Loading...
HomeMy WebLinkAboutSW8070323_Historical File_20070328Michael F. Easley, Governor William G. Ross Jr., Secretary North Carolina Department of Environment and Natural Resources Alan W. Klimek, P.E. Director Division of Water Quality March 28. 2007 Robert D. Shipp, Jr., Carteret County ABC 410 Live Oak Street Beaufort, NC 28516 Supervisor/General Manager Board Subject: Stormwater Permit No. SW8 070323 ABC Store — Town of Beaurfort High Density Project Carteret County Dear Mr. Shipp: The Wilmington Regional Office received a complete Stormwater Management Permit Application for ABC Store -Town of Beaurfort on March 27, 2007. Staff review of the plans and specifications has determined that the project, as proposed, will comply with the Stormwater Regulations set forth in Title 15A NCAC 2H.1000. We are forwarding Permit No. SW8 070323 dated March 28, 2007, for the construction of the subject project. This permit shall be effective from the date of issuance until March 28, 2017, and shall be subject to the conditions and limitations as specified therein. Please pay special attention to the Operation and Maintenance requirements in this permit. Failure to establish an adequate system for operation and maintenance of the stormwater management system will result in future compliance problems. If any parts, requirements, or limitations contained in this permit are unacceptable, you have the right to request an adjudicatory hearing upon written request within thirty (30) days following receipt of this permit. This request must be in the form of a written petition, conforming to Chapter 150B of the North Carolina General Statutes, and filed with the Office of Administrative Hearings, P.O. Drawer 27447, Raleigh, NC 27611-7447. Unless such demands are made this permit shall be final and binding. If you have any questions, or need additional information concerning this matter, please contact Chris Baker, or me at (910) 796-7215. Sinc1y, Edward Beck Regional Supervisor Surface Water Protection Section ENB/csb: S:IWQSISTORMWATIPERMIT1070323.mar07 cc: Peter W. Sokalski, P.E., Appian Consulting Engineers, PA Carteret County Building Inspections Division of Coastal Management Chris Baker Wilmington Regional Office Central Files one rCarol' a r North Carolina Division of Water Quality 1617 Mail Service Center Raleigh, NC 27699-1617 Phone (919) 733-7015 Customer Service Internet: www.newa=uality.org Location: N. 512 Salisbury St. Raleigh, NC 27604 Fax (919) 733-2496 1-877-623-6748 An Equal OpportunitylAffirmative Action Employer-50% Recycledl110% Post Consumer Paper State Stormwater Management Systems Permit No. SW8 070323 STATE OF NORTH CAROLINA DEPARTMENT OF ENVIRONMENT AND NATURAL RESOURCES DIVISION OF WATER QUALITY STATE STORMWATER MANAGEMENT PERMIT HIGH DENSITY DEVELOPMENT In accordance with the provisions of Article 21 of Chapter 143, General Statutes of North Carolina as amended, and other applicable Laws, Rules, and Regulations PERMISSION IS HEREBY GRANTED TO Robert D. Shipp and Carteret County ABC Board ABC Store — Town of Beaufort 1791 Live Oak Street, Carteret County FOR THE construction, operation and maintenance of an infiltration basin in compliance with the provisions of 15A NCAC 2H .1000 (hereafter referred to as the "stormwater rules') and the approved stormwater management plans and specifications and other supporting data as attached and on file with and approved by the Division of Water Quality and considered a part of this permit. This permit shall be effective from the date of issuance until March 28, 2017, and shall be subject to the following specified conditions and limitations: I. DESIGN STANDARDS 1. This permit is effective only with respect to the nature and volume of stormwater described in the application and other supporting data. 2. This stormwater system has been approved for the management of stormwater runoff as described in Section 1.6 on page 3 of this permit. The stormwater control has been designed to handle the runoff from 88,863 square feet of impervious area. 3. The tract will be limited to the amount of built -upon area indicated on page 3 of this permit, and per approved plans. The built -upon area for the future development is limited to 57,935 square feet. 4. All stormwater collection and treatment systems must be located in either dedicated common areas or recorded easements. The final plats for the project will be recorded showing all such required easements, in accordance with the approved plans. 5. The runoff from all built -upon area within the permitted drainage area of this project must be directed into the permitted stormwater control system. Page 2 of 7 State Stormwater Management Systems Permit No. SW8 070323 6. The following design criteria have been provided in the infiltration basin and must be maintained at design condition: a. Drainage Area, acres: 3.71 Onsite, ft2: 161,608 Offsite, ft2: None b. Total Impervious Surfaces, ft2: 88,863 C. Design Storm, inches: 1.5 d. Basin Depth, feet: 1 e. Bottom Elevation, FMSL: 10.1 f. Bottom Surface Area, ft2: 11,375 g. Bypass Weir Elevation, FMSL: ** h. Permitted Storage Volume, ft3: 11,375 i. Type of Soil: Sandy Loam j. Expected Infiltration Rate, in/hr: 0.62 k. Seasonal High Water Table, FMSL: 8.1 I. Time to Draw Down, hours: 7.2 M. Receiving Stream/River Basin: UT to Turner Creek / White Oak n. Stream Index Number: 21-35-1-11-1 o. Classification of Water Body: "SA;HQW" ** Stormwater runoff is collected in two detention basins then pumped to the infiltration basin. Each detention basin has a spillway properly designed to overflow after collecting the required 1.5" storm event. II. SCHEDULE OF COMPLIANCE 1. The stormwater management system shall be constructed in its entirety, vegetated and operational for its intended use prior to the construction of any built -upon surface. 2. During construction, erosion shall be kept to a minimum and any eroded areas of the system will be repaired immediately. 3. The permittee shall at all times provide the operation and maintenance necessary to assure the permitted stormwater system functions at optimum efficiency. The approved Operation and Maintenance Plan must be followed in its entirety and maintenance must occur at the scheduled intervals including, but not limited to: a. Semiannual scheduled inspections (every 6 months). b. Sediment removal. C. Mowing and revegetation of slopes and the vegetated filter. d. immediate repair of eroded areas. e. Maintenance of all slopes in accordance with approved plans and specifications. Page 3 of 7 State Stormwater Management Systems Permit No. SW8 070323 f. Debris removal and unclogging of bypass structure, infiltration media, flow spreader, catch basins, piping and vegetated filter. g. A clear access path to the bypass structure must be available at all times. 4. Records of maintenance activities must be kept and made available upon request to authorized personnel of DWQ. The records will indicate the date, activity, name of person performing the work and what actions were taken. 5. The facilities shall be constructed as shown on the approved plans. This permit shall become voidable unless the facilities are constructed in accordance with the conditions of this permit, the approved plans and specifications, and other supporting data. 6. Upon completion of construction, prior to issuance of a Certificate of Occupancy, and prior to operation of this permitted facility, a certification must be received from an appropriate designer for the system installed certifying that the permitted facility has been installed in accordance with this permit, the approved plans and specifications, and other supporting documentation. Any deviations from the approved plans and specifications must be noted on the Certification. A modification may be required for those deviations. 7. If the stormwater system was used as an Erosion Control device, it must be restored to design condition prior to operation as a stormwater treatment device, and prior to occupancy of the facility. 8. Access to the stormwater facilities shall be maintained via appropriate easements at all times. 9. The permittee shall submit to the Director and shall have received approval for revised plans, specifications, and calculations prior to construction, for any modification to the approved plans, including, but not limited to, those listed below: a. Any revision to any item shown on the approved plans, including the stormwater management measures, built -upon area, details, etc. b. Project name change. C. Transfer of ownership. d. Redesign or addition to the approved amount of built -upon area or to the drainage area. e. Further subdivision, acquisition, lease or sale of all or part of the project area. The project area is defined as all property owned by the permittee, for which Sedimentation and Erosion Control Plan approval or a CAMA Major permit was sought. f. Filling in, altering, or piping of any vegetative conveyance shown on the approved plan. 10. The permittee shall submit final site layout and grading plans for any permitted future areas shown on the approved plans, prior to construction. 11. A copy of the approved plans and specifications shall be maintained on file by the Permittee for a minimum of ten years from the date of the completion of construction. 12. The Director may notify the permittee when the permitted site does not meet one or more of the minimum requirements of the permit. Within the time frame specified in the notice, the permittee shall submit a written time schedule to the Director for modifying the site to meet minimum requirements. The permittee shall provide copies of revised plans and certification in writing to the Director that the changes have been made. Page 4 of 7 State Stormwater Management Systems Permit No. SW8 070323 III. GENERAL CONDITIONS This permit is not transferable except after notice to and approval by the Director. In the event of a change of ownership, or a name change, the permittee must submit a formal permit transfer request to the Division of Water Quality, accompanied by a completed name/ownership change form, documentation from the parties involved, and other supporting materials as may be appropriate. The approval of this request will be considered on its merits and may or may not be approved. The permittee is responsible for compliance with all permit conditions until such time as the Division approves the transfer request. 2. Failure to abide by the conditions and limitations contained in this permit may subject the Permittee to enforcement action by the Division of Water Quality, in accordance with North Carolina General Statute 143-215.6A to 143-215.6C. 3. The issuance of this permit does not preclude the Permittee from complying with any and all statutes, rules, regulations, or ordinances, which may be imposed by other government agencies (local, state, and federal) having jurisdiction. 4. In the event that the facilities fail to perform satisfactorily, including the creation of nuisance conditions, the Permittee shall take immediate corrective action, including those as may be required by this Division, such as the construction of additional or replacement stormwater management systems. 5. The permittee grants DENR Staff permission to enter the property during normal business hours for the purpose of inspecting all components of the permitted stormwater management facility. 6. The permit may be modified, revoked and reissued or terminated for cause. The filing of a request for a permit modification, revocation and reissuance or termination does not stay any permit condition. 7. Unless specified elsewhere, permanent seeding requirements for the stormwater control must follow the guidelines established in the North Carolina Erosion and Sediment Control Planning and Design Manual. 8. Approved plans and specifications for this project are incorporated by reference and are enforceable parts of the permit. 9. The permittee shall notify the Division any name, ownership or mailing address changes within 30 days. Permit issued this t 28th day of March, 2007. NORT C OLINA VI ONMENTAL MANAGEMENT COMMISSION for Alan W. Klimek, P.E., Director Division of Water Quality By Authority of the Environmental Management Commission Page 5 of 7 State Stormwater Management Systems Permit No. SW8 070323 ABC Store — Town of Beaufort Stormwater Permit No. SW8 070323 Carteret County Designer's Certification I, , as a duly registered in the State of North Carolina, having been authorized to observe (periodically/ weekly/ full time) the construction of the project, (Project) for (Project Owner) hereby state that, to the best of my abilities, due care and diligence was used in the observation of the project construction such that the construction was observed to be built within substantial compliance and intent of the approved plans and specifications. The checklist of items on page 2 of this form is included in the Certification. Noted deviations from approved plans and specification: Signature Registration Number Date SEAL Page 6 of 7 State Stormwater Management Systems Permit No. SW8 070323 Certification Requirements: 1. The drainage area to the system contains approximately the permitted acreage. 2. The drainage area to the system contains no more than the permitted amount of built -upon area. 3. All the built -upon area associated with the project is graded such that the runoff drains to the system. 4. All roof drains are located such that the runoff is directed into the system. 5. The bypass structure weir elevation is per the approved plan. 6. The bypass structure is located per the approved plans. 7. A Trash Rack is provided on the bypass structure. 8. All slopes are grassed with permanent vegetation. 9. Vegetated slopes are no steeper than 3:1. 10. The inlets are located per the approved plans and do not cause short- circuiting of the system. 11. The permitted amounts of surface area and/or volume have been provided. 12. All required design depths are provided. 13. All required parts of the system are provided. 14. The required system dimensions are provided per the approved plans. cc: NCDENR-DWQ Regional Office Carteret County Building Inspections Page 7 of 7 OFFICE USE ONLY Date Received Fee Paid Permit Number 'S ! %-7 /O 7 44co0 I Sw 07 0 3 X State of North Carolina Department of Environment and Natural Resources Division of Water Quality STORMWATER MANAGEMENT PERMIT APPLICATION FORM This form may be photocopied for use as an original I. GENERAL INFORMATION 1. Applicants name (specify the name of the corporation, individual, etc. who owns the project): Carteret County ABC Board 2. Print Owner/Signing Official's name and title (person legally responsible for facility and compliance): Robert D. Shipp, Jr., Supervisor/General Manager 3. Mailing Address for person listed in item 2 above: 410 Live Oak Street City: Beaufort State: NC Zip: 28516 Telephone Number: (252 ) 782-4269 4. Project Name (subdivision, facility, or establishment name - should be consistent with project name on plans, specifications, letters, operation and maintenance agreements, etc.): ABC Store - Town of Beaufort 5. Location of Project. (street address): 1791 Live Oak Street City: Beaufort County: Carteret 6. Directions to project (from nearest major intersection): Approximately 1 mile north along US Hwy. 70 from the intersection of NC 101 and US Hwy. 70 (Live Oak Street) 7. Latitude: 34.73423 Longitude:-76.64059 of project 8. Contact person who can answer questions about the project: Name: Peter W. Sokalski, PE Telephone Number: ( 252 ) 972-7703 II. PERMIT INFORMATION: 1. Specify whether project is (check one): X New Form SWU-101 Version 3.99 Page I of 4 Renewal Modification 2. If this application is being submitted as the result of a renewal or modification to an existing permit, list the existing permit number and its issue date (if known) 3. Specify the type of project (check one): Low Density X High Density Redevelop General Permit Other 4. Additional Project Requirements (check applicable blanks): _CAMA Major K Sedimentation/Erosion Control 404/401 Permit X NPDES Stormwater Information on required state permits can be obtained by contacting the Customer Service Center at 1-877-623-6748. in. PROJECT INFORMATION 1. In the space provided below, summarize how stormwater will be treated. Also attach a detailed narrative (one to two pages) describing stormwater management for the project. Stormwater will be treated utilizing infiltration basin located at the rear of the property. See attached narrative for additional explanation. 