: 1 "= 50' ; VERT. 1 11=10' '13 W • w Q 0 Z 0 a U W 0 O Z O Q N N Lmm GRAPHIC SCALE 1 INCH = 50 FEET SCALE. HORIZ: 1 "= 50' ; VERT. 1 11=10' '13 W • JB #4 STA. 119+86.90 LINE "A" STA. X+XX.XX END LINE "B" 10' x 15' JUNCTION BOX (SEE SHEET PL-29) S46° 11' 28"E 52.42 LF S62° 42' 05"E 16.40 LF PIN:9637944030 MH #34 BILTMORE COMPANY D.B.0244, D.P.0056 (LOCKDOWN / WATERTIGHT) MH #35 S43° 09' 18"E 480.00 LF STA. 120+03.30 LINE "A" (LOCKDOWN / WATERTIGHT) MH #36 (VENT) PROVIDE NEW 6' DIA. MH STA. 122+14.55 LINE "A" (LOCKDOWN /WATERTIGHT) PROVIDE NEW 6' DIA. MH STA. 127+44.55 PROVIDE NEW 6' DIA. MH = ---------------------------------------- -------------- — ---_.m �Z "E530.00LF —�---° 14"E211.25LFwwwwow 56 — U)S49 — <36"RCP ___S-- ----s---- 5-----S—---5-----5---<36"RCP -5-----5---- m m —s---- —s _S— Cn — GRAVEL ROAD = EXISTING 20' EASEMENT m PER D.B. 953, PG. 189 PROPOSED VARIABLE WIDTH PERMANENT EASEMENT _ MSD SMH #50-28075 RIM-1983.65 �'-'-�•------- _ MSD SMH #50-4500 • • INV=1968.46 RIM=1984.06 " INV=1968.81 PROPOSED VARIABLE WIDTH TEMPORARY N48° 41' 34"E 18.08 LF CONSTRUCTION EASEMENT MSD SMH #50-45004 EXMH MSD #50-462283 RIM=1984.35 (MH# B1) INV=1969.50 STA. 0+00.00 BEGIN LINE "B" EXISTING MH TO REMAIN CONNECT NEW SEWER LINE (SEE SHEET PL-29) MSD SMH #50-462283 RIM=1982.18 INV=1968.01 F R E N C H B R 0 A D R I V E R SANITARY SEWER PLAN (STA. - STA. 128+00-00) SCALE: 1 "= 50' 111 U ^ O w U v O Q Q Q ft CD J 00 O u- Q U o N _ _ ^ O < O w Q O " Ln DC v O w cld Q U O Z 4.1 rrn pw[ c O O Il 2 Y 4-1 cL.J` r �_ m J LU W O v Z Y O of = a U Q W Q 0 z aw WZ = z -i C7 J Q rn z w 2000.00' 2000 x w Q VENT ELEV. 00 N m x rn u') MH #36 (VENT) x z LOCKDOWN / WATERTIGHT * Q Q g + 00 STA. 127+44.55 LINE "A" U) U) Of �, p cc'j RIM = 1982.35' co U II 1990 MH #34 STA. 120+03.30 1 F EXISTING GROUND - RIM = 1982.35' 36" D.I.P. @ 0.05% 36" D.I.P. @ 0.13% _ z w ? u 36" INV. IN = 1968.70' (SE) v� o 36" INV. OUT = 1968.70' (NW) 0 c.4 - Lo 6 LC 36" D.I.P. @ 0.04% 0') � 6 36" INV. IN = 1968.70' (SE) 0 z O 60" INV. OUT = 1968.70' (NW1 > ; j - 36" INV. OUT = 1968.81' (SW) z z Z C4 M C4 M M �� 60"DIP @0.02% 60 % DESIGN PRELIMINARY PLANS. DO NOT USE FOR CONSTRUCTION. EXHIBIT ONLY. 120+00 121+00 122+00 123+00 124+00 125+00 126+00 SANITARY SEWER PROFILE (STA. - STA. 128+00-00) 0 25 50 100 150 SCALE. HORIZ: 1 11 =50' ; VERT. 1 11=10' 36" D.I.P. @ 0.0 127+00 -Lf 970 1960 1950 940 930 J 1920 128+00 W CD O �RICT � bN��66� '- o s Z 13W• GRAPHIC SCALE 1 INCH = 50 FEET O N O \ \ >> ?• 0\ O PASTURE \ \ T FENCE \ \ PIN: 9637944030 �tiC [] n n [] n [] BILTMORE COMPANY \1 ¢ ✓\ PASTURE D.B.0244, D.P. 0056 PASTURE '' 1 M H #40 FENCE n SHED En n n \ , ° \ (LOCKDOWN / WATERTIGHT) J, MH #37 \' \ FENCE STA. 138+73.39 LINE "A" ° [0 �— [] ] [] PROVIDE NEW 6 DIA. MH (LOCKDOWN / WATERTIGHT) MH #38 PASTURE STA. 132+24.55 LINE "A" \ \ (LOCKDOWN / WATERTIGHT) MH #39 (VENT) m W PROVIDE NEW 6 DIA. MH \ Lju \ STA. 134+07.18 LINE "A" (LOCKDOWN /WATERTIGHT) — 1 _, \ d PROVIDE NEW6'DIA.MH STA.135+80.39 NE --------------- _ _ o� o \ \\ PROVIDE NEW 6' DIA. MH ROPOSED TEMPORARY CONSTRUCTION EASEMENT — — — — (n Lij_ \ P ___ ---- 480.00LF m S4 _ _ PROPOSE TD EWoRq_ ��/ \ _ _ _ — — — — — D PERMANENT EASEMENT 3 p RY _ _ _ S57° 06' 31 E m _ S _ _ _ _ _ PROPOSE _ (n 18_ P o __ON ASE NT \ _-- __—------- — --- — —1 g �E480� ROP TRUC7 OI N E� ME i ' �F \ _ _ — —s — —s — _ _ s S ERMgNENTEA i -A S44°23'04" --_—_------- " 293.00LF ___--s--- — ---Foy— — ■m _ ED p / ��� _ _ _ _ <36"RCP —S — � � _F E _ SEMEN- — rn 182 63 LF \ F E 173.21 LF S56° 44' 23 —s — — — — s — _ —Fob Farms ° 52 4g"E OCR _ — --5--- _ __Foy J; S 136"RCP — ' S64 I — ''f FOC _ G 13_—FOC D----536"RCP ---S-- --r -.—. �S — — —S — — --G� �_ —FpC FaC .. � EXISTING 20' EASEMENT ��� —s _ _ _ _ iS �' <36i i roc— — — N PER D.B. 953, PG. 189 i EXISTING 20' EASEMENT PROPOSED VARIABLE WIDTH TEMPORARY —' --.. PER D.B. 953, PG. 189 _ _...� �---- -- -�� CONSTRUCTION EASEMENT MSD SMH #50-28072 -.RIM=1984.32 INV=1970.17 CONCRETE -•- PROPOSED VARIABLE WIDTH TEMPORARY TBMMAGNAIL BOAT RAMP �'" —. _ -•..• ..-r----�__„-�••-� -- _—MSD SMH#50-28073 EL=1981.85 RIM=1984.14 MSD SMH #50-431294 CONSTRUCTION EASEMENT MSD SMH#50-45005 — MSD SMH #50-28074 RIM=1982.99 INV=1969.99 RIM=1984.78INV=1970. —10 RIM=1984.73 INV OUT=1969.84 INV=1969.90 INV IN, (8")=1974.24 —' F R E N C H B R O A D R I V E R SANITARY SEWER PLAN (STA. 128+00-00 — STA. 143+00-00) M SCALE: 1 "= 50' 2010 H 2 (D H F- 2 Q C7 2000 �- z w j J w Lo Q W n g >Z > EXISTING GROUND O N co — W M rn EXISTING o c�i Q co Y II FIBER OPTIC CABLE 0 + rn A!' ?v 1990 =pQg 00 II J c~/) of EXISTING U 0 < 8" P.V.C. SEWER 1980 1970 2000.00' VENT ELEV. MH #39 (VENT) (LOCKDOWN / WATERTIG STA. 135+80.39 RIM = 1983.68' (MATCH PAVEMENT) M- 36" D.I.P. @ 0.07% 36" D.I.P. @ 0.05% 36" D.I.P. @ 0.43% � N 1960 ai N rn ai rn 0') — rn C.0 cD 0') co I I II M II II p II 0 0 Z Z Z z z > > z z 1950 z_z_ _-- (o co i zo zo (.0 M CO e') M c ) i M M I 1940 I- 31 $I 1930 1920 ' 128+00 50 0 25 50 GRAPHIC SCALE 36" D.I.P. @ 0.05% CD F- Q WW Qz J >�0) >Z �vj coo +co ao 00co 20<� z w o � � II 0 O Z — z z M Ico 60 % DESIGN PRELIMINARY PLANS. DO NOT USE FOR CONSTRUCTION. EXHIBIT ONLY. 129+00 130+00 131+00 132+00 133+00 134+00 135+00 136+00 137+00 138+00 139+00 140+00 SANITARY SEWER PROFILE (STA. 128+00-00 — STA. 143+00.00) 100 150 SCALE. HORIZ: 1 11= 50' ; VERT. 1 11=10' 1 INCH = 50 FEET 36" D.I.P. @ 0.09% 141+00 142+00 2010 'o$e ..1 970 M 950 940 930 1920 143+00 w Q 0 z z O o a > W U W 0 6 z ge- N 13N0 2010 2000 1990 1980 1970 I 1960 i u u a n 1950 0 I L 1, EI �I 1940 L 31 gl 1930 CULTIVATION (LOCKDOWN / WATERTIGHT) STA. 143+53.39 LINE "A" PROVIDE NEW 6' DIA. MH MH #42 (VENT) (LOCKDOWN / WATERTIGHT) STA. 147+06.39 PROVIDE NEW 6' DIA. MH CULTIVATION _ PIN:9637944030 BILTMORE COMPANY D.B. 0244, D.P. 0056 ----------------------------------- PROPOSED STET MPAR ON _ MH#43 S54° 15' 00"E 353.00 LF PROPOSED PE — _ STRUCTION ASEMEIVT (LOCKDOWN /WATERTIGHT) CULTIVATION _ STA. 152+34.39 LINE "A" S — — RMANENT EASEMENT PROVIDE NEW 6' DIA. MH —S-----5-----S— <36"RCP �_ S43°p , RAVEL ROgD p 26"E 5 —FOC— — — FOC— — — — —FOC — Gnr =— FOC s 28. )0 LF C — FOC— — _ _ Lo HEADWALL im, - - _/ _• . FQ� S _ 4 (VENT) �— _s _ _ _ MH #4 EN T --.�.-.... U.P.L. — — _ (LOCKDOWN / W) V - — ... — ....� __ _ TBMMAGNAIL �----� � � �-� � � � EL=1983.40 .. - E CAB. — — —s — _ _ STA. 156+49.39 ' POSSIBLE CONC. DECK EXISTING 20' EASEMENT--••—•.----.� U.P.E&T�-� ' ELEC. ��—SS41°47' 19" _ PROVIDE NEW 6' DIA. MH MSD SMH #50-28071 PER D.B. 953, PG. 189 _ _ _ — FOC CARD READER RIM=1983.44 �- ELECTRONIC GATE _ \ \ PROPOSED VARIABLE WIDTH TEMPORARY FOCCABINET E.JUNC E.CAB � �S 13s"RCP CONSTRUCTION EASEMENT 18" CMP — \ NV=1980.63 M _S \ \ , ' ) PROPOSED VARIABLE WIDTH TEMPORARY S o CONSTRUCTION EASEMENT DI. GRATE=1986.15 o _ s — 34 INV=1981.55 O O TBM MAG NAIL m m A INV=1979.77 \ 319. p0 LF \ \ _ _ ♦[� EL=1986.63 m Z •• 18"CMP •. \ \ \S /� wm m \... A TOP=1986.46 m C.B.INV=1980.86 MSD SMH #50-28069 \ \ \ S F R E N C H B R 0 A D R I V E R o NIV=1971: — \co PROPOSED VARIABLE WIDTH TEMPORARY 1 \ ♦� CONSTRUCTION EASEMENT EXISTING 20' EASEMENT PER D.B. 953, PG. 189 \ '----...... J MSD SMH #50-28068 ♦� RIM=1984.37 INV=1971.22 F`°°°WqY_ SANITARY SEWER PLAN (STA. 143+00-00 STA. 158+00-00) SCALE: 1 "= 50' 0�x oti 2 O 2000.00' Q VENT ELEV. W LU H Q Z J rn � c') Z + M ao O ❑tea' =0�� 36" D.I.P. @ 0.05% MH #42 (VENT) (LOCKDOWN / WATERTIG STA. 147+06.39 RIM = 1983.13' 36" D.I.P. @ 0.06% U H Q W LU H Qz J >� rn M >Z o + co co M 0 Lo 20<� �J�w 36" D.I.P. @ 0.05% EXISTING GROUND 2000.00' VENT ELEV. MH #44 (VENT) (LOCKDOWN / WATERTIGH STA. 156+49.39 RIM = 1983.05' --17\ z w Z w z w Z LL M N U Lo O Lo N corno �� f,- 6) �o CD c)) I� M � II II 0Z II II 0? 0z 0z Z Z Z Z Z Z Z M M M M ce) M Ch C, 36" D.I.P. @ 0.09% 60 % DESIGN PRELIMINARY PLANS. DO NOT USE FOR CONSTRUCTION. EXHIBIT ONLY. 36" D.I.P. @ 0.08% 2010 ••1 •:1 970 •.1 950 940 930 cf� N U O o w >1 � v CD o +� w 4- + o z at Ln w oa U-1 rz "3 o QCV J Q Q I N O � o n Lo O o" LL N O o LLI co V1 CD -- a �• C)o U)i p z_ m Lu O O w Y 4-� � � m D Ln J o 5 O ... z r� Y Q V) a LU d U I Q O O VO oS-�Ricr. bN,�� W H a 0 9 ii IsL 6 z 1920 ' 1920 143+00 144+00 145+00 146+00 147+00 148+00 149+00 150+00 151+00 152+00 153+00 154+00 155+00 156+00 157+00 158+00 W s z Y cd S IJJ I}- SANITARY SEWER PROFILE (STA. 143+00-00 - STA. 158+00.00) C(3 50 0 25 50 100 150 GRAPHIC SCALE 1 INCH = 50 FEET SCALE. HORIZ: 1 "= 50' ; VERT. 1 "=10' 13W• 201 2000 1990 4Q \ — Gj- O 'n S3v\ \ IN, MH #45 (LOCKDOWN / WATERTIGHT) STA. 159+68.39 LINE "A" — \ 0 2 \ Is, 9�O \ \ \ PROVIDE NEW 6' DIA. MH — 270�� I \.� \\\\s\ IN, IN, \\ \ OA — — \\\\ \ \\\ S�46 \ - - ••.\ \ \S\ FoA\ \ cOtis\ — \ — — T IN, T V — MSD SMH #50-431291 \ \ \\ \ \ \ 7 RIM=1983.51 MH #48 INV=1971.46 \\ \ \ \ \ \ (LOCKDOWN / WATERTIGHT) \ \\ SS \\ \ STA. 170+92.39 LINE "A" \ \s \ g°A \ \ PROVIDE NEW 6' DIA. MH MSD SMH #50-28067 RIM=1985.10 \ \ \ INV=1971.54 \ PROPOSED VARIABLE WIDTH TEMPORARY \s6R �O \ MH #46 CONSTRUCTION EASEMENT �\ \ �\ �� \ \ \ (LOCKDOWN / WATERTIGHT) (LOCKDOWN (VENT) _ — _ \\ \ \ \ \ \ \ STA. 163+60.39 LINE "A" PIN:9637944030 S166+4.39 WATERTIGHT) — 75 48, 41"E 343• V+ _ 00 LF \ \ \ \ \ PROVIDE NEW 6' DIA. MH BILTMORE COMPANY , ° T \ s\ \ \ D.B.0244, D.P.0056 PROVIDE NEW 6 DIA. MH _ — _ S �36"RCP —I1 „ EXISTING 20' EASEMENT rn PER D.B. 953, PG. 189 418.00,E S61 _ — — S78° 53 04 E 5rn 1 \ \ \ 314.00 - \ _-- "E LF — 36:'RCVS — —�—_ l \ — _ 136'RCP � — S \ c� \ .� •,\ _GRAVEL ROAD —� �— - - — MSD SMH #50-28064 RIM=1984.17 F \ O -. INV=1972.15 — �Q ww Q Z J >� rn c')� Zoo, N Ln 0 Ln =O�� zz�J � ---� PROPOSED VARIABLE WIDTH TEMPORARY RIM=19 MSD SMH#s0-28 I jl 7168 ... EXISTING EXISTING 20' EASEMENT Nv=19.— --_.. PER D.B. 953, PG. 189 -- " - MSD SMH #50-28065 RIM=1984.81 INV=1972.01 SANITARY SEWER PLAN (STA. 158+00.00 - STA. 173+00.00) SCALE: 1 "= 5 0' 0 _ w w 2001.00' Q Q z VENT ELEV.uJ J uJ ~ w Z Z � MH #47 (VENT) »� 60 N + 0D cy)EXISTING LOCKDOWN / WATERTIGHT z m GROUND (.00 C° STA. 166+74.39 p + 0No U� 2 II RIM =1983.75' 000��' t U II 0 u)o =OQ� J C/) � 1980 1970 36" D.I.P. @ 0.08% 36" D.I.P. @ 0.06% 36" D.I.P. @ 0.11% 36" D.I.P. @ 0.03% Z Z U) in Eo N O 0) N g 1960 ti 0) 0) N � rn 0)e _ _ ti II II O z Z pz Oz » Z Z a 0 » Z Z z -- z __ ° 1950 z_z_ cy) cy) O (.0co M cy) co z (o M 2 1940 1930 1920 158+00 0 25 50 GRAPHIC SCALE 60 % DESIGN PRELIMINARY PLANS. DO NOT USE FOR CONSTRUCTION. EXHIBIT ONLY. 36" D.I.P. @ 0.08% 159+00 160+00 161+00 162+00 163+00 164+00 165+00 166+00 167+00 168+00 169+00 170+00 171+00 172+00 SANITARY SEWER PROFILE (STA. 158+00.00 - STA. 173+00.00) 100 150 SCALE. HORIZ: 1 11= 50' ; VERT. 1 "=10' 1 INCH = 50 FEET 2010 2000 m U O LUoo Z at Cc r w 0 4.� ED LL QJ O O LLI „� m (%) H Q p Z 4 000 �--+ � r Y _ lun Q Y Z m J ❑ W O v Z Y O V) = a ❑ U Q .