2. Stormwater runoff from this project drains to the White Oak 3. Total Project Area: 8.32 River basin. acres 4. Project Built Upon Area: 8.53 (24.52% Fut.) % 5. How many drainage areas does the project have? 1 6. Complete the following information for each drainage area. If there are more than two drainage areas in the project, attach an additional sheet with the information for each area provided in the same format as below. Basin Information Drainage Area 1 Drainage Area 2 Receiving Stream Name Unnamed Tributary of Turner Creek Unnamed Tributary of Turner Creek Receiving Stream Class SA; HQW SA; HQW Drainage Area 0.82 Ac 2.89 Existing Impervious* Area 0.066 Ac (Removed) 0 Proposed Impervious*Area 0.71 Ac 1.33 Ac (Future) % Impervious* Area (total) 86.59% 46.02% (Future) Impervious* Surface Area Drainage Area 1 Drainage Area 2 On -site Buildings 6,992 sf (0.16 Ac) 17,000 sf (0.39 Ac) On -site Streets On -site Parking 22,759 sf (0.52 Ac) 39,011 sf (0.90 Ac) On -site Sidewalks 1,177 sf (0.03 Ac) 1,924 sf (0.04 Ac) Other on -site Off -site Total: 30,928 sf (0.71 Ac) Total: 57,935 sf (1.33 Ac) Impervious area is defined as the built upon area including, but not limited to, buildings, roads, parking areas, sidewalks, gravel areas, etc. Form SWU-101 Version 3.99 Page 2 of 4 7. How was the off -site impervious area listed above derived? N/A IV. DEED RESTRICTIONS AND PROTECTIVE COVENANTS The following italicized deed restrictions and protective covenants are required to be recorded for all subdivisions, outparcels and future development prior to the sale of any lot. If lot sizes vary significantly, a table listing each lot number, size and the allowable built -upon area for each lot must be provided as an attachment. 1. The following covenants are intended to ensure ongoing compliance with state stormwater management permit number as issued by the Division of Water Quality. These covenants may not be changed or deleted without the consent of the State. 2. No more than square feet of any lot shall be covered by structures or impervious materials. Impervious materials include asphalt, gravel, concrete, brick, stone, slate or similar material but do not include wood decking or the water surface of swimming pools. 3. Swales shall not be filled in, piped, or altered except as necessary to provide driveway crossings. 4. Built -upon area in excess of the permitted amount requires a state stormwater management permit modification prior to construction. 5. All permitted runoff from outparcels or future development shall be directed into the permitted stormwater control system. These connections to the stormwater control system shall be performed in a manner that maintains the integrity and performance of the system as permitted. By your signature below, you certify that the recorded deed restrictions and protective covenants for this project shall include all the applicable items required above, that the covenants will be binding on all parties and persons claiming under them, that they will run with the land, that the required covenants cannot be changed or deleted without concurrence from the State, and that they will be recorded prior to the sale of any lot. V. SUPPLEMENT FORMS The applicable state stormwater management permit supplement form(s) listed below must be submitted for each BMP specified for this project. Contact the Stormwater and General Permits Unit at (919) 733-5083 for the status and availability of these forms. Form SWU-102 Wet Detention Basin Supplement Form SWU-103 Infiltration Basin Supplement Form SWU-104 Low Density Supplement Form SWU-105 Curb Outlet System Supplement Form SWU-106 Off -Site System Supplement Form SWU-107 Underground Infiltration Trench Supplement Form SWU-108 Neuse River Basin Supplement Form SWU-109 Innovative Best Management Practice Supplement Form SWU-101 Version 3.99 Page 3 of 4 VI. SUBMITTAL REQUIREMENTS Only complete application packages will be accepted and reviewed by the Division of Water Quality (DWQ). A complete package includes all of the items listed below. The complete application package should be submitted to the appropriate DWQ Regional Office. 1. Please indicate that you have provided the following required information by initialing in the space provided next to each item. Initials • Original and one copy of the Stormwater Management Permit Application Form PW s • One copy of the applicable Supplement Form(s) for each BMP PW S • Permit application processing fee of $420 (payable to NCDENR) PW S • Detailed narrative description of stormwater treatment/management PW S • Two copies of plans and specifications, including: PW S - Development/Project name - Engineer and firm -Legend - North arrow - Scale - Revision number & date - Mean high water line - Dimensioned property/project boundary - Location map with named streets or NCSR numbers Original contours, proposed contours, spot elevations, finished floor elevations Details of roads, drainage features, collection systems, and stormwater control measures Wetlands delineated, or a note on plans that none exist Existing drainage (including off -site), drainage easements, pipe sizes, runoff calculations - Drainage areas delineated - Vegetated buffers (where required) VII. AGENT AUTHORIZATION If you wish to designate authority to another individual or firm so that they may provide information on your behalf, please complete this section. Designated agent (individual or firm): Appian Consulting Engineers, PA Mailing Address: P.O. Box 7966 City: Rocky Mount State: NC Zip: 27803 Phone: ( 252 ) 972-7703 Fax: ( 252 )972-7638 VIII. APPLICANT'S CERTIFICATION I, (print or type name of person listed in General Information, item 2) Robert D. Shipp, Jr., Supervisor/General Manager certify that the information included on this permit application form is, to the best of my knowledge, correct and that the project will be constructed in conformance with the approved plans, that the required deed restrictions and protective covenants will be recorded, and that the proposed project complies with the requirements of 15A NCAC 2H .1000. Signature: io oal Date: 3'-aa- amri Form SWU-101 Version 3.99 Page 4 of 4 IfGM MM "PiAwill CONSULTING ENGINEERS, PA CIVIL, MUNICIPAL 3 STRUCTURAL ENGINEERS R tl1e NE ENYVI ONMENTAL SERVICES 841 S. Wesleyan Boulevard P.O. Box 7966 Rocky Mount, North Carolina 27803 elephone (252) 972-7703 Fax (252) 972-7638 e-mail: admin0aDpianenQineers_com Web: AppianEngineers.com LETTER OF TRANSMITTAL DATE: March 26, 2007 I APPIAN JOB NO.: 06-083 t" PROJECT: Mr. Chris Baker NCDENR - Stormwater Program 127 Cardinal Drive Extension Wilmington. NC 28405 ABC Store - Beaufort GENTLEMEN: We are sending you ® herewith ❑ under separate cover: SUBMITTAL FOR- CODE FOR APPROVAL 1 FOR YOUR USE 2 AS REQUESTED 3 BID TAB DISTRIBUTION 4 ❑ APPROVED PERMITS 5 ❑ ACTION CODE APPROVED A ❑ APPROVED AS NOTED B ❑ NOT APPROVED c ❑ REVISE AND RESUBMIT D ❑ PLEASE SIGN AND RETURN E ❑ PRINT COPIES DRAWING NUMBER (REVISION NO. OR DATE) DESCRIPTION CODE 1 Modified Permit Sheet 2 of 4 1 Appian Check #16043 $4000 express permiting fee 2 Sets of modified plans (Sheets CE-3 & 4) Kr R 2 7 �007 REMARKS. - Mr. Baker, Attached are the modified Information as requested. Thank you! Sentby: First Class Mail ❑ UPS Next Day I AM 10 UPS Next 2nd Day ❑ Federal Express ❑ Faxed ❑ Hand Delivered Pick Up ❑ cc: File ff enclosures received are not as listed above, ldndiynod& at once. Thank vou. 3.14 [i=`7 Received By Date r IF LETTER OF TRANSMITTAL ` - o o - M! . DATE: APPIAN JOB NO. an 6/21/2007 CONSULTING ENGINEERS, PA TO: CML, MUNICIPAL & STRUCTURAL ENGINEERS COMPREHENSIVE ENVIRONMENTAL SERVICES inward Beak 841 S. Wesleyan Boulevard Division of Water Quality P.O. Box 7966 Rocky Mount, North Carolina 27603 Telephone (252) 972 7703 Fax (262) 972-76311 PROJECT: e-mail: admin@appianengineem.c:om ABC Store - Town of Beaufort Web. ApphmEnl ineers.com GENTLEMEN: We are sending you (X) herewith ( ) under separate cover: SUBMIT VAL FM- CODE FOR APPROVAL 1 FOR YOUR INFORMATION 2 AS REQUESTED 3 BID TAB DISTWBUTION 4 APPROVED PERMITS 5 REVIEW AND COMMENT 6 PLEASE SXW AND RETURN 7 PLEASE SUBMIT A PRICE 6 X ACTION CODE APPROVED A AS NOTED B APPROVED C PmE AND RESUBMIT D PLEASE SIGN AND RETURN E MODIFIED AS REQUESTED, RETU F FLLL oUT AND RETURN G 06-00 IRA PRINTS I COPIES DRAWING NUMBER (REVISION NO. OR DATE) DESCRIPTION CODE 1 Original Designer's Cerd reste WSW 3 Remarks: TnanK you. First Class Mail X UPS Next Day I AM UPS Next 2nd Day Federal Express Faxed Hand Delivered Picked Up cc: File Bob Shipp - ABC Board Jimmy Mercer - Eddie Cameron Construction server .acestandard brms.officeforms leWroltransmit aLdoc lf�" received are not as fisted above, kindly nodfy at once. 7hWA �4 BY= Dame. June 21, 2007 Recipients Signature: Date: Environmental Consultants, Job # 10653.51 Appian Consulting Engineers 841 South Weslyn Blvd. Rocky Mount, NC 27803 Re: Detailed Soils Evaluation for Stormwater Infiltration Basin at Proposed ABC Store, Hwy 70, Beaufort, NC. & NCDWQ Site Meeting Results. Dear Appian Corsulting: Soil & Environmental Consultants, PA (S&EC) performed a detailed soils evaluation at the proposed ABC Store Site, looted on Hwy 70 in Beaufort, Carteret County, NC. You provided a map showing the location of the proposed infiltration pond and where soil borings should be performed by S&EC, PA. At the indicated locations the following were performed: 4 profile descriptions to seven feet (or as deep as possible with hand augers), apparent water table measut esnenls, and estimation of pearnesbility, hydraulic conductivity, and seasonal high water table. The purpose of this evaluation was to provide you with additional information for designing stormwater infiltration basins. The following is a brief report of the methods utilized in this evaluation and the results obtained. A site evaluation was performed by Walter Cole, NCLSS to acquire the information you needed. The evaluation was performed by making hand auger borings to a depth of 7 feet at four locations which were located with a GPS receiver and are shown an the attached map and. identifying and recording the: soil morphological conditions at those four locations in order to develop soil profile descriptions, which are also included with this report and shown on the attached map. The soils varied little over the sites with most borings consisting of a sandy loam surface horizons and sandy clay loam subsurface horizons. The lower portion of the profile consisted of mottled fine loamy sand marine deposits that are saturated. Because all soil horizons had a soil colorof du+oma 2 or less, we were unable to determine the seasonal high water table using soil dm ma color, however, we were able to measure the apparent water table directly. Please note that infiltration systems must be a minimum of two feet above the seasonal high water table. ). The apparent water table ranged from a low of 20 inches to a high of 26 inches. Under current regulations, the bottom of any infiltration systems must be a minimum of two feet above the seasonal high water table, so it would be necessary to bring in fill material to this site. Based on our site meeting with Mr. Vincent Lewis of the NCDWQ, the bottom of the proposed stormwater infiltration basin must be at natural ground. elevation. Charlotte CHIke• chwwboro OBce• 236 LePMp Cm % Suite C 3817E LavAW& Drive Concord, NC 29025 Cmeasboro, NC 27455 %mme: (704) 720-0-40 Phnw. : (336) 5a248234• Fax: (704) 720-9406 Fax: (336) 540-8235 Soil borings 1-4 all had sandy clay loam subsurface horizons that have an estimated hydraulic conductivity of 0.14 —1.4 inches per hour. Although saturated hydraulic aonductmty vaemwernents would be needed to definitively itively slaw OW tbese layers am below the 0.52 inches per hour threshold, we feel that any testing will reveal that this texture will not meet the threshold, and that the excavation of the sandy clay layers and replacement with sand would be necessary. Based on our sibs meeting with Mr. Vincent Lewis of the NCDW% it was agreed that the sandy clay loam (Btg & BCg) soil horizons must be removed from the proposed stormwater infiltration basin, which will result in the excavation of approzimatdy 4 feet of soli from existing natural ground elevation and then the entire area bath -filled with clean sandy soil. In conclusion, it was.sgreed that the bottom of the proposed sbormwater infiltration basin must be at natural ground elevation, the sandy clay loam (Btg & BCg) soil horizons must be removed, the stornmater infiltration basin should be located as close to the existing drainage ditch as possible, and the old berm adjacent to the existing drainage ditch should be breached. Soil &Environmental Consultants, PA is pleased to be of service in this matter and we look forward to assisting in the sncrosfW completion of the project: Please feel free to call with any questions or comments. Sincerely, *-07 Walter Cole NC Licensed Soil Scientist #1267 PONY CALCUIA, T! a e Ap?;An PROJECT:SHEET NO. OF APPIAN CONSULTING ENGINEERS, PA DATE: Ety 841 South Wesleyan Blvd., Rocky Mount, NC 27803 P.O. Box 7966, Rocky Mount, NC 27804 C W i.n 0J2 0O t u.U. — W i in O_ — — — — — — •- — r C O> O r N N r r O! b G! t+ O co N N r M N M 4 Co N 4. O O r Qf Of W r ?. M O CO r O O h O O Cs M C N d? N h r w 4�0 O m r m a o c W -0p M •p m w CL � O �S x= g O i- 3 W m - v v ti GI `• ^ � m w cep v ro m a3+ Q ;W di +' O O C. O O C ti n �• O LL 'O m '40 CO O x h V = •o T- co m0 .9 -9 co � c c m a a a 0 qu } of 1= a o V v w rj uS U) N C• e V N Q Oi g �.. O — •O aoOD m c Ci Gi cC co m co co co co O O O i s C] O c M •y = 71 40 � fA _ _ ?r _ - pC Pi CL w y • O •O O •� O r ol � � � LL m U •O 0 OO 4 m m do. m N C y, � >S co m m�lpe a ®: p• N Oa is H Ai O a in m O r cl 2 M c M x :: to O m O A M CO 60 y Goco ®e di'�id11 WX APPIAN CONSULTING ENGINEERS, PA 841 South Wesleyan Blvd., "Mount, NC 27803 P.O. Box 7966, Rocky Mount, NC 27804 PROJECT: Ate- 51bae - SHEET NO. OF DATE: gy; �SUbcafi Reach qri Li11( Pond 1 Drainage Diagram for Storage Ponds Prepared by Appian Consulting Engineers, PA 3/23/2007 HydroCAD® 8.00 s!n 003967 0 2006 HydroCAD Software Solutions LLC Storage Ponds Prepared by Appian Consulting Engineers, PA Page 2 HydroCAD® 8.00 s/n 003967 ® 2006 HydroCAD Software Solutions LLC 3/23/2007 Area Listing (all nodes) Area (acressi CN Description (subcats) 0.040 86 Newly graded area, HSG B (1 S) 0.540 98 Paved roads w/curbs & sewers (1 S) 0.580 Storage Ponds Prepared by Appian Consulting Engineers, PA HydroCADO 8.00 s!n 003967 ® 2006 HvdroCAD snfh Solutions Type it 24-hr 1.5" Rainfall=1.78" Page 3 Time span=1.00-40.00 hrs, dt=0.05 hrs, 781 points Runoff by SCS TR-20 method, UH=SCS, Split Pervious/imperv. Reach routing by Stor-Ind method - Pond routing by Stor-Ind method Subcatchment 1S: Area 1 Ruoff Area=0.580 ac Runoff Depth=1.50" Flow Length=280' Slope=0.0200'P Tc=4.1 min CN=86/98 Runoff=1.44 cfs 0.072 of Pond 2P: Pond 1 Peak Elev--8.5T Storage=1,330 cf Inflow=1.44 cfs 0.072 of Outfkmr-0.08 cfs 0.072 of Total Runoff Area = 0.580 ac Runoff Volume = 0.072 of Average Runoff Depth =1.50" &90% Pervious Area = 0.040 ac 93.10% Impervious Area = 0.540 ac Storage Ponds Type ff 24-hr 1.5- Rainfall=l * 78" Prepared by Appian Consulting Engineers, PA Page 4 HydroCADS 8.00 s1n 003967 0 2006 HydroCAD Software Solutions LLC 3123/2007 Subcatchment IS: Area 1 Runoff = 1.44 cfs @ 11.94 hrs, Volume= 0.072 af, Depth= 1.50" Runoff by SCS TR-20 method, UH=SCS, Split Pervious/Imperv., Time Span= 1.00-40.00 hrs, dt= 0.05 hrs Type 11 24-hr 1.5" Rainfall=1.78" Area (ac) CN Description 0.540 98 Paved roads w/curbs & sewers 0-040 86 Newly graded area. HSG B 0.580 97 Weighted Average 0.040 86 Pervious Area 0.540 98 Impervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft1ft) (ft/sec) (cfs) 4.1 280 0.0200 1.14 Lag/CN Method, Overland 1 2 3 4 5 6 7 8 9 10 1112 cfs TV unoff 1718 1920 2122: Time (hours) 38 39 40 Storage Ponds Type R 24-hr 1.5" Rainfall=1.78" Prepared by Appian Consulting Engineers, PA Page 5 HydroCAD® 8.00 sln 003967 ® 2006 HydroCAD Software Solutions LLC 3123/2007 Hydrograph for Subcatchment IS: Area 1 Time Precip. Perv.Excess Imp.Excess Runoff (hours) (inches) (inches) (inches) (cfs) 1.00 0.02 0.00 0.00 0.00 1.50 0.03 0.00 0.00 0.00 2.00 0.04 0.00 0.00 0.00 2.50 0.05 0.00 0.00 0.00 3.00 0.06 0.00 0.00 0.00 3.50 0.07 0.00 0.00 0.00 4.00 0.09 0.00 0.01 0.00 4.50 0.10 0.00 0.01 0.01 5.00 0.11 0.00 0.02 0.01 5.50 0.13 0.00 0.03 0.01 6.00 0.14 0.00 0.03 0.01 6.50 0.16 0.00 0.04 0.01 7.00 0.18 0.00 0.05 0.01 7.50 0.19 0.00 0.07 0.01 8.00 0.21 0.00 0.08 0.01 8.50 0.24 0.00 0.09 0.02 9.00 0.26 0.00 0.11 0.02 9.50 0.29 0.00 0.14 0.02 10.00 0.32 0.00 0.16 0.03 10.50 0.36 0.00 0.20 0.04 11.00 0.42 0.00 0.25 0.06 11.50 0.50 0.02 0.32 0.10 12.00 1.18 029 0.97 1.06 12.50 1.31 0.37 1.09 0.10 13.00 1.37 0.41 1.16 0.06 13.50 1.42 0.44 1.20 0.05 14.00 1.46 0.47 1.24 0.04 14.50 1.49 0.49 1.27 0.03 15.00 1.52 0.50 1.30 0.03 15.50 1.54 0.52 1.32 0.03 16.00 1.57 0.54 1.35 0.02 16.50 1.59 0.55 1.37 0.02 17.00 1.61 0.56 1.38 0.02 17.50 1.62 0.58 1.40 0.02 18.00 1.64 0.59 1 A2 0.02 18.50 1.65 0.60 1.43 0.02 19.00 1.67 0.61 1.45 0.02 19.50 1.68 0.62 1.46 0.01 20.00 1.69 0.63 1.47 0.01 20.50 1.71 0.63 1.48 0.01 21.00 1.72 0.64 1.49 0.01 21.50 1.73 0.65 1.51 0.01 22.00 1.74 0.66 1.52 0.01 22.50 1.75 0.66 1.53 0.01 23.00 1.76 0.67 1.54 0.01 23.50 1.77 0.68 1.55 0.01 24.00 1.78 0.69 1.56 0.01 24.50 1.78 0.69 1.56 0.00 25.00 1.78 0.69 1.56 0.00 25.50 1.78 0.69 1.56 0.00 26.00 1.78 0.69 1.56 0.00 26.50 1.78 0.69 1.56 0.00 27.00 1.78 0.69 1.56 0.00 27.50 1.78 0.69 1.56 0.00 Time Precip. Perv.Excess Imp.Excess Runoff (hours) (inches) (inches) (inches) WS) 28.00 1.78 0.69 1.56 0.00 28.50 1.78 0.69 1.56 0.00 29.00 1.78 0.69 1.56 0.00 29.50 1.78 0.69 1.56 0.00 30.00 1.78 0.69 1.56 0.00 30.50 1.78 0.69 1.56 0.00 31.00 1.78 0.69 1.56 0.00 31.50 1.79 0.69 1.56 0.00 32.00 1.78 0.69 1.56 0.00 32.50 1.78 0.69 1.56 0.00 33.00 1.78 0.69 1.56 0.00 33.50 1.78 0.69 1.56 0.00 34.00 1.78 0.69 1.56 0.00 34.50 1.78 0.69 1.56 0.00 35.00 1.78 0.69 1.56 0.00 35.50 1.78 0.69 1.56 0.00 36.00 1.78 0.69 1.56 0.00 36.50 1.78 0.69 1.56 0.00 37.00 1.78 0.69 1.56 0.00 37.50 1.78 0.69 1.56 0.00 38.00 1.78 0.69 1.56 0.00 38.50 1.78 0.69 1.56 0.00 39.00 1.78 0.69 1.56 0.00 39.50 1.78 0.69 1.56 0.00 40.00 1.78 0.69 1.56 0.00 Storage Ponds Prepared by Appian Consulting Engineers, PA HydroCADS 8.00 s/n 003967 0 2006 HydroCAD Softy Solutions LLC Type l/ 24-hr 1.5" Rainfall=1.78" Page 6 Pond 2P: Pond 1 Inflow Area = 0.580 ac, Inflow Depth = 1.50" for 1.5" event Inflow = 1.44 c% @ 11.94 hrs, Volume= 0.072 of Outflow = 0.08 cfs @ 12.66 hrs, Volume= 0.072 af, Men= 94%, Lag= 43.1 min Primary = 0.08 cfs @ 12.66 firs, Volume= 0.072 of Routing by Stor-Ind method, Time Span=1.00-40.00 hrs, dt= 0.05 hrs Peak Elev= 8.57' @ 12.66 hrs Surf.Area= 2,745 sf Storage= 1,330 cf Plug -Flow detention time=127.7 min calculated for 0.072 of (100% of inflow) Center -of -Mass det. time= 127.5 min ( 895.3 - 767.7 ) Volume Invert Avail.Storage Storage Description #1 8.00' 2,635 cf Custom Stage Data (Prismatic) Listed below (Recalc) Elevation SurfArea Inc.Store Cum.Store (feet) (sq-ft) (cubic -feet) (cubic -feet) 8.00 1,890 0 0 9.00 3,380 2,635 2,635 Device Routing Invert Outlet Devices #1 Primary 6.60' 8.0" x 35.0' long Culvert CPP, square edge headwall, Ke= 0.500 Outlet Invert= 6.25' S= 0.0100 T Cc= 0.900 n= 0.013 Corrugated PE, smooth interior #2 Device 1 6.60' 1.5" Verb OrifrcefGrate C= 0.600 #3 Primary 8.70' 30.0' long x 10.0' breadth Broad -Crested Rectangular Weir Head (feet) 0.20 0.40 0.60 0.80 1.00 1.20 1.40 1.60 Coef. (English) 2.49 2.56 2.70 2.69 2.68 2.69 2.67 2.64 Primary OutFlow Max=0.08 cfs @ 12.66 hrs HW=8.57' (Free Discharge) 1=Culvert (Passes 0.08 cfs of 1.96 cfs potential flow) t-2=0rifice/Grate (Orifice Controls 0.08 cfs @ 6.66 fps) 3=13road-Crested Rectangular Weir ( Controls 0.00 cfs) Storage Ponds Type 1124-hr 1.5" Rainfa1F1.78" Prepared by Appian Consulting Engineers, PA Page 7 HydroCAD® 8.00 s!n 003967 0 2006 HydroCAD Software Solutions LLC 3/23/2007 n Inflow p Primary Storage Ponds Type /I 24-hr 1.5" Rainfall=1.78" Prepared by Appian Consulting Engineers, PA Page 8 HydroCAD® 8.00 sln 003967 ® 2006 H droCAD Software Solutions LLC 3/23/2007 Hydrograph for Pond 2P: Pond 1 Time Inflow Storage Elevation Primary (hours) (ds) (cubic -feet) (feet) (cfs) 1.00 0.00 0 8.00 0.00 2.00 0.00 0 8.00 0.00 3.00 0.00 1 8.00 0.00 4.00 0.00 1 8.00 0.00 5.00 0.01 2 8.00 0.01 6.00 0.01 3 8.00 0.01 7.00 0.01 3 8.00 0.01 8.00 0.01 4 8.00 0.01 9.00 0.02 6 8.00 0.02 10.00 0.03 8 8.00 0.03 11.00 0.06 16 8.01 0.06 12.00 1.06 1,053 8.47 0.08 13.00 0.06 1,319 8.67 0.08 14.00 0.04 1,205 8.53 0.08 15.00 0.03 1,039 8.46 0.08 16.00 0.02 854 8.39 0.08 17.00 0.02 657 8.31 0.08 18.00 0.02 458 8.22 0.07 19.00 0.02 257 8.13 0.07 20.00 0.01 56 8.03 0.07 21.00 0.01 4 8.00 0.01 22.00 0.01 3 8.00 0.01 23.00 0.01 3 8.00 0.01 24.00 0.01 3 8.00 0.01 25.00 0.00 0 8.00 0.00 26.00 0.00 0 8.00 0.00 27.00 0.00 0 8.00 0.00 28.00 0.00 0 8.00 0.00 29.00 0.00 0 8.00 0.00 30.00 0.00 0 8.00 0.00 31.00 0.00 0 8.00 0.00 32.00 0.00 0 8.00 0.00 33.00 0.00 0 8.00 0.00 34.00 0.00 0 8.00 0.00 35.00 0.00 0 8.00 0.00 36.00 0.00 0 8.00 0.00 37.00 0.00 0 8.00 0.00 38.00 0.00 0 8.00 0.00 39.00 0.00 0 8.00 0.00 40.00 0.00 0 8.00 0.00 Storage Ponds Prepared by Appian. IHydroCAD® 8.00 9/n 0 Elevation Primary (feet) (cfs) 8.00 0.00 8.01 0.07 8.02 0.07 8.03 0.07 8.04 0.07 8.05 0.07 8.06 0.07 8.07 0.07 8.08 0.07 8.09 0.07 8.10 0.07 8.11 0.07 8.12 0.07 8.13 0.07 8.14 0.07 8.15 0.07 8.16 0.07 8.17 0.07 8.18 0.07 8.19 0.07 8.20 0.07 8.21 0.07 8.22 0.07 8.23 0.07 8.24 0.07 8.25 0.07 8.26 0.07 8.27 U7 8.28 0.08 8.29 0.08 8.30 0.08 8.31 0.08 8.32 0.08 8.33 0.08 8.34 0.08 8.35 0.08 8.36 0.08 8.37 0.08 8.38 0.08 8.39 0.08 8.40 0.08 8.41 0.08 8.42 0.08 8.43 0.08 8.44 0.08 8.45 0.08 8.46 0.08 8.47 0.08 8.48 0.08 8.49 0.08 8.50 0.08 8.51 0.08 8.52 0.08 8.53 0.08 Engineers, PA Solutions LLC Type 1124-hr 1.5" Rainfall1.78" Page 9 Stage -Discharge for Pond 213: Pond 1 Elevation Primary (feet) (Cfs) 8.54 0.08 8.55 0.08 8.56 0.08 8.57 0.08 8.58 0.08 8.59 0.08 8.60 0.08 8.61 0.08 8.62 0.08 8.63 0.08 8.64 0.08 8.65 0.08 8.66 0.08 8.67 0.08 8.68 0.08 8.69 0.08 8.70 0.08 8.71 0.16 8.72 0.30 8.73 0.47 8.74 0.68 8.75 0.92 8.76 1.18 8.77 1.47 8.78 1.78 8.79 2.10 8.80 2.45 8.81 2.81 8.82 3.19 8.83 3.59 8.84 4.00 8.85 4.43 8.86 4.87 8.87 5.32 8.88 5.79 8.89 6.27 8.90 6.77 8.91 7.29 8.92 7.82 8.93 8.36 8.94 8.92 8.95 9.49 8.96 10.08 8.97 10.67 8.98 11.28 8.99 11.90 9.00 12.54 Storage Ponds Type // 24-hr 1.5" Rainfall=1.78" Prepared by Appian Consulting Engineers, PA Page 10 HydroCAD® 8.00 s/n. 003967 ® 2006 HydroCAD Software Solutions LLC 3/23/2007 Stage -Area -Storage for Pond 2P: Pond 1 Elevation Surface Storage (feet) (sq-ft) (cubic -feet) 8.00 1,890 0 8.01 1,905 19 8.02 1,920 38 8.03 1,935 57 8.04 1,950 77 8.05 1,965 96 8.06 1,979 116 8.07 1,994 136 8.08 2,009 156 8.09 2,024 176 8.10 2,039 196 8.11 2,054 217 8.12 2,069 238 8.13 2,084 258 8.14 2,099 279 8.15 2,114 300 8.16 2,128 321 8.17 2,143 343 8.18 2,158 364 8.19 2,173 386 8.20 2,188 408 8.21 2,203 430 8.22 2,218 452 8.23 2,233 474 8.24 2,248 497 8.25 2,263 51.9 8.26 2,277 542 8.27 2,292 565 8.28 2,307 588 8.29 2,322 611 930 2,337 634 8.31 2,352 857 8.32 2,367 681 8.33 2,382 705 8.34 2,397 729 8.35 Z,411 753 8.36 2,426 777 8.37 2,441 801 8.38 2,456 826 8.39 2,471 850 8.40 2,486 875 8.41 2,501 900 8.42 2,516 925 8.43 2,531 950 8.44 2,546 976 8.45 2,560 1,001 8.46 2,575 1,027 8.47 2,590 1,053 8.48 2,605 1,079 8.49 2,620 1,105 8.50 2,635 1,131 8.51 2,650 1,158 8.52 2,665 1,184 8.53 2,680 1,211 Elevation Surface Storage (feet) (sq-ft) (cubio-feet) 8.54 2,695 1,238 8.55 2,710 1,265 8.56 2,724 1,292 8.57 2,739 1,319 8.58 2,754 1,347 8.59 2,769 1,374 8.60 2,784 1,402 8.61 2,799 1,430 8.62 2,814 1,458 8.63 2,829 1,486 8.64 2,844 1,515 8.65 2,859 1,543 8.66 2,873 1,572 8.67 2,888 1,601 8.68 2,903 1,630 8.69 2,918 1,659 8.70 2,933 1,688 8.71 2,948 1,717 8.72 2,963 1,747 8.73 2,978 1,777 8.74 2,993 1,807 8.75 3,008 1,837 8.76 3,022 1,867 8.77 3,037 1,897 8.78 3,052 1,927 8.79 3,.067 1,958 8.80 3,082 1,989 8.81 3,097 2,020 8.82 3,112 2,051 8.83 3,127 2,082 8.84 3,142 2,113 8.85 3,156 2,145 8.86 3,171 2,176 8.87 3,186 2,208 8.88 3,201 2,240 8.89 3,216 2,272 8.90 3,231 2,304 8.91 3,246 2,337 8.92 3,261 2,369 8.93 3,276 2,402 8.94 3,291 2,435 8.95 3,305 2,468 8.96 3,320 2,501 8.97 3,335 2,534 8.98 3,350 2,568 8.99 3,365 2,601 9.00 3,380 2,635 Storage Ponds Type U 24-hr 10-YR Rainfall=6.80" Prepared by Appian Consulting Engineers, PA Page 11 HydroCADO 8.00 s/n 003967 ® 2006 H droCAD Software Solutions LLC 3/23/2007 Time span=1.00-40.00 hrs, dt=0.05 hrs, 781 points Runoff by SCS TR-20 method, UH=SCS, Split Pervious/Imperv. Reach routing by Stor-Ind method - Pond routing by Star -Ind method Subcatchment 1S: Area 1 Runoff Area=0.580 ac Runoff Depth>6.46" Flow Length=280' Slope=0.0200 T Tc=4.1 min CN=86/98 Runoff=5.82 cfs 0.312 of Pond 2P: Pond 1 Peak EIev=8.8T Storage--2,223 cf Inflow=5.82 cfs 0.312 of Outflow=5.54 cfs 0.312 of Total Runoff Area = 0.580 ac Runoff Volume = 0.312 of Average Runoff Depth = 6.46" 6.90% Pervious Area = 0.040 ac 93.10% Impervious Area = 0.540 ac Storage Ponds Prepared by Appian Consulb HydroCADS 8.00 s/n 003967 0: Type I/ 24-hr 10-YR Rainfall=6.80" Engineers, PA Page 12 3 HydroCAD Software Solutions LLC 3/23/2007 Subcatchment IS: Area 1 Runoff = 5.82 cfs @ 11.94 hrs, Volume= 0.312 af, Depth> 6.46" Runoff by SCS TR-20 method, UH=SCS, Split Pervious/Imperv., Time Span=1.00-40.00 hrs, dt= 0.05 hrs Type II 24-hr 10-YR Rainfall=6.80" Area (ac) CN Description 0.540 98 Paved roads w/curbs & sewers 0.040 86 Newly graded area, HSG B 0.580 97 Weighted Average 0.040 86 Pervious Area 0.540 98 Impervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 4.1 280 0.0200 1.14 Lag/CN Method, Overland F 3� b W6 Subcatchment 1S: Area 1 Hydrogmph Time (hours) p Runoff Storage Ponds Prepared by Appian Consulting Engineers, PA HydroCAD® 8.00 s/n 003967 ® 2006 HydroCAD Sofb Solutions LLC Type 1124-hr 10-YR Rainfall=6.80" Page.13 Hydrograph for Subcatchment 1S: Area 1 Time Precip. Perv.Excess Imp.Excess Runoff (hours) (inches) (inches) (inches) (cfs) 1.00 0.07 0.00 0.00 0.01 1.50 0.11 0.00 0.02 0.02 2.00 0.15 0.00 0.04 0.02 2.50 0.19 0.00 0.06 0.03 3.00 0.23 0.00 0.09 0.03 3.50 0.28 0.00 0.13 0.04 4.00 0.33 0.00 0.17 0.04 4.50 0.38 0.00 0.21 0.05 5.00 0.43 0.01 0.25 0.05 5.50 0.48 0.01 0.30 0.06 6.00 0.54 0.03 0.36 0.06 6.50 0.61 0.04 0.42 0.07 7.00 0.67 0.06 0.48 0.07 7.50 0.74 0.09 0.54 0.08 8.00 0.82 0.11 0.61 0.08 8.50 0:90 0.15 0.69 0.10 9.00 1.00 0.20 0.79 0.12 9.50 1.11 0.25 0.90 0.12 10.00 1.23 0.32 1.02 0.15 10.50 1.39 0.42 1.17 0.19 11.00 1.60 0.56 1.38 0.27 11.50 1.92 0.79 1.70 0.44 12.00 4.51 3.01 427 4.25 12.50 5.00 3.47 4.76 0.40 13.00 5.25 3.70 5.01 0.25 13.50 5.43 3.87 5.20 0.19 14.00 5.58 4.01 5.34 0.15 14.50 5.70 4.12 5.46 0.13 15.00 5.80 4.22 5.57 0.12 15.50 5.90 4.31 5.66 0.11 16.00 5.98 4.39 5.75 0.09 16.50 6.06 4A7 5.82 0.09 17.00 6.13 4.53 5.89 0.08 17.50 6.20 4.60 5.96 0.08 18.00 6.26 4.66 6.02 0.07 18.50 6.32 4.72 6.08 0.07 19.00 6.38 4.77 6.14 0.06 19.50 6.43 4.82 6.19 0.06 20.00 6.47 4.86 6.23 0.05 20.50 6.52 4.90 6.28 0.05 21.00 6.56 4.94 6.32 0.05 21.50 6.60 4.98 6.36 0.05 22.00 6.64 5.02 6.40 0.05 22.50 6.68 5.06 6.45 0.05 23.00 6.72 5.10 6..48 0.05 23.50 6.76 5.14 6.52 0.04 24.00 6.80 5.17 6.56 0.04 24.50 6.80 5.17 6.56 0.00 25.00 6.80 5.17 6.56 0.00 25.50 6.80 5.17 6.56 0.00 26.00 6.80 5.17 6.56 0.00 26.50 6.80 5.17 6.56 0.00 27.00 6.80 5.17 6.56 0.00 27.50 6..80 5.17 6.56 0.00 Time Precip. Perv.Excess Imp.Excess Runoff (hours) (inches) (inches) (inches) (cfS) 28.00 6.80 5.17 6.56 0.00 28.50 6.80 5.17 6.56 0.00 29.00 6.80 5.17 6.56 0.00 29.50 6.80 5.17 6.56 0.00 30.00 6.80 5.17 6.56 0.00 30.50 6.80 5.17 6.56 0.00 31.00 6.80 5.17 6.56 0.00 31.50 6.80 5.17 6.56 0.00 32.00 6.80 5.17 6.56 0.00 32.50 6.80 5.17 6.56 0.00 33.00 6.80 5.17 6.56 0.00 33.50 6:80 5.17 6.56 0.00 34.00 6.80 5.17 6.56 0.00 34.50 6.80 5.17 6.56 0.00 35.00 6.80 5.17 6.56 0.00 35.50 6.80 5.17 6.56 0.00 36.00 6.80 5.17 6.56 0.00 36.50 6.80 5.17 6.56 0.00 37.00 6.80 5.17 6.56 0.00 37.50 6.80 5.17 6.56 0.00 38.00 6.80 5.17 6.56 0.00 38.50 6.80 5.17 6.56 0.00 39.00 6.80 5.17 6.56 0.00 39.50 6.80 5.17 6.56 0.00 40.00 6.80 5.17 6.56 0.00 Storage Ponds Type/1 24-hr 10-YR Rainfall=6.80" Prepared by Appian Consulting. Engineers, PA Page 14 HydroCADS 8.00 s/n 003967 ® 2006 HydroCAD Software Solutions LLC 3/23/2007 Pond 2P: Pond 9 Inflow Area = 0.580 ac, Inflow Depth > 6.46" for 10-YR event Inflow = 5.82 cfs @ 11.94 hrs, Volume= 0.312 of Outflow = 5.54 cfs @ 11.96 hrs, Volume= 0.312 af, Atten= 5%, Lag= 0.9 min Primary = 5.54 cfs @ 11.96 his, Volume= 0.312 of Routing by Stor-Ind method, Time Span=1.00-40.00 hrs, dt= 0.05 hrs Peak Elev= 8.87' @ 11.96 hrs Surf.Area= 3,193 sf Storage= 2,223 cf Plug -Flow detention time=100.7 min calculated for 0.312 of (100% of inflow) Center -of -Mass det. time= 100.9 min ( 841.3 - 740.5 ) Volume Invert Avail.Storage Storage Description #1 8.00, 2,635 cf Custom Stage Data (Prismatic) Listed below (Recalc) Elevation Surf.Area Inc.Store Cum.Store (feet) (sq-ft) (cubic -feet) (cubic -feet) 8.00 1,890 0 0 9.00 3,380 2,635 2,635 Device Routing Invert Outlet Devices #1 Prmary 6.60' 8.0" x 35.0' long Culvert CPP, square edge headwall, Ke= 0.500 Outlet Invert-- 6.25' S= 0.0100 T Cc-- 0.900 n= 0.013 Corrugated PE, smooth interior #2 Device 1 6.60' 1.5" Vert Orifice/Grate C= 0.600 #3 Primary 8.7V 30.0' long x 10.0' breadth Broad -Crested Rectangular Weir Head (feet) 0.20 0.40 0.60 0.80 1.00 1.20 1.40 1.60 Coef. (English) 2.49 2.56 2.70 2.69 2.68 2.69 2.67 2.64 Primary OutFow Max=5.45 cfs @ 11.96 hrs HW=8.87' (Free Discharge) 4=Culvert (Passes 0.09 cfs of 2.13 cfs potential flow) t2=OrificelGrate (Orifice Controls 0.09 cfs @ 7.16 fps) 3=Broad-Crested Rectangular Weir (Weir Controls 5.36 cfs @ 1.03 fps) Storage Ponds Prepared by Appian HydroCAD® 8.00 sln 0 w u LL Engineers, PA 3 HydroCAD Software Solutions LLC Pond 2P: Pond 1 Hydrograph Tune (hours) Type 1124-hr 90-YR Rainfall=6.80" Page 15 6 Inflow ® Primary Storage Ponds Type H 24-hr 10-YR RainfalM.80" Prepared by Appian Consulting Engineers, PA Page 16 HydroCAD® 8.00 sln 003967 ® 2006 HydroCAD Software Solutions LLC 3/23/2007 Hydrograph for Pond 2P: Pond 1 Time Inflow Storage Elevation Primary (hours) (cfs) (cubic -feet) (feet) (cfs) 1.00 0.01 1 8.00 0.00 2.00 0.02 7 8.00 0.02 3.00 0.03 9 8.00 0.03 4.00 0.04 12 8.01 0.04 5.00 0.05 14 8.01 0.05 6.00 0.06 17 8.01 0.06 7.00 0.07 20 8.01 0.07 8.00 0.08 44 8.02 0.07 9.00 0.12 144 8.07 0.07 10.00 0.15 340 8.17 0.07 11.00 0.27 786 8.36 0.08 12.00 4L25 2,182 8.86 4.95 13.00 0.25 1,741 8.72 0.27 14.00 0.15 1,717 8.71 0.16 15.00 0.12 1,703 8.71 0.12 16.00 0.09 1,693 8.70 0.10 17.00 0.08 1,687 8.70 0.08 18.00 0.07 1,660 8.69 0.08 19.00 0.06 1,599 8.67 0.08 20.00 0.05 1,505 8.64 0.08 21.00 0.05 1,390 8.60 0.08 22.00 0.05 1,271 8.55 0.08 23.00 0.05 1,148 8.51 0.08 24.00 0.04 1,022 8.46 0.08 25.00 0.00 751 8.35 0.08 26.00 0.00 480 8.23 0.07 27.00 0.00 218 8.11 0.07 28.00 0.00 1 8.00 0.00 29.00 0.00 0 8.00 0.00 30.00 0.00 0 8.00 0.00 31.00 0.00 0 8.00 0.00 32.00 0.00 0 8.00 0.00 33.00 0.00 0 8.00 0.00 34.00 0.00 0 8.00 0.00 35.00 0.00 0 8.00 0.00 36.00 0.00 0 8.00 0.00 37.00 0.00 0 8.00 0.00 38.00 0.00 0 8.00 0.00 39.00 0.00 0 8.00 0.00 40.00 0.00 0 8.00 0.00 Storage Ponds Prepared by Appian Consu ing Engineers, PA HydroCAD® 8.00 s/n 003967 ® 2006 HydroCAD Software Elevation Primary (feet) (Cfs) 8.00 0.00 8.01 0.07 8.02 0.07 8.03 0.07 8.04 0.07 8.05 0.07 8.06 0.07 8.07 0.07 8.08 0.07 8.09 0.07 8.10 0.07 8.11 0.07 8.12 0.07 8.13 0.07 8.14 0.07 8.15 0.07 8.16 0.07 8.17 0.07 8.18 0.07 8.19 0.07 8.20 0.07 8.21 0.07 8.22 0.07 8.23 0.07 8.24 0.07 8.25 0.07 8.26 0.07 8.27 0.07 8.28 0.08 8.29 0.08 8.30 0.08 8.31 0.08 