� O �O 1990 ' 1980 1970 1960 1950 1940 1930 ' 1920 173+00 LJ V J w ❑ r. RICT• �V 6bo z 13N0 r O � I STREAM PROPOSED COIR MATTING MH #49 EROSION CONTROL (LOCKDOWN / WATERTIGHT) \ STA. 174+35.39 LINE "A" ' PROVIDE NEW 6' DIA. MH n \ MH #50 (VENT) (LOCKDOWN / WATERTIGHT) _ STA. 177+88.39 CULTIVATION _ PROPOSED TEMPORARY CONSTRUCTION PROVIDE NEW 6' DIA. MH -- :c------------------- EASEM ENT CULTIVATION � Z--�__���-- Rj 48' 41' E 343.00 LF S65° 52' 43"E 353.00 LF PROPOSED PERMANENT _ S75° EASEMENT V♦ �� —S--L�—S--_--S—_-- rn _ s--- •S6 —5-----s____ <36"RCP °°51 '6„E320.00LFrnGRAVEL ROAD � �S ��""m — - _<36"RCp -__- II.DG - m EXISTING 20' EASEMENT - -� PER D.B. 953, PG. 189 \ \ \ MSD SMH #50-28062- RIM-1982.55 _ TBM MAG NAIL INV=1972.59 EL=1982.91 ' POSSIBLE CONC. SLAB PROPOSED VARIABLE WIDTH TEMPORARY CONSTRUCTION EASEMENT F B E N C H B R O A D R I V E R okm 2 Z �C G� io O J 20 ,a cp cp PROPOSED , PAVEMENT SURFACE REPAIR oo\ 0 STREAM PIN: 9637944030 BILTMORE COMPANY D.B. 0244, D.P. 0056 \ 0 51 IrPROPOSED COIR MATTING \ OLD,/ EROSION CONTROL MH #52 gShHgLTERRO4D (LOCKDOWN / WATERTIGHT) S�RFq�E MH #51 STA. 184+90.39 LINE "A" \ \ (LOCKDOWN / WATERTIGHT) m PROVIDE NEW 6 DIA. MH STA. 181+08.39 LINE "A" — ° 21 23„E 275 00 u51 F —� ------ — S79 - - - - - - - - - - - - - - S67° 36' 21 "E 382.00 LF GRASS -- — — —S — -- -10 �- -� _ —S — _ <36"RCP _ ---S-----S-----S-----S— 36"RCP — J ---S< -----S —S ,ul ASPHALT WALKING/CYCLING PATH 72" CMP INV=1974.84 •' _ _ - - - _ . MSD SMH #50-28060 RIM=1985.65 ` \ \ - MSMH 431288 INV=1973.97 TBM MAG NAIL MSD SMH #50-28061 RIMIM=1985.2222 EL=1984.18 RIM=1983.96 \ INV=1973.57 I POSSIBLE CONC. SLAB INV=1972.86 SANITARY SEWER PLAN (STA. 173+00.00 — STA. 187+50-00) SCALE: 1 "= 50' 202 2020 201 2010 STREAM CROSSING (SC-3) STREAM CROSSING (SC-4) C7 2001.00' �Q 2000- VENT ELEV. w Q z J 2000 Ch CV >� + 00 N 00 MH #49 MH #50 (VENT) LOU Q II EXISTING GROUND 1990 LOCKDOWN / WATERTIGHT LOCKDOWN / WATERTIGHT MH #51 = 0 J < 1990 � STA. 174+35.39 STA. 177+88.39 LOCKDOWN / WATERTIGHT � 0-1\ RIM = 1984.02' RIM = 1981.94' STA. 181+08.39 RIM = 1982.13' 1980 PROPOSED COIR MATTING 1980 PROPOSED COIR MATTING EROSION CONTROL EROSION CONTROL 0 36" D.I.P. @ 0.29% 36" D.I.P. @ 0.13% 36" D.I.P. @ 0.08% 36" D.I.P. @ 0.05% 36 D.I.P. @ 0.09 /o 1970 1970 �w zw z _ = co U) w �w rn u N � M L0 � cy) Lq 00 M [` — N � N � m r N ti II 196 c II II II H °' II II H °' II 1960 0 z 0 II z 0 z O z - O> Z Z z — z — z z z 77 z Eco M coM coM — co `o — CO m zo co Zo 1950 n z - 1950 i 60 % DESIGN PRELIMINARY PLANS. g 194 DO NOT USE FOR CONSTRUCTION. 1940 n 0 EXHIBIT ONLY. n 1930 1930 d 173+00 174+00 175+00 176+00 177+00 178+00 179+00 180+00 181+00 182+00 183+00 184+00 185+00 186+00 187+00 187+50 0 n SANITARY SEWER PROFILE (STA. 173+00-00 —STA. 187+50-00) 50 0 25 50 100 o 150 0 SCALE. HORIZ: 1 "= 50' ; VERT. 1 "=10' U ^� I —I 0 w u `~o O p + J z at 00 LLJ cc c) N O ' ^ v LI O o (D ! I I ce N O o 6i m V) p E- a O ate-+ M O O IL Y 4--) _ Q Y Z m D I^ V/ J 0 w Lu > O v z a Y w V1 w 0 U Q w 00 / O !2L 6 Z oS-�Ricr. bN,�� s z 13W• GRAPHIC SCALE 1 INCH = 50 FEET ON 12020 PROPOSED VARIABLE WIDTH TEMPORARY CONSTRUCTION EASEMENT WALKING TRAIL r . 1 FLOODWAY _ r PROPOSED COIR MATTING EROSION CONTROL / � nnnc+rn m 36" D.I.P. @ 0.13% 2010 MH #53 (VENT) LOCKDOWN / WATERTIGHT STREAM CROSSING (SC-5) STA. 187+65.39 RIM = 1985.75' 2001.00' O - 2000 VENT ELEV. Q WW I \ � Q Z J >� N I N Co >Z r': N I � N p _ 00 1990 LO Y EXISTING < Q l\ 15 HDPE zz�J U) 0� 1980 � /7-- z 1970 � � w � � M u C3) II 0) a F- =p 1960 Z I I z Iz '1 1950 1 J W z o O 36" DIP DR-17 (125 PSI) DIPS U DIPS OUTSIDE DIA. = 38.300" 1940 INSIDE DIA. = 33.524" z AVG THICKNESS = 2.253" w WEIGHT = 112.13 LB/FT m 1930 ' 187+50 188+00 0 S n 50 0 25 50 o n I GRAPHIC SCALE 36"DIP @0.10% 54" DIA. x TBD WALL THICKNESS STEEL ENCASEMENT PIPE, MICROTUNNEL STA. 187+65.39 TO STA. 191 +47.22 36" DUCTILE IRON PIPE 189+00 190+00 100 150 1 INCH = 50 FEET z Z 7BE9: J W z z O ry U 0 z W 1' LM JJ LY V L1 LJ 1M V J7 L lb L V JJ lb '�'Vv V1°RIM=1986.35 INV=1975.65 RIM=1985.29 TBM MAG NAIL INV=1975.39 EL=1987.14 \ S42- 32' 38"E 4 CONCRETE BRIDGE \ . SANITARY SEWER PLAN (STA. 187+50.00 - STA. 202+50-00) SCALE: 1 -=5U' WETLAND IMPACT (WI-4) OIR MATTING gTROL 2001.00' VENT ELEV. MH #55 (VENT) LOCKDOWN / WATERTIGHT STA. 196+27.21 EXISTING GROUND RIM = 1982.69' STREAM CROSSING (SC-6) PROPOSED COIR MATTING EROSION CONTROL WW Qz J Z O O M O + 00 c000 Lo U N II =O<�� J lo� z 2020 1 C7 i= Q - LIJW J 2000 Z N rn N M Lo p + 00 r'- Q O Lo U N II 2�<� 1990 1980 36" D.I.P. @ 0.05% 36" D.I.P. @ 0.10% 36" D.I.P. @ 0.21% _ zw Zw zZ -� 1970 M� �� �Lu �_. M L6 O ti O O ti M � O Lfl O O Lo I� II �~ II W II OZ Oz Oz 1960 z z z z z z cocoCo co Co co co co m m 60 % DESIGN PRELIMINARY PLANS. �1950 DO NOT USE FOR CONSTRUCTION. 191+00 192+00 193+00 194+00 195+00 196+00 197+00 SANITARY SEWER PROFILE (STA. 187+5 SCALE. HORIZ: 1 "= 50' ; VERT. 1 "=10' EXHIBIT ONLY. 198+00 199+00 200+00 0.00 - STA. 202+50-00) 201+00 36" D.I.P. @ 0.12% 202+00 1940 J 1930 202+50 U O O �--' w + O rV 4� Z O tA w c N 4.) w M DC to I C) ` N _ V_ ^J < O o Lo O O o " DC a O w bi J cld Tm �n LIP) i 0 cl) U + r� + O Z 4-J 00 0 ILL � Q Y = 4� Ln Z m o O Z W Y p V) Q Lu a. = a U Q IIo coc* ° O �O w Q 0 O �RICT � bN��66� n o s z c 13W• PROPOSED COIR MATTING �vuuWAY EROSION CONTROL Xx STREAM sti , FLOpDWAr F` ppD� Py Q� / / / / STREAM DELINEATED WETLAND /OINEAR \Gj� \ WETLAND Z�Lo / GRASS PI� 4030 BILTMORE COMPANY /Q� J GRASS D.B. 0244, D.P. 0056 MH �OQ / ��Qg`l'� Off% QORr. #59 � / � �OQ/ 1 MH #58 (VENT) (LOCKDOWN / WATERTIGHT) / ,�' 1 (LOCKDOWN / WATERTIGHT) STA. 211+04.30 LINE "A" w STA. 206+82.21 PROVIDE NEW 6' DIA. MH --- qo w O . �, LU SECTEMPORARY CONSTRUCTION S42° 32' 38"E 450.00 LF — — — — — / GRASS (l) 1—s---- — — — — _ — —---------- EASEMENT — — W _ _ _ = s= _ =S <36'RCP- - -S - - - - -S _ — — _ PROPOSED NENT S ENT DERMA / EA EM S42° 13' 37"E 422.09 LF Z GRASS — — — = 5---- 1 MSD SMH #50-28054 -S - - - _ 36"RCP r 1 RIM=1985.99 fL•/ -- GRASS INV=1976.18- - - EXISTING 20' EASEMENT --------- - - --- - PER D.B. _ ------ - -- __-- --� � 953 PG. 189 s ---------- -- —s - -S - - - <36"RCP - -S -- S MSD SMH #50-432660 RIM-1989.19 INV=1976.69 / =04mia aid... -'•...."-MSD SMH #50-28053 FRENCH _ B R 0 A D R I V E R RIM=1989.54 INV=1976.70 ANITARY SEWER PLAN (STA. 202+50-00 - STA. 215+00-00 --ALE: 1 "= 5 0' GRASS - \ <36"RCP ---S----7S---- 2020 2010 2000 1990 1980 1970 1960 1950 1940 U w � = O CD J Zrn w 06 w L� � cn C N Lo O O N i— LLI m V1 O Q U = i O o U) O Z 4 -+ 00 0 0 LL V) Q Y n ` VJ Z2 } m J W W O Z Y O a U Q O �O w Q 6 Z 1930 ' 1930 y 202+50 203+00 204+00 205+00 206+00 207+00 208+00 209+00 210+00 211+00 212+00 213+00 214+00 215+00 �� s W s Y � _ O SANITARY SEWER PROFILE (STA. 202+50-00 - STA. 21 5 + 00.00) - �g 50 0 25 50 100 150 �. oU j GRAPHIC SCALE 1 INCH = 50 FEET SCALE. HORIZ: 1 11= 50' ; VERT. 1 11=10' 13N0 PASTURE i ' 1• • M Off PROPOSED .. ``\\\ \\\\\\\\ • �\ • • A\_ \` ��..STA. 222+41.78 LINE "A 04 ACE PROVIDE NEW 6'DIA. MI • ` `` "V" • ♦ •� ♦ • ♦� • ♦0 � • • .• O' ♦• • ♦♦� ♦• ••1 (VENT) m♦�(LOCKDOWN / WATERTIGHT) Ig♦ 60 PROVIDE • STONEAw. •- CULVERT 08, • P I N: 9637944030 BILTMORE COMPAN D.B. 0244, D.P. 005E PASTURE IS25° 31' 14"E 256A MH #64 (LOCKDOWN / WATERTIGHT) LF 2020 MH #61 (LOCKDOWN / WATERTIGHT) STA. 218+42.10 LINE "A" PROVIDE NEW 6' DIA. MH (LOCKDOWN / WATERTIGHT) STA. 224+51.39 PROVIDE NEW 6' DIA. MH "THE LAGOON" P.L. 1989.7 SANITARY SEWER PLAN (STA. 215+00-00 - STA. 229+00-00) SCALE: 1 "= 50' wq y co yv C.� m� I 60 % DESIGN PRELIMINARY PLANS. DO NOT USE FOR CONSTRUCTION. EXHIBIT ONLY. _ 0 � Q 2010 Q W � 2002.00' w w H Z z Q J VENT ELEV. MH #63 (VENT -EXTENSION) Q z J 0000 _ (LOCKDOWN / WATERTIGHT) co ti W o iv z ° STA. 224+51.39 EXISTING GROUND z Q �NIo 0++rn RIM =1995.03' 0 ��� 2001.00' O 00 00 0 04 °' co (MATCH PAVEMENT) N U 2000 VENT ELEV. 0 Y 04 II U II MH#60(VENT) 0�� JC� �"��" LOCKDOWN / WATERTIGHT _ STA.215+49.12 — �- — RIM = 1985.50' 199 198 �� 0 36" D.I.P. @ 0.51% 36" D.I.P. @ 0.06% 36" D.I.P. @ 0.02% o 36 D.I.P. @ 0.04 /0 36 D.I.P. @ 0.05 /o _ Z W Z W a o O W W M� Z W ti fn 1970- rno o�� N� °Now ti 0 O ti ti N rZ N 0')00 m 00 I,- i II 0) 0) ti II II <A i II II II 0z II II II DOZ H � II OZ Oz O z > > 196 zz > > zz j j > > zz zz _ _ - - z z - - - - "o i M coM 00 cM M (D (D M M M co co a 9 2 0 36" D.I.P. @ 0.05% 195 n J 0 a U d 1940 215+00 216+00 217+00 218+00 219+00 220+00 221+00 222+00 223+00 224+00 225+00 226+00 227+00 228+00 0 SANITARY SEWER PROFILE (STA. 215+00.00 -STA. 229+00-00) 50 0 0 25 50 100 150 0 F SCALE. HORIZ: 1 "= 50' ; VERT. 1 "=10' GRAPHIC SCALE 1 INCH = 50 FEET L ••ff - 970 1950 J 1940 229+00 4- 1 U �—E oC ULu O O OLLJ O + rl.. I J �z 0 N � W N Lu N _ O Q O N O o Ln DC v � � w m �/� p < Q � = i O o Q I--I--I z ate-+ Ll1 LLJ O O LPL ro V) Y �_}� �m J LU W O v Z Y O of = a U Q W Q 0 z / O�S�RICT•eN,b ��Ci 6do ti WQ � s �z L u N � o o� �13 W MH #65 (LOCKDOWN / WATERTIGHT) STA. 230+14.85 LINE "A" �.� PROVIDE NEW 6' DIA. MH I PROPOSED PAVEMENT ,¢Q SURFACE REPAIR g ' \ S25° 31' 14"E 256.98 LF 4L•��1 PROPOSED COIR MATTING \ STREAM / 0 EROSION CONTROL ] / F�OOD`1`1A '`v 198\ NV- / + � PIN:9637944030 / / BILTMORE COMPANY C+� \ D.B. 0244, D.P. 0056 IN, s 8 INV= 1988.81 72" WIDE BY 54" STONE \ \ 36" BRICK ARCH TOP CULVERT \ \ OA\ /� CULVERT \ iV \ 2030 2020 C7 ry w 2010 Q z w 0o OD w zi EXISTING O + °' CD 36"BRICK LoON°'U 2000 CULVERT = UO Q Q �zz�U�� 1990 I 1980 u of 1970 I 1960 / L J' I1950 1940 r 229+00 s 0 n 50 IN b-,E 0 r` rn oc z Z O PC coe' 36" D.I.P. @ 0.02% 0 25 50 GRAPHIC SCALE 10 ti \ PIN:9637944030 \ \�.9 \ \ \ I BILTMORE COMPANY Is, \ D.B. 0244, D.P. 0056 \ GRASS \� I ` I \ IN, "THE LAGOON" P.L. 1989.7 \ \ / I/ — STREAM CROSSING (SC-8) I PROPOSED COIR MATTING EROSION CONTROL 230+00 231+00 100 150 1 INCH = 50 FEET 232+00 loe .TIN 2 / cy / /s L'�/ / • " / MSD SMH #50-28004 RIM=1991.46 INV=1978.56 / / MSD / ' RIM=1S 9i.300-28003 / / / / / • • � INV=1978.48 loll loll 1-1 000, PROPOSED VARIABLE WIDTH TEMPORARY CONSTRUCTION EASEMENT EXISTING 20' EASEMENT PER D.B. 953, PG. 189 / c3...___.__----- - RIM=1988.188.14 1 PROVIDE NEW 6' DIA. MH / ENV-1978.34 TBM MAG NAIL - d / EL=1988.55 BRIDGE WITH CONCRETE DECK SANITARY SEWER PLAN (STA. 229+00.00 / / SCALE: 1 11= 50' Y �g CULTIVATION 2 ABANDON AND PLUG EXISTING SEWER 0 R1H NPDB3 l / ABANDON AND PLUG , / EXISTING SEWER do �g Z� I'?