8.32 0.08 8.33 0.08 8.34 0.08 8.35 0.08 8.36 0.08 8.37 0.08 8.38 0.08 8.39 0.08 8.40 0.08 8.41 0.08 8.42 0.08 8.43 0.08 8.44 0.08 8.45 0.08 8.46 0.08 8A7 0.08 8.48 0.08 8.49 0.08 8.50 0.08 8.51 0.08 8.52 0.08 8.53 0.08 Type 1124-hr 10-YR Rainfall=6.80" Page 17 LLC Stage -Discharge for Pond 213: Pond 1 Elevaton Primary (feet) (Cfs) 8.54 0.08 8.55 0.08 8.56 0.08 8.57 0.08 8.58 0.08 8.59 0.08 8.60 0.08 8.61 0.08 8.62 0.08 8.63 0.08 8.64 0.08 8.65 0.08 8.66 0.08 8.67 0.08 8.68 0.08 8.69 0.08 8.70 0.08 8.71 0.16 8.72 0.30 8.73 0.47 8.74 0.68 8.75 0.92 8.76 1.18 8.77 1.47 8.78 1.78 8.79 2.10 8.80 2.45 8.81 2.81 8.82 3.19 8.83 3.59 8.84 4.00 8.85 4.43 8.86 4.87 8.87 5.32 8.88 5.79 8.89 6.27 8.90 6.77 8.91 7.29 8.92 7.82 8.93 8.36 8.94 8.92 8.95 9.49 8.96 10.08 8.97 10.67 8.98 11.28 8.99 11.90 9.00 12.64 Storage Ponds Type H 24-hr 10-YR Rainfa#=6.80" Prepared by Appian Consulting Engineers, PA Page 18 HydroCAD® 8.00 s/n 003967 0 2006 HydroCAD Software Solutions t.LC 3/23/2007 Stage -Area -Storage for Pond 2P: Pond 1 Elevation Surface Storage (feet) (sq-ft) (cubic -feet) 8.00 1,890 0 8.01 1,905 19 8.02 1,920 38 8.03 1,935 57 8.04 1,950 77 8.05 1,965 96 8.06 1,979 116 g-07 1,994 136 8.08 2,009 156 8.09 2,024 176 8.10 2,039 196 8.11 2,054 217 8.12 2,069 238 8.13 2,084 258 8.14 2,099 279 8.15 2,114 300 8.16 2,128 321 8.17 2,143 343 8.18 2,158 364 8.19 Z173 386 8.20 2,188 408 8.21 2,203 430 8.22 2218 452 8.23 2,233 474 8.24 2,248 497 8.25 2,263 519 8.26 2,277 542 8.27 2,292 565 8.28 2,307 588 8.29 2,322 611 8.30 2,337 634 8.31 2,352 657 8.32 2,367 681 8.33 2,382 705 8.34 2,397 729 8.35 2,411 753 8.36 2,426 777 8.37 2,441 801 8.38 2,456 826 8.39 2,471 850 8.40 2,486 875 8.41 2,501 900 8.42 2,516 925 8A3 2,531 950 8.44 2,.546 976 8.45 2,560 1,001 8.46 2,575 1,027 8.47 2,590 1,053 8.48 .2,605 1,079 8.49 2,620 1,105 8.50 2,635 1,131 8.51 2,650 1,158 8,52 2,665 1,184 8.53 2,680 1,211 Elevation - (feet) Surface (sg-ft) Storage (cubic -feet) 8.54 2,695 1,238 8.55 2,710 1,265 8.56 2,724 1,292 8.57 2,739 1,319 8.58 2,754 1,347 8.59 2,769 1,374 8.60 2,784 1,402 8.61 2,799 1,430 8.62 2,814 1,458 8.63 2,829 1,486 8.64 2,844 1,515 8.65 2,859 1,543 8.66 2,873 1,572 8.67 2,888 1,601 8.68 2,903 1,630 8.69 2,918 1,659 8.70 2,933 1,688 8.71 2,948 1,717 8.72 2,963 1,747 8.73 2,978 1,777 8.74 2,993 1,807 8.75 3,008 1,837 8.76 3,022 1,867 8.77 3,037 1,897 8.78 3,052 1,927 8.79 3,067 1,958 8.80 3,082 1,989 8.81 3,097 2,020 8.82 3,112 2,051 8.83 3,127 2,082 8.84 3,142 2,113 8.85 3,156 2,145 8.86 3,171 2,176 8.87 3,186 2,208 8.88 3,201 2,240 8.89 3,216 2,272 8.90 3,231 2,304 8.91 3,246 2,337 8.92 3,261 2,369 8.93 3,276 2,402 8.94 3,291 2,435 8.95 3,305 2,468 8.96 3,320 2,501 8.97 3,335 2,534 8.98 3,350 2,568 8.99 3,365 2,601 9.00 3,380 2,635 Storage Ponds Type 1124-hr 100-YR Rainfa1F=11.39" Prepared by Appian Consulting Engineers, PA Page 19 HydroCADO 8.00 s/n 003967 ® 2006 HydroCAD Software Solutions LLC 3/23/2007 Time span=1.00-40.00 hrs, dt=0.05 hrs, 781 points Runoff by SCS TR-20 method, UH=SCS, Split Pervioushmnerv. Reach routing by Stor-Ind method - Pond routing by Stor-Ind method Subcatchment 1S: Area 1 Runoff Area=0.580 ac Runoff Depth>11.03" Flow Length=280' Slope=0.0200 'r Tc=4.1 min CN=86/98 Runoff=9.$1 cfs 0.533 of Pond 2P: Pond 1 Peak Elev=8.95' Storage=2,464 cf Inflow=9.81 cfs 0.533 of Outflow=9.43 cfs 0.533 of Total Runoff Area = 0.580 ac Runoff Volume = 0.533 of Average Runoff Depth=11.03" 6.90% Pervious Area = 0.040 ac 93.10% Impervious Area = 0.540 ac Storage Ponds Type 1124-hr 100-YR Rainfall=11.39" Prepared by Appian Consulting Engineers, PA Page 20 HydroCADO 8.00 s/n 003967 ® 2006 H droCAD Software Solutions LLC 3/23/2007 Subcatchment 1S: Area 1 Runoff = 9.81 cfs aQ 11.94 hrs, Volume= 0.533 af, Depth>11.03" Runoff by SCS TR 20 method, UH=SCS, Split Pervious/Imperv., Time Span=1.00-40.00 hrs, dt= 0.05 hrs Type II 24-hr 100-YR Rainfall=11.39" Area (ac) CN Description 0.540 98 Paved roads w/curbs & sewers 0.040 86 Newly graded area. HSG B 0.580 97 Weighted Average 0.040 86 Pervious Area 0.540 '98 Impervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 4.1 280 0.0200 1.14 Lag/CN Method, Overland �3 b LL Subcatchment 1S: Area 1 Hydrograph Time (hours) A Runoff Storage Ponds Prepared by Appian Consulting Engineers, PA HydroCAD® 8.00 s/n 003967 ® 2006 HvdroCAD Soft Solutions LLC Type H 24-hr 100-YR Rainfall=11.39" Page 21 Hydrograph for Subcatchment 1S: Area 1 Time Precip. Perv.Excess Imp.Excess Runoff (hours) (inches) (inches) (inches) (cfs) 1.00 0.12 0.00 0.02 0.03 1.50 0.18 0.00 0.06 0.05 2.00 0.25 0.00 0.11 0.06 2.50 0.32 0.00 0.16 0.06 3.00 0.39 0.00 0.22 0.07 3.50 0.47 0.01 0.29 0.08 4.00 0.55 0.03 0.36 0.08 4-50 0.63 0.05 0.44 0.09 5.00 0.72 0.08 0.52 0.10 5.50 0.81 0.11 0.61 0.10 6.00 0.91 0.15 0.71 0.11 6.50 1.02 0.21 0.81 0.12 7.00 1.13 0.26 0.91 0.13 7.50 1.24 0.33 1.03 0.13 &00 1.37 0.41 1.15 0.14 8.50 1.51 0.50 1.29 0.17 9.00 1.67 0.61 1.45 0.20 9.50 1.86 0.74 1.63 0.21 10.00 2.06 0.90 1.84 0.25 10.50 2.32 1.10 2.10 0.33 11.00 2.68 1.39 2.45 0.45 11.50 3.22 1.86 2.99 0.76 12.00 7.55 5.90 7.31 7.16 12.50 8.37 6.69 8.13 0.67 13.00 8.79 7.10 8.55 0.43 13.50 9.10 7.40 8.86 0.32 14.00 9.34 7.64 9.10 0.25 14.50 9.54 7.83 9.30 0.23 15.00 9.72 8.01 9.48 0.20 15.50 9.88 8.17 9.64 0.18 16.00 10.02 8.30 9.78 0.16 16.50 10.15 8.43 9.91 0.15 17.00 10.27 8.55 10.03 0.14 17.50 10.38 8.66 10.14 0.13 18.00 10.49 8.76 10.25 0.12 18.50 10.59 8.86 10.35 0.11 19.00 10.68 8.95 10.44 0.10 19.50 10.77 9.03 10.52 0.10 20.00 10.84 9.11 10.60 0.09 20.50 10.92 9.18 10.68 0.09 21.00 10.99 9.25 10.75 0.08 21.50 11.06 9.32 10.82 0.08 22.00 11.13 9.39 10.89 0.08 22.50 11.20 9.45 10.95 0.08 23.00 11.26 9.52 11.02 0.08 23.50 11.33 9.58 11.09 0.08 24.00 11.39 9.65 11.15 0.07 24.50 11.39 9.65 11.15 0.00 25.00 11.39 9.65 11.15 0.00 25.50 11.39 9.65 11.15 0.00 26.00 11.39 9.65 11.15 0.00 26.50 11.39 9.65 11.15 0.00 27.00 11.3A 9.65 11.15 0.00 27.50 11.39 9.65 11.15 0.00 Time Precip. Perv.Excess Imp.Excess Runoff (hours) (inches) (irr Ivs) (inches) MO 28.00 11.39 9.65 11.15 0.00 28.50 11.39 9.65 11.15 0.00 29.00 11.39 9.65 11.15 0.00 29.50 11.39 9.65 11.15 0.00 30.00 11.39 9.65 11.15 0.00 30.50 11.39 9.65 11.15 0.00 31.00 11.39 9.65 11.15 0.00 31.50 11.39 9.65 11.15 0.00 32.00 11.39 9.65 11.15 0.00 32.50 11.39 9.65 11.15 0.00 33.00 11.39 9.65 11.15 0.00 33.50 11.39 9.65 11.15 0.00 34.00 11.39 9.65 11.15 0.00 34.50 11.39 9.65 11.15 0.00 35.00 11.39 9.65 11.15 0.00 35.50 11.39 9.65 11.15 0.00 36.00 11.39 9.65 11.15 0.00 36.50 11.39 9.65 11.15 0.00 37.00 11.39 9.65 11.15 0.00 37.50 11.39 9.65 11.15 0.00 38.00 11.39 9.65 11.15 0.00 38.50 11.39 9.65 11.15 0.00 39.00 11.39 9.65 11.15 0.00 39.50 11.39 9.65 11.15 0.00 40.00 11.39 9.65 11.15 0.00 Storage Ponds Type // 24-hr 100-YR Rainfall=11.39" Prepared by Appian Consulting Engineers, PA Page 22 HydroCADS 8.00 s/n 003967 0 2006 HydroCAD Software Solutions LLC 3/23/2007 Pond 2P: Pond 1 Inflow Area = 0.580 ac, Inflow Depth > 11.03" for 100-YR event Inflow = 9.81 cfs @ 11.94 hrs, Volume= 0.533 of Outflow = 9.43 cfs @ 11.95 hrs, Volume= 0.533 af, Men= 4%, Lag= 0.8 min Primary = 9.43 cfs @ 11.95 hrs, Volume= 0.533 of Routing by Stor-Ind method, Time Span= 1.0040.00 hrs, dt= 0.05 hrs Peak Elev= 8.95' @ 11.95 hrs Surf.Area= 3,304 sf Storage= 2,464 cf Plug -Flow detention time= 82.2 min calculated for 0.532 of (100% of inflow) Center -of -Mass det. time= 82.4 min ( 817.1 - 734.6 ) Volume Invert Avail.Stora a Storage Description #1 8.00' 2,635 cf Custom Stage Data (Prismatic) Listed below (Recalc) Elevation Surf.Area Inc.Store Cum.Store (feet) (sq-ft) (cubic -feet) (cubic -feet) 8.00 1,890 0 0 9.00 3,380 2,635 2,635 Device Routing Invert Outlet Devices #1 Primary 6.69 8.0" x 35.0' long Culvert CPP, square edge headwall, Ke= 0.500 Outlet Invert= 6.26 S= 0.0100'r Cc= 0.900 n= 0.013 Corrugated PE, smooth interior #2 Device 1 6.60' 1.5" Vert. Orifice/Grate C= 0_600 #3 Primary 8.70' 30.W long x 10.0' breadth Broad -Crested Rectangular Weir Head (feet) 0.20 0.40 0.60 0.80 1.00 1.20 1.40 1.60 Coef. (English) 2.49 2.56 2.70 2.69 2.68 2.69 2.67 2.64 Primary OutFlow Max=9.31 cfs @ 11.95 hrs HW=8.95' (Free Discharge) T_ 1=Culvert (Passes 0.09 cfs of 2.17 cfs potential flow) t-2=Orifice/Grate (Orifice Controls 0.09 cfs @ 7.28 fps) =Broad -Crested Rectangular Weir (Weir Controls 9.22 cfs @ 1.25 fps) Storage Ponds Type l/ 24-hr 100-YR Rainfall=11.39" Prepared by Appian Consulting Engineers, PA Page 23 HydroCAD® 8.00 s/n 003967 ® 2006 HydroCAD Software Solutions LLC 3/23/2007 Pond 2P: Pond 1 Hydrograph Ci Inflow ® Primary grime (houm) Storage Ponds Prepared by Appian Con; HydroCAD® 8.00 stn 003967 Type 1124-hr 100-YR Rainfall=11.39" Engineers, PA Page 24 i HydroCAD Software Solutions LLC R/XA nn7 Hydrograph for Pond 2P: Pond 1 time Inflow Storage Elevation Primary (hours) (cfs) (cubic -feet) (feet) (cfs) 1.00 0.03 2 8.00 0.01 2.00 0.06 15 8.01 0.05 3.00 0.07 19 8.01 0.07 4.00 0.08 42 8.02 0.07 5.00 0.10 109 8.06 0.07 6.00 0.11 226 8.11 0.07 7.00 0.13 391 8.19 0.07 8.00 0.14 600 8.29 0.08 9.00 0.20 933 8.42 0.08 10.00 0.25 1,425 8.61 0.08 11.00 0.45 1,772 8.73 0.44 12.00 7.16 2,395 8.93 8.25 13.00 0.43 1,772 8.73 0.44 14.00 0.25 1,740 8.72 0.26 15.00 0.20 1,727 8.71 0.21 16.00 0.16 1,717 8.71 0.16 17.00 0.14 1,710 8.71 0.14 18.00 0.12 1,703 8.71 0.12 19.00 0.10 1,697 8.70 0.11 20.00 0.09 1,690 8.70 0.09 21.00 0.08 1,688 8.70 0.08 22.00 0.08 1,678 8.70 0.08 23.00 0.08 1,657 8.69 0.08 24.00 0.07 1,625 8.68 0.08 25.00 0.00 1,343 8.58 0.08 26.00 0.00 1,053 8.47 0.08 27.00 0.00 771 8.36 0.08 28.00 0.00 499 8.24 0.07 29.00 0.00 237 8.12 0.07 30.00 0.00 3 8.00 0.01 31.00 0.00 0 8.00 0.00 32.00 0.00 0 8.00 0.00 33.00 0.00 0 8.00 0.00 34.00 0.00 0 8.00 0.00 35.00 0.00 0 8.00 0.00 36.00 0.00 0 8.00 0.00 37.00 0.00 0 8.00 0.00 38.00 0.00 0 8.00 0.00 39.00 0.00 0 8.00 0.00 40.00 0.00 0 8.00 0.00 Storage Ponds Type 1124-hr 100-YR Rainfall=91.39" Prepared by Appian Consulting Engineers, PA Page 25 HydroCAD® 8.00 sin 003967 ® 2006 HydroCAD Software Solutions LLC 3/23/2007 Elevation Primary _ (feet) (cfs) 8.00 0.00 8.01 0.07 8.02 0.07 8.03 0.07 8.04 0.07 8.05 0.07 8.06 0.07 8.07 0.07 8.08 0.07 8.09 0.07 8.10 0.07 8.11 0.07 8.12 0.07 8.13 0.07 8.14 0.07 8.15 0.07 8.16 0.07 8.17 0.07 8.18 0.07 8.19 0.07 8.20 0.07 8.21 0.07 8.22 0.07 8.23 0.07 8.24 0.07 8.25 0.07 8.26 0.07 8.27 0.07 8.28 0.08 8.29 0.08 8.30 0.08 8.31 0.08 8.32 0.08 8.33 0.08 8.34 0.08 8.35 0.08 8.36 0.08 8.37 0.08 8.38 0.08 8.39 0.08 8.40 0.08 8.41 0.08 8.42 0.08 8.43 0.08 8.44 0.08 8.45 0.08 8.46 0.08 8.47 0.08 8.48 0.08 8.49 0.08 8.50 0.08 8.51 0.08 8.52 0.08 8.53 0.08 Stage -Discharge for Pond 2P: Pond 1 Elevation Primary (feet) (cfs) 8.54 0.08 8.55 0.08 8.56 0.08 8.57 0.08 8.58 0.08 8.59 0.08 8.60 0.08 8.61 0.08 8.62 0.08 8.63 0.08 8.64 0.08 8.65 0.08 8.66 0.08 8.67 0.08 8.68 0.08 8.69 0.08 8.70 0.08 8.71 0.16 8.72 0.30 8.73 0.47 8.74 0.68 8.75 0.92 8.76 1.18 8.77 1.47 8.78 1.78 8.79 2.10 8.80 2.45 8.81 2.81 8.82 3.19 8.83 3.59 8.84 4.00 8.85 4.43 8.86 4.87 8.87 5.32 8.88 5.79 8.89 6.27 8.90 6.77 8.91 7.29 8.92 7.82 8.93 8.36 8.94 8.92 8.95 9.49 8.96 10.08 8.97 10.67 8.98 11.28 8.99 11.90 9.00 12.54 Storage Ponds Type H 24-hr 100-YR Rainfall=11.39" Prepared by Appian Consulting Engineers, PA Page 26 HydroCAD® 8.00 s/n 003967 ® 2006 HydroCAD Software Solutions LLC 3/23/2007 Stage -Area -Storage for Pond 2P: Pond 1 Elevation Surface Storage (feet) (sq-ft) (cubic -feet) 8.00 1,890 0 8.01 1,905 19 8.02 1,920 38 8.03 1,935 57 8.04 1,950 77 8.05 1,965 96 8.06 1,979 116 8.07 1,994 136 8.08 2,009 156 8.09 2,024 176 8.10 2,039 196 8.11 2,054 217 8.12 2,069 238 8.13 2,084 258 8.14 2,099 279 8.15 2,114 300 8.16 2,128 321 8.17 2,143 343 8.18 2,158 364 8.19 2,173 386 8.20 2,188 408 8.21 2,203 430 8.22 2,218 452 8.23 2,233 474 8.24 2,248 497 8.25 2,263 519 8.26 2,277 542 8.27 2,292 565 8.28 2,307 588 8.29 2,322 611 8.30 2,337 634 8.31 2,352 657 8.32 2,367 681 8.33 2,382 705 8.34 2,397 729 8.35 2,411 753 8.36 2,426 777 8.37 2,441 801 8.38 2,456 826 8.39 2,471 850 8.40 2,486 875 8.41 2,501 900 8.42 2,516 925 8.43 2,531 950 8.44 2,546 976 8.45 2,560 1,001 8.46 2,575 1,027 8.47 2,590 1,053 8.48 2,605 1,079 8.49 2,620 1,105 8.50 2,635 1,131 8.51 2,650 1,158 8.52 2,665 1,184 8.53 2,680 1,211 Elevation Surface Storage (feet) (sq-ft) (cubic -feet) 8.54 2,695 1,238 8.55 2,710 1,265 8.56 2,724 1,292 8.57 2,739 1,319 8.58 2,754 1,347 8.59 2,769 1,374 8.60 2,784 1,402 8.61 2,799 1,430 8.62 2,814 1,458 8.63 2,829 1,486 8..64 2,844 1,515 8.65 2,859 1,543 8.66 2,873 1,572 8.67 2,888 1,601 8.68 2,903 1,630 8.69 2,918 1,659 8.70 2,933 1,688 8.71 2,948 1,717 8.72 2,963 1,747 8.73 2,978 1,777 8.74 2,993 1,807 8.75 3,008 1,837 8.76 3,022 1,867 8.77 3,037 1,897 8.78 3,052 1,927 8.79 3,067 1,958 8.80 3,082 1,989 8.81 3,097 2,020 8.82 3,112 2,051 8.83 3,127 2,082 8.84 3,142 2,113 8.85 3,156 2,145 8.86 3,171 2,176 8.87 3,186 2,208 8.88 3,201 2,240 8.89 3,216 2,272 8.90 3,231 2,304 8.91 3,246 2,337 8.92 3,261 2,369 8.93 3,276 2,402 8.94 3,291 2,435 &95 3,305 2,468 8.96 3,320 2,501 8.97 3,335 2,534 8.98 3,350 2,568 8.99 3,365 2,601 9.00 3,380 2,F35 PROJECT S'(� - 01E�lJ�� SHEET NO. OF App;� APPIAN CONSULTING ENGINEERS, PA DATE: BY: 841 South Wesleyan Blvd, Rocky Mount, NC 27803 P.O. Box 7966, Rocky Mount, NC 27804 a 3S), Area 2 P Pond 2 I �U Ftea iin rLjnlk Drainage Diagram for Storage Ponds-2 Prepared by Appian Consulting Engineers, PA 3/23/2007 HydroCAD®8.00 s/n 003967 02006 HydroCAD Software Solutions LLC Storage Ponds-2 Prepared by Appian Consulting Engineers, PA Page 2 HydroCAD® 8.00 sin 003967 ® 2006 HydroCAD Software Solutions LLC 3/23/2007 Area Listing (all nodes) Area (acres) CN Description (subcats) 0.030 86 Newly graded area, HSG B (3S) 0.170 98 Paved parking & roofs (3S) 0.200 Storage Ponds-2 Type U 24-hr 1.5" Rainfall=1.86- Prepared by Appian Consulting Engineers, PA Page 3 HydroCADO 8.00 sin 003967 0 2006 HydroCAD Software Solutions LLC 3/23/2007 Time span=1.00-40.00 hrs, dt=0.05 hrs, 781 points Runoff by SCS TES-20 method, UH=SCS, Split Pervious/lmperv. Reach routing by Stor-Ind method - Pond muting by Stor-Ind method Subcatchment 3S: Area 2 Runoff Area=0.200 ac Runoff Depth=1.50" Flow Length=80` Slope--0.0200 7 Tc=1.6 min CN=86/98 RunofF0.52 cfs 0.025 of Pond 4P: Pond 2 Peak. Elev=8.3W Storage=329 cf Inflow=0.52 cfs 0.025 of Outflow=0.08 cfs 0.025 of Total Runoff Area = 0.200 ac Runoff Volume = 0.025 of Average Runoff Depth =1.50" 15.00% Pervious Area = 0.030 ac 85.00% Impervious Area = 0.170 ac Storage Ponds-2 Type // 24-hr 1.5" Rainfa#=1.86" Prepared by Appian Consulting Engineers, PA Page 4 HydroCADO 8.00 s/n 003967 0 2006 HydroCAD Software solutions LLC 3/23/2007 Subcatchment 3S: Area 2 Runoff = 0.52 cfs @ 11.91 hrs, Volume= 0.025 af, Depth= 1.50" Runoff by SCS TR-20 method, UH=SCS, Split Pervious/Imperv., Time Span=1.00-40.00 hrs, dt= 0.05 hrs Type II 24-hr 1.5" Rainfall=1.86" Area (ac) CN Description 0.170 98 Paved parking & roofs 0.030 86 Newly graded area, HSG B 0.200 96 Weighted Average 0.030 86 Pervious Area 0.170 98 Impervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 1.6 80 0.0200 0.84 Lag/CN Method, Overland Subcatchment 3S: Area 2 Hydrograph ---.. _:1 Q Runoff 35 3637 38 3940 Storage Ponds-2 Type H 24-hr 1.5" Rainfall=1.86" Prepared by Appian Consulting Engineers, PA Page 5 HydroCAD® 8.00. s/n 003967 ® 2006 HydroCAD Software Solutions LLC 3/23/2007 Hydrograph for Subcatchment 3S: Area 2 Time Precip. Perv.Excess Imp.Excess Runoff (hours) (inches) (inches) (inches) (cfs) 1.00 0.02 0.00 0.00 0.00 1.50 0.03 0.00 0.00 0.00 2.00 0.04 0.00 0.00 0.00 2.50 0.05 0.00 0.00 0.00 3.00 0.06 0.00 0.00 0.00 3.50 0.08 0.00 0.01 0.00 4.00 0.09 0.00 0.01 0.00 4.50 0.10 0.00 0.01 0.00 5.00 0.12 0.00 0.02 0.00 5.50 0.13 0.00 0.03 0.00 6.00 0.15 0.00 0.04 0.00 6.50 0.17 0.00 0.05 0.00 7.00 0.18 0.00 0.06 0.00 7.50 0.20 0.00 0.07 0.00 8.00 0.22 0.00 0.09 0.01 8.50 0.25 0.00 0.10 0.01 9.00 0.27 0.00 0.12 0.01 9.50 0.30 0.00 0.15 0.01 10.00 0.34 0.00 0.18 0.01 10.50 0.38 0.00 0.21 0.01 11.00 0.44 0.01 0.26 0.02 11.50 0.53 0.02 0.34 0.04 12.00 1.23 0.32 1.02 0.20 12.50 1.37 0.41 1.15 0.03 13.00 1.44 0.45 1.22 0.02 13.50 1.49 0.48 1.27 0.02 14.00 1.53 0.51 1.30 0.01 14.50 1.56 0.53 1.34 0.01 15.00 1.59 0.55 1.37 0.01 15.50 1.61 0.57 1.39 0.01 16.00 1.64 0.58 1.42 0.01 16.50 1.66 0.60 1.44 0.01 17.00 1.68 0.61 1.45 0.01 17.50 1.70 0.63 1.47 0.01 18.00 1.71 0.64 1.49 0.01 18.50 1.73 0.65 1.51 0.01 19.00 1.74 0.66 1.52 0.01 19.50 1.76 0.67 1.53 0.01 20.00 1.77 0.68 1.55 0.00 20.50 1.78 0.69 1.56 0.00 21.00 1.79 0.70 1.57 0.00 21.50 1.81 0.71 1.58 0.00 22.00 1.82 0.71 1.59 0.00 22.50 1.83 0.72 1.60 0.00 23.00 1.84 0.73 1.61 0.00 23.50 1.85 0.74 1.63 0.00 24.00 1.86 0.74 1.64 0.00 24.50 1.86 0.74 1.64 0.00 25.00 1.86 0.74 1.64 0.00 25.50 1.86 0.74 1.64 0.00 26.00 1.86 0.74 1.64 0.00 26.50 1.86 0.74 1.64 0.00 27.00 1.86 0.74 1.64 0.00 27.50 1.86 0.74 1.64 0.00 Time Precip. Perv.Excess Imp.Excess Runoff (hours) (inches) (inches) (inches) (cfs) 28.00 1.86 0.74 1.64 0.00 28.50 1.86 0.74 1.64 0.00 29.00 1.86 0.74 1.64 0.00 29.50 1.86 0.74 1.64 0.00 30.00 1.86 0.74 1.64 0.00 30.50 1.86 0.74 1.64 0.00 31.00 1.86 0.74 1.64 0.00 31.50 1.86 0.74 1.64 0.00 32.00 1.86 0.74 1.64 0.00 32.50 1.86 0.74 1.64 0.00 33.00 1.86 0.74 1.64 0.00 33.50 1.86 0.74 1.64 0.00 34.00 1.86 0.74 1.64 0.00 34.50 1.86 0.74 1.64 0.00 35.00 1.86 0.74 1.64 0.00 35.50 1.86 0.74 1.64 0.00 36.00 1.88 0.74 1.64 0.00 36.50 1.86 0.74 1.64 0.00 37.00 1.86 0.74 1.64 0.00 37.50 1.86 0.74 1.64 0.00 38.00 1.86 0.74 1.64 0.00 38.50 1.86 0.74 1.64 0.00 39.00 1.86 0.74 1.64 0.00 39.50 1.86 0.74 1.64 0.00 40.00 1.86 0.74 1.64 0.00 Storage Ponds-2 Type/1 24-hr 1.5" Rainfall=1.86" Prepared by Appian. Consulting Engineers, PA Page 6 HydroCADS 8.00 s/n 003967 0 2006 HydroCAD Software Solutions LLC 3/23/2007 Pond 4P: Pond 2 Inflow Area = 0.200 ac, Inflow Depth = 1.50" for 1.5" event Inflow = 0.52 cfs @ 11.91 hrs, Volume= 0.025 of Outflow = 0.08 c% @ 12.07 hrs, Volume= 0.025 af, Aften= 85%, Lag= 9.7 min Primary = 0.08 cfs @ 12.07 hrs, Volume= 0.025 of Routing by Stor-Ind method, Time Span=1.00-40.00 hrs, dt= 0.05 hrs Peak Elev= 8.39' @ 12.07 hrs Surf.Area= 942 sf Storage= 329 cf Plug -Flow detention time= 24.0 min calculated for 0.025 of (100% of inflow) Center -of -Mass det. time= 24.0 min ( 791.5 - 767.6 ) Volume Invert Avail.Storage Storage Description #1 8.00, 1,000 cf Custom Stage Data (Prismatic) Listed below (Recalc) Elevation Surf.Area Inc.Store Cum.Store (feet) (sq-ft) (cubic -feet) (cubic -feet) 8.00 730 0 0 9.00 1,270 1,000 1,000 Device Routing Invert Outlet Devices #1 Primary 6.60' 8.0" x 35.0' long Culvert CPP, square edge headwall, Ke= 0.500 Outlet Invert-- 6.26 S= 0.0100 7 Cc= 0.900 n= 0.013 #2 Device 1 6.60' 1.5" Vert. Orifice/Grate C= 0.600 #3 Primary 8.40' 15.0' long x 10.0' breadth Broad -Crested Rectangular Weir Head (feet) 0.20 0.40 0.60 0.80 1.00 1.20 1.40 1.60 Coef. (English) 2.49 2.56 2.70 2.69 2.68 2.69 2.67 2.64 Primary OutFlow Max=0.08 cfs @ 12.07 hrs HW=8.39' (free Discharge) 1=Culvert (Passes 0.08 cfs of 1.85 cfs potential flow) 'L2=Orifice/Grate (Orifice Controls 0.08 cfs @ 6.33 fps) 3=Broad-Crested Rectangular Weir ( Controls 0.00 cfs) Storage Ponds-2 Type II 24-hr 1.5" Rainfall=1.86" Prepared by Appian Consulting Engineers, PA Page 7 HydroCAD® 8.00 s/n 003967 ® 2006 HydroCAD Software Solutions LLC 3/23/2007 Pond 4P: Pond 2 Hydrograph p Inflow C Primary Time (hours) Storage Ponds-2 Type ►/ 24-hr 1.5" Rainfa/N7.86" Prepared by Appian Consulting Engineers, PA Page. 8 HydroCAD® 8.00 s/n 003967 ® 2006 HydroCAD Software Solutions LLC 3/23/2007 Hydrograph for Pond 4P; Pond 2 Time Inflow Storage Elevation Primary (hours) (c%) (cubic -feet) (feet) (cfs) 1.00 0.00 0 8.00 0.00 2.00 0.00 0 8.00 0.00 3.00 0.00 0 8.00 0.00 4.00 0.00 0 8.00 0.00 5.00 0.00 0 8.00 0.00 6.00 0.00 0 8.00 0.00 7.00 0.00 0 8.00 0.00 8.00 0.01 1 8.00 0.01 9.00 0.01 1 8.00 0.01 10.00 0.01 1 8.00 0.01 11.00 0.02 2 8.00 0.02 12.00 0.20 317 8.38 0.08 13.00 0.02 195 8.26 0.07 14.00 0.01 3 8.00 0.03 15.00 0.01 1 8.00 0.01 16.00 0.01 1 8.00 0.01 17.00 0.01. 1 8.00 0.01 18.00 0.01 1 8.00 0.01 19.00 0.01 1 8.00 0.01 20.00 0.00 0 8.00 0.00 21.00 0.00 0 8.00 0.00 22.00 0.00 0 8.00 0.00 23.00 0.00 0 8.00 0.00 24.00 0.00 0 8.00 0.00 25.00 0.00 0 8.00 0.00 26.00 0.00 0 8.00 0.00 27.00 0.00 0 8.00 0.00 28.00 0.00 0 8.00 0.00 29.00 0.00 0 8.00 0.00 30.00 0.00 0 8.00 0.00 31.00 0.00 0 8.00 0.00 32.00 0.00 0 8.00 0.00 33.00 0.00 0 8.00 0.00 34.00 0.00 0 8.00 0.00 35.00 0.00 0 8.00 0.00 36.00 0.00 0 8.00 0.00 37:00 0.00 0 8.00 0.00 38.00 0.00 0 8.00 0.00 39.00 0.00 0 8.00 0.00 40.00 0.00 0 8.00 0.00 Storage Ponds-2 Type I/ 24-hr 1.5" Rainfall=1.86" Prepared by Appian: Consuiting. Engineers, PA Page 9 HydroCAD® 8.00 s/n 003967 ® 2006 HydroCAD Software Solutions LLC 3/23/2007 Elevation Primary (feet) (cfs) 8.00 0.00 8.01 0.07 8.02 0.07 8.03 0.07 8.04 0.07 8.05 0.07 8.06 0.07 8.07 0.07 8.08 0.07 8.09 0.07 8.10 0.07 8.11 0.07 8.12 0.07 8.13 0.07 8.14 0.07 8.15 0.07 8.16 0.07 8.17 0.07 8.18 0.07 8.19 0.07 8.20 0.07 8.21 0.07 8.22 0.07 8.23 0.07 8.24 0.07 8.25 0.07 8.26 0.07 8.27 0.07 8.28 0.08 8.29 0.08 8.30 0.08 8.31 0.08 8.32 0.08 8.33 0.08 8.34 0.08 8.35 0.08 8.36 0.08 8.37 0.08 8.38 0.08 8.39 0.08 8.40 0.08 8.41 0.12 8.42 0.1.8 8.43 0.27 8.44 0.38 8.45 0.50 8.46 0.63 8.47 0.77 8.48 0.92 8.49 1.09 8.50 1.26 8.51 1.44 8.52 1.63 8.53 1.83 Stage -Discharge for Pond 4P: Pond 2 Elevation Primary (feet) (Cfs) 8.54 2.04 8.55 2.25 8.56 2.47 8.57 2.70 8.58 2.93 8.59 3.18 8.60 3.42 8.61 3.68 8.62 3.95 8.63 4.22 8.64 4.50 8.65 4.78 8.66 5.08 8.67 5.38 8.68 5.68 8.69 5.99 8.70 6.31 8.71 6.63 8.72 6.96 8.73 7.29 8.74 7.64 8.75 7.98 8.76 8.33 8.77 8.69 8.78 9.06 8.79 9.43 8.80 9.80 8.81 10..20 8.82 10.60 8.83 11.00 8.84 11.42 8.85 11.84 8.86 12.26 8.87 12.70 8.88 13.14 8.89 13.58 8.90 14.04 8.91 14.50 8.92 14.96 8.93 15.43 8.94 15.91 8.95 16.39 8.96 16.89 8.97 17.38 8.98 17.89 8.99 18.40 9.00 18.91 Storage Ponds-2 Prepared by Appian Consulting Engineers, PA HydroCAD® 8.00 sin 003967 ® 2008 HydroCAD Sofb Type H 24-hr 1.5" RainfalM.86" Page 10 Stage -Area -Storage for Pond 4P: Pond 2 Elevation Surface Storage (feet) (sq-ft) (cubic -feet) 8.00 730 0 8.01 735 7 8.02 741 15 8.03 746 22 8.04 752 30 8.05 757 37 8.06 762 45 8.07 768 52 8.08 773 60 8.09 779 68 8.10 784 76 8.11 789 84 8.12 795 91 8.13 800 99 8.14 806 107 8.15 811 116 8.16 816 124 8.17 822 132 8.18 827 140 8.19 833 148 8.20 838 157 8.21 843 165 8.22 849 174 8.23 854 182 8.24 860 191 8.25 865 1.99 8.26 870 208 8.27 876 217 8.28 881 226 8.29 887 234 8.30 892 243 8.31 897 252 8.32 903 261 8.33 908 270 8.34 914 279 8.35 919 289 8.36 924 298 8.37 930 307 8.38 935 316 8.39 941 326 8.40 946 335 8.41 951 345 8.42 957 354 8.43 962 364 8.44 968 373 8.45 973 383 8A6 978 393 8.47 984 403 8.48 989 413 8.49 995 423 8.50 1,000 433 8.51 1,005 443 82 1,011 4 153 8.53 1,016 463 Elevation Surface Storage (feet) (sq-ft) (cubic -feet) 8.54 1,022 473 8.55 1,027 483 8.56 1,032 493 8.57 1,038 504 8.58 1,043 5.14 8.59 1,049 525 8.60 1,054 535 8.61 1,059 546 8.62 1,065 556 8.63 1,070 567 8.64 1,076 578 8.65 1,081 589 8.66 1,086 599 8.67 1,092 610 8.68 1,097 621 8.69 1,103 632 8.70 1,1.08 643 8.71 1,113 654 8.72 1,119 666 8.73 1,124 677 8.74 1,130 688 8.75 1,135 699 8.76 1,1.40 711 8.77 1,146 722 8.78 1,151 734 8.79 1,157 745 8.80 1,162 757 8.81 1,167 768 8.82 1,173 780 8.83 1,178 792 8.84 1,184 804 8.85 1,189 816 8.86 1,194 827 8.87 1,200 839 8.88 1,205 851 8.89 1,211 864 8.90 1,216 876 8.91 1,221 888 8.92 1,227 900 8.93 1,232 912 8.94 1,238 925 8_95 1,243 937 8.96 1,248 950 8.97 1,254 962 8.98 1,259 975 8,99 1,265 987 9.00 1,270 1,000 Storage Ponds-2 Type H 24-hr 10-YR Rainfall=6.80" Prepared by Appian Consulting Engineers, PA Page 11 HydroCADO 8.00 s/n 003967 ® 2006 HydroCAD Software Solutions LLC 3/23/2007 Time span=1.00-40.00 hrs, dt=0.05 hrs, 781 points Runoff by SCS TR-20 method, UH=SCS, Split Pervious/imperv. Reach routing by Star -Ind method - Pond routing by Stor-Ind method Subcatchment 3S: Area 2 Runoff Area=0.200 ac Runoff Depth>6.35" Flow Length=80' Slope=0.0200 T Tc=1.6 min CN=86/98 Runoff=2.06 cfs 0.106 of Pond 413: Pond 2 Peak EIev=8.54' Storage=470 cf Inflow=2.06 cfs 0.106 of Outflow=1.98 cfs 0.106 of Total Runoff Area = 0.200 ac Runoff Volume = 0.106 of Average Runoff Depth = 6.35', 15.000/9 Pervious Area = 0.030 ac 85.00% Impervious Area = 0.170 ac Storage Ponds-2 Prepared by Appian Consulting Engineers, PA HydroC" 8.00 s/n 003967 ® 2006 HydroCAD Software Subcatchment 3S: Area 2 Type 1124-hr 10-YR Rainfall=6.80" Page 12 Runoff = 2.06 cfs @ 11.90 hrs, Volume= 0.106 af, Depth> 6.35" Runoff by SCS TR-20 method, UH=SCS, Split Pervious/Imperv., Time Span=1.00-40.00 hrs, dt= 0.05 hrs Type II 24-hr 10-YR Rainfall=6.80" Area (ac) CN Description 0.170 98 Paved parking & roofs 0.030 86 Newly graded area, HSG B 0.200 96 Weighted Average 0.030 86 Pervious Area 0.170 98 Impervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ftlft) (ft/sec) (cfs) 1.6 80 0.0200 0.84 Lag/CN Method, Overland Subcatchment 3S: Area 2 Hydrograph 10 Runoff Time (hours) Storage Ponds-2 Type 11 24-hr 10-YR Rainfall=6 80" Prepared by Appian Consulting Engineers, PA Page 13 HydroCAD® 8.00 s!n 003967 ® 2006 HydroCAD Software Solutions LLC 3/23/2007 Hydrograph for Subcatchment 3S: Area 2 Time Precip. Perv.Excess Imp.Excess Runoff (hours) (inches) (inches) (inches) (cfs) 1.00 0.07 0.00 0.00 0.00 1.50 0.11 0.00 0.02 0.01 2.00 0.15 0.00 0.04 0.01 2.50 0.19 0.00 0.06 0.01 3.00 0.23 0.00 0.09 0.01 3.50 0.28 0.00 0.13 0.01 4.00 0.33 0.00 0.17 0.01 4.50 0.38 0.00 0.21 0.02 5.00 0.43 0.01 0.25 0.02 5.50 0.48 0.01 0.30 0.02 6.00 0.54 0.03 0.36 0.02 6.50 0.61 0.04 0.42 0.02 7.00 • 0.67 0.06 0.48 0.02 7.50 0.74 0.09 0.54 0.02 8.00 0.82 0.11 0.61 0.03 8.50 0.90 0.15 0.69 0.03 9.00 1..00 0.20 0.79 0.04 9.50 1.11 0.25 0.90 0.04 10.00 1.23 0.32 1.02 0.05 10.50 1.39 0.42 1.17 0.07 11.00 1.60 0.56 1.38 0.09 11.50 1.92 0.79 1.70 0.116 12.00 4.51. 3.01 4.27 0.78 12.50 5.00 3.47 4.76 0.13 13.00 5.25 3.70 5.01 0.08 13.50 5.43 3.87 5.20 0.06 14.00 5.58 4.01 5.34 0.05 14.50 5.70 4.12 5.46 0.05 15.00 5.80 4.22 5.57 0.04 15.50 5.90 4.31 5.66 0.04 16.00 5.98 4.39 5.75 0.03 16.50 6.06 4.47 5.82 0.03 17.00 6.13 4.53 5.89 0.03 17.50 6.20 4.60 5.96 0.03 18.00 6.26 4.66 6.02 0.02 18.50 6.32 4.72 6.08 0.02 19.00 6.38 4.77 6.14 0.02 19.50 6.43 4.82 6.19 0.02 20.00 6.47 4.86 6.23 0.02 20.50 6.52 4.90 6.28 0.02 21.00 6.56 4.94 6.32 0.02 21.50 6.60 4.98 6.36 0.02 22.00 6.64 5.02 6.40 0.02 22.50 6.68 5.06 6.45 0.02 23.00 6.72 5.10 6.48 0.02 23.50 6.76 5.14 6.52 0.02 24.00 6.80 6.17 6.56 0.01 24.50 6.80 5.17 6.56 0.00 25.00 6.80 5.17 6.56 0.00 25.50 6.80 5.17 6.56 0.00 26.00 6.80 5.17 6.56 0.00 26.50 6.80 5.17 6.56 0.00 27.00 6.80 5.17 6.56 0.0V 27.50 6.80 5.17 6.56 0.00 Time Precip. Perv.Excess Imp.Excess Runoff (hours) (inches) (inches) (inches) (cfs) 28.00 6.80 5.17 6.56 0.00 28.50 6.80 5.17 6.56 0.00 29.00 6.80 5.17 6.56 0.00 29.50 6.80 5.17 6.56 0.00 30.00 6.80 5.17 6.56 0.00 30.50 6.80 5.17 6.56 0.00 31.00 6.80 5.17 6.56 0.00 31.50 6.80 5.17 6.56 0.00 32.00 6.80 5.17 6.56 0.00 32.50 6.80 5.17 6.56 0.00 33.00 6.80 5.17 6.56 0.00 33.50 6.80 5.17 6.56 0.00 34.00 6.80 5.17 6.56 0.00 34.50 6.80 5.17 6.56 0.00 35.00 6.80 5.17 6.56 0.00 35.50 6.80 5.17 6.56 0.00 36.00 6.80 5.17 6.56 0.00 36.50 6.80 5.17 6.56 0.00 37.00 6.80 5.17 6.56 0.00 37.50 6.80 5.17 6.56 0.00 38.00 6.80 5.17 6.56 0.00 38.50 6.80 5.17 6.56 0.00 39.00 6.80 5.17 6.56 0.00 39.50 6.80 5.17 6.56 0.00 40.00 6.80 5.17 6.56 0.00 Storage Ponds-2 Type /I 24-hr 10-YR Rainfall=6.80" Prepared by Appian Consulting Engineers, PA Page 14 HydroCADO 8.00 sfi 003967 ® 2006 HydroCAD Software Solutions LLC 3/23/2007 Pond 4P: Pond 2 Inflow Area = 0.200 ac, Inflow Depth > 6.35" for 10-YR event Inflow = 2.06 cfs @ 11.90 hrs, Volume= 0.106 of Outflow = 1.98 cfs @ 11.92 hrs, Volume= 0.106 af, Men= 4%, Lag= 1.0 min Primary = 1.98 cfs @ 11.92 hrs, Volume= 0.106 of Routing by Stor-Ind method, Time Span=1.00-40.00 hrs, dt= 0.05 hrs Peak Elev= 8.54' @ 11.92 hrs Surf.Area= 1,020 sf Storage= 470 of Plug -Flow detention time=16.9 min calculated for 0.106 of (100% of inflow) Center -of -Mass det. time= 16.8 min ( 758.4 - 741.6 ) Volume Invert Avail.Storage Storage Description #1 8.00, 1,000 cf Custom Stage Data (Prismatic) Listed below (Recalc) Elevation Surf.Area Inc.Store Cum.Store (feet) (sq-ft) (cubic -feet) (cubic -feet) 8.00 730 0 0 9.00 1,270 1,000 1,000 Device Routing Invert Outlet Devices #1 Primary SW 8.0" x 35.0' long Culvert CPP, square edge headwall, Ke= 0.500 Outlet Invert-- 6.25' S= 0.01007 Cc= 0.900 n= 0.013 02 Device 1 6.60' 1.5" Vert Orifice/Grate C= 0.600 #3 Primary 8.40' 15.W long x 10.0' breadth Broad -Crested Rectangular Weir Head (feet) 0.20 0.40 0.60 0.80 1.00 1.20 1.40 1.60 Coef. (English) 2.49 2.56 2.70 2.69 2.68 2.69 2.67 2.64 Primary OutFlow Max=1.92 cfs @ 11.92 hrs HW=8.53' (Free Discharge) 1=Culvert (Passes 0.08 cfs of 1.94 cfs potential flow) t-2=OrifcelGrate (Orifice Controls 0.08 cfs @ 6.59 fps) -Broad-Crested Rectangular Weir (Weir Controls 1.84 cfs @ 0.91 fps) Storage Ponds-2 Type H 24hr 10-YR Rainfall=6 80" Prepared by Appian Consulting Engineers, PA Page 15 HydroCAD® 8.00 sln 003967 0 2006 HydroCAD Software Solutions LLC 3/23/2007 Pond 4P: Pond 2 Hydrograph Z Inflow p Primary Time (hours) Storage Ponds-2 Type 1124-hr 10-YR Rainfall=6.80" Prepared by Appian Consulting Engineers, PA Page 16 Hydr+oCAD® 8.00 s/n 003967 ® 2006 HydroCAD Software Solutions LLC 3/23/2007 Hydrograph for Pond 4P: Pond 2 Time Inflow Storage Elevation Primary (hours) (cfs) (cubic -feet) (feet) (cfs) 1.00 0.00 0 8.00 0.00 2.00 0.01 1 8.00 0.01 3.00 0.01 1 8.00 0.01 4.00 0.01 1 8.00 0.01 5.00 0.02 2 8.00 0.02 6.00 0.02 2 8.00 0.02 7.00 0.02 2 8.00 0.02 8.00 0.03 3 8.00. 0.03 9.00 0.04 4 8.01 0.04 10.00 0.05 5 8.01 0.05 11.00 0.09 25 8.03 0.07 12.00 0.78 424 8.49 1.11 13.00 0.08 338 8.40 0.09 14.00 0.05 292 8.35 0.08 15.00 0.04 185 8.23 0.07 16.00 0.03 55 8.07 0.07 17.00 0.03 3 8.00 0.03 18.00 0.02 3 8.00 0.02 19.00 0.02 2 8.00 0.02 20.00 0.02 2 8.00 0.02 21.00 0.02 2 8.00 0.02 22.00 0.02 2 8.00 0.02 23.00 0.02 2 8.00 0.02 24.00 0.01 2 8.00 0.01 25.00 0.00 0 8.00 0.00 26.00 0.00 0 8.00 0.00 27.00 0.00 0 8.00 0.00 28.00 0.00 0 8.00 0.00 29.00 0.00 0 8.00 0.00 30.00 0.00 0 8.00 0.00 31.00 0.00 0 8.00 0.00 32.00 0.00 0 8.00 0.00 33.00 0.00 0 8.00 0.00 34.00 0.00 0 8.00 0.00 35.00 0.00 0 8.00 0.00 36.00 0.00 0 8.00 0.00 37.00 0.00 0 8.00 0.00 38.00 0.00 0 8.00 0.00 39.00 0.00 0 8.00 0.00 40.00 0.00 0 8.00 0.00 Storage Ponds-2 Type 1! 