- / / / / - STA. 244+00-00) STREAM CROSSING (SC-9) _ _ O O- LU w Z ww Q Q J 2002.00' 0z ti N Lq VENT ELEV. z ti p 0 0 + rn O N M MH #66 (VENT) EXISTING GROUND 0 M � m Y 04 II 00 Y N II U LOCKDOWN / WATERTIGHT O < O STA. 235+49.40 RIM = 1987.80' PROPOSED COIR MATTING EROSION CONTROL — 36" D.I.P. @ 0.04% 36" D.I.P. @ 0.02% 36" D.I.P. @ 0.08% 0 36" D.I.P. @ 0.07% w Z Z z :;I 6 cfl LLJ Lo N ('') a0 M C6 Lf� O 1?06 N O 00 O II II O II � F- II =pz � II II Ozz II O z z Z zz z z z — — -- (off- Ly) M 00 O O co (07 co co 60 % DESIGN PRELIMINARY PLANS. DO NOT USE FOR CONSTRUCTION. EXHIBIT ONLY. 233+00 234+00 235+00 236+00 237+00 238+00 239+00 240+00 241+00 242+00 243+00 SANITARY SEWER PROFILE (STA. 229+00.00 - STA. 244+00.00) SCALE. HORIZ: 1 "= 50' ; VERT. 1 11=10' 2030 2020 10 1990 1980 1970 1960 1950 1940 244+00 U O OLu I O J U v CD a--' uw c7— O w N Q uj N _ Lo O O ^^�1 " W O O W cld m V) O I— Q = i O o z rn O O LL ro � Y }� �_ 00 Ln J LU W O v Z Y O of w 2 d U Q °,r�1•`� M C� O �O LV CD w Q z z 0 O � o > W W cl 6 z O �RICT � bN��66� o s z 13n0 U 0 N.C. GRID NORTH O NAD83 (2011) NAVD88 W J U v O Lu O 0 + ok,tLo Cr w N q� w f oN Lo CD N O bi W J MH #69 (VENT) `//fI C� O ~ Q (LOCKDOWN / WATERTIGHT) v� U " O STA. 247+23.32 LINE "A" PROVIDE NEW 6' DIA. MH / (� LU MH #72 /� cC fV Y PIN:9637944030 MH #70 (LOCKDOWN WATERTIGHT) / / /F Cn Y = BILTMORE COMPANY (LOCKDOWN / WATERTIGHT) D.B.0244, D.P.0056 STA. 257+83.32 LINE "A" / 'l°' 0) STA. 251+16.32 LINE A PROVIDE NEW 6' DIA. MH / // N y ~ ~ o w PROVIDE NEW 6' DIA. MH CULTIVATION / �� / `'//�� �� Z Y 0 — — CULTIVATION / / / / "♦ O Q w d SO _ — _ — _ _ PROPOSED T O� MH #71 (VENT) / / 53� Z � � — — — 9° 22' 30"w — _ RARy CONST (LOCKDOWN /WATERTIGHT) m------- 393.00�F --P _ RUCTI N SE _ _— — RO O — — _ _ O EA N1ENT STA. 255+19.32 LINE "A" LINE "A" — — ° 40' 38"E 522.58 LF _ _s _ �' ED _ 5 CD (n S06 __ -- _ — _s — s _ _ ___ PERMANENT PROVIDE NEW 6 DIA. MH — 0 _ _ — m _ — —s — — — — s — — _s — _ _ _ —� EASEMENT — — — — — — — — — g09° 46' 45„E 264.0 1-F rn _ —S —,36 RCP — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — —S — — 36"RCP o " �S — _ S00 18' 00 W 403.00 LF F T _ —i- -+-`�� �.. - \ �S _ —S <36"RCP 1 — GRAY _ S m�� SEC ROgI) g S 36"RCP S S MSD SMH #50-28005 MSD SMH 450-28007 - _ _ RIM-1990.97 _� INV-1979.35 RIM=1992.43 � • - - — - � / - r EXISTING 20' EASEMENT - i / KACf1CAAH itSn-9RnnR INV=1978.91 " - �� — 00 00 PER D.B. 953, PG. 189 PROPOSED VARIABLE WIDTH S09° 46' 45"E 264.00 LF TEMPORARY CONSTRUCTION EASEMENT _ — .. — _— MSD SMH #50-431283 — RIM=1990.71 INV=1979.11 MSD SMH #50-28006 RIM=1991.22 INV=1979.20 2030 2010 2000 1990 1980 n u a 1970 3 n 1960 �I 1950 1940 L_ 0 244+00 Y 0 0 n` 50 36" D.I.P. @ 0.07% 0 25 50 GRAPHIC SCALE 245+00 246+00 100 150 1 INCH = 50 FEET 2003.00' 247+00 F R E N C H B R O A D R I V E R MH #69 (VENT) LOCKDOWN / WATERTIGHT' STA. 247+23.32 LINE "A" RIM = 1992.87' Z U 0 0 6 r Cl) « r II Q � II 0� z 2 248+00 36" D.I.P. @ 0.07% 249+00 SANITARY SEWER PLAN (STA. 244+00.00 - STA. 259+00-00) SCALE: 1 "= 5 0' WW Qz J N z M M � cm O + rn UN 20<� 2iJU)0� rn 0') � r- � II 0z z z mm EXISTING GROUND 36" D.I.P. @ 0.05% 60 % DESIGN PRELIMINARY PLANS. DO NOT USE FOR CONSTRUCTION. 250+00 SANITARY EXHIBIT ONLY. SEWER PROFILE (STA. 244+00.00 SCALE. HORIZ: 1 11= 50' ; VERT. 1 11=10' 2003.00' VENT ELEV. 255+00 - STA. 25 MH #71 (VENT) (LOCKDOWN / WATERTIGHT) STA. 255+19.32 LINE "A" RIM = 1990.29' (MATCH PAVEMENT) 36" D.I.P. @ 0.09% 256+00 9+00-00) ELECTRIC RISER WITH UNDERGROUND CABLE 2030 .7 2010 �Q WW H Qz J >� N M � z 0+rn 2000 N L � V N II =0<�� �J0� 1990 36" D.I.P. @ 0.07% 4-11 1970 1960 1950 ' 1940 257+00 258+00 259+00 LU Q 9 Z y } I- 13W• PIN:9637944030 BILTMORE COMPANY D.B. 0244, D.P. 0056 1 PROPOSED COIR MATTING EROSION CONTROL r_ m -- mo IAN K/ i cn �s m c9 MH #73 (LOCKD STA. 25' PROVID 1 1 co rd JLTIVATIONpPO / � 1 G��F< MH #74 ROgo STA. 263+24.11 LINE "A" PROVIDE NEW 6' DIA. MH i� (1 /-`/lnI NIC('T CYICTInI (_ CC\A/CD n1 i.. MSD SMH #50-28010 /�'^ NIV=1984.87 - - ' Vry0 3? �r�/O p, O'')� V, V 40�O 8 I 1 1 MH #76 (LOCKDOWN / WATERTIGHT) GRASS STA. 269+73.63 LINE "A" PROVIDE NEW 6' DIA. MH LINE "A" GRAS31 n I 12 GRASS - GATE FENCE [1 1 — - -- m -— -- --------------- _ __ --------------------- __ S21°47'31'E482.00LF _ (n WV11,01,11,0114 POST p SPIGOT m ST POST PO1 1 � � <36"RCP S-----S--- cn _S--- S-----S-----5-----5----- GRAVEL SURFACE MSD SMH #50-28013 RIM=1992.03 INV=1981.41 1 1 F R E N C H B R O A D R I V E R I SANITARY SEWER PLAN (STA. 259+00-00 - STA. 274+00-00) SCALE: I"=50' 030 2020 STREAM CROSSING FOURMILE BRANCH _ (SC-10) 201 Q Q Q 2010 Lu w Qz J aZ QZ z�� zj°p a) 2003.00' VENT ELEV. zM"? 2000 � OD N + MH #75 (VENT) 0 o + rn EXISTING GROUND 2000 � p c °' LOCKDOWN / WATERTIGHT � floo °' co � U 04 I I U a I I STA. 264+61.63 LINE "A" U a I I = O J PROPOSED COIR MATTING = OJ Cn RIM = 1992.39' _ 0 U) of EROSION CONTROL, 1990 To 1990 1980 0 36 D.I.P. @ 0.30 /° 36" D.I.P. @ 0.05% 36" D.I.P. @ 0.09% �j z z 3 w oo U) LI r Z2 00 fn O 00 N 00 07 a°>ID00N 6 0') � � I rn1970 0') II0) I I F-I II I �z Zd') Z zz OO— >I O z z >°�' z z z zzI' z E 1960 z — z CONCRETE ENCASEMENT M — M M co co M 0 M� An /. nFqlr-,N PRFI IMINARY PI ANS L36" D.I.P. @ 0.07% DO NOT USE FOR CONSTRUCTION. 1950 EXHIBIT ONLY. 3 0 1940 259+00 260+00 261+00 262+00 263+00 264+00 265+00 266+00 267+00 268+00 269+00 270+00 271+00 SANITARY SEWER PROFILE (STA. 259+00-00 - STA. 274+00.00) 36" D.I.P. @ 0.06% 272+00 970 m 950 ' 1940 273+00 274+00 cc CD 0 CD N w U p ���oo O w N Lu cc CD Q N ' ^ O O v LI O O�.," ne a)O o LLI m V1 p a _ �. O o co z � m 0� � (V Y O O= V Q Y 0 � � m D L J o 0 O `� z Y O V1 a LU a U Q Z ca O O GO w a 0 9 IsL 6 z F SCALE. HORIZ: 1 "= 50' ; VERT. 1 "=10, GRAPHIC SCALE 1 INCH = 50 FEET 13W• W U w PIN:9637944030 ` " m BILTMORE COMPANY m D.B. 0244, D.P. 0056 z m ♦ m ♦ S21 ° 47' 31 "E 482.00 LF GRASS LINE "A" MH #77 (VENT) (LOCKDOWN / WATERTIGHT) STA. 274+55.63 PROVIDE NEW 6' DIA. MH FENCE(]-4 GRASS MH #79 (LOCKDOWN / WATERTIGHT) STA. 281+20.63 LINE "A" PROVIDE NEW 6' DIA. MH — _ _ — — — — — — — — — — — — _ — — — — — — — — — — — — — — — — — — — — — — — ♦ - PROPOSED TEMPORARY CONSTRUCTION EASEMENT 460.00 LF S06° 35' 04' 205.00 LF ---- � S12 MANENT EASEMENT _ [] MH #80 (LOCKDOWN / WATERTIGHT) STA. 284+96.63 LINE "A" PROVIDE NEW 6' DIA. MH P/ GRASS m _ PROPOSED COIR MATTING o \ EROSION CONTROL \ PARKED STORAGE TRAILER FOR RAFTING — — — — PROPS PER — — — — _ — ij — 7/ OPERATIONS h SPIGOT � y <36"R � —S — cn — EXISTING 20' PER D.B. 95 ♦ MSD SMH #50-28014 RIM=1993.30 INV=1981.68 N O MSD SMH #50-431280 RIM=1992.71 INV=1981.68 ----S— — _ GRASS DECK _ MSD SMH #50-2801, \ RIM=1992.07 • • • _ INV-1982.07 �— \ TBM MAG NAIL \� EL=1990.96 _ \ MSD SMH #50-28016 RIM=1991.82 INV=1982.12 F R E N C H B R O A D R I V E R N.C. GRID NORTH NAD83 (2011) NAVD88 U '—' +-' O W O u N O W 000 N J dl j� O LL 0a w �--I Q LU M o Q W N O N _� Q� O LLI O F- Q = i O o � O I+1 z w O O IL N 2 Q Y +� } D Ln o w >O lu O `/ z Y 0 of w U \ \ o ^S _iRW=1985.98 \ �/ \ MH #81 z \ \ (LOCKDOWN / WATERTIGHT) \ \ \ STA. 288+41.45 LINE "A" \ ems\ \ S \ \ PROVIDE NEW 6' DIA. MH 09, GRAss \ \OF \ \S\O E �•-.� \ \ \ \\\S\\ .SPIGOT � .. \ \ o 4 \ POS- \ -- \ \ !. � \ \ RIr,\ SPII w \ \ R0 �\ w,, \ \ a SMH (NO MSD NUMBER) RIM=1992.90 INV=1985.75, (APPROXIMATE) (STANDING WATER IN BOTTOM) (NO VISIBLE FLOW) J SANITARY SEWER PLAN (STA. 274+00-00 - STA. 289+00-00) SCALE: 1 "= 50' MSD SMH #50-28017 RIM-1994.27 INV=1982.50 r-nv: ao°raww"°" BILTMORE COMPANY D.B. 0244, D.P. 0056 1 i I I i I i cy 1 j UJ I _S \ ,UJ I� co _1? 1 203 202 _ STREAM CROSSING (SC-11) 201 �: (D - w aaz wLU LLJ H Z w W J 2004.00' Q J Q Z 2604.00' t co Z VENT ELEV. b � M PROPOSED COIR MATTING VENT ELEV. 00 0 cc"i MH #77 Z Lri EXISTING GROUND � + C° rn EROSION CONTROL N o MH #80 (VENT) + rn p 00 200 LOCKDOWN / WATERTIGHT o � p rn LOCKDOWN / WATERTIGHT it U N II STA. 274+55.63 00 ti Y N II *k () m o 00 STA. 284+96.63 r- Y N = O Q H — RIM=1992.22' �p�2 =OQ� RIM=1991.29' �JCOf 199 198 36" D.I.P. @ 0.06% 36" D.I.P. @ 0.06% 36" D.I.P. @ 0.05% 36" D.I.P. @ 0.08% F- z z Z z z 60 v N (0BID 00 CD N � CV N 00 p U) CD N (fl M rn N � 00 1970n °) n F i II Z) z D II Z)z 0O Z O O z O Z O— — zz zZ zz zz - Z Z — 7-- — — GJ (0 7-— Zo CO M co CO Cfl Zo zo M �r� M co M M 196 M co 60 % DESIGN PRELIMINARY PLANS. 36"D.I.P.@0.06% 36" D.I.P. @ 0.06% 1950 DO NOT USE FOR CONSTRUCTION. EXHIBIT ONLY. Iadn 274+00 Y O O n` 50 0 25 50 GRAPHIC SCALE 275+00 276+00 277+00 278+00 279+00 280+00 281+00 282+00 283+00 284+00 285+00 286+00 SANITARY SEWER PROFILE (STA. 274+00.00 - STA. 289+00.00) 100 150 SCALE. HORIZ: 1 III = 50' ; VERT. 1 11=10' 1 INCH = 50 FEET 287+00 288+00 2030 2020 2010 2000 1990 m 1970 1960 1950 1940 289+00 uj CD 13V0 w Q 0 z z 0 o o_ > w w� 0 6 z \ 1 I I MH #82 (VENT) (LOCKDOWN / WATERTIGHT) — GRASS 83 STA. 293+72.57 LINE "A" I MI #T) PROVIDE NEW 6' DIA. MH (LOCKDOWN /WATERTIGHT) LINE °A° STA. 296+80.57 LINE "A" GRASS J PROVIDE NEW 6' DIA. MH u 4— —— — — c SPIGOT SPIGOTA;'�� S10° 42' 02"W 308.00 LF-�Ploor SPIGOT Now HV Z — „W 531.12LF —tj- _—----s-----s-----s-----s-----s-- — s _ S05° 34' 24 �_— 1—__ 36"RCP> u m`fir—-----s---- -—S — — — READ _ m_S — — — 36"RCP>� OLD RIVER — — — - - - - - mr— — — — -—— T • • MSD SMH #50-28018 MSD SMH #50-431277 y . - — — — RIM=1995.30 RIM=1994.52 INV=1982.80 INV=1983.03 rn — / — MSD SMH #50-2=9 019 65 _ RIM191983:0 INV=1983.05 �1 F R E N C H B R O A D R I V E R \ \ PROPOSED COIR MATTING EROSION CONTROL � S25° 22' 08"W 65.00 LF / MH #84 (LOCKDOWN / WATERTIGHT) STA. 297+45.57 LINE "A" PROVIDE NEW 6' DIA. MH \ GRASS \ c P;io '25° 19 14 „w 38-q � ` `/ POSEp PO MH #8 (LOCK5DOWN /WATERTIGHT) STA. 301+29.08 LINE "A" PROVIDE NEW 6' DIA. MH m CONS Rop q„` OSEp PER�jgNE`I ` lON EASE�jENT 1 v �RF ` NT EAS r� _ 36"/?CP GRASS , INV=1985.91 ... ` \ EXISTING 20' EASEMENT �— . _ `S \� �� / S36o \ \ \ o 00 PER D.B. 953, PG. 189`36"R P` PROPOSED VARIABLE WIDTH TEMPORARY CONSTRUCTION EASEMENT MSD SMH #50-28020 RIM=1995.41 INV=1983.30 4 SEWER PLAN(STA. 289+00-00 -STA.303+00-00)SANITARY � SCALE: 1 "= 50' S� ID NORTH N G. GR ��� NAVDg8 NAp83 �20 203 2 STREAM CROSSING (SC-11) 202 2 P = C7 PROPOSED COIR MATTING O Q EROSION CONTROL ~ Q w 2010 wLu Z Qz J 2 Q J 00 w MH #82 (VENT) EXISTING GROUND 2004.00 LOCKDOWN / WATERTIGHT MH #83 Lo z L6 Oo Z cq � N + a, VENT ELEV. STA. 293+72.57 LOCKDOWN / WATERTIGHT 0 o rn RIM = 1995.52' STA. 296+80.57 p r rn 00 Y M II �* U 2000 RIM = 1994.28' 00 U N II = p< g 2 2o< J Jc)0� 07 a 1990 1 36" D.I.P. @ 0.06% 36" D.I.P. @ 0.05% 36" D.I.P. @ 0.09% 36" D.I.P. @ 0.05% 1980 w 1 00 00 0000 rn � 00 a� (� 00 6> N — 00 N 00 O 1970 F- i z � 0')F- 0')001 O p z p z z z Z Z >> z z p z — — > > Rio M M M co �� M M z_z_ 1960 �o �o M M 1 36" D.I.P. @ 0.05% 60 ° DESIGN PRELIMINARY PLANS. CONCRETE ENCASEMENT 1950 DO NOT USE FOR CONSTRUCTION. 