24-hr 90-YR Rainfa11==6.80" Prepared by Appian Consulting Engineers, PA Page 17 HydroCAD® 8.00 s/n 003967 ® 2006 HvdroCAD Software Solutions LLC 3/23/2007 Elevation Primary (feet) (cfs) 8.00 0.00 8.01 0.07 8.02 0.07 8.03 0.07 8.04 0.07 8.05 0.07 8.66 0.07 8.07 0.07 8.08 0.07 8.09 0.07 8.10 0.07 8.11 0.07 8.12 0.07 8.13 0.07 8.14 0.07 8.15 0.07 8.16 0.07 8.17 0.07 8.18 0.07 8.19 0.07 8.20 0.07 8.21 0.07 8.22 0.07 8.23 0.07 8.24 0.07 8.25 0.07 8.26 0.07 8.27 0.07 8.28 0.08 8.29 0.08 8.30 0.08 8.31 0.08 8.32 0.08 8.33 0.08 8.34 0.08 8.35 0.08 8.36 0.08 8.37 0.08 8.38 0.08 8.39 0.08 8.40 0.08 8.41 0.12 8.42 0.18 8.43 0.27 8.44 0.38 8.45 0.50 8.46 0.63 8.47 0.77 8.48 0.92 8.49 1.09 8.50 1.26 8.51 1.44 8.52 1.63 8.53 1.83 Stage -Discharge for Pond 4P: Pond 2 Elevation Primary (feet) WS) 8.54 2.04 8.55 2.25 8.56 2.47 8.57 2.70 8.58 2.93 8.59 3.18 8.60 3.42 8.61 3.68 8.62 3.95 8.63 4.22 8.64 4.50 8.65 4.78 8.66 5.08 8.67 5.38 8.68 5.68 8.69 5.99 8.70 6.31 8.71 6.63 8.72 6.96 8.73 7.29 8.74 7.64 8.75 7.98 8.76 8.33 8.77 8.69 8.78 9.06 8.79 9.43 8.80 9.80 8.81 10.20 8.82 10.60 8.83 11.00 8.84 11.42 8.85 11.84 8.86 12.26 8.87 12.70 8.88 13.14 8.89 13.58 8.90 14.04 8.91 14.50 8.92 14.96 8.93 15.43 8.94 15.91 8.95 16.39 8.96 16.89 8.97 17.38 8.98 17.89 8.99 18.40 9.00 18.91 Storage Ponds-2 Type I/ 24-hr 10-YR Rainfall=6.80" Prepared by Appian Consulting Engineers, PA Page 18 HydroCAD® 8.00 s/n 003967 ® 2006 HydroCAD Software Solutions LLC 3/23/2007 Stage -Area -Storage for Pond 4P: Pond 2 Elevation Surface Storage (feet) (sq-ft) (cubic -feet) 8.00 730 0 8.01 735 7 8.02 741 15 8.03 746 22 8.04 752 30 8.05 757 37 8.06 762 45 8.07 768 52 8.08 773 60 8.09 779 68 8.10 784 76 8.11 789 84 8.12 795 91 8.13 800 99 8.14 806 107 8.15 811 116 8.16 816 124 8.17 822 132 8.18 827 140 8.19 833 148 8.20 838 157 8.21 843 165 8.22 849 174 8.23 854 182 8.24 860 191 8.25 885 199 8.26 870 208 8.27 876 217 8.28 881 226 8.29 887 234 8.30 892 243 8.31 897 252 8.32 903 261 8.33 908 270 8.34 914 279 8.35 919 289 &36 924 298 8.37 930 307 8.38 935 316 8.39 941 326 8.40 946 335 8.41 951 345 8.42 957 354 8A3 962 364 8.44 968 373 8.45 973 383 8.46 978 393 8.47 984 403 8.48 989 413 8.49 995 423 8.50 1,000 433 8.51 1,005 443 8.52 1,011 453 8.53 1,016 463 Elevation Surface Storage (feet) (sq ft) (cubic -feet) 8.54 1,022 473 8.55 1,027 483 8.56 1,032 493 8.57 1,038 504 8.58 1,043 514 8.59 1,049 525 8.60 1,054 535 8.61 1,059 546 8.62 1,065 556 8.63 1,070 567 8.64 1,076 578 8.65 1,081 589 8.66 1,086 599 8.67 1,092 610 8.68 1,097 621 8.69 1,103 632 8.70 1,108 643 8.71 1,113 654 8.72 1,119 666 8.73 1,124 677 8.74 1,130 688 8.75 1,135 699 8.76 1,140 711 8.77 1,146 722 8.78 1,151 734 8.79 1,1.57 745 8.80 1,162 757 8.81 1,167 768 8.82 1,173 780 8.83 1,178 792 8.84 1,184 804 8.85 1,189 816 8.86 1,194 827 8.87 1,200 839 8.88 1,205 851 8.89 1,211 864 8.90 1,216 876 8.91 1,221 888 8.92 1,227 900 8.93 1,232 912 8.94 1,238 925 8.95 1,243 937 8.96 1,248 950 8.97 1,254 962 8.98 1,259 975 8.99 1,265 987 9.00 1,270 1,000 Storage Ponds-2 Type U 24-hr 100-YR Rainfall=11.39" Prepared by Appian Consulting Engineers, PA Page 19 HydroCAD® 8.00 s/n 003967 ® 2006 HydroCAD Software Solutions LLC 3/23/2007 Time span=1.0040.00 hrs, dt=0.05 hrs, 781 points Runoff by SCS TR-20 method, UH=SCS, Split Pervious/imperv. Reach routing by Stor-Ind method - Pond routing by Stor-Ind method Subcatchment 3S: Area 2 Runaff Area=0.200 ac Runoff Depth>10.91" Flow Length=80' Slope=0.0200'f Tc=1.6 min CN=86/98 RunofF3.48 cfs 0.182 of Pond 4P: Pond 2 Peak Elev=8.60' Storage=533 cf In low=3.48 cfs 0.182 of Outflow=3.37 cfs 0.182 of Total Runoff Area = 0.200 ac Runoff Volume = 0.182 of Average Runoff Depth=10.91" 15.00% Pervious Area = 0.030 ac 85.00% Impervious Area = 0.170 ac Storage Ponds-2 Type 1124-hr 100-YR Rainfall=11.39" Prepared by Appian Consulting Engineers, PA Page 20 HydroCADS 8.00 s/n 003967 ® 2006 HydroCAD Software Solutions LLC 3/23/2007 Subcatchment 3S: Area 2 Runoff = 3.48 cfs @ 11.90 hrs, Volume= 0.182 af, Depth>10.91" Runoff by SCS TR-20 method, UH=SCS, Split Pervious/Imperv., Time Span=1.00-40.00 hrs, dt= 0.05 hrs Type If 24-hr 100-YR Rainfall=11.39" Area (ac) CN Description 0.170 98 Paved parking & roofs 0.030 86 Newly graded area, HSG B 0.200 96 Weiighted Average 0.030 86 Pervious Area 0.170 98 Impervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 1.6 80 0.0200 0.84 Lag1CN Method, Overland �3 b LL Subcatchment 3S: Area 2 Hydrograph Time (hours) 18 Runoff Storage Ponds-2 Type /I 24-hr 100-YR Ralnfa#=11.39" Prepared by Appian Consulting Engineers, PA Page 21 HydroCAD® 8.00 s/n 003967 ® 2006 HydroCAD Software Solutions LLC 3/23/2007 Hydrograph for Subcatchment 3S: Area 2 Time Precip. Perv.Excess Imp.Excess Runoff (hours) (inches) (inches) (inches) (cfs) 1.00 0.12 0.00 0.02 0.01 1.50 0.18 0.00 0.06 0.01 2.00 0.25 0.00 0.11 0.02 2.50 0.32 0.00 0.16 0.02 3.00 0.39 0.00 0.22 0.02 3.50 0.47 0.01 0.29 0.02 4.00 0.55 0.03 0.36 0.03 4.50 0.63 0.05 0.44 0.03 5.00 0.72 0.08 0.52 0.03 5.50 0.81 0.11 0.61 0.03 6.00 0.91 0.15 0.71 0.04 6.50 1.02 0.21 0.81 0.04 7.00 1.13 0.26 0.91 0.04 7.50 1.24 0.33 1.03 0.04 8.00 1.37 0.41 1.15 0.05 8.50 1.51 0.50 1.29 0.06 9.00 1.67 0.61 1.45 0.07 9.50 1.86 0.74 1.63 0.07 10.00 2.06 0.90 1.84 0.09 10.50 2.32 1.10 2.10 0.11 11.00 2.68 1.39 2.45 0.16 11.50 3.22 1.86 2.99 0.27 12.00 7.55 5.90 7.31 1.32 12.50 8.37 6.69 8.13 0.21 13.00 8.79 7.10 8.55 0.14 13.50 9.10 7.40 8.86 0.11 14.00 9.34 7.64 9.10 0.09 14.50 9.54 7.83 9.30 0.08 15.00 9.72 8.01 9.48 0.07 15.50 9.88 8.17 9.64 0.06 16.00 10.02 8.30 9.78 0.05 16.50 1.0.15 8.43 9.91 0.05 17.00 10.27 8.55 10.03 0.05 17.50 10.38 8.66 10.14 0.04 18.00 10.49 8.76 10.25 0.04 18.50 10.59 8.86 10.35 0.04 19.00 10.68 8.95 10.44 0.04 19:50 10.77 9.03 10.52 0.03 20.00 10.84 9.11 10.60 0.03 20.50 10.92 9.18 10.68 0.03 21.00 10.99 9.25 10.75 0.03 21.50 11.06 9.32 10.82 0.03 22.00 11.13 9.39 10.89 0.03 22.50 11.20 9.45 10.95 0.03 23.00 11.26 9.52 11.02 0.03 23.50 11.33 9.58 11.09 0.03 24.00 11.39 9.65 11.16 0.02 24.50 11.39 9.65 11.15 0.00 25.00 11.39 9.65 11.15 0.00 25.50 11.39 9.65 11.15 0.00 26.00 11.39 9.65 11.15 0.00 26.50 11.39 9.65 11.15 0.00 27.00 11.39 9.65 i i A 5 0.00 27.50 11.39 9.65 11.15 0.00 Time Precip. Perv.Excess Imp.Excess Runoff (hours) finches) (inches) (inches) (cfs) 28.00 11.39 9.65 11.15 0.00 28.50 11.39 9.65 11:15 0.00 29.00 11.39 9.65 11.15 0.00 29.50 11.39 9.65 11.15 0.00 30.00 11.39 9.65 11.15 0.00 30.50 11.39 9.65 11.15 0.00 31.00 11.39 9.65 11.15 0.00 31.50 11.39 9.65 11.15 0.00 32.00 11.39 9.65 11.15 0.00 32.50 11.39 9.65 11.15 0.00 33.00 11.39 9.65 11.15 0.00 33.50 11.39 9.65 11.15 0.00 34.00 11.39 9.65 11.15 0.00 34.50 11.39 9.65 11.15 0.00 35.00 11.39 9.65 11.15 0.00 35.50 11.39 9.65 11.15 0.00 36.00 11.39 9.65 11.15 0.00 36.50 11.39 9.65 11.15 0.00 37.00 11.39 9.65 11.15 0.00 37.50 11.39 9.65 11.15 0.00 38.00 11.39 9.65 11.15 0.00 38.50 11.39 9.65 11.15 0.00 39.00 11.39 9.65 11.15 0.00 39.50 11.39 9.65 11.15 0.00 40.00 11.39 9.65 11.15 0.00 Storage Ponds-2 Type H 24-hr 100-YR Rainfall=l1.39" Prepared by Appian. Consulting Engineers, PA Page 22 HydroCADO 8.00 s/n 003967 ® 2006 HydroCAD Software Solutions LLC 3/23/2007 Pond 4P: Pond 2 Inflow Area = 0.200 ac, Inflow Depth > 10.91" for 100-YR event Inflow = 3.48 cfs @ 11.90 hrs, Volume= 0.182 of Outflow = 3.37 cfs @ 11.92 hrs, Volume= 0.182 af, Men= 3%, Lag= 0.8 min Primary = 3.37 cfs @ 11.92 hrs, Volume= 0.182 of Routing by Stor-Ind method, Time Span=1.00-40.00 hrs, dt= 0.05 hrs Peak Bev= 8.60' @ 11.92 hrs Surf.Area= 1,053 sf Storage= 533 cf Plug -Flow detention time= 17.1 min calculated for 0.182 of (100% of inflow) Center -of -Mass det. time= 17.0 min ( 752.2 - 735.3 ) Volume Invert Avail.Storaae Storage Description #1 8.00, 1,000 cf Custom Stage Data (Prismatic) Listed below (Recalc) Elevation Surf.Area Inc.Store Cum.Store (feet) (sq-ft) (cubic -feet) (cubic -feet) 8.00 730 0 0 9.00 1,270 1,000 1,000 Device Routing Invert Outlet Devices #1 Primary 6.69 8.0" x 35.0' long Culvert CPP, square edge headwall, Ke= 0.500 Outlet Invert= 6.25' S= 0.0100P Cc= 0.900 n= 0.013 #2 Device 1 6.60' 1.5" Vert. Orific elGrate C= 0.600 #3 Primary 8.40' 15.W long x 10.W breadth Broad -Crested Rectangular Weir Head (feet) 0.20 0.40 0.60 0.80 1.00 1.20 1.40 1.60 Coef. (English) 2.49 2.56 2.70 2.69 2.68 2.69 2.67 2.64 Primary OutFlow Max=3.27 cfs @ 11.92 hrs HW=8.59' (Free Discharge) L1=Culvert (Passes 0.08 cfs of 1.97 cfs potential flow) 13=13road-Crested 2=0rifice/Grate (Orifice Controls 0.08 cfs @ 6.69 fps) Rectangular Weir (Weir Controls 3.18 cfs @ 1.10 fps) Storage Ponds-2 Type 1124-hr 100-YR Rainfall=1 1.39" Prepared by Appian Consulting Engineers, PA . Page 23 HydroCAD® 8.00 sln 003967 ® 2006 HydroCAD Software Solutions LLC 3/23/2007 w n LL Pond 4P: Pond 2 Hydrograph Time (hours) 110 inflow e Primary Storage Ponds-2 Type H 24-hr 100-YR Rainfall= 11. 39 " Prepared by Appian Consulting Engineers, PA Page 24 HydroCAD® 8.00 s/n 003967 ® 2006 HydroCAD Software Solutions LLC 3/23/2007 Hydrograph for Pond 4P: Pond 2 Time Inflow Storage Elevation Primary (hours) (cfs) (cubic -feet) (feet) (cfs) 1.00 0.01 0 8.00 0.00 2.00 0.02 2 8.00 0.02 3.00 0.02 2 8.00 0.02 4.00 0.03 3 8.00 0.03 5.00 0.03 3 8.00 0.03 6.00 0.04 4 8.01 0.04 7.00 0.04 4 8.01 0.04 8.00 0.05 5 8.01 0.05 9.00 0.07 7 8.01 0.07 10.00 0.09 26 8.03 0.07 11.00 0..16 194 8.24 0.07 12.00 1.32 462 8.53 1.81 13.00 0.14 349 8.41 0.15 14.00 0.09 338 8.40 0.09 15.00 0.07 327 8.39 0.08 16.00 0.05 269 8.33 0.08 17.00 0.05 178 8.23 0.07 18.00 0.04 77 8.10 0.07 19.00 0.04 4 8.01 0.04 20.00 0.03 3 8.00 0.03 21.00 0.03 3 8.00 0.03 22.00 0.03 3 8.00 0.03 23.00 0.03 3 8.00 0.03 24.00 0.02 3 8.00 0.02 25.00 0.00 0 8.00 0.00 26.00 0.00 0 8.00 0.00 27.00 0.00 0 8.00 0.00 28.00 0.00 0 8.00 0.00 29.00 0.00 0 8.00 0.00 30.00 0.00 0 8.00 0.00 31.00 0.00 0 8.00 0.00 32.00 0.00 0 8.00 0.00 33.00 0.00 0 8.00 0.00 34.00 0.00 0 8.00 0.00 35.00 0.00 0 8.00 0.00 36.00 0.00 0 8.00 0.00 37.00 0.00 0 8.00 0.00 38.00 0.00 0 8.00 0.00 39.00 0.00 0 8.00 0.00 40.00 0.00 0 8.00 0.00 Storage Ponds-2 Type l! 24-hr 100-YR Rainfall=11.39" Prepared by Appian Consulting Engineers, PA Page 25 HydroCAD® 8.00 sln 003967 ® 2006 HydroCAD Software Solutions LLC 3/23/2007 Elevation Primary (feet) (Cfs) 8.00 0.00 8.01 0.07 8.02 0.07 8.03 0.07 8.04 0.07 8.05 0.07 8.06 0.07 8.07 0.07 8.08 0.07 8.09 0.07 8.10 0.07 8.11 0.07 8.12 0.07 8.13 0.07 8.14 0.07 8.15 0.07 8.16 0.07 8.17 0.07 8.18 0.07 8.19 0.07 8.20 0.07 8.21 0.07 8.22 0.07 8.23 0.07 8.24 0.07 8.25 0.07 8.26 0.07 8.27 0.07 8.28 0.08 8.29 0.08 8.30 0..08 8.31 0.08 8.32 0.08 8.33 0.08 8.34 0.08 8.35 0.08 8.36 0.08 8.37 0.08 8.38 0.08 8.39 0.08 8.40 0.08 8.41 0.12 8.42 0.18 8.43 0.27 8.44 0.38 8.45 0.50 8.46 0.63 8.47 0.77 8.48 0.92 8.49 1.09 8.50 1.26 8.51 1.44 8.52 1.63 8.53 1.83 Stage -Discharge for Pond 412: Pond 2 Elevation Primary (feet) (Cfs) 8.54 2.04 8.55 2.25 8.58 2.47 8.57 2.70 8.58 2.93 8.59 3.18 8.60 3.42 8.61 3.68 8.62 3.95 8.63 4.22 8.64 4.50 8.65 4.78 8.66 5.08 8.67 5.38 8.68 5.68 8.69 5.99 8.70 6.31 8.71 6.63 8.72 6.96 8.73 7.29 8.74 7.64 8.75 7.98 8.76 8.33 8.77 8.69 8.78 9.06 8.79 9.43 8.80 9.80 8.81 10.20 8.82 10.60 8.83 11.00 8.84 11.42 8.85 11.84 8.86 12.26 8.87 12.70 8.88 13.14 8.89 13.58 8.90 14.04 8.91 14.50 8.92 14.96 8.93 15.43 8.94 15.91 8.95 16.39 8.96 16.89 8.97 17.38 8.98 17.89 8.99 18.40 9.00 18.91 Storage Ponds-2 Type 1124-hr 100-YR Rainfall=11.39" Prepared by Appian Consulting Engineers, PA Page 26 HydroCAD® 8.00 s/n 003967 0 2006 HydroCAD Software Solutions LLC 3/23/2007 Stage -Area -Storage for Pond 4P: Pond 2 Elevation Surface Storage (feet) (sq-ft) (cubic -feet) 8.00 730 0 8.01 735 7 8.02 741 15 8.03 746 22 8.04 752 30 8.05 757 37 8.06 762 45 8.07 768 52 8.08 773 60 8.09 779 68 8.10 784 76 8.11 789 84 8.12 795 91 8.13 800 99 8.14 806 107 8.15 811 116 8.16 816 124 8.17 822 132 8.18 827 140 8.19 833 148 8.20 838 157 8.21 843 165 8.22 849 174 8.23 854 182 8.24 860 191 8.25 865 199 8.26 870 208 8.27 876 217 8.28 881 226 8.29 887 234 8.30 892 243 8.31 897 252 8.32 903 261 8.33 908 270 8.34 914 279 8.35 919 289 8.36 924 298 8.37 930 307 8.38 935 316 8.39 941 326 8.40 946 335 8.41 951 345 8.42 957 354 8A3 962 364 8.44 968 373 8.45 973 383 8.46 978 393 8.47 984 403 8.48 989 413 8.49 995 423 8.50 1,000 433 8.51 1,005 443 8.52 1,011 453 8.53 1,016 463 Elevation Surface Storage (feet) (sq ft) (cubic -feet) 8.54 1,022 473 8.55 1,027 483 8.56 1,032 493 8.57 1,038 504 8.58 1,043 514 8.59 1,049 525 8.60 1,054 535 8.61 1,059 546 8.62 1,065 556 8.63 1,070 567 8.64 1,076 578 8.65 1,081 589 8.66 1,086 599 8.67 1,092 610 8.68 1,097 621 8.69 1,103 632 8.70 1,108 643 8.71 1,113 654 8.72 1,119 666 8.73 1,124 677 8.74 1,130 688 8.75 1,135 699 8.76 1,140 711 8.77 1,146 722 8.78 1,151 734 8.79 1,157 745 8.80 1,162 757 8.81 1,167 768 8.82 1,173 780 8.83 1,178 792 8.84 1,184 804 8.85 1,189 816 8.86 1,194 827 8.87 1,200 839 8.88 1,205 851 8.89 1,211 864 8.90 1,216 876 8.91 1,221 888 8.92 1,227 900 8.93 1,232 912 8.94 1,238 925 8.95 1,243 937 8.96 1,248 950 8.97 1,254 962 8.98 1,259 975 8.99 1,265 987 9.00 1,270 1,000 pi '' UN CA L , CUU L A T- 10 Appian Consulting Engineers, PA PO Box 7966 o Q Rocky Mount, NC 27804 INKAn 252.972.7703 Project: Beaufort ABC Store 1.0 Wastewater Flow Rate (from NCAC 15A 02H.0200 Rules): a. Facility Type: b. Flow Rate: gpm c. Units each Total Design Flow Rate: 80 gallons(min 2.0 Pump Design Peak Flow Rate: (pumps to be capable of pumping at 1.0 times the average daily flow rate with pump out of service): 80 x 1. = 1 80.0 gallons/minute a. Proposed Force Main Pipe Size: inch Velocity 2.04 fps ---Velocity > 2 fps, okay. b. Selected Pump Flow Rate: gpm Velocity 2.04 fps ---Velocity > 2 fps, okay. C. Future Pump Flow Rate: Velocity J 2.04 fps 3.0 Schematic Profile of Force Main, Wet Well & Discharge point A f�— Pro WV L = 1500' Prop invert Gravity in = 5.65 Prop bottom of WW = 1.90 >2 1L 4-inch FM 100 yr Flood = NIA Inv FM = 10.00 4.0 Wetwell Section ----------------- C/L Pump Suction = #V,ALUE! ft Top WW = 7.75 Main .: WW diameter 4 Influent Elev = 5.65 Influent Line HW Alarm = Lag Pump On = 5.40 Lead Pump On = 5.40 Off = ?.90 Bottom of WW = 1.90 LO N 0 5.0 Emergency Storage Current Flow: a. Bottom Slab of WW Elev: 6.75 (or limiting elevation) b. HW Alarm Elev: 5.40 Diff = 1.35 0 storage/VF in a 4 ft dia WW C. - a Nns of available storage in WW d. Average Flow = 1\8r Ns/day =1440 = 0.06 gpm e. Therefore, the availab.., WW-.Ti-rge„cy store = 0.0 min, or (excluding storage in gravity lines and manholes) 0.00 hours Future Flow = f. Fut DU's in service area 0 Lots x 80 gpd/DU - gpd Average Flow = 0 gpm Req'd pump size = 0 gpm Wetwell Storage Req'd = #DIV/01 min, or #DIV/O! hours (excludes storage in gravity lines & MH's) 6.0 Reliability a. Primary Power Source: Power is proposed to be underground; 1 phase b. Secondary Power Source: A fail to start alarm is to be installed at the pump station SEWER LIFT STATION o 0 0 CALCULATION SCHEDULE CONSULTING CIVIL, MUNICIPAL & STRUCTURAL ENGINEERS Note: Fill in red place holders only! COMPREHENSIVE ENVIRONMENTAL SERVICES Project: 3eaufort ABC Date: 3/23/2007 Location: Beaufort, NC Designer: pws Prop. FM Diameter —> inches (actual ID) Project No 06-083 fps calculation given gpm = 2.04 fps 1 Force Main Discharge Flev (Hinh Pf = ) I -in nn 2 Center Line Suction Elevation #VALUE! 3 Slab Elevation 7.75 4 Gravity Influent Elevation 5.65 5 Pump on Elevation 6.40 6 Pump off Elevation 2.90 7 Ground Elevation 7.25 8 Elevation of wetwell bottom 1.90 9 Suction Inlet Elevation 2 10 Force Main Length & Type Pipe: 4" PVC 1,500 LF 11 Type Motors Specified 1 ph/240V 12 HP required non -overloading at Design Conditions 1 HP 13 HP required future 1 HP 14 TDH Present 11.31 feet 15 TDH Future 13.35 feet 16 GPM Present 80 gpm 17 GPM Future 80 gpm 18 Pump Selected Zoeller N161, 2" flanged discharge 19 Pump Speed Present 3450 rpms 20 Pump Speed Future 3450 rpms 21 Pump Impeller Diameter 6 inches 22 Suction Pipe Size Vel Sta Suction Pump at gpm NIA fps 23 Discharge Sta. Pipe Size ", Vel Sta Discharge, 80 gpm 7.65 fps 24 FM Pipe Size ", Vel in force main at 80 gpm. 2.72 fps 25 Wet Well Size 4 ft. in dia. 26 Gallons per vertical foot of wet well 94.0 s/VF Appian Consulting Engineers, PA PO Box 7966 Rocky Mount, NC 27804 Telephone: (252) 972-7703 Fax: (252) 972-7638 www.appianengineers.com SEAL 8421 00 ,,'.0. Pf4i1 iti y``�ti (This form developed by Appian - last revised 3 July, 2006) 3. 2 .O ; Appian Consulting Engineers, PA Page 2 Note. Fill in red place holders only! 1.0 Total Dynamic Suction Lift NIA" DIP A. Static Suction Lift ft, B. Suction Friction (1) Total StmWht Pise ■ 2 4 1 uu - e Quanft fir. i 0 ►tr. ' i 0 Str. Pi e 0 Feet 1 I. u 11.0 0.0 0.0 0.0 0.0 5 - e Str. Pie 0 0.01 0.0 Total E m= 0 x hf uiv Str. Pipe 0.00 0.00 0 x hf = 0.5311 x I (C100 = 1 0.00 (C100) TDSL = 1 0.00 ft. 2.0 NPSH at 80 GDM 3.0 0 MSL of station floor = 1 7.8 feet above sea level A. Total Atmospheric Pressure at Sea Level B. Deductior z• (1) Total D n• t S cti Lff IL 0.00 2 NPSH re( sire + "i (3) Altitude Q -re Y:)00' a► we MSL) 0.00 0.01 4 Safety 2.00 5 Vapor Pressure at 74 degrees F 1.00 33.90 NPSH required: 3.01 Excess NPSH at 80 gpm 30.89 a Station Discharge PlDing Friction Loss (oioe materiall A. Total Straight Pie If Fittings Quantity Feet B. " - e . Str. Pie 1 5.5 ft C. 3all valve_- e . Str. Pie 1 1.3 1.3 ft D. - eq. Str. Pipe 1 0.3 0.3 ft E. - e . Str. Pie 0 8.0 - ft F. - e . Str. Pie 0 11.0 - ft G. - e . Str. Pipe n 4.0 - ft Total E uiv Str. Pipe 13.9 ft 4.0 Page 3 Station Discharge Piping Friction Loss (in feet of head) _ limm = 80 0.141 x hf = 9.5356 (C150)= 1.32 (C130) 9.141 x hf = 9.5356 (C150)x 1 1.303 (C130) = 1 1.72 (C100 b Station Discharge PiDina Friction Loss of (nine materiall a A. Total Straight Pipe n n if Fittings Quantity Feet B. - e . Str. Pie 0 .0 0.0 ft C. - e . Str. Pie 0 0.0 0.0 ft D. _ _ - e . Str. Pie 0 0.0 0.0 ft E. - e . Str. Pi 0 0.0 0.0 ft F. - e . Str. Pi 0 0.0 0.0 ft G. - e . Str. Pie 0 0.0 0.0 ft Total E uiv Str. Pie 0.0 ft Station Discharge Piping Friction Loss (in feet of head) = m = 80 0.00 x hf = = 0.00 -� 0.00 1 x hf = 0 x I (C 100) = 0.00 (C 100) FM Friction 4" PVC (pipe maV , 80 gpm A. Total Straight Pie If Fittings QuantKy Feet B. 90 deg El- e . Str. Pipe 2 11.0 22.0 ft C. 2" to 4" Inc - e . Str. Pie 1 6.5 6.5 ft D. Gate Valve- e . Str. Pipe 1 2.5 2.5 ft E. Thru Tee - eq. Str. Pie 0 11.0 0.0 ft F. Enlar 't- e . Str. Pie 0 4.0 0.0 ft G. - e . Str. Pie � 10.0 0.0 ft Total E uiv Str. Pie 1531.0 ft Force Main Friction (in feet of head) _ I,gpm = 80 15.311 x hf = _ 1 5.39 (C130) 15.311 x hf = 0.3521 (C150) x 1.303� (C130) = 7.02 (C100) C 6.0 FM Friction " (pipe mat`I , 80 gpm A. Total Straight Pie If Fittings Quantity Feet B. vu aeg !