1 EXHIBIT ONLY. 330 D20 D10 )90 )80 a70 a60 )50 1e o w U OC LLJ N — O O O , + f V N I J a) z rn � o M W M l~ ^ ` Q o N o Lo O O O O U w M W V I O C �-�-I Z 4.1 00 O O LL ro l �_JLU LU Lu O of = a U Q O 60 A' �- A O 0 w Q 6 z O �RICT � bN��66� s 1940 -1940 �`-' - 289+00 290+00 291+00 292+00 293+00 294+00 295+00 296+00 297+00 298+00 299+00 300+00 301+00 302+00 303+00 d s o Y cd o a> °o � F SANITARY SEWER PROFILE (STA. 289+00-00 - STA. 303+00.00) 50 0 25 50 100 150 GRAPHIC SCALE 1 INCH = 50 FEET SCALE. HORIZ: 1 III = 50' ; VERT. 1 11=10' 13W• N �Ii 71 � O ' STREAM O U 4� z— — — — — — — — — — — — — m S36° 47' 23"W 367.00 LF T'R m�[l m----S-----5-36V ,mmPROPOSED COIR MATTIFRCS.qIC�N r.nN]TR( N \ MH #86 (VENT) \ (LOCKDOWN / WATERTIGHT) STA. 304+96.08 LINE "A" STA.0+00.00 BEGIN LINE "D" PROVIDE NEW 6' DIA. MH LINE "D" (SEE SHEET PL-29) / / MH #D1 / STA. 0+19.19 END LINE "D" ��[� PROVIDE NEW 4' DIA. MH RECONNECT EXISTING SEWER / (SEE SHEET PL-29) \ LINE "A" \ GRASS \ \ _SPIGOT \ SS61 8 4� -- `p� OS \ GRASS \ \ \S \ \n\ �4S 0 \ FA P R ABANDON AND PLUG \S�� \ PRO, -_ co, V\ _ EXISTING SEWER \ _ SED PFRMgN� � � �T l pN qs M \ NT Fgs FNT s IGOT EI�jF \ . \ 6 RCP ! o MH #87 / LOCKDOWN / WATERTIGHT CSTA. 309+46.08 LINE "A" � .PROVIDE NEW 6' DIA. MH FENCE _)2(__[[�n y ' Q \ I / SHED ' Z� \ MH #88 II/ \ \ �sE�As\ \ c (LOCKDOWN / WATERTIGHT) GRASS FENCE \ \ \ \ STA. 312+04.08 LINE "A" MH #89 (VENT) () \ \ \ \ \ \ S \ \ PROVIDE NEW 6' DIA. MH (LOCKDOWN / WATERTIGHT) XISTING 20' EASEMENT �• \ PER D.B. 953, PG. 189 \ R PROPOSED VARIABLE WIDTH TEMPORARY CONSTRUCTION EASEMENT STA. 316+04.08 r 6°2T33��\ \ \ _ GIs \ \ \ \ \ 2S8 00 �F °i�� — PROVIDE � 6� IA. MH ATE FENCE �1 \ \ OL \\� \ \ J EQUINE ARENA — — — — — — \ ,D \SPIGOT \ \ I7.RIDING RING _ \ lvzR \=� \\-------------- 400.00 LF S39046'25"W400.00LF ---------------- m \ \ \ �� • • -� SPIGOT — GRAV ���\ SPIGOT _ • • _ \ E� sURF� \ 36 \ • POST D.I. GRATE=1994.31 SPIGOT— [1 [] _S — 36"RCP — V ---S-- [l�� POST _ S_�� �P S S—---S-----S—IP6>e�7.9&1fi2- 36"RCP �— ---S— S�� � — ` 36"RCP WV/ICv MSD SMH #50-28023 \ d RIM=1992.47 . " . — U INV=1983.77 \ " • - • • " — ,� MSD SMH #50-28024 RIM=1994.31 INV=1989.47 INV=1987.00 SANITARY SEWER PLAN (STA. 303+00-00 - STA. 318+00-00) SCALE: 1 "= 5 0' --- Wv/ICv_ — ' �m wv / Icv -- r U.P.L WITH U.P.L WITH U/G ELEC U/G ELEC MSD SMH #50-28025 1 RIM=1995.43 INV=1984.12 I 203 202 2030 —2020 MH #86 (VENT) LOCKDOWN / WATERTIGHT = STREAM CROSSING (SC-12) STA. 304+96.08 = O _ RIM = 1991.95' O _ Q 201 �Q LIJw —2010 2005.50' H z Q — z � -12006.50' 00 MH #89 (VENT) VENT ELEV. J 00 _ — (DM VENT ELEV. z rr LOCKDOWN / WATERTIGHT PROPOSED COIR MATTING _ z o �) � � o c') O 04 STA. 316+04.08 =_ EROSION CONTROL EXISTING GROUND � Q + — RIM = 1994.97' 200 00 U H 2O00 00Ycr) II = O Q 20<� J (/ v J U) f. t 199 *--zjJ —1990 36" D.I.P. @ 0.05% a 36" D.I.P. @ 0.05% — 36" D.I.P. @ 0.05% 36" D.I.P. @ 0.06% 36" D.I.P. @ 0.06% 198 ? 1980 w z � U r`� U) ao� Lu z� ti fn 00 ti 00 00 c7 to 00 u') M — 00 I I — 00 0) I I N -- CONCRETE ENCASEMENT 6) M OR — 00 co II II 00 00 197 II 0) 00 z O— z O— II 0)-1970 II H o z z > > z z — — > > z_ z_ F-II __ � O? z z z M m M m z z M M 00 (M M 196 —1960 60 % DESIGN PRELIMINARY PLANS. == 1950 DO NOT USE FOR CONSTRUCTION. 1950 EXHIBIT ONLY. _- loan1 1aan d 303+00 304+00 305+00 306+00 307+00 308+00 309+00 310+00 311+00 312+00 313+00 314+00 315+00 316+00 317+00 318+00 0 SANITARY SEWER PROFILE (STA. 303+00-00 -STA. 318+00.00) 50 0 25 50 100 150 o 0 SCALE. HORIZ: 1 "= 50' ; VERT. 1 "=10, GRAPHIC SCALE 1 INCH = 50 FEET U Cl� T Q('V i� Lu U I..I..I O O O CD I z � + O w m � � a Q C:, N O Q O O a ,,..a m O Q U a-d 2 O 0 U) Z p � r�i �I C� L O O O ITS m Y � } CO J 0 w z Y 0 of=a 0 U Q W CD �A' �- IN, .o w Q 0 II �u 6 z O �RICT • eN,�66� s z 13N0 Z -- IF POND ILI) 'W.E. 19923 GRASS 1` STREAM MH #94 II PROPOSED \' ' MH #93 (VENT) LOCKDOWN / WATERTIGHT MATTING 'DELINEATED G `L ( ) COIR (LOCKDOWN / WATERTIGHT) STA. 330+77.66 LINE A \� w �� �� EROSION CONTROL WETLAND STA. 328+55.66 LINE "A" PROVIDE NEW 6' DIA. MH PROVIDE NEW 6' DIA. MH1= — ICn — — _ — — _ui 263.65 LF MH#92 ui GRASS —NE SA EME T----------------------- S31 - � (LOCKDOWN WATERTIGHT) � � CONSTRUCTIO — � S36° 23' 35"W STA. 325+71.66 LINE „A.. P SED TEMPORARY — EASEMENT —s S-- PROVIDE —30"RCP _ — 1 PROVIDE NEW 6 DIA. MHLLI pR0 NEN Os — Z — C ppERMA ��S-----S-----S-----S---36,RCP S INV=19 / pRopoSE _ S--- 36"RCP J MH #91 / ° 84-� -S— (LOCKDOWN / WATERTIGHT) / / / / _ g gOAD_ _ _ — — — — U STA. 322+81.58 LINE "A" PROVIDE NEW 6' DIA. MH GRASS/ / / / / — — _ —'OLD INV=1987.24 / / / O�„ `" 290 / / / / is / / / _ ... / ' • _ ... .. - MSD SMH 03 30 RIM199 =- .81 BRIDG 1 s / / / / - f MSD SMH #50-2-9 INV=1985.22 I LINE „/�n„ / / .. RIM=1993.59 - / 1 ' / / // �. EXISTING 20' EASEMENT INV=1985.06 TBMMAGNAIL 1 MH #90 / / -1/ / s�R P� ///// i PER D.B. 953, PG. 189 TOP OF CONCRETE RETE WALL 1 (LOCKDOWN / WATERTIGHT) > STA. 320+04.08 LINE "A" GRASS i GRASS / s /�/ PROPOSED VARIABLE WIDTH TEMPORARY yO PROVIDE NEW 6' DIA. MH ' POST �MSD SMH#50-28028 CONSTRUCTION EASEMENT 1 �� / / _ RIM=1994.37 .50 �'F ' I /_ INV=1984.65 I m1------------------- '� _s_ F R E N C H B R 0 A D R I V E R (n S33° 37' 1011W 400.00 LF yo 36•RCP' / i T - --!---POST iS — I 1 'm'-SIGN _ —S • _ — ' — — _ / . U) ts---- _ - ms--- - _ _ / • MSD SMH #50-431274 RIM=1994.49 / • - INV=1984.49 T - - • u ' - - MSD SMH #50-28027 MSD SMH #50-28026 — DSO RIM=1994.28 .. - — - • - r — --• RIM=1993.89 INV=1984.56 TBM MAG NAIL INV=1984.37 I/V�W� IN UTILITY POLE 1 EL=1996.78 1 2030 2020 2010 2000 1990 1980 i u a 1970 0 i♦ EI 'I 1960 / L J' gl 1950 1940 318+00 50 36" D.I.P. @ 0.06% 0 25 50 GRAPHIC SCALE ww az J >� 00 Z 4 o 0 0 + rn (D0Mo� 20�� 36" D.I.P. @ 0.07% � II D z 0 z z 1.1 C7 CD �Q ww az J 00 u? Z 3:00) O CNN °� U OM II =�� �Jcoof w z_ zo U. - Lo CL 0 a II Q H I D Z 0 >> z z SANITARY SEWER PLAN (STA. 318+00.00 SCALE: 1 "= 5 0' EXISTING GROUND 36" D.I.P. @ 0.09% CD �Q ww az J 0 �(o z�Lo ti N 0 N - * U M II =0<2 �Jcoof CR ItT a rn � a Lei 11 z2 36" D.I.P. @ 0.08% - STA. 333+00.00) 2007.50' VENT ELEV. MH #93 (VENT) LOCKDOWN / WATERTIGHT STA. 328+55.66 RIM = 1994.26' 36" D.I.P. @ 0.05% z� zo O L6 (.0 00 O 00 co IM STREAM CROSSING (SC-13) CD �Q w �w J PROPOSED COIR MATTING �F) EROSION CONTROL zro 0+M �CD m 0co U M II =O<� �JC� L6 r c a II 6 DII Oz z'z (. ICt coC�. 60 % DESIGN PRELIMINARY PLANS. DO NOT USE FOR CONSTRUCTION. EXHIBIT ONLY. 319+00 320+00 321+00 322+00 323+00 324+00 325+00 326+00 327+00 328+00 329+00 330+00 331+00 SANITARY SEWER PROFILE (STA. 318+00-00 - STA. 333+00-00) 100 150 SCALE. HORIZ: 1 III = 50' ; VERT. 1 11=10' 1 INCH = 50 FEET 36" D.I.P. @ 0.05% 332+00 2030 ?020 1010 'lll 970 950 J 1940 333+00 qq- ce U O N w O I O J a--' Lv O 1--m Z m � C) w � m Lu L/) o N _ Q � WO o Ln O O ^^�11 " ce O O bi m l/I p F- Q = i O o O Z 4 00 � m O O Y }� �_ m Ln J LU w O v Z Y O of < Lu 2 d 0 U Q M CJ O �O Lu V , w Q 0 z z O O a > W U w 0 0 z O �RICT • bN��66� o s z H- 13W• 50 2030 2020 2010 2000 1990 1980 1970 1960 1950 1940 333+00 0 25 50 100 MH #99 (LOCKDOWN / WATERTIGHT) STA. 344+39.31 LINE "A" PROVIDE NEW 6' DIA. MH 1 ___ CO / / / — -- -- _, 'i� , A-,-f _— ROPOSED PERMANENT EASE — — — — — — — 0166 (LOCKDOWN /WATERTIGHT) _ 3"RMENTSTA. 336+18.31 LINE "AII / s---° PROVIDE NEW 6'DIA. MH /�_ —s----_ --- a r S31 12 04 W 263.65 LF ---s— gOAD s-----s--- S42° / 0 52' 16„W 26$ _OLD RIVER _ — —s — — — 32 32"�/ 2 00 LF MH #95 / S2A —s — — — — —s — 66. �L1� (LOCKDOWN / WATERTIGHT) / _ — ~ W � � ' / iS � ' / � � � � � 36"RCP —� STA. 333+41.31 LINE "A" DELINEATED � WETLAND / ' �S �36^RCP ' PROVIDE NEW 6 DIA. MH co GRAVEL SURF Z _ Cui _ w PROPOSED VARIABLE WIDTH TEMPORARY MSD SMH#50-28035 �• Lij RIM=1998.14 \ \ / / s / // �• CONSTRUCTION EASEMENT INV=1985.95 MSD SMH #50-28 1y / / / MSD SMH #50-28034 Z -"` //•'• / ° H 997.02 RIM=1997.73 NV19 5.6\ INV=1985.745.74 zr-� / / / / /j i EXISTING 20' EASEMENT ) PER D.B. 953, PG. 189 mm� i / �/ . m f /S// ii �• MSD SMH #50-28032 RIM=1995.17 / INV=1985.42 m _ m� e F R E N C H B R 0 A D R I V E R r N .0e MSD SMH #50-28031 ' RIM=1993.77 INV=1985.29 \ / SANITARY SEWER PLAN (STA. 333+00-00 - STA. 346+00-00) \ll DELINEATED MH #98 WETLAND (LOCKDOWN / WATERTIGHT) _ �• STA. 340+85.31 LINE "A" n�[]�n °\���/_ /• ••,� •� ,� ,� .••.�••';� PROVIDE NEW 6' DIA. MH ;..�-., —, • L- \ DELINEATED [] - FLOODWAY .. 7WETLAND MH #97 (VENT) '\• ' .• - - •, • �-��"- ��� �] I (LOCKDOWN /WATERTIGHT) •� _ / — — — _ — — — — — — — —PROPOSE TEMPORA STA. 338+86.31 LINE "A" ✓ _ _ PROVIDE NEW 6' DIA. MH / _ _ _ — — — — — 199.00 LF — — — — — — _ RY CONSTRUCTION MH #96 / / — — — — S28° 54' 38' W S40° 53' 49"W — — — — — — — — — EASEMENT 354.00 i p SCALE: 1 "= 5 0' 334+00 335+00 336+00 337+00 338+00 339+00 340+00 341+00 342+00 343+00 344+00 SANITARY SEWER PROFILE (STA. 333+00-00 - STA. 346+00.00) 150 SCALE. HORIZ: 1 "= 50' ; VERT. 1 11=10' 345+00 1 - 346+00 1A\x - 86 P� �G. Off' �P T U cf� Q LLJ 4— O c O + Lll N cOLD O w ca m LJ rcs L Q N O Q O O C) 11 oC N di clz�m V1 p � a I -I --I z ate-+ M Lu � O O IL M Y 4--) Lu D I ^ L/ J 0 O Z a Y Q V1 w a 0 U Q w a 0 !ac o 6 z oS-�Ricr. bN,�� 13W• GRAPHIC SCALE 1 INCH = 50 FEET 60 % DESIGN PRELIMINARY PLANS. DO NOT USE FOR CONSTRUCTION. EXHIBIT ONLY. d H MH #101 (LOCKDOWN / WATERTIGHT) STA. 347+45.92 LINE "A" PROVIDE NEW 6' DIA. MH I MH #100 Nx (LOCKDOWN / WATERTIGHT) STA. 347+05.31 LINE'0 O PROVIDE NEW 6' DIA. MH d alU m Olt_ S42rn 32 136"RCP T � � y m V� MSD SMH #50-32412 EXIST. MH TO REMAIN MSD SMH #50-38178 L=1996.92 (18")=1991.82 (12")=1993.07 ABANDON AND PLUG 1F EXISTING SEWER W PROPOSED EROSION C, a N _ — = CON ° ES D - MPpR RUCTIpN EASEMEY 1 ___ PROP — _ OSED PER — — NT MANENT EASEMENT — _ _ MSD SMH #50-32416 RIM-1996.38 INV=1986.18 BRIDGE S _ _ 42"RCP $ — — — _ _S — _ _ — _S _ y GRAVEL SURFACE TBM MAG NAIL — OLD RIVER ROAD IN CONCRETE BRIDGE EL=1995.57 _ MSD SMH #50-32414 RIM=1996.43 EXISTING 20' EASEMENT INV (42")=19ss.ss PER D.B. 953, PG. 189 INV(12")=1990.43 PROPOSED VARIABLE WIDTH TEMPORARY CONSTRUCTION EASEMENT20' - ABANDON AND PLUG EXISTING SEWER FRENCH B R D A,D R I V E JR SANITARY SEWER PLAN (STA. 346+00-00 — STA. 350+07-75) SCALE: 1 "= 501 2030 <42"RCP DINGLE CREEK ROAD 2030 2020 _ 2020 STREAM CROSSING Q (SC-14) X z _ m �Q �Q zo O z 2010 Qz J Qz J w 2010 j U Z r- � j z ch o z rn �J J EXISTING GROUND D o o + lfj rn + o O o O� o z 0 u') X cn II 00, U M II II * U m— 2000 = p . = 0 < PROPOSED COIR MATTING U) Of 2000 J cn� -7— 2i J� Of —7 — — —\ EROSION CONTROL — WE 1990 � 1970 1960 1950 1940 346+00 36" D.I.P. @ 0.05% z t co lCf 347+00 w z � U) o U) 00oo rn (o M 00 00 II o 0 II II p z z z z z Cfl Cfl ao co co — " D.I.P. @ 0.05% 348+00 36" D.I.P. @ 0.04% 349+00 c6 ;t 00 7 O> (o 00 n o �1 O z z Iz 03N 350+00 1990 1980 1970 1960 1950 ' 1940 351+00 4-� 4-� v� ~ oC Q Lu U Lu ~ v O n �o N J z O Lo clz� w m 4� w � _r kEl o Q N O O 3: " m V'I o Q U = i O o Q Z 4-J Q0 LLJ O O LL as Y � m I^ v , � LU 0 v 2 z Y O � = a 0 U Q 0 � O 00 O �RICT•bN,�6 n 'I SANITARY SEWER PROFILE (STA. 346+00-00 — STA. 350+07.75) �(��I W H Q z z 0 O cn �; Dfw c� 0 6 z GRAPHIC SCALE 1 INCH = 50 FEET SCALE. HORIZ: 1 "= 50' ; VERT. 1 "=10' 13V0 MH #2 (LOCKDOWN / WATERTIGHT) STA. 1+73.14 LINE "A" PROVIDE NEW 10' DIA. MH MH #1 SSMH #21-14743 RIM: 1,976.27' LOCKDOWN / WATERTIGHT) �:_ INV:1,961.0' F STA. 0+00.00 LINE "A" =— 1 TBMBOLTINCe:_ MH #3 R PROVIDE NEW 10' DIA. MH i� / ONSWRIMOFSM�r«Tda\� E N EL=1976.08 (LOCKDOWN / WATERTIGHT) C H SSMH #21-14742��� RIM: 1,976.34' / % 1� STA. 5+53.97 LINE "A" R Q A NV: 1,960.4' \ PROVIDE NEW 10' DIA. MH D INVERT ELEV. R j MH # 21-14744 V EI Lj 1950.00' �RIM: 1,978.85' 1j F 13rrW 173.14 gEMENT #1 ;�/S7 INV: 1,960.9' y o PERMANENT EASEMENT #2 - S57 321 PERMANENT EA Zg8 � � 5 281 08 W 380 o n DB 5389/PG 286 , Cp— 398, P� / / 148"RCP 83 L•F' � <48' R 5 / �• � � � �� � _ --. / = � ,_ - __�;-•,•..\ (LOCKDOWN /WATERTIGHT) STA. 9+51.03 LINE "A" /� -r �/ ` \ •' _ _� ° _ �r AMON^.� _ �_ _.. _ - _ PROVIDE NEW 10' DIA. MH CITY OF ASHEVILLt N.C. GRID NAD83(2011) COORDS: ;ITY OF ASHEVILLE \ \ �_- MH #5 PIN 9638-90-9798 \\\ OH N:680,712.27', E:939,758.16' • ASPHALT i S 76 ° — �` - -� - _ MH #21-14745 / / ) CITY OF ASHEVILLE _� _ _ / ® D.B.5242,PG.1141 PIN 9638-90-9746 I \\�\ OH LEV:1,976. PATH 2Or05rr RIM:1,979.6T LOCKDOWN/WATERTIGHT PIN 9648-00-1832 /TP-T1 1-29-18 �� D.B. 5095,PG. 1167 \� w 397. - _ �- — _ INV: 1,961.3' ( n ) \� D.B.1659,PG. 436 P.B.10,PG.96 P.B.10,PG. 96 \ \=� _ _ �_ 06 LF - --.