_ - e . Str. Pie 0 0.0 ft C. 22 1/2 de E,- e . Str. Pie 0 j.5 0.0 ft D. Gate Valve- e . Str. Pie 0 3.5 0.0 ft E. Thru TeP - e . Str. Pie 0 16.0 0.0 ft F. - e . Str. Pie 0 0.0 0.0 ft G. _ - e . Str. Pie r) 0.0 0.0 ft Total E uiv Str. Pie 0.0 ft Force Main Friction (in feet of head) _ dr"n = nn Page 4 10.001 x hf = 0.3521 (C150)= 1 0.00 (C130) 1 0.00 1 x hf = 0.3521 x I (C130) = 0.00 (C100} Total Dynamic Head A. Static Discharge Hd 10.0 - 5.6) 4.6 B. Suction Friction from 1.0 above 0.00 C. Discharge Station Piping Friction 1.32 C1. Discharge Station Piping Friction 0.00 D. Force Main Friction 5.39 Di. Force Main Friction 0.00 Total Dynamic Head 11.31 6.0 Minimum Suction Submergence (ref.) - 1 3a 3b 4a 4b (C 130) (ref) - 1 3a 3b 4a 4b 4.6 0.00 1.721 0.00 7.02 0.00 13.35 IA. ' suction inlet at gpm intake velocity at Minimum Submergence = B. " suction inlet at gpm intake velocity at 'fsec. Minimum Submergence = 7.0 Primina Lift: (FWnzina Lift has no relation to net nostive suction heath) A. Maximum dry prime & repriming lift at 0 rpm ft B. Actual dry prime & repriming lift at 0 rpm ft 8.0 Assuming a specific gravity of 1.0, the brake horsepower required by the pump = 0.5 HP Operating at % efficiency at Futwe TDH (see pump curve for estimate of efficiency) Page 5 9.0 Check cycling to prevent sewage from becoming septic: B. Select Est. Detention time = min (30 min max) x 0.1 gpm (from 8A above) 0.0 gallons of storage required C. Pump on/off elevations: 1. Storage required = 0.0 gallons 2. Wetwell diameter = feet 3. Vol. per vertical foot = 94.0 gaINF 4. Storage depth req'd = 0.00 feet between pump on and off 5. Pump Design flog I.'-ol i 1. - 80 gpm 6. Est time to pump NNW uown = 0.00 minutes (=pump run time) 9. Duration of Pump Cycle T= V + V Qa - QI QI T= time in minutes V = Wet Well Volume from pump start to pump off Qd = Pump Discharge Rate (gpm) Qi = Inflow rate into wetwell (gpm) T= 0.0 minutes 7. Cycles/Hour = #DIV/01 cycles/hr #DIV/OI 8. Det. time (less pump run time) 0.0 minutes Page 6 NOTE: When alternating between pumps, a pump that has just shut off should not be restarted sooner than the following lapsed times. Horsepower Time < 30 4 minutes 30 to 75 6 minutes 75 to 100 8 minutes 100 to 200 10 minutes (source: Smith & Loveless, Inc., Jan 1987) bj.excel.Lift Station Worksheet.xls form acee04.x1s PUMP PERFORMANCE CURVE L I I I I I I I MODELS 1611416146314163-16514165 m MODELS 1 161/4101 1 109103 1 1S5/41N 20 x 60 18 50 12 40 GALLONS 10 W 30 40 50 00 70 Ito 90 10D 11 LRERS o e0 1160 2 0 364;0 FLOW PER MINUTE mom Standard all,:. . ?0fl cc: 1B1 MODELS 4161 MODELS Control Seledlon Liwe st 811191e8681 DoubteSed Vane - Ph Mods Amp Simp14tr Dmplex CBA UL M161 115 1 Aub 15.5 1 Y Y N161 N4161 115 1 Non 15.6 2or3&5 4&5 Y Ym D161 23D 1 Auto 7.5 1 Y Y E161 E4161 230 1 Non 7.5 2or3&5 4&5 Y Y ' H161 200.208 1 Auto 8.8 1 Y N ' 1161 14161 200-2D8 1 Nan 1 6.8 1 2or3&5 4&5 Y N " J4161 200-21M 3 Non &4 3&5 485 Y Y ' F161 F4161 1230 3 1 Non 5.2 1 3&5 485 Y Y 10161 04161 IGO 3 1 Non 2.9 1 3&5 4&5 Y Y as Mr'-%- W 1 183MOOELS 111881110=3 Contrsl SslscBon Listlggs Slagle Sal Doubts Sad Vdb - Phl Mods Mips I Slunplax DWO C&A I UL M163 115 1 Auto 15.0 1 Y Y N163 N4163 115 1 Non 16.0 2or3A5 485 Y Y„I D163 230 1 Aub 7.5 1 Y Y E163 E4163 230 1 Non 7.5 2 or 3& 5 41115 Y Y ` H163 200-2DB 1 Auto 8.5 1 Y N • 1163 • 14163 200-21118 1 Non 1 8.5 2 or 3 & 5 495 Y N ` J163 • J4163 2D0-208 31 Non ED 3&5 4115 Y I Y ' F163 ' F41M 230 311 4.8 385 4&5 Y I Y ' G163 • G4163 460 31 Non 1 19 3&5 4&5 Y Y 188M6 T 83M s 1n 1 L111r NPTSTANDARD rrFT OR rwr I A RLABLE I— 1 IX NPT STANDARD r NPr I OR r NPT AVAILABLE I S074 207M6 1 iE SR1413 Standard all models - 20 ft. cord -1 HP iM MODELS 4165 MODELS Control Selection Listirps Single Seel Double Sal Vale - Phl Mode Amps 8hnplar DupleR CSA UL D165 23D 1 Auto 102 1 Y Y E165 E4165 230 1 Non 102 2 or 3& 5 4&5 Y Y • H165 2OD-208 1 Auto 12.6 1 Y N • 1165 ' 14165 200-206 1 Non 12.6 2 or 3 & 5 4&5 Y N •J185 ' J4185 2OD-208 3 Nan 7.5 3&5 485 Y Y •F165 ' F4165 230 3 an 7.4 3&5 495 Y Y • G165 • G4165 400 3 Non 3.7 3&5 Y Y •BA165 ' BA4165 1575 3 Non 1 3.0 3&5 -4&5 485 N N 1. Integral float operated mechanical switch, no external control required. 2. For automatic use single piggyback variable level float switch or double piggyback variable level float switch. Refer to FMO477. 3. See FM1228 for tarred model of simplex control panel. 4. See FW712 for correct model of duplex control panel. 5. Variable level control switch 10-0225 used as control activator, • Molded specify sirnplex (3) float or duplex (3) or (4) float system. ro LLI.Moduderal"Wh20Asgplup � CA1 71ON For information an additional Zoeier produucts refer to cabft an Pinrbadc Variable Level float All 1ncbdladm ofcontrols, protection devices ardwlringshould bedonabyaqualirredliansed Switches, FM0477; ElectricalAlbmalor, Ft10486, MsdrakWAlterrebr, FM04KAlarm Package, dectricion. All electrical and an" codes shoudd beldlorred including thernost recentliadonal FM0732; and SumpiSawage Basins, F11110487. Electric Code (NEC) and the Occupational Safety and Health Act (OSHA). RESERVE POWERED DESIGN For unusual conditions a reserve safety factor is engineered into the design of every Zoeller pump. 0 Copyright 2004 Zoeller Co. All rights reserved. QZrirr .ice /9F Prudu d idartnafim preceded here rdlem c wWwom at lima Of pnbwion. Com mm- twy mprdm or COMPARE THFSE FEATURES MW T0t PQ BW MW- Loei v^ KV 4 W SUPM 3MCaoeliOP"d -Lodb* KY 4N1!-IM (5g778.4731.1MM!ffiMW-i"f ffiM 7743M No%dogging bronze vorfat ntVeller deft. Durable cast construction. Cast iron swhch case, base, motor and pump housing. Castings - Cast mm class 25a (25,00F>tJ:tensile skmgtfi). Irrn)etler, bronze class tto-5 M. Corrosion vesmW powdercoaledeprsc In sh. 20 fL UL Listed 3 wire neoprene oard and plug. Longer girds atraildtle in len$m of 2 -WW feet Motor - 60 Hz, 3450 RPM, a'MM, herrnetic* sealed, aubrnatic reset thermal overload profectiat (1 Ph only). Upper sleeve bowing and bow bd bearing running in bath of oil. Carbon and ceramic shaft sad. Mmnum lure for effluent err dmmdming, 13VF-54-C (ED 140-F-60-C). Major wldlh 12'W HwgM 1801,; . (Single seal puirp) No screens b clog. Square Rang & Ga - Neoprene. Stainless steel saews, bolls, foot rod, handle glmFd, arm and seal assentnW. Passes w spherical sobds_ IW NPT discharge with 7 or 3' flange avdabla h*amtic un►Ts avaaable with float operated, submersible (NEMA 6) 2-pols rnedtattitsl switch. On point 14'Yi - Off point S. Avadable in single or double seat designs 100%of units arecompulafted tested. MOL)Li-O 416141W-41U DOUBLE SEAL PUMPS (Nonauto only; Protects motor Fran seal twits. Improved beeratg It9miCafo n. Helps elmnaie sad and bearing damage from dry trots. L%orwidth 12'W He *2ti7 . *OIL The 8mV 0l6ffi d systems nWn* requires vmmbb levd I*S)cmkob andpmWly sited basinslo whimmgAW pxnMqchmcrdmVknmwffinmadm%ftpm4w, AUTOMATIC UNITS NOT RECOMMEND FOR USE IN EFFLUENT SYSTEMS SEcnON:2.2US now OW4 Supersedes 1103 visa our web sft. www.zcmWer co►11 161-163 -165 Single Seal Series 4161- 4163 - 4165 Double Seal Series (ForPmW he& Uniftem see Alm & IIA9+m OW d1GH HEAD "FLOMMATE" FOR SEPTIC TANK - LOW PRESSURE PIPE (LPP) ("Filve AND ENHANC® FLOW STEP SYSTEMS �i +ere JClw OR DEWATERING PUMP - Slfl%RSIBLE 1W NPT D WiARGE STANDARD - 2' AND 3' NPT FLANGE AVAILABLE ill 3E .L POWDER ,..� COATED TOUGW VIZA M FAZZ AWSBWANE RWNIMMAM Au nhakc (Single Sad Only) or Namoutomatio 161-163 and 410-063 Series 165 and 4165 Senors % HP, 1 Pb,115V, 2W-206Var230V 1 HP,1 Ph, 2004War239V %HP, 3 Ph, 200M,, 230V ar460V 1 HP, 3 Ph, 200M 230V or460V Copyright 2004 Zoeller Co. An rights reserved. APPEN-MV-W n " - SECTION. 5.10.280 Qlf4L/Ti'P!/�[!PS IAIZT �9�� FM0531 0103 Product information ® (Z' Supersedespresented here reflects//� i/0302 conditions at time of publication. Consult factory regarding discrepancies or MAL TO. P.O BDX 16347- Lorda ge, KY 40256.0347 visit our web sfte: inconsistencies. SHIP TO. 3649 Cane f a Road • LoukAb, KY 40211-1961 f }ffp.1Avww,zoeffer com (W4 M2731.1(800) 92&PUWP • FAX (502) M-3624 SPECIFICATIONS EFFLUENUSUMP SIMPLE( SYSTEM ZOELLER SUBMERSIBLE DEWATERING OR EFFLUENT PUMPS SEAL SOLIDS DISCHARGE MATERIAL MODELS Single 1/2" 1%a NPT CastIron 53 57 98 140 Single 10 1W NPT Cast Bronze 55 59 Single 5/8" 1W NPT Cast Iron 137 191 Single 5/8" 1W NPT Cast Bronze 139 Single 3/4" 1%" NPT Cast Iron 1152 153 Single 314" 1 W, 2", or 3 NPT Cast Iron 161 163 165 185 186 188 189 Double 1/2" 1%" Cast Iron 4140 Double 3/4" 1W, 2", or 3 NPT Cast Iron 41611416314165 4185 4186 4188 4189 SIMPLEX SYSTEM Furnish a Zoeller Submersible Pump Model Mko I Single Seal or Model Double Seal, with a capacity of 00 GPM against a Total Dynamic Head of 11.31 feel. Motor Specification: Voltage, Cycles, I Phase, 0.15 HP. Discharge to be 1 %inch NPT. Optional X 2" NPTor . 3" NPT(161/4161-189/4189). Cord length to be A71 feet Pumps will pass % inch so' 55,57,59, 98 & 140/4140 Series) or 5/8 inch solids (137 & 139 Series) or_ A 3/4 inch solids(152,153,1,16314163,165/4165,18514185,186/4186,18814188 & 189/4189 Series.) Pumps shall be �_ Ill- listed, CSA approved, SSPM.A certified, State of Wisc. approved, other (Specify }, SINGLE PHASE PUMPS GENERAL Pump motor shall be hermetically sealed, submersible type operating in ahigh quality dielectric oil for coolingthewindings and for lubrication of the motor bearings and ceramic -carbon shaft seal. Single phase motor shall have Internal automatic resetting, thermal overload protection. Construction shall be of Cast iron with 100% baked -on powder coated epoxy finish for corrosion resistance and longer casting durability(or Cast Bronze). All fasteners and external metal parts shall be of stainless steel. Impeller shall be of vortex non -clog design. (Addition noted below.) Check Applicable Series: 53 (cast iron) 55 (cast bronze) Series- Pump shall have a shaded pole motor. Impeller, with metal insert, and base shall be of glass reinforced molded material. Switch case shall be of cast or molded material. Guard and handle shall be of stainless steel. 57 (cast iron)59 (cast bronze) Series- Pump shall have a shaded pole motor. Guard and handle shall be of stainless steel. 98 (cast iron) Series - Pump shall have % HP PSG motor. 137 (cast iron) 139 (cast bronze) Series - Pump shall have % HP split phase motorwith current sensing, starting relay enclosed in switch housing. 152 (.4 HP) 153('f HP) series pump shall have a permanent split capacitor motor. The impeller shall be glass reinforced thermoplastic. Motor housing shall be cast iron. 140 (Cast Iron) Series Pump shall have a 1 HP permanent split capacitor motor with capacitor in the switch housing attached to the pump. The impeller shall be cast bronze. Motor housing shall be cast iron. Discharge shall be a permanently affixed 1 %7 female NPT hub. 4140 (Cast Iron) Series Pump with double carbon/ ceramic shaft seals shall have a 1 HP permanentsplit capacitor motor. with capacitor in the switch housing attached to the pump. The impeller shall be cast bronze. Motor housing shall be cast iron. Discharge shall be a permanently affixed I female NPT hub_ The lower seal cavity shall be oil -filled. — 161 (% HP) 163 (% HP)165 (1 HP) Cast Iron Series- Pump shall have a permanent split capacitor motor with run capacitor and magnetic contactor enclosed in switch housing. Impeller shall be of cast bronze_ Motor housing shall be finned for extra cooling capability. 4161(%HP) _ 4163 (% HP) 4165 (1 HP) Cast iron series pump with double xarbon/cerarnic shaft seals shall have a permanent split capacitor motor with run capacitor and magnetic contactor enclosed in the switch housing. Impeller shall be cast bronze. Motor housing shall be finned forexira cooling capability. The- lower seal cavity shall be oil -filled. 0 Copyright 2003 Zoeller Co. All rights reserved. 185(1HP) 186(1%HP) 188(1Y.HP) 189 (2 HP) Cast Iron Series- Pump shall have a permanent split capacitor motor with run capacitor and magnetic contactor enclosed in switch housing. Impeller shall be of cast bronze. Motor housing shall be finned for extra cooling capability. 4185 (1 HP) 4186 (1'/ HP) 4188 (1'/ HP) 4189 (2 HP) Cast iron series pump with double carbon/ceramic shaft seals shall have a per- manent split capacitor motor with run capacitor and magnetic contactor enclosed in the switch housing. Impeller shall be cast bronze. Motor housing shall be finned for extra cooling capability. The lower seal cavity shall be oil -filled. 191 (2 HP) Cast iron series pump with carbon/ ceramic shaft seals shall have a permanent split capacitor motor with run capacitor enclosed in the switch housing. Impellershall be cast bronze and the housing shall be epoxy coated. Impeller shall be of a closed type construction. Motor housing shall be finned for extra cooling capability. AUTOMATIC CONTROL - INTEGRAL FLOAT TYPE Single phase pump shall have an integral mechanical float switch, which shall require no adjustment, nor require addi- tional equipment for operation. AUTOMATIC CONTROL PIGGYBACK VARIABLE LEVEL FLOAT SWITCH A Zoeller Piggyback Variable Level Float Switch with a fifteen (15) foot SJOWA cord and molded plug shall be furnished to control a nonautomatic pump. Control shall be constructed of durable plastic and be omnidirectional. Con- trol shall be fastened to discharge pipe with plastic tie mounting strap and shall require no extra wiring. (Addition Noted Below.) Check Applicable Control: 10-0034 (115V/Max. % HP) or 10-0035 (230V1 Max. 2 HP) (For use on 115V or 230V, 1 Phase, nonautomatic Zoeller pump). Designed forautomatic pump operation with the appropriate voltage and horsepower, single phase, Zoeller pump. 10-0229 (115V/Max./ HP) or 10-0230 (230V! Max. 2 HP) (For use on 115V or 230V, 1 Phase, nonautomatic Zoeller pump.) Double float system shall have an adjustable pumping range. Pumping range shall be a minimum of one (1) inch to a maxi- mum of forty-eight (48) inches. SIMPLEX CONTROL PANEL A Zoeller Simplex Control Panel shall be fur- nished to control a nonautomatic pump. The panel shall have a Nema 4x enclosure, pump run indicator right, high water alarm; selector switches, float switches, and UL label. Panel will be sized for Zoeller Model Volt, Cycle, Phase, HP, FLA pump. THREE PHASE SYSTEM (FOR USE WITH 130, 16014160, or 180M180 SERIES ZOELLER PUMP) GENERAL Pump motor shall be hermetically sealed, submersible type, operating in a high quality dielectric oil for cooling the wind- ings and for lubrication of the motor bearings and ceramic - carbon shaft seal. Pump motor shall have external magnetic contactorand overload protection. All fasteners and external metal parts shall be of stainless steel. Impeller shall be of vortex non -clog design. 137 (cast iron) model 139 (cast bronze) model shall have a 4-pole squirrel cage induction motor. X 161('/ HP) 163 (Y. HP) 165 (1 HP) cast iron series shall have a 2-pole squirrel cage induction motor. Impeller shall be cast bronze. Motor housing shall be finned for extra cooling capability. 4161(% HP) 4163 (% HP) 4165 (1 HP) cast iron series pump with double carbon/ceramic shaftseals shall have a 2-pole squirrel cage induction motor. Impeller shall be cast bronze. Motor housing shall be finned for extra cooling capability. The lower seal cavity shall be oil -filled. 185 (1 HP) 186 (1%HP) 188 (1% HP) 189 (2 HP) cast iron series shall have 2- pole squirrel cage induction motor. Impeller shall be cast bronze. Motor housing shall be finned for extra cooling capability. 