-. STA. 12+76.79 LINE A" M BRIDGE / P.B. 1 ),PG. 96 O �_ \ —� —�__ _ _ ` J � —T _ =_ ,___� � � _ � - __ off �----• _—.---.. _ PROVIDE NEW 10' DIA. MH �1 /%� \ \ \ \-�� t_ r �-� 0— �'16 �� . - MH #21-37431 �! / ��..�,�}=�-� p,�' CATCH BASIN _ _ _ RIM: 1,976.87' , n 'GR: 1,973.8T INV: 1,961.0' INV: 1,971.7'— _ I � \ -- W W = == = HIGH TENSION��-�� -9 —_ 1' bNd S S+ 1 ro_ �� — Ljj POWER POLE. �� _ b 76° 7' T.!`=WC1QD-STE2S- .- . / •--- —, �S _ __ = ==19$8"�•� O AMON 48"IN 325.7 MSD MH #21-14741 � — SSMH #21-17475 — _ G f — _ -� ` =S _ _ _�� A _ _ _ RIM=1975.91 v RIM:1,993.59' \ \ INV:1.980,4p' lv1 RQAD ` �` A 83 2011) COOR F _ _ N:680,615. / INV.=1961.20 �� ! _ ASP ��_ �� �� ELEV: 1,975.65 — �/� ( $„ vcP i i / �� — Q -- - -- HALT P V — _ W�-- o \a\ / \ eec oRGgro // �— \ `\�\;� — ` \ 6�A{A� A EME \� `�= _�-�OPOSED PER - off �, ' © Lu s _ MANEN W \\=`= s \ \ \�\ EASEMENT off / /y c/) JO TBM 60d NAIL W/ SHINER \ =� �S \ �� �H #21-431809 CATCH BASIN ' 1 ' \ 9�� ELEV: 1,993.52' \ _ - �S GR: 1,972.97' \/ RIM: 1,979.28' W OUT: 1,969.1'MSD MH L /I 47 RIM UN NOWN / I I I I I ' �I _ �S co 1 INV.=1970.0' \ r I ` ` i- 1 WATER VALVE ` \ I \ \ S ` / IN MANHOLE y i I I ' I ` ` / \ — , U (A. S—� FLOOR CONCRETE I I I P.B. 158. P. 36 I ` ` \_ ELEV: 1,986.1' I I I I �' I I �S ` C< MH #21-14771 (NOT SURVEYED)_ SANITARY SEWER PLAN (STA. 0+00.00 — STA. 13+25.00) 2000 1990 1 19 1 1 ii I 1930- n -1 -0+50 0 25 50 SCALE: 1 11= 50' 60 % DESIGN PRELIMINARY PLANS. DO NOT USE FOR CONSTRUCTION. EXHIBIT ONLY. Q a _ a Q Q � -i °O rn _ � 1990 (hIt 00 OD CD Lo O co �+ + O + 0) O Q IIN + II = II Q �_ 2 II H Lo II Q (n Q' 2 � (n Q' fn Q' (n of cn Of 1980 1970 1960 O O O L17 rn i z z 0 CD 0+00 100 0+50 150 60" DIP @ 0.02% 60" DIP @ 0.02% 60" DIP @ 0.02% 60" DIP @ 1.97% z ?Lo w _ w w Lo � N > o ( M co Lo MLo O M Lq O cy)Lo - Lo co 0) 0) (`0 (`') Lf) LO 0) r Lo 0)II LO II d7 II II II II O— z O Z O z O z z z z z z z z z 0 CD 0 CD flo 0 (o 0 co co co co 1+00 1+50 2+00 2+50 3+00 3+50 4+00 4+50 5+00 5+50 6+00 6+50 7+00 7+50 8+00 8+50 9+00 9+50 10+00 10+50 11+00 11+50 12+00 12+50 SANITARY SEWER PROFILE (STA. 0+00.00 — STA. 13+25-00) 1950 1940 ' 1930 13+00 13+25 +-' CV U o J CD O Ln o� 00 + �. �') O m _o m w u z W N W I o Lo O ce Z O I U o w �= W 0 cUn -� C ZD w o O O 0 Q J Y 2 tA Y m Y 0 Lu 0 Z Y O Q O Q TZ Q ° _ $ O �O LV CD w a 0 PI 0Le O H a_ W W w 0 OCJ�R�CTo VN/,�� \ � 60 ti 9 �101- GRAPHIC SCALE 1 INCH = 50 FEET SCALE. HORIZ: 1 "= 50' ; VERT. 1 11=10' 13W• z rlr N b y8�„8is W W � WOOD DECK MH #6 \ MH #9 (LOCKDOWN / WATERTIGHT) — — �� _ — — �_ (LOCKDOWN / WATERTIGHT) STA. 16+50.73 LINE "A" STA. 25+99.98 LINE "A" - PROVIDE NEW 10' DIA. MH © PROVIDE NEW 10' DIA. MH _ MH 21-14746 ASPHALT PATH - RIM: 1,9,977.9 W .99' MONITOR WELL — _ INV: 1,961.7' MH #7 PILE OF DEBRIS S7 � � S740 39' 13"V►/ 373.94 9° 13' LF — — _ (LOCKDOWN / WATERTIGHT) 48w 335. W OH HIGH TENSION POLE STA. 19+72.35 LINE "A" �.F MH #8 POWER ,� Moor z H ASPHALTpgRK1NGL1 5 PROVIDE NEW 10' DIA. MH 292�2 (LOCKDOWN / WATERTIGHT) , a O MH 21-37771 n 'Raw J AMON off 5 — — — — — — STA. 22+64.37 LINE A" _ N.C. / — _ SHOWN PER MOD FGIS IND o COORDD NADg3(2011) ` _UNABLE TO FIND I CA PROVIDE NEW 10' DIA. MH O (� U 'L LLI N: 680, 523 OH S 78 ° r 12 �/`/ E:938,948.100' G I 41 n ELEV. 1,975.38, \ I OH 321. Q b �\ - 62 LF 2 5 � I I O�j ' 6 \'• � MONITOR WELL �^ L _ � CITY OF ASHEVILLE\ I ON - 1' PILE OF DEBRIS , co PIN: 9638-90-0544 \, — H �— D.B. 1659, PG. 0436 '' 1 P.B. 0010, PG. 0096— H _ \ AMON , �1 —� O PLANTED FLOWERS IN MULCH N.C. GRID NAD83(2011) COORDS: ASPHALT PATH .937,769.08' — / HIGH TENSION S _ ' E EV:1,980.46' OH - 5APpR TI N Lij H S MH 21-37772 - / AMON �,] O ` INV: 1,962.0'4 Ir _ —S------ — N6oRDDNAD83(2011)� , E' �8$8p8 , ON MH UNKNOWN \ `8-- RIM: 1,981.78' \ IN: 1,967.5' ■ \ I S — _ _ — I OUT: 1,967.2' S ASPHALT PARKING Oh, LOT o I TBM - MAGNAIL S — N.C. GRID NAD83(2011) COORDS: �S ---WAG SPIKE � � N:680,373.74', E:938,118.89' � ELEV: 1,981.07' I �� ■ I — MH 21-14765 \- \ S \ � MH 21-37773 RIM: 1,980.54' _ \ RIM: 1,979.52' S— INV:1,962.1' co — `S ` \ \ 20 SANITq S S\ S`____® \ \ \ \96>PE63 REq EMNr \S\ \ ' MH 21-14764 `,979.39' SANITARY SEWER PLAN (STA. 13+25.00 — STA. 28+00.00)_ -- Q -- C 1990-_ M 6, � N O Lo Lo r- + M 0 — II U) of 1980- —�-- — _ �1r 1 1 SCALE: 1 "= 5 0' 60 % DESIGN PRELIMINARY PLANS. DO NOT USE FOR CONSTRUCTION. EXHIBIT ONLY. f 2 U) 0 / Q J M Lo M + 00 N M 04 II C/) Of 60" DIP @ 0.02% 60" DIP @ 0.02% w �. 60" DIP @ 0.02% 1950` '-' � o � w z � (.0 Lu M Lo ti � � flo m L) Mi � cli M (.0 II Lo 1940 �m Lo II D oz II �z D II z z O — O z - - z z Z Z 0 CD c0 co — — - - CD (.0 C9 C9 1930 13+25 13+50 14+00 14+50 15+00 15+50 16+00 16+50 17+00 17+50 18+00 18+50 19+00 19+50 20+00 20+50 21+00 21+50 22+00 22+50 23+00 23+50 SANITARY SEWER PROFILE (STA. 13+25.00 — STA. 28+00-00) 50 0 25 50 100 150 SCALE. HORIZ: 1 "= 50' ; VERT. 1 "=101 GRAPHIC SCALE 1 INCH = 50 FEET 60" DIP @ 0.02% 24+00 24+50 25+00 25+50 r iY M ri co Lo oq I I 6) F- 11 Z) O z z z 0 CD co (..0 26+00 26+50 27+00 27+50 I I 970 •.i 950 940 ---J 1930 28+00 T U �4-- ago 00 O + M � m 00 rO w N ce v, 4� El LLu Lu I N o N II ZO — O C� LL L11 a U ce O O O Y Ln Z 0}0 ❑ Lu � U 0 0 U Q cn 13n0 W Q ❑ ---S-----5-----5-----5-----S-----S-----S-----5---- RIM: 1,980.92' AMBOY ROAD ASPHALT PAVEMENT I NCDOT CLAIMS MAINTENANCE RIGHT-OF-WAY I �wLu yyZ� -- -- -- -- -- -- I W W I Q U1 a MH #11 / AMON (LOCKDOWN / WATERTIGHT) / MH #10 N.C. GRID NAD83(2011) COORDS: N:679,918.87', E:937,206.00' STA. 35+85.91 LINE "A" LOCKDOWN / WATERTIGHT ( ) ELEV: 1,977.38' � PROVIDE NEW 10' DIA. MH — STA. 32+12.48 LINE "A" — \ _ S79° 13' 48"W 612.50 LF PROVIDE NEW 10' DIA. MH ASPHALT P ArH \ r ---- S79° 13' 48"W 373.43 LF — — — — 1 �- ASPHACT- PATH --------------... INFO a / '�,w0O0 STAND (TYP) BR/pG� / O� OENCH NCOGRID NAD83(2011) T 1 , 1 U I ( —I /I O- O --- --- �- ---_- ��- O�Ft �00 COORDS: INFON:679,917.03', I P� WOOD - STAND (TYP) 936,898 5 ELEV: 1,977.29' �%� `s' a Vj I W SpNP BRIDGE i p0 --------- ----_ - r- 2 T---- _ O BENCH ' f ' AMON N.C. GRID NAD83(2011) COORDS: Y^ �97� f �� (TEN // _ - _ -- - - - m, 1 N:680,081.85', E:937,554.18' ELEV: 1,982.72' � � I\ WOOD BRIDGE / SOo � I O I • 15: HD PE INV: 1.971.55'AMON '.\ NC GRID NAD83(201 1) MH #12 COORDS: N:680,051.74', (LOCKDOWN / WATERTIGHT) I ELEV:1,976.1 STA. 39+88.57 LINE "A" --- - , \ t 1 PROVIDE NEW 10 DI/A. MH --- ssp •a ROWS OF8"X8" , \ WOOD POSTS O co AMONG 'y83o, /'' ui N.C. GRID NAD83(2011) COORDS: ' _ _ 8' 00,, , u/ - S— — N:680,144.34', E:936,623.21' / /� "V 425 0p �F co — S— — ELEV: 1,977.83' S— _ MH 65-37776 S— � � SHOWN PER MSD GIS _ S— — - UNABLE TO FIND \\ s-_ ASPPHALT AT T � S� H y N.C. GRID NAD83( 0111) , — COORDS: S;68Q140.78, E V: 1,,333.68'\ ELEV:1,978.80 -- H I ul I SANITARY SEWER PLAN (STA. 28+00-00 - STA. 42+00.00)_ SCALE: 1 "= S 0' 60 % DESIGN PRELIMINARY PLANS. DO NOT USE FOR CONSTRUCTION. EXHIBIT ONLY. 6 Z 2000 Q Q � Q � J � J 0) 199 v o Lo � � � 1990 001— Lo N r6 + ? Lo r op L6 00 O N - M II + 10-1 — M II Q N 0 2 � 198 ' — — � � � 1980 197 ` J 1970 1960 1960 g f 2 'a 60"DIP @0.02% 1 1940 1930 ' 28+00 28+50 29+00 50 0 25 50 3I (3F<AFJHIU '5UALt f 100 150 1 INCH = 50 FEET Lo rn ,6 Lo rn rn LO u °') II O z z z 29+50 30+00 30+50 31+00 31+50 32+00 32+50 33+00 60" DIP @ 0.02% 33+50 34+00 34+50 35+00 35+50 w§ N 2 0 4 C', Lo c rn a Lr,, u 6 � u � 2 O _ z 22 CC 36+00 60" DIP @ 0.02% 36+50 37+00 37+50 38+00 38+50 39+00 39+50 SANITARY SEWER PROFILE (STA. 28+00-00 - STA. 42+00.00) SCALE. HORIZ: 1 "= SO' ; VERT. 1 11=10' 01` .4 c_ m d u a II O 2 zz m P. 40+00 40+50 41+00 41+50 1950 1940 JRICT• 1930 6� 42+00 s co z W �' N >rcr O �0�0 • 6v�G �` �13 W 2000 1990 1980 1970 i> oDitt ofL O =I 1940 u e I I -I IFFE: 1,983.13' HARRINS SAND AND GRAVEL, I D.B. 5682, P. 736 P.B. 14, P. 73 & P.B. 72, P. 53 PIN:9637-59-8823 I I 1 STORY METAL BUILDINC / _ _ — cp MH #14 (LOCKDOWN / WATERTIGHT) MH #15 STA. 46+90.33 LINE "A" (LOCKDOWN / WATER] \ PROVIDE NEW 10' DIA. MH STA. 49+03.35 LINE "A" PROVIDE NEW 10' DIA. —S--- I cn Z i _S _ ACT PARKING ) (07, (LOCKDOWN / WATERTIGHT) "i P R��No �� I I �s _ _ _ STA. 50+89.52 LINE "A" M P s _ PROVIDE NEW 10' DIA. MH N83° 18' 00"W 213.02 LF ® \ N83° 18'°00"W 276.76 LF i 63 °S410 ,I,VV 186 \ ASPHCONCRETE WALL ��F _S ALT PATH non— WOOD MEMORIAL MP \ ORIAL STAIRSIRA 60, I I C 1 l ° — FFE=1,981.95' c ASPHALT PATH 8 W47 AMON LF \I BLOCK / WOOD N I � J� N.C. GRID NAD83(2011) COORDS: MH 50-21370 \ CO (3) CONTROL BOX N:680,305.31', €-935,521.229'_ — RIM: 1,979.58' I I ELEV:1,979.26' —s----- NV: 1,963.4' o�ff LU- - MH#13 s— —s-----s-- 0 5-----S----- � —CH(LOCKDOWN/WATERTIGHT) s--- s�— U -- = _ " MH 65-21371 — — — — AMON STA. 44+13.57 LINE A" � 82.96'_ _ — � — — � � N.C. GRID NAD83(2011) COORDS: C14PROVIDE NEW 10' DIA. MH — RINV:19963.8'�I I AMBOY ROAD W N:680,408.43', E:935,040.34' m OH � ELEV: 1,979.88' FLOW METER _ — I ASPHALT PAVEMENT -- S� — — SH MH #2( 50-303006????? — � h M H 65-21358 _ _ VVAY — — NV: 1,972.50' — — _ �MH (LOCKDOWN / WATERTIGHT _ 5---- (NOT SURVEYED) — — — — — — RIM: 1,979.51' _ — — — — UNABLE TO INVERT - FULL STA. 55+59.77 LINE "A r — — — — PROVIDE NEW 10' DIA. MF 60"DIP @0.02% 193 42+00 42+50 43+00 6 FD 0 O IS _ 50 0 25 50 n �I GRAPHIC SCALE 43+50 100 150 1 INCH = 50 FEET co 2 C J O O co aD + v� I I t (n Q' 2 60"DIP @0.02% O v 00 Lo 7 r LO II O ZII OZ Z Z co co 44+00 44+50 45+00 45+50 i 0) C J co M N C) + 1.0 U) Of SANITARY SEWER PLAN (STA. 42+00-00 — STA. 56+50-00) SCALE: 1"=50' 60 % DESIGN PRELIMINARY PLANS. DO NOT USE FOR CONSTRUCTION. EXHIBIT ONLY. Q J C 0 O J + 00 Lo OOO cl? Lo I I + °' U) of 2 U) of 60" DIP @ 0.02% w �- 60" DIP @ 0.02% w >bo z w N v 00 ,4 N Lo N N M Lo 07 .4 — LO LLo (V ('M LO I I O II II O O Z > O Z z z z z z z O O O O O O - - CO CO O O CID Q0 46+00 46+50 47+00 47+50 48+00 48+50 49+00 49+50 50+0 SANITARY SEWER PROFILE (S SCALE. HORIZ: 1 "= SO' ; VERT. 1 I'=10' 60" DIP @ 0.02% r , ki-A O CN ,on ASP HALT PATH I THE CITY OF ASHEVILLE D.B. 2053, P. 438 P.B. 72, P. 53 IS H MH SHOWN PER MSD GIS UNABLE TO FIND —) MH RIM: MH RIM:1,981.86' 2000 1990 — 1980 1970 m w 60" DIP @ 0.02% 1950 Lo LO II O OZ 1940 0 1930 50+50 51+00 51+50 52+00 52+50 53+00 53+50 54+00 54+50 55+00 55+50 56+00 56+50 TA. 41 + 00.00 — STA. 56+50-00) '13 W • w Q 0 Z 0 H a_ U W 0 I Metropolitan Sewerage District of Buncombe County I DWR Project No. 20230477 ��� Response to the Division of Water Resources Request for Additional Information Appendix C Updated Figures / Maps hdrinc.com 440 S. Church Street, Suite 1200; Charlotte, NC 28202 704.338.6700 Sroao 5-t Rd, LEGEND Project Limits Location Proposed Access Route DATA SOURCE: ESR1 World Topographic Ennnna crowne Pla:'a Basemap Tennis & Go; N Resort epi HAffi netery' ;Buncombe County, WNC 0 0.5 F Miles Hazel Green Elshire Park Ir Z". vq rv-e!Jy p, Wst Asheville Mission Health Mission Hospital > 0 ak Zj -L A s h ev 11 e - B u n cc IT, b e > Tech Cmty Cbl Malvern Hills Pisgah View CarrIer, Park' 1, 6y"` Existing Carrier Bridge Pump 2214-ft Station Q!'d Ride 'p ry ,q �Jl --P' ri 9-11 0 cill. XD Lone 1 M91 Moun P 4Z 2257' 26 57f r ft \N A h L shevillle 0 u t 1'e t \4\s; MSD CARRIER BRIDGE PUMP STATION REPLACEMENT PROJECT PROJECT LOCATION MAP Figure 1 X\CUSMIN\G—ISTROJEC-671 M—UNCO-101943—RRIERBRIDGEPS UPDATEM-1-00MMSD CARRIERBRID—SACEAPRX --M USACE PRECONSTRUCTION NOTIFICATION APPLICATION LEGEND• Project Limits 'Rip` _ Proposed Access Route Topographic Quadrangles DATA SOURCE: USGS 24k Topographic Map - USA Topo Maps GIS Service t •o lv � � � � j -? - 0 2,000 7 1 inch = 2,000 Feet 50 0 �'�.i �� lfff•��� �ss'�-�� r. �4` = r' D Gas "r L 44 r - i� M`IO O 12 O • * �. ;+►`may I�•l `J ` \, ..%���,� O �. i MSD CARRIER BRIDGE PUMP STATION REPLACEMENT PROJECT USGS TOPOGRAPHIC QUADRANGLE lip Figure 2 \\CUSMAIN\GIS DATA\GIS\PROJECTSWB]1 MSD BUNCOMBE\101-80 CARRIERBRIDGEPS UPDATED\].2 WIPVu1AP DOCS\MSD CARRIERBRIDGE USACEAPR% DATE:3I20Y1023 USACE PRECONSTRUCTION NOTIFICATION APPLICATION LEGEND Pr — E; Pr Pr Rr Pr Ri I t WIN ip Station ■ �' Rehabilitation Station S with CIPP �'ra Arc• _ i�► iy -� ■ 4i- ` ich Gravity Sewer 6. T,-ich Gravity Sewer ich Gravity Sewer ~r . p i Aich Force Mains � Fren 5th Ave--- r r ��`= vi+.4 . Broad r•46' ,. • .: � . � - - River :h DIP Force Main �y Sewer Pipes trid Aerial Imagery +• The French ,..d ti i � i `� � • ' River IF • r -Tr + + r- — '•f 1 �`�� � � � _ . � � � \. _ ' „b Aye►+ err' t� �-GranadaA - - YC Cardova rx LSewer with .1 - A rnboy, Rd �\ use ` French Broad River .s J X r til French Broad River ".It oil IN 'L fA 4 French Broaa River i .' r . ■ French Broad River J Ap is LEGEND Construction Work Area Soil Map Unit Hydric Rating 0 1-32% 66-99% y �:V 100% DATA SOURCE: USDA NRCS Web Soil Survey(2021) N AJIL 0 Feet 120 _ ►� . it 4w L MSD CARRIER BRIDGE PUMP STATION REPLACEMENT PROJECT Fn w NRCS SOIL MAP :_,. t., •.• Figure 4113 \\CUSMAIN\GIS DATA\OIS\PROJECTSWB]1 MSD BUNCOMBE\101BG380 CARRIERBRIDGEPS UPDATED\].2 WIPVu1AP DOCS\MSD CARRIERBRIDGE USACEAPR% DATE 31-3 USACE PRECONSTRUCTION NOTIFICATION APPLICATION LEGEND Construction Work Area Delineated Wetlands' Delineated Streams/Rivers` Three Oaks PJD Study Area Projected Jurisdictional Waters— LISGS National Hydrography Dataset AliUSFWS National Wetlands Inventory DATA SOURCE: Bing Maps Hybrid Aerial Imagery 'Surface waters were delineated by Three Oaks Engineering and HDR. "Stream/river delineated limits have been projected based on prior delineation survey data and aerial review to reflect alignment changes for the proposed river crossing that occurred after the on -site delineation survey. N A 0 250 Feet 6 SI3Z 0 �� 0 � 2,000 Feet MSD CARRIER BRIDGE PUMP STATION REPLACEMENT PROJECT Fnw WATERS AND WETLAND RESOURCES t !',:• Figure 5A \\CUSMAIN\GIS DATA\GIS\PROJECTSWB]1 MSD BUNCOMBE\10-380 CARRIERBRIDGEPS UPDATED\].2 WIPVu1AP DOCS\MSD CARRIERBRIDGE USACEAPR% DATE 31Y 3 USACE PRECONSTRUCTION NOTIFICATION APPLICATION LEGEND Construction Work Area DATA SOURCE: Bing Maps Hybrid Aerial Imagery Delineated Wetlands* *Surface waters were delineated by Three Oaks Engineering and HDR. Delineated Streams/Rivers` **Stream/river delineated limits have been• Three Oaks PJD Study Area projected based on prior delineation ` survey data and aerial review to reflect Projected Jurisdictional alignment changes for the proposed river Waters** crossing that occurred after the on -site _ delineation survey. USGS National Hydrography Dataset n USFWS National Wetlands I Inventory 0 Feet 250 Joll A • Nk 'I. I i i I I 0 2,000 r Feet i MSD CARRIER BRIDGE PUMP STATION REPLACEMENT PROJECT 7)l w WATERS AND WETLAND RESOURCES t !� 'a• Figure 5B \\CUSMAIN\GIS DATA\GIS\PROJECTSWB]1 MSD BUNCOMBE\10-380 CARRIERBRIDGEPS UPDATED\].2 WIPVu1AP DOCS\MSD CARRIERBRIDGE USACEAPR% DATEII27Y 3 USACE PRECONSTRUCTION NOTIFICATION APPLICATION r LEGEND Construction Work Area DATA SOURCE: Bing Maps Hybrid Aerial Imagery Delineated Wetlands* *Surface waters were delineated by Three Oaks Engineering and HDR. Delineated Streams/Rivers` **Stream/river delineated limits have been Three Oaks PJD Study Area projected based on prior delineation survey data and aerial review to reflect Projected Jurisdictional alignment changes for the proposed river Waters** crossing that occurred after the on -site delineation survey. USGS National Hydrography Dataset A USFWS National Wetlands Inventory 0 Feet 250 j f -4#OFA , <<; Figure 5C Carrier r NA u 0�Feet 2,000 ;saMSD CARRIER BRIDGE PUMP STATION REPLACEMENT PROJECT `d WATERS AND WETLAND RESOURCES `7 t !� 'a• Figure 5C \\CLTSMAIN\GIS DATA\GIS\PROJECTSWBTI MSD BUNCOMBE\10-380 CARRIERBRIDGEPS UPDATED\].2 WIPVu1AP DOCS\MSD CARRIERBRIDGE USACEAPR% DATE 31Y 3 USACE PRECONSTRUCTION NOTIFICATION APPLICATION LEGEND CQ Project Limits 4z "o. I CZ Buncombe County Parcels *Public Right -of -Way associated with Lyman Street, Norfolk Southern Railway, and Wilma Dykeman Greenway. #25: CITY OF DATA SOURCE: ESRI World Topographic ASHEVILLE Basemap N A 11., Livingston 5�O Street Park Feet nary #21: V G ENTERPRISES P'a:.,nef M'-evl Rd. LLC 24: FOUNDATION \ LLC 11, IVA Southcrn Sr STUDIOS LLC 4E Scort 22: V J'S dr- AUTO INC No k A 25 ASHEVILLE OF EVILLE #2 1-V G IS S ENTERPRE 2209 #23: FOUNDATION STUDIOS LLC PUBLIC Walton Street' RIGHT-OF-WAY" Park #20: PROGRESS ENERGY '3OF THE CAROLINAS FKA 4 CAROLINA POWER AND LIGHT C, 5 41 Ave 0 ry ench oad Cn� Q� V. ark #19: CITY OF ASHEVILLE < #18: METROPOLITAN SEWERAGE DISTRICT 5,t OF BUNCOMBE'tOUNTY #17#30- Q SOUTHERN CITY RAILROAD OFASHEVILLE F-\ CO #27: CITY OF ASHEVILLE#29: ROBERT #26: #28: BURRIS ASHEVILLE HEIRS #16: CITY OF CITY RIVER #1'5'CITY OF ASHEVILLE----'OF ASHEVILLE ASHEVILLE Rive- RECREATION #14: 001 5f 00 INC RIVERLINK INC cz- #6: BILTMORE COMPANYxb N MSD CARRIER BRIDGE PUMP STATION REPLACEMENT PROJECT I-��PROPERTY OWNERS Figure 6A X\CUSMIN\G—ISTROJEC-671 M—UNCOM-101943—RRIERBRIDGEPS UPDATEM-1-00MMSD CARRIERBRID—SACEAPRX —V27-3 USACE PRECONSTRUCTION NOTIFICATION APPLICATION 01 Ell X hi Ave LEGEND //� G t Project Limits Sevvart Sir 6 Proposed Access Route Buncombe County Parcels tat, S.t DATA SOURCE: ESRI World Topographic Basemap te 1v 1 rt st, < N 7Z 2101ft if, 0 500 Feet Pisgah New #10: FLORA r J WILSON REVOCABLE TRUST #8: 521 AMBOY LLC #11: CITY OF ASHEVILLE #12: CITY OF Carrier Pa #13: CITY OF #71,WILSON TON, #9: 521 ASHEVILLE ;ASHEVILLE KWILSON.ANMB AMBOY 4 --LLC— #2. G IT11Y OF #3--SAND #5: RIVER FRONT STUDIO ASHEVILHE LE STONE PROPERTIES Fren h Bro-Qd' LRLC �0"d oveK LL 0 w- I #6: BILTMORE COMPANY #4-.-HARRINS— SAND 40 AND GRAVEL LLC - - - ----------- - - - - — --------------------------------- - —21 2,122, ft F va'P ni #1Z RIVER IN( MSD CARRIER BRIDGE PUMP STATION REPLACEMENT PROJECT F'l PROPERTY OWNERS Figure 613 \\CLTSMAIN\GIS DATA\GIS\PROJECTS\4671-MSD-BUNCOMBE\10194380 CARRIERBRIDGEPS-UPDATED\7.2 WIPWAP DOCS\MSD CARRIERIBRIDGE USACE.APRX DATE:2/27/2023 USACE PRECONSTRUCTION NOTIFICATION APPLICATION MSD CARRIER BRIDGE PUMP STATION REPLACEMENT PROJECT t PROPERTY OWNERS Figure 6C \\CUSMAIN\GIS DATA\GIS\PROJECTSWS]1 MSD BUNCOMBE\1019J380 CARRIERBRIDGEPS UPDATED\].2 WIPVu1AP DOCS\MSD CARRIERBRIDGE USACEAPR% DATE:II27-3 USACE PRECONSTRUCTION NOTIFICATION APPLICATION +LEGENDr f _ _ l i? ` r^�— ', �', '�•, ` y Iwo c; IC�r� Project Limits Proposed Access Route `. t } .L • i r�Floodway SURTO W EST WOOD PLACE r 1 .r.STRfti r, ;*. _ 11 ••• • - UCFL70N,T #•� gS ^'• -a•. Via. �s!! I :: CIRCLE a.:•: 9 sr .r f p rr - . fi i ��v� p. y. SOUTH fRENCH'iRQAQ 11••• • - P47 tl;IISIANA Imagery SOURCE:DATA ' �j.. .. r��� • r.+i,••. �' w'`• � �IP °' +.tea •` s yr Feet 7. � t �� •N.T�-, 4.-Y t • ! 7 .. ,•i% { 00' IrCf.'.• 41 'I ..'� r•'+• it 1 �jr. �1-_ ra�i_�vr 51 -�iKi - .M• •'�J' L, 0 50 t.. Feet • ... . • a Existing Pump Station J 4 i l 9rn,.y 1 R..Lv LEGEND Construction Work Area Proposed Pump Station - Existing Pump Station Proposed Cofferdams (stage 1) ® Proposed Cofferdams (stage 2) Proposed 60-inch Gravity Sewer Proposed 60-inch Gravity Sewer Replacement Proposed 36-inch Force Mains Proposed 54-inch Gravity Sewer Rehabilitation Proposed Access Route Delineated Wetlands* Delineated Streams/Rivers' Projected Jurisdictional Waters`" DATA SOURCE: Bing Maps Hybrid Aerial Imagery *Surface waters were delineated by Three Oaks Engineering and HDR. **Stream/river delineated limits have been projected based on prior delineation survey data and aerial review to reflect alignment changes for the proposed river crossing that occurred after the on -site delineation survey. N G 0 400 Feet �: rawyt 02 No steam impacts anticipated. This proposed footprint is for the rock cofferdam option which has a wider base than the sheet pile cofferdam option. A temporary culvert may be placed in the tributary at its confluence with the river to ensure continued stream flow if a rock cofferdam option is selected. A temporary culvert would not be required if the sheet pile cofferdam option is selected as it would have a narrower footprint and would not impede flows from this tributary. Impact Number: S1 Impact Type: Fill (Cofferdam) Impact Duration: Temporary Stream Type: Perennial (French Broad River) Impact Area: 100 Linear Feet (0.92 Acres) Impact Number: S2 Impact Type: Dewatering/Excavation (Pipe Installation) Impact Duration: Temporary Stream Type: Perennial (French Broad River) Impact Area: 50 Linear Feet (0.30Acres) " Impact Number: W1 • Impact Type: Matting Impact Duration: Temporary Wetland Type: Emergent Impact Area: 0.08 Acres MSD CARRIER BRIDGE PUMP STATION REPLACEMENT PROJECT POTENTIAL IMPACTS TO WATERS OF THE U.S. Figure 8A \\CLTSMAIWGIS DATA\GIS\PROJECTSb4671 MSD BUNCOMBE\10194380 CARRIERBRIDGEPS UPDATED\7.2 WIP\MAP DOCS\MSD CARRIERBRIDGE USACE.APRX DATE:61112023 USACE PRECONSTRUCTION NOTIFICATION APPLICATION LEGEND Construction Work Area Proposed Cofferdams (stage 1) ® Proposed Cofferdams (stage 2) Proposed 60-inch Gravity Sewer Proposed Access Route Delineated Wetlands* Delineated Streams/Rivers* Projected Jurisdictional Waters** DATA SOURCE: Bing Maps Hybrid Aerial Imagery *Surface waters were delineated by Three Oaks Engineering and HDR. **Stream/river delineated limits have been projected based on prior delineation survey data and aerial review to reflect alignment changes for the proposed river crossing that occurred after the on -site delineation survey. N A 0 200 Feet 1 ' s This is a proposed footprint for the rock cofferdam option which has a wider base than the sheet pile cofferdam option. A temporary culvert may be placed on the tributary to the French Broad River near the confluence with the river to not impede flow and route water away from the cofferdam. The sheet pile cofferdam would have a much narrower footprint from that of the rock cofferdam and therefore would have no impact on flows from the tributary or require a temporary culvert installed to mitigate potential impact to flows. Impact Number: S4 Impact Type: Dewatering/Excavation (Pipe Installation) Impact Duration: Temporary Stream Type: Perennial (French Broad River) Impact Area: 50 Linear Feet (0.26 Acres) Impact Number: S3 Impact Type: Fill (Cofferdam) Impact Duration: Temporary Stream Type: Perennial (French Broad River) Impact Area: 100 Linear Feet (0.87 Acres) le ` 1n ' MSD CARRIER BRIDGE PUMP STATION REPLACEMENT PROJECT 01 POTENTIAL IMPACTS TO WATERS OF THE U.S. t .... V Figure 8B \\CLTSMAIWGIS DATA\GIS\PROJECTSb4671 MSD BUNCOMBE\10194380 CARRIERBRIDGEPS UPDATED\7.2 WIP\MAP DOCS\MSD CARRIERBRIDGE USACE.APRX DATE:61112023 USACE PRECONSTRUCTION NOTIFICATION APPLICATION Metropolitan Sewerage District of Buncombe County I DWR Project No. 20230477 ��� Response to the Division of Water Resources Request for Additional Information Appendix D hdrinc.com 440 S. Church Street, Suite 1200; Charlotte, NC 28202 704.338.6700 BASE FLOW WATER SURFACE (EL. OF - DOWNSTREAM RIFFLE) EXISTING GROUND EDGE OF WATER AT BASE FLOW PROVIDE ROCK SILL AT UPSTREAM AND DOWNSTREAM END OF TOE WOOD EXTENDING UP TO BANK FULL. USE 24" TO 36" BOULDERS STACKED. RESTORE DISTURBED AREA WITH TOPSOIL, SEEDING, - MULCHING AND PLANTING LIVE BRANCH LAYERING GEO-LIFT TOE WOOD - ANCHOR ROCK ROOT WAD -\ 18" MIN. OVERHANG' mw FOOTER LOGS _/ BANKFULL ClQ:ii►yl 11►s SECTION A -A LIMITS OF PAYMENT I 2 LIVE STAKES EXCAVATION LIMITS WOVEN GEOTEXTILE FABRIC (TYPE III) WOOD EXTENDS INTO THE BANK 4' TO 6' MINIMUM. CONTROL POINT - POINT OF CURVATURE (PC) ROOT WAD LOGS (6"-10" DIA. & 6'-8' LONG) _ FOOTER LOGS SPACED EVERY 4'-6' (12"-18" DIA. MIN.) FLOW POOL RIPARIAN PLANTINGS AND LIVE STAKES PLAN VIEW A CONTROL POINT F-POINT OF TANGENCY (PT) A Z i - FOOTER WOOD BANKFULL PLACE MULCH INSIDI BLANKET WRAP 7nncr/M 2 COIR BLANKET WOOD STAKES -OR ANCHORING REINFORCED EARTH G EO-LIFTS (AS DIRECTED BY THE ENGINEER) 2" x 4" x 18" WOODEN STAKE WOOD STAKE NOTE: STAKES MAY BE MADE BY SAWING A 2" x 4" DIAGONALLY IN HALF. WOOD TOE WITH GEO-LIFTS NOTES OA WOOD AND BOULDER TOE WITH GEO-LIFTS AND LIVE BRUSH LAYERING ARE BANK STABILIZATION MEASURES THAT PROTECT THE STREAM BANK ALONG OUTSIDE MEANDER BENDS FROM EROSION AND ENHANCE THE ESTABLISHMENT AND GROWTH OF NATIVE VEGETATION USING LIVE BRANCHES AND CUTTINGS. WOOD TOE ALSO PROVIDES HABITAT FOR INVERTEBRATES AND FISH AND HELPS TO MAINTAIN POOL DEPTH BY CREATING TURBULENT FLOW AND SCOUR ALONG THE STREAM BED. OB WOOD AND BOULDER TOE WITH LIVE BRUSH LAYERING SHOULD BE PLACED AT THE STATIONS, OFFSETS, ELEVATIONS, AND GEOMORPHIC POSITIONS INDICATED ON THE STREAM MITIGATION DATA TABLE IN THE PROJECT PLANS, STREAM MITIGATION PLAN, OR AS DIRECTED BY THE ENGINEER. AT A MINIMUM, THE BANKFULL WIDTH, WOOD AND BOULDER DIMENSIONS AND ELEVATIONS, NUMBER AND DIMENSIONS OF GEO-LIFTS, AND LENGTH AND NUMBER OF LIVE BRUSH AND CUTTINGS SHOULD BE SPECIFIED IN THE STREAM MITIGATION DATA TABLE. OC WOOD TOE SHALL CONSIST OF A MIX OF ROOT WADS, LOGS, BRANCHES, BRUSH, AND OTHER WOODY VEGETATION INSTALLED AT VARIOUS ANGLE, BUT NOT PARALLEL TO THE FLOW. OD A HYDRAULIC EXCAVATOR WITH A HYDRAULIC THUMB SHALL BE USED TO PLACE WOOD AND BOULDERS. OE CONSTRUCT WOOD OR BOULDER TOE, GEO-LIFTS, AND LIVE BRUSH LAYERING BY: (1) SHAPE THE CHANNEL AND FLOODPLAIN TO THE SPECIFIED GRADES AND DIMENSIONS. (2) EXCAVATE THE POOL AND GRADE EXISTING BANK SUBGRADE TO 2:1 (MIN). (3) FOR WOOD TOE, LAYER THE WOOD WITH LARGER MATERIAL ON THE BOTTOM AND A MAT OF BRANCHES AS THE TOP LAYER. IF USED, ANGLE ROOT WADS SLIGHTLY UPSTREAM INTO THE FLOW. FILL GAPS BETWEEN LARGER MATERIAL WITH A MIX OF BRANCHES AND WOODY DEBRIS. THE TOP TYPE III LAYER OF TOE WOOD SHALL BE AT THE ESTABLISHED NORMAL BASE FLOW ELEVATION (I.E., ELEVATION OF THE DOWNSTREAM RIFFLE). PLACE WOVEN GEOTEXTILE FABRIC ON TOP OF WOOD TOE. (4) FOR BOULDER TOE, EXCAVATE BANK TO KEY IN BOULDERS AND PLACE TYPE III WOVEN GEOTEXTILE FABRIC ALONG THE EXCAVATED BANK. PLACE BOULDERS IN OVERLAPPING LAYERS AND IMBRICATE EACH LAYER. BACKFILL AREA BEHIND BOULDER WITH SOIL OR ALLUVIUM AND COMPACT WITH EXCAVATOR BUCKET. (5) CONSTRUCT GEO-LIFTS AND LIVE BRUSH LAYERING ABOVE WOOD OR BOULDER TOE, AS FOLLOWS: (a) FOR EACH LIFT, PLACE BRUSH CUTTINGS PERPENDICULAR TO THE BANK AT A DENSITY OF 10-12 STEMS PER FOOT AND COVER WITH 2" OF SOIL. (b) LAY 7000 COIR BLANKETS OVER THE LIVE CUTTINGS PARALLEL TO THE BANK AND SHINGLED IN A DOWNSTREAM DIRECTION. (c) PLACE SPECIFIED SOIL LIFT OVER THE BACK HALF OF THE COIR BLANKET AND COMPACT WITH THE EXCAVATOR BUCKET. (d) PLACE CLEAN STRAW OR MULCH ALONG THE FACE OF THE SOIL LIFT, WRAP THE LIFT WITH THE FRONT HALF OF THE COIR BLANKET AND STAKE IN PLACE WITH A MINIMUM OF TWO ROWS OF 2" x 4" x 18" WOOD STAKES AT FIVE-FOOT SPACING. (e) REPEAT STEPS (a) THROUGH (d) FOR EACH GEO-LIFT SPECIFIED. (f) PLACE LIVE STAKES OR WOODY PLANTINGS, AS SPECIFIED, ON THE TOP LIFT. OF ALL MATERIALS ARE TO BE APPROVED BY ENGINEER OR ENGINEER'S ONSITE CONSTRUCTION OBSERVER. OG PAYMENT FOR THE WOOD TOE WITH REINFORCED EARTH AND LIVE BRUSH LAYERING SYSTEM SHALL INCLUDE ALL MATERIALS, EQUIPMENT, AND LABOR NECESSARY FOR CONSTRUCTION, AND SHALL BE PAID FOR UNDER THE FOLLOWING ITEM NUMBERS: 209-03.67, STREAM MITIGATION - WOOD TOE W/REINFORCED EARTH, L.F., 209-03.42, STREAM MITIGATION - LIVE BRUSH LAYERING, L.F. OH FOR BOULDER TOE DETAILS SEE STANDARD DRAWING D-NSD-32A. REV. 9-15-17: MODIFIED PAY ITEM DESCRIPTION. MODIFIED THE STREAM MITIGATION PLAN LEGEND SYMBOL. ADDED NOTE HO. MODIFIED WOOD TOE PLAN VIEW. ADDED "GEO-LIFTS" AND AS DIRECTED BY THE ENGINEER: TO THE REINFORCED EARTH DETAIL. MODIFIED DRAWING NAME. MODIFIED PLAN VIEW AND LEGEND. REV. 05-01-20: REDREW SHEET. MATERIAL SHOWN ARE ONLY A GRAPHICAL REPRESENTATION AND DO NOT DEPICT THE ACTUAL DEPTH OR QUANTITY OF MATERIALS TO APPROPRIATELY CONSTRUCT OR STABILIZE THE CHANNEL. STATE OFTENNESSEE STANDARD DRAWING DEPARTMENT OF TRANSPORTATION WOOD TOE WITH NOT TO SCALE WOOD TOE STREAM MITIGATION PLAN LEGEND: WOOD TOE WITH GEO-LIFTS GEO-LIFTS 11-01-2016 I D-NSD-32 SEEDED FILTREXX@ GROSOXXTM (8"-12" TYP.) OR LIVE PLANTED (SEE NOTE 5) LIVE WILLOW STAKES OR OTHER PLANT MATERIAL FROM SEED OR FROM LIVE PLUGS FLW 20 GEOGRID WRAPPED AROUND FILTREXX@ GROSOXXT"^ FASCIA OR OTHER STRENGTH (FLW 35 OR FLW 55) FACE BATTER (MAX 2: 1) 7— BOULDERS (SIZED BY ENGINEER FOR FLOW CONDITION) EXISTING GRADE 12"+OR HIGH FLOW VELOCITY CREEK BED - EXCAVATE BELOW EXPECTED SCOUR LINE FILTREXX BANK TOE ROCKSOXX (LOOSE STONE WRAPPED IN FABRIC) NOTES: 1. ALL MATERIAL TO MEET FILTREXX@ SPECIFICATIONS. 2. GROSOXXTm FILL TO MEET APPLICATION REQUIREMENTS. 3. ALL GROSOXXTm TO BE SEEDED PER LANDSCAPE ARCHITECT'S SPECIFICATIONS. 4. BACKFILL TO BE PLACED PER ENGINEER'S REQUIREMENTS. 5. GEOGRID STRENGTH, LENGTH AND VERTICAL SPACING TO BE DETERMINED BY ENGINEER. GEOGRID — NO STRANDS ARE TO BE CUT DURING PLANTING, ETC. WE RECOMMEND BI—DIRECTIONAL STRENGTH FOR CONSTRUCTION EASE. 6. NATIVE AND DRAINAGE BACKFILL TO BE SEPARATED BY NON —WOVEN FILTER FABRIC. 7. MAXIMUM HEIGHT RECOMMENDED: TEN FEET EXPOSED HEIGHT. 8. FILTREXX@ GROSOXXTm DEPENDS ON APPLICATION (SIZE DEPENDENT ON PROJECT) 9. CUT BANK NO STEEPER THAN 2H:1V. FOR STEEPER EMBANKMENTS, REFER TO GREENLOXX SYSTEM. f I These graphic representations are intended for SCALE: r1L 111CAA CLJUC,AVCK � 1 IKCAM t 1ove X � Preliminary design purposes only and are not NONE BANK STABILIZATION SYSTEM to be used for construction without the U: r A I MA 6 t i T C, H% 0 L 0 L E• signature of a registered professional engineer. REINFORCED WITH RIPRAP TOE SEEDED FILTREXX® GROSOXXTM (8"-12" TYP.) OR LIVE PLANTED (SEE NOTE 5) LIVE WILLOW STAKES OR OTHER PLANT MATERIAL FROM SEED OR FROM LIVE PLUGS ORANGE WITNESS BARRIER OVERLYING FLW 20 GEOGRID WRAPPED AROUND FILTREXX® GROSOXXTm FASCIA OR OTHER STRENGTH 7MHW (FLW 35 OR FLW 55) FACE BATTER (MAX 2:1) F YAP W RIPRAP/BOULDERS illl�l CREEK BED - EXCAVATE BELOW EXPECTED SCOUR LINE FILTREXX BANK TOE ROCKSOXX (LOOSE STONE WRAPPED IN FABRIC) NOTES: 1. ALL MATERIAL TO MEET FILTREXX® SPECIFICATIONS. 2. GROSOXXTm FILL TO MEET APPLICATION REQUIREMENTS. 3. ALL GROSOXXTm TO BE SEEDED PER LANDSCAPE ARCHITECT'S SPECIFICATIONS. 4. BACKFILL TO BE PLACED PER ENGINEER'S REQUIREMENTS. 5. GEOGRID STRENGTH, LENGTH AND VERTICAL SPACING TO BE DETERMINED BY ENGINEER. GEOGRID — NO STRANDS ARE TO BE CUT DURING PLANTING, ETC. WE RECOMMEND BI—DIRECTIONAL STRENGTH FOR CONSTRUCTION EASE. 6. NATIVE AND DRAINAGE BACKFILL TO BE SEPARATED BY NON —WOVEN FILTER FABRIC. 7. MAXIMUM HEIGHT RECOMMENDED: TEN FEET EXPOSED HEIGHT. 8. FILTREXX@ GROSOXXTm DEPENDS ON APPLICATION (SIZE DEPENDENT ON PROJECT) 9. WITNESS BARRIER SHOULD BE OPEN MESH GRID TO PERMIT PLANTING. EXISTING GRADE These graphic representations are intended for SCALE: f I tvexx Preliminary design purposes only and are not NONE FILTREXX EDGESAVER STREAM to be used for construction without the BANK STABILIZATION SYSTEM :U:TAINAB 1:.Cr��.aLflL E• signature of a registered professional engineer. LIVE CUTTINGS, TYPICAL (SEE NOTE 3) APPROXIMATE BASE FLOW WATER SURFACE TOE OF BANK X7 rlDr)QQ QCrl-rinNl PROPOSEDTOP OF BANK TOP OF BANK MATTING ANCHOR (SEE DETAIL, SHEET 2) BACK FILL (SEE NOTE 5) EROSION CONTROL MATTING, TYPICAL (SEE NOTE 4) COARSE BACKFILL (SEE NOTE 2) STREAM BANK TOE PROTECTION, BOULDER TOE PROTECTION SHOWN (SEE NOTE 2) PROPOSED TOP OF BANK MATTING STAKE DEAD STOUT STAKE, TYPICAL (SEE DETAIL, SHEET2) TOP OF ANCHOR (SEE DETAIL, SHEET 2) STREAM BANK TOE PROTECTION, BOULDER TOE PROTECTION SHOWN (SEE NOTE 2) X10 X13 EXISTING TOP OF BANK PLAN VIEW LIVE CUTTINGS, TYPICAL (SEE NOTE 6) (SEE NOTE 3) THIS FIGURE IS ONLY MEANT TO DEFINE THE MINIMUM INFORMATION REQUIRED BY THE CITY OF CHARLOTTE TO BE INCLUDED IN A DETAIL FOR THIS TYPE OF TECHNIQUE. THIS FIGURE IS NOT MEANT TO REPRESENT A STANDARD DESIGN METHOD FOR THIS TYPE OF TECHNIQUE AND SHALL NOT BE USED AS SUCH. NOT TO SCALE Cinrielle-Mecklenburg SHEET NUMBER STORA CHARLOTTE -MECKLENBURG VEGETATED GEOGRID 1 OF WATER STORM WATER SERVICES REV. DATE REV services Mlm� GENERIC DETAIL REQUIREMENTS DRAFT - NOT TO BE USED FOR CONSTRUCTION +`O p ik - p APPROXIMATE BASE FLOW WATER SURFACE X10 )(9 LIVE CUTTINGS (SEE NOTE 3) - BACKFILL (SEE NOTE 5) STREAM BANK TOE PROTECTION, RIPRAP SHOWN (SEE NOTE 2) EROSION CONTROL MATTING, TYPICAL (SEE NOTE 4) MATTING WRAPPED LIFT DETAIL PHOTO: VEGETATED GEOGRID UNDER CONSTRUCTION EXISTING TOP OF BANK 4" EROSION CONTROL UNTREATED X1 MATTING 2" X 4" (NOMINAL) 'I II II BOARD BACKFILL tIX16 (SEE NOTE 5) -//." / X17 DEAD STOUT STAKE �/ TRENCH BACKFILL (SEE DETAIL, THIS SHEET,(SEE NOTE 4) 0" - 1 /2" TOP OF BANK FABRIC ANCHOR DETAIL DEAD STOUT STAKE DETAIL THIS FIGURE IS ONLY MEANT TO DEFINE THE MINIMUM INFORMATION REQUIRED BY THE CITY OF CHARLOTTE TO BE INCLUDED IN A DETAIL FOR THIS TYPE OF TECHNIQUE. THIS FIGURE IS NOT MEANT TO REPRESENT A STANDARD DESIGN METHOD FOR THIS TYPE OF TECHNIQUE AND SHALL NOT BE USED AS SUCH. NOT TO SCALE S1TORK I CHARLOTTE -MECKLENBURG WATER ISTORM WATER SERVICES services gsm GENERIC DETAIL REQUIREMENTS VEGETATED GEOGRID DRAFT - NOT TO BE USED FOR CONSTRUCTION 2OF3 DIMENSIONS (VALUES TO BE PROVIDED BY DESIGNER) VARIABLE VALUES TYPICAL UNIT DESCRIPTION X1 IN. OR FT. VEGETATED GEOGRID PLACEMENT FROM TOP OF BANK X2 FT. VEGETATED GEOGRID HEIGHT X3 IN. OR FT. TOE PROTECTION HEIGHT X4 IN. OR FT. VEGETATED GEOGRID RELATIONSHIP TO APPROXIMATE BASE FLOW WATER LEVEL X5 IN. OR FT. FIRST SOIL LIFT FACE HEIGHT X6 IN. OR FT. SOIL LIFT FACE HEIGHT X7 FT. BASE WIDTH OF STREAM BANK/SLOPE REPAIR X8 IN. OR FT. TOP WIDTH OF STREAM BANK/SLOPE REPAIR X9 IN. OR FT. WIDTH OF LIFTS (MIN. AND MAX. IF APPLICABLE) X10 IN. OR FT. LIVE CUTTING LENGTH X11 IN. LIVE CUTTING DIAMETER (MIN. AND MAX.) X12 IN. OR FT. DEAD STOUT STAKE SPACING - TOP OF ANCHOR X13 IN. OR FT. MATTING STAKE SPACING X14 IN. OR FT. TOP OF BANK ANCHOR TRENCH SETBACK FROM TOP OF BANK X15 IN. OR FT. TOP OF BANK ANCHOR TRENCH WIDTH X16 IN. TOP OF BANK ANCHOR TRENCH DEPTH X17 IN. DEAD STOUT STAKE LENGTH X18 IN. LIVE CUTTING SPACING X19 NONE BANK SLOPE (HORIZONTAL COMPONENT) X20 FT. SLOPE/BANK HEIGHT NOTES: 1. VEGETATED GEOGRID SHALL CONSIST OF LIVE CUTTINGS PLACED BETWEEN SOIL LIFTS WRAPPED WITH EROSION CONTROL MATTING. 2. VEGETATED GEOGRID MAYBE INSTALLED OVER A STREAM BANK TOE PROTECTION MEASURE (E.G. - BOULDER OR RIP RAP TOE PROTECTION, ROOT WADS; ETC.). INFORMATION REGARDING TOE PROTECTION ACTIVITIES SHALL BE ADDED TO THE VEGETATED GEOGRID DETAIL OR DETAILED SEPARATELY AND REFERENCED HEREIN. 3. THE LIVE CUTTINGS USED IN THE VEGETATED GEOGRID SHALL BE SPECIFIED BY THE DESIGNER (SPECIES, LENGTH, DIAMETER) AND SHOWN IN THIS DETAIL IN ATABLE OR ELSEWHERE IN THE PLANS (E.G. -A PLANTING PLAN) AND REFERENCED HEREIN. ADDITIONAL INFORMATION ABOUT LIVE CUTTINGS INCLUDING HARVESTING AND HANDLING INFORMATION SHALL BE DETAILED IN THE SPECIFICATIONS. 4. EROSION CONTROL MATTING SHALL BE OF A TYPE SPECIFIED BY THE DESIGNER. IT SHALL BE USED TO WRAP THE SOIL LIFTS AND ALSO BE PLACED FLAT AND STAKED AGAINST ALL OTHER PREPARED (GRADED, TILLED, SMOOTHED; ETC.) AND SEEDED AND MULCHED SLOPES. ADDITIONAL INFORMATION REGARDING EROSION CONTROL MATTING, SLOPE PREPARATION, AND SEEDING/MULCHING SHALL BE ADDED TO THE VEGETATED GEOGRID DETAIL OR DETAILED SEPARATELY AND REFERENCED HEREIN. 5. THE SOIL PLACED BELOW, WITHIN, AND ABOVE THE LIFTS SHALL BE AMENDED AS SPECIFIED BY THE DESIGNER. ALSO THE DESIGNER SHALL SPECIFY MAXIMUM LIFT HEIGHT AND COMPACTION REQUIREMENTS. INSTALLATION OF VEGETATED GEOGRID SHALL PROGRESS GENERALLY AS FOLLOWS: A. TOE PROTECTION SHALL BE INSTALLED AS SPECIFIED BY THE DESIGNER. B. PLACE LAYER OF EROSION CONTROL MATTING OVER TOE PROTECTION. MATTING SHALL EXTEND OVER THE TOE PROTECTION TO THE FACE OF THE EXISTING SLOPE. A SUFFICIENT AMOUNT OF MATTING SHOULD REMAIN TO WRAP THE FACE OF THE SOIL LIFT AND EXTEND BACK ON TOP OF THE LIFT A MINIMUM DISTANCE SPECIFIED BY THE DESIGNER. C. PLACE FIRST LIFT OF SOIL OVER THE MATTING. THIS LIFT SHALL BE THE SPECIFIED LIFT HEIGHT AT THE "BACK" OF THE LIFT (WHERE IT MEETS THE EXISTING SLOPE FACE). THE LIFT SHALL SLOPE UPWARD TOWARD THE PROPOSED SLOPE FACE TO ACHIEVE THE SPECIFIED SLOPE OF THE PROPOSED STREAM BANK FACE. D. COMPACT SOIL LIFTS AS SPECIFIED BY THE DESIGNER. E. WRAP COMPACTED SOIL LIFT WITH THE REMAINING EROSION CONTROL MATTING. F. PLACE LAYER OF LIVE CUTTINGS ON TOP OF THE LIFT AT THE SPECIFIED SPACING. THE BASAL ENDS OF THE LIVE CUTTINGS SHALL CONTACT THE FACE OF THE EXISTING SLOPE AND SHALL PROJECT NO MORE THAN 6 INCHES FROM THE PROPOSED SLOPE FACE. G. CONSTRUCT REMAINING LIFTS IN SIMILAR FASHION AT THE SPECIFIED HEIGHT(S). H. THE FACE OF THE COMPLETED VEGETATED GEOGRID SHALL MATCH THE PROPOSED BANK SLOPE. 6. THE PLAN VIEW ILLUSTRATES A PERPENDICULAR PERSPECTIVE OF EACH SURFACE DEPICTED IN THE CROSS SECTION. THERE IS NO FORESHORTENING OF THE STREAM BANK (OR ANY OTHER SLOPED SURFACE) IN THE PLAN VIEW. THIS FIGURE IS ONLY MEANT TO DEFINE THE MINIMUM INFORMATION REQUIRED BY THE CITY OF CHARLOTTE TO BE INCLUDED IN A DETAIL FOR THIS TYPE OF TECHNIQUE. THIS FIGURE IS NOT MEANT TO REPRESENT A STANDARD DESIGN METHOD FOR THIS TYPE OF TECHNIQUE AND SHALL NOT BE USED AS SUCH. NOT TO SCALE CHARLOTTE -MECKLENBURG I VEGETATED GEOGRID 1 3 OF 3 WATER I STORM WATER SERVICES I - Services as GENERIC DETAIL REQUIREMENTS DRAFT - NOT TO BE USED FOR CONSTRUCTION Metropolitan Sewerage District of Buncombe County I DWR Project No. 20230477 ��� Response to the Division of Water Resources Request for Additional Information Appendix E Additional Photographs hdrinc.com 440 S. Church Street, Suite 1200; Charlotte, NC 28202 704.338.6700 Metropolitan Sewerage District of Buncombe County I DWR Project No. 20230477 ��� Response to the Division of Water Resources Request for Additional Information Photo 1. Representative photograph of proposed South River Crossing location llllr Photo 2. Representative photograph of proposed North River Crossing location hdrinc.com 440 S. Church Street, Suite 1200; Charlotte, NC 28202 704.338.6700 Metropolitan Sewerage District of Buncombe County I DWR Project No. 20230477 ��� Response to the Division of Water Resources Request for Additional Information Photo 3. Representative photograph of Tributary to French Broad River located downstream of North River Crossing Photo 4. Representative photo of existing riparian buffer near North River Crossing hdrinc.com 440 S. Church Street, Suite 1200; Charlotte, NC 28202 704.338.6700 Appendix F Meeting Minutes from April 277 2023, Site Meeting hdrinc.com 1201 Market Street (423)414-3551 Meeting Minutes Project: MSD - Carrier Bridge Pump Station Replacement Project Subject: Onsite Meeting with Environmental Regulators Date: Tuesday, May 16, 2023 Location: Carrier Park and French Broad River Parks — Asheville, North Carolina Attendees: Andrew Moore — NC Department of Darin Prosser — Metropolitan Sewerage Environmental Quality (NCDEQ) District of Buncombe County (MSD) Andrea Leslie — NC Wildlife Resources Crystal Allgood — HDR Commission (NCWRC) Eric Mularski — HDR On behalf of the Metropolitan Sewerage District of Buncombe County (MSD), HDR submitted the Section 404/401 Pre -Construction Notification for Carrier Bridge Pump Station Replacement Project (Project) electronically on March 29, 2023. After reviewing the application, Andrew Moore (NCDEQ) requested an onsite meeting to discuss the temporary bank stabilizations measures and proposed tree clearing at the proposed crossing locations. This document provides a summary of the items discussed during the onsite Project site visit conducted on April 27, 2023.. • NCDEQ inquired about what the hydrologic -hydraulic model (HEC-RAS model) uses to equate the stream flood levels, significant rain events, and potential erosion/scouring effects. NCDEQ was curious on what were the baseline studies used to develop the algorithms for the model program and if they are equivalent to the conditions present for the French Broad River Stream System. HDR is looking into this further and will address this inquiry with the formal response to NCDEQs request for additional information. • NCDEQ communicated that based on knowledge of the area, established bank vegetation would likely survive a storm event even with the cofferdam structures in place and expressed that removing the existing bank vegetation to replace with protective gabion riprap slope protection measures would result in more damage to the bank through the construction of implementing those measures, the scouring/washing away of the rip rap, and the overall aesthetics along the bank over the long term rather than trying to re-establish the existing old growth riparian vegetation. Mature woody vegetation documented onsite included boxelders, red maples, sycamores, and river birch. • NCDENR and NCWRC both expressed the preference to leave the existing bank vegetation in place (i.e., no bank slope protection measures beyond the immediate crossing area), minimize the crossing impacts along the banks, and remediate any affects to the banks afterwards should a storm come during the period of construction and impose a negative effect (i.e., scour, erosion) on the riverbanks. Also, feel like 600ft at the south crossing for bank slope protection measures is too much. • NCDEQ and NCDWR both expressed that the removal of the riparian buffer and installation of the temporary cofferdams may impact the stream temperature. • NCWRC recommend minimizing impacts to riparian areas as a conservation measure to preserve foraging habitat for gray bats. • It was discussed that the proposed height of the cofferdam structures was design to overtop at a 2-year storm event and therefore mitigate bank erosion in constricted areas with higher velocities. • NCWRC expressed they are okay to leave the cofferdam options open for the contractor to decide which option would be the best to use based on the data available and experience working in the area/stream system. • NCDEW and NCWRC requested additional details for the post -construction permanent bank stabilization/restorations efforts. NCWRC discussed installing geolifts as a post -construction permanent bank stabilization option and recommended reaching out Andrew Bick at Headwaters Engineering to discuss a project on the Biltmore property. Project link: French Broad River Bank Stabilization Completed (https://headwaters-eng.com/2020/06/11/french-broad-river-bank- stabilization-completed/) • NCDEQ and NCWRC indicated that quantitative assessments would be required to monitor planted riparian vegetation post construction. • NCWRC requests a copy of the mussel survey report. (Attached to these meeting minutes and included in the PCN submittal Package in Attachment 10 — Biological Assessment, Appendix C — Resource Reports) • A tributary to the French Broad River was identified immediately downstream of the North River Crossing (i.e., the force main crossing). This feature was located outside of the original survey area and not previously identified on the plans. HDR will evaluate if the proposed North Crossing cofferdam will impede discharge flows and establish measures to protect the tributary from adjacent construction activities. (KMZ file with georeferenced photos of this feature is attached to these meeting minutes) Several items were discussed in the field that were included in the Formal Request for Additional Information received from NCDEQ via email on 5/3/2023 including: • A figure that depicts the future extension of the 60-inch diameter gravity sewer interceptor pipe from the South River Crossing and extending upgradient/south. • Clarify if the rockfill cofferdam is still being considered for the project or if the sheet pile cofferdam is the preferred option. • Sheet piles will require drilling into bedrock along the riverbed. Provide detail on how the river flow does not come in to contact with the disturbed area and/or how the river will be protected from turbidity during the drilling process. • Sheet piles and brace box will likely require grout to seal the sheet piles from seepage. Provide a detailed plan on how the grouting will be contained to prevent contact with the river flow as cement contains lime and contact with water can affect pH and have detrimental effects on aquatic life. HDR will respond to NCDEQ's Formal Request for Additional Information by 6/2/2023. Attachments: Three Oaks Freshwater Mussel Survey Report for the Proposed Carrier Bridge Pump Station MSD Carrier Bridge Road Pump Station Project Google Earth KMZ File with Geo-Referenced Photographs