4185 (1 HP) 4186 (1% HP) 4188 (1% HP) 4189 (2 HP) cast iron series pump with double carbon/ceramic shaft seals shall have 2- pole squirrel cage induction motor. Impeller shall be cast bronze. Motor housing shall be finned for extra cooling capability. The lower seal cavity shall be oil - filled. SIMPLEX CONTROL PANEL A Zoeller Simplex Control Panel with three 10-0225 Control Switches shall be furnished to control a nonautomatic pump. The panel shall have a Nema 4X enclosure, pump run indicator light, high water alarm, selector switches. and a UL label. Panel will be sized for Zoeller Model Volt, Cycle, Phase, HP, FLA pump. Panels used with double seal pumps with optional moisture sensors will require a seal leak detector light. CONTROL SWITCHES A Zoeller Variable Level Float Switch shall be furnished to operate control circuit. Float shall be omnidirectional and include a fifteen (15) foot SJOWA cord and plastic tie mount- ing strap_ ACCESSORIESIMISCELLANEOUS UNICHECK 30-0200, (Clamp union valve)(1 Vall % inch) full flow check valve, rated at4.3 psi (10 feetMH) at 130° deg. F.. shall be furnished to fit 1 % inch 1% inch ABS, PVC, CPVC, steel or copper piping. Unicheck shall have valve body and seat of PVC plastic and shall be assembled with thru bolts. Gasket and flapper shall be neoprene with brass backing plates and stainless 0 Copyright 2003 Zoeller Co. AN rights reserved. 2 steel rivet. Unicheck shall include two (2) neoprene unions and four(4) stainless steel clampsand fasteners. 30-0021, (Clamp union valve) (2 inch) full flow check valve, rated at 4.3 psi (10 feet TDH) at 130° deg. F. shall be furnished to fit2 inch ABS, PVC, CPVC, steel orcopperpiping. Unicheckshall havevalve body and seat of PVC plastic and shall be assembledw'rth thru bolts. Gasket and flapper shall be neoprene with brass backing plates and stainless steel rivet Unicheck shall include two (2) neoprene unions and four (4) stainless steel clamps and fasteners. 30-0015 (Compression Union Valve)1% inch IPS full flow check valve shall be furnished to fit 1% inch IPS pipe. Unicheck body and compression and fittings shall be constructed of PVC. Flapper and end seals shall be Buna-N. Valve shall include no metallic parts. Pressure rated at 25 PSI (57 feet TDH) at 1300 F_ 30-0152, (2 inch.) cast iron fullffowcheckvalvewith 2" female N.P.T. Rated at 50 PSI (115 feet TDH) at 1300 F. Neoprene polyester reinforced flapper with cast iron and brass backing plates and stainless steel fastener. 30-0160 (3 inch) cast iron full flow check valve with T' female N.P.T. Rated at 50 PSI (116 feet TDH) at 130° F. Neoprene polyester reinforced flapper with cast iron and brass backing plates and stainless steel fastener. OPTIONAL ALARM SYSTEM An audible high water alarm system shall include a Zoeller 10-0015 (115V) or 10-0016 (230V) A -Pak and a 10-0225 Variable Level Float Switch. The A -Pak shall include a six (6) inch steel alarm bell, which shall sound sixty-eight (68) decibels at a distance of ten (10) feet and a dual mount transformer, which shall step down 115V or 230V 1 PH line voltage to 8V. The 10-0225 Variable Level Float Switch shall be constructed of plastic and shall beomnidirectional. Floatshallinclude fifteen (15)foot SJOWA cord and shall be fastened to discharge pipe with plastic tie mounting strap. 10-0053 (115V/1Ph) A Pak complete with sensor float and Nema 1 metal enclosure (cord and plug). Solid state warning fight and hom, which can be manually turned off. UL listed and GSA certified on complete alarm system. 10-0126 (115V(1Ph) High level Alarm complete with Nema 4x enclosure, alarm bell, Alarm light, Silence switch, and sensor float switch with 16 cord_ Entire unit is UL Listed and CSA Certified. 10-0623 (115V/IPH) High Level Alarm rated for Indoor/Outdoor use perUL 864. The alarm will include an alarm hom, alarm light, silence and test buttons, and a 15' float switch. 10-0682 (115V11 Ph) deluxe high level alarm rated for indoor/outdoor use per UL 864. The alarm will include an alarm hom, alarm light, silence and test buttons, a 20' floatswtich, 6' powercord, andwatertightconnec- tors. SUMP BASIN A Zoeller polyethylene basin, .200 inch thick, .949 G/ CC dense, orZoeller fiberglass basin, 3/16 inch thick, .058 poundslcubic feet dense, inches inside diameter by inches deep shall be furnished. The basin shall include four (4) inch cast iron caulk inlet hubs with anticorrosion coating. The center4iine of the hub(s) shall be located nine (9) inches from the ton of the basin. The basin shall also include a .115 inch thick steel sump cover. An optional pump installation plate can be provided on covers twenty-four (24) inches in diameter or larger. Optional anti - flotation ring can also be provided. Also included shall be a neoprene seal for pump cord, neoprene seal for vent and discharge flange, foam coverseal and plated steel fasteners. Covershall include a inch vent a inch discharge flange with mounting hardware. PIPING & POWER WIRING All piping shall be rigid and permanent in nature and shall be fumished and installed by the contractor. A unicheck shall be installed in the discharge pipe. A 3116" vent hole shall be drilled in the discharge pipe below the check valve and pit cover to purge the system of trapped air. Power wiring shall be supplied by electrical contractor. Power wiring for pump- ing system and alarm system shall be connected to separate circuits. EXTRA DUTY Where conditions require, specify extra duty for adverse conditions. HIGH TEMPERATURE PUMPS For applications up to 200' F. continuous operation, specify HighTemperature Zoeller Pump Co. models. See literature on HighTemperature pumps, FM0806 and FM0807, for ad- ditional informat►on. For 200° F. specification sheet, see FM0817. PUMP DISCONNECTS AND RAIL SYSTEMS Where conditions, due to safety, health and the economy of maintenance require pump disconnects or rail systems specify. 39-0001,1W NPT Disconnect (Non -pump Supporting) 39-0002, 2' Disconnect (Non -pump Supporting) 39-0003, 1 W NPT Rail System(Non-pump Supporting) 39-0004, 2° NPT Rail System (Non -pump Supporting) 39-0085, 1 W NPT Galv. Ez Out (Pump Supporting) 39-0086, 1 YT NPT S.S. Ez Out (Pump Supporting) 39-0083, 2" NPT Galv. Ez Out (Pump Supporting) 39-0084, 2" NPT S-S. Ez Out (Pump Supporting) 39-0074, X NPT GaIv. Fi Out (Pump Supporting) 39-0075, 3" NPT S.S. Ez Out (Pump Supporting) Square Guide Rail Systems shall include single rigid stain- lesssteelsquare rail design, red brass disconnectfitting, cast iron angle arm bracket and guide plates. Galvanized or stainless piping, PVC ball valve, cast iron check valve. Rail system shall be for a Zoeller .Model with a inch discharge. Rail system will be for a inch diameter basin. 0 Copyright 2003 Zoeller Co. Al rights reserved. 3 SECTION: 5.10.040 0503 Product information ® Supersedes presented here reflects P//w �1P `Q. � 0402 lxinditions at time of publication. Consult factory regarding discrepancies or AEK 11i7: P.O. BOX 15347.Otis�Aie, KY 40256.OW Visit our web site. inconsistencies. SW TO: 3649 Cane Run Road - Lor:A r , KY 40211-1961 hftp:lAvww 2oefler corn (W4 778-2731.1(8M 928-PUNP • FAX (5M 774M24 FRICTION HEAD FOR SCHEDULE 40 PLASTIC PIPE Velocity in FT, / SEC. Friction head loss in feet of wafer per 100 fL of pipe. GALS. PER 9/T' PPE 3/4" PIPE 1" PIPE 1 VC PIPE i 1t2" PIPE 2' PIPE 211r PPE 3" PIPE 4" PPE VEL LOSS VEL LOSS VEL LOSS VEL LOSS VEL LOSS VEL LOSS VEL LOSS VEL LOSS VEL LOSS 2 '` t20 0.90 0.74 0.28 043 0.07 0.31 0.03 4 ' 1t 1 1.48 1.01 0.86 025 0.63 0.13 0.38 0.04 '. 1.29 056 0.94 0.27 067 DAI 0.40 0.03. 8 8.44 4617 _ 1.71 0.98 1.26 0.45 0.76 0.13 0.54 0.06 10 10.55 69 80 ' .. 1.57 0.68 0.95 0.20 0.67 0.09 043 0.03 12 15 1&05 97.84 9.01 37.65 i ii o3 jF iri 189 0.96 `:r C15 1.43 028 0.43 0.80 too 0.12 0.78 052 065 0.04 0.06 0.38 0.02 18 1082 5277 t t.72 0.60 t.20 0.25 a78 0.09 a45 M02 20 1202 64.14 _ 1.91 0,73 1.34 0.31 0.87 0.11 0.50 0.03 25 9.27 29.96 4 1.67 0.47 _ i.08 1.30 0.16 0.23 0.63 0.76 0.04 0.06 30 11.12 35 1298 55 86 "' a ; 695 334 h - 1.52 0.30 0.88 0.08 40 1483 141.99 71.53 85T 18.84 I $B 0.39 1.01 0.10 45 50 8" PIPE 16.68 86 97 i07t 28.48 328 399 3.09 3.35 [$8 ,1.73 r ` `'I1= ..13M 1.13 1.26 0.13 0.16 0.55 0.02 65 OBt 0.03 ti.78 33.87 &86 16.05 4.76 368 1.38 0.19 60 0.67 0.03 1285 39.91 9.44 18.85 , 5.59 402 ► = 1.51 0.22 66 0.72 0.03 1393 4829 1023 21.87 ri48 r _ t 1.64 0.25 70 0.78 0.04 15.00 53.10 11.02 25.08 r `:5 i 1.76 0.29 76 0.83 0-04 1C07 6D34 tf.8t 2861 f+ 8 4_ ti6 +£15' , 1.89 0.33 8o 089 0_05 11714 8800 1259 3292 •01' '2 85 0.94 0. d <, 90 95 1.00 1.05 0.06 0-07 19.28 84.57 14.17 14.95 39.95 44.16 1O59 9.07 it. 84 13.09 + 22 100 1.11 ODS 1074 48.56 9.55 1440 69'- 110 1,22 0.09 17.31 57.93 10.50 17.18 4... 2.51 7-'7 - 120 1.33 0.11 18.89 68.06 11.46 20.18 &03 8.50 :Sri: 2 95 302 130 144 0.12 8" POPE 20.46 78.93 1241 23.40 &70 9.86 $#° . 3.43 3.21 f 0901 0.04 140 1.55 0-14 2204 90M 13.37 26.85 9.37 11.31 3.93 3.52 1' - 150 1 1.661 0.16 0961 0.04 23.61 102-89 14.32 30.51 10.04 12.85 4.47 378 1 160 1.77 0.18 1.02 0.05 __. 15.26 34.38 10.71 14.48 '. 5 ns 4 (13 1 170 1.89 0.20 1-09 0.05 1623 38.46 11.38 1620 : 1 180 + 1.15 0.06 17.19 4Z76 1205 18.01 .428 4.53 1 190 1.22 0.07 1 & 14 4726 12.72 19.91 _: &24 6.92 4.78 1, _ ' 200 4 1.28 0.07 10" PPE 19.10 51.07 113.39 21.89 &67 7.61 220 244 0 1.41 0.09 089 0 03 21.01 6Z01 14.72 26.12 9.54 9.011 S 240 266 0 1.54 0.10 0.98 0.03 22.92 7285 i6.06 30.68 10.40 10.66 ;A i 250 288 OF 1.67 0.12 1.06 0.04 1740 35.59 11.27 12-37 280 3.11 -0 1.79 0.14 1.1.4 0.04 1&74 40.82 IZ14 14.19 300 3.33 _ 01 1.92 1 0.15 1.22 0.05 1 2008 46.38 1300 1 16.12 320 '.3.55 0 .. : 1.30 0A6 21.42 5227 13.87 18.17 805 4 84 340 3 77 U. 1 d `. 1.36 QOfi 22.76 58.48 14.74 20.33 8.56 5.42 380 Y: 1.46 0.07 2" PPE 24.09 65.02 15.60 22.W 9.06 6.02 380 Odl 1.64 0.08 2&43 71.86 1647 24.98 8.57 6_66 1.08 0.03 400 1 ` "�Cd98 1.631 0.09 1.13 0A4 tT.34 27.48 10.07 7.32 450 9 1-83 0.11 1.28 0.04 19.51 34.16 11.33 9.11 500 $ A I 1.42 0.05 21.67 41.52 12.59 11.07 660 1 �y}, 4 . 1.56 0.07 23.84 49.53 13.84 13.20 600 7 14 ? .44 8 04. 1.70 om 26.01 58M 1&10 15.61 650 1.84 0.09 28. U 67.50 16.36 17.99 750 8.32 3.19 800 887 360 850 9.43 4.03 Ai ¢ 21.40 29.5T The velocity of two (2) feet per second Is generally accepted as the veloclarto carry solids. The shaded area above indicates Chose accepted velocities over two (2) ft. / sec. and less then eight (8) fL / sec. Data shown is calculated from the Hazen -Williams equation: H =1043 94 X ((0^1.852) / (CAI.852 X D"4-8655)) USING: C =150 flor water at 60 degrees F C = ooeficient for roughness of the Interior pipe surface for plastic pipe H = head toss to FT. V =fluid velocity In FT. / SEC. D = Inside diameter of the pipe In INCHES. Q = flow rate GPM. 0 Copyright 2003 Zoeller Co. All rights reserved. FRICTION HEAD FOR SCHEDULE 40 IRON OR STEEL PIPE VelocIty In FT. / SEC. Friction head loss in feet of water per 100 f . of pipe. GALS' PER 1/2'• PIPE 31,C PIPE V PIPE 1 114- PIPE 1 1/2" PIPE 2'• PIPE 21/r" PIPE 3•' PIPE 4" PIPE MN. VEL LOSS VEL LOSS VEL LOSS VEL LOSS VEL LOSS VEL LOSS VEL LOSS VEL LOSS VEL LOSS 2 ., wit 5.20 1.21 074 fl-s Q43 0_16 0.31 0.07 019 U112. 4 _ " t;IIE t 48 213 0 86 0.58 063 0 038 0.08 0 27 0.03 6 1.29. 1.19 0.94 0. 057 0-17 0.40 0.07 026 0.02 8 6.44 97.84 + 31 1.71 2-03 1.26 0.9q 076 028 0.54 0.12 0-35 0.04 10 10.55147.91 1.57 1_ 095 0.43 0.67 0.18 0.43 0_06 0.25 0.02 12 15.05 2D7.32 ' : ,} =_ t.89 1.15 0.60 0.80 0.26 0.52 0.09 0.30 0.02 15 9.01 79 77�' 4 _ 2.36 1.43 091 1.00 0.38 0.65 0.13 0.38 0.04 18 10.82 111.81 • _. - 283 4. t72 127 1.20 0.54 0.78 0.19 0'" 0.05 20 1202 135.91 ' 3.15 5 ` 1.91 1.55 1.34 0.65 087 023 050 0.06 25 927 63.47 194 7 1.671 0.99 1.08 0.34 0.63 1 0.09 30 11.12 88.97'XIW,- 4.72 _ 1 T ; ;_ 1.30 0.48 0.76 0.13 95 12.88 118.38 .. 551 14.7 3 34 1.52 0.64 088 0.17 40 14.83 151.57 &57 39.91 5.30 18 3.82 1.73 0_82 1.01 022 45 V PEE 16.68 185.51 9.64 49.64 . 708 234 4.30 �'A* t 13 0.27 56 1071 60.34. Z.� `< 34 7 g 2_ 1.26 0.33 0.55 0.04 55 061 0.05 11.78 71.99 aft 4.25 2. t38 0.39 60 0.67 0.06 1285 $4.67 9.44 39 rz z 7!..4 j 499 2 1.51 0.46 65 a72 0.07 1393 98.09 10.23 46 ' 6-21 1a74 4.35 579 2$ ._ 1.64 0.54 70 0.78 0.08 1500 112.52 tt02 63.1 . rx68 15.76 4.69 6-M 3. 1.76 0.61 75 083 fl.10 1507 127.85 Its 60.3 ' 562 7.54 3.25 1.89 0.70 80 0.89 0_.11 17.14 144.08 t259 68. . 535 8.50 3.47 85 0 0.12 i@ 1 161.20 t . 5.69 9.51 90 1.00 0.13 1128 17921 14.17 84. 8.59 25.10 `' 602 10St 390 95 1.05 0.15 14.85 93. 9.07 27.74 fi 36 11 68 412 4 100 1.71 016 1574 102.8 9.55 3D.51 . 110 122 019 17.31 1227 10.50 36.40 d �% 12D 1.33 023 ISM 14421 11.46 4275 8.03 18:01 130 1.44 026 r PIPE 20.46 167 1241 49.59 a70 20.89 1.55 0.30 0.90 08 191140 .133756.89 937 23.96 150 t66 0.34 096 0_09 23.61 218 14.32 64.64 1004 27.23 ' 160 1.77 0.39 1.02 0.10 15.28 7285 f0 71 30.68 3p��88 170 1.89 0.43 1.09 0.11 16.23 81.50 11.38 34.33 180 1.15 0.13 17.19 9D.60 1205 3816 180 t 1.22 0-14 18.14 1OD-15 1272 4218 8.24 14.86 200 1.28 0-15 W PIPE 1 19 10 111013 1339 1 46.38 567 16.12 220 1.41 0.111 0,89 006 21.01 131.39 14.72 55.34 9.54 19.23 240 1 1.54 0.22 0.98 0.07 2292 154.36 16.06 66.02 10.40 22.60 F =. 25D 280 2. !I 1.67 t79 0.25 028 t.06 t 14 D_08 0.09 17.40 1874 75.40 86.50 1 11.27 1214 25.21 30.06 T P f f= 300 _ _ t 92 0.33 t 22 0-11 20.08 98.29 13.00 34.16 6 ' 320 1.30 012 21.42 110.76 13.87 38.50 8.05 10.26 340 1.38 0.14 2276 123.93 14.74 43.07 &56 11.48 360 ;L 1.74 231 i 1.46 0.15 72" PEE 24.09 137.76 1580 47.88 9.06 1276 f_08 0.07 380 ! .97 2 LI r t 54 0.17 2543 152.27 16 47 52.92 9.57 14.11 400 2.11 258 iL . 1.63 0.18 1 17.34 5820 10.07 115.51 450 2.63 286 1 1.83 0 23 1.28 0.09 19.51 72.38 11.33 19.29 500 3.19 3.20 � � _ t42 0.12 21.67 87.98 1259 23.45 550 3.87 3.62 1 .... . t56 014 2384 104.96 13.84 27.98 SOD 4.48 384 1.18 244 t70 0.16 2601 123.32 f510 3287 650 - 14 4.16 1.37 264 1.84 0.191 1 9 1 128.17 143.02 M36 38.12 700 4.48 1.57 ? 84 f7 82 43.73 75D 8.32 6.77 4.80 1.78 35p, i - 1&88 49.69 8D0 8.87 7.83 5.12 2014 56.00 850 9.43 8.53 21.40 62.85 The velocilyof two (2) feet per second Is generally accepted as the veloatyto carry solids. The shaded area above indicates those accepted velocities over two (2) IL / sea and less than eight (8) ft. / sec. Data shown Is calculated from the HazLnWIlilams equation: H=1043-94 X ((Q"1.852) / (C1+1.852 X D44.8655)) USING: C =100 for water at 60 degrees F. C = coefficient for roughness of the Interior pipe surface H = head loss in FL V =fluid velocity in FT. / SEC. D = Inside diameter of the pipe In INCHES. Q = flow rate GPK Nominal pipe size ' Fitting 1/2" 3/4" 1" 11W' 11/2" 2" 2 11rj 3" 4" 8" 8" 10" 12" 90° elbow 1.6 2.1 2.6 • 3.5 4.0 5.2 6.2 7.7 10.1 15.2 20.0 25.1 29.8 45° elbow 0.8 1.1 1.4 1.8 2.2 2.8 3.3 4.1 5.4 8.1 10.6 13.4 15.9 Tee then flow 1.0 1 A 1.8 2.3 2.7 3.5 4.1 5.1 8.7 10.1 13.3 16.7 19.9 Tee (branch Flow) 3.1 4.1 5.3 6.9 8.1 10.3 12.3 15.3 20.1 30.3 39.9 50.1 59.7 Check valve 5.2 6.9 8.7 1 11.5 13A 17.2 20.6 25.6 33.6 50.5 66.5 83.6 99.0 Gate valve (full open) 0.4 0.6 0.7 0.9 1.1 1.4 1.7 2.0 2.7 4.0 5-3 6.7 8.0 0 Copyright 2003 Zoeller Co. All rights reserved. Rig SECTION: 4.10.006 Product information FM1228 0107 Supersedes presented here reflects conditions at time of publication. Consult factory 0805 regarding diseMaricies or inconsistencies. 1160112. TO: P.O. BOX 16347. Louisa % KY 40256-047 Waft our web afte. SHIP Tlk- 3649 Cone Run Road - Louisvft, KY 402114961 www.zoeffencom (502) 778-2M I - 1 (800) 928-PUMP - FAX (502) 774-3624 SIMPLEX CONTROL PANEL RECOMMENDED APPLICATIONS SINGLE PHASE SIMPLEX CONTROL PANELS MODEL# VOLTS PHASE AMPS :HP E: Plug-ln Panel* Pull -Out Circuit Breaker Disconnect Disconnect N53 115.9.7 (13 03 I 104610 10-0125 10-1031 E53 230 40 0 t a 104M V-0125 10-1036 N55 115 9.7 0.3 10-1019 1"125 10-1037 E55 230 7 4.8 0.3 10-1023 10-0125 10-1036 N57 115 1 9.7 01 10-1019 10=0125 i0-1037 e57 230 1 4.8 03 10-1013 10-01�5 10-1-036 N59 115 1 9.7 0.3 10-1019 10-M5 .10-1037 E59 230 1 4.8 0.3 10-1023 10-0125 10-1036 N95 115 1 BA 0.5 10-1019 1"125 10-1037 E98 230 1 4,7 05 104023 10-0125 10-1036 N137 115 1 10.7 0.5 10-1019 10-0125 10-1037 E137 230 1 5.8 0.5 10-1023 10-0125 10-1036 1137 208 1 6-2 0.5 - 10-0125 10-1036 N139 its 1 10.7 0.5 10-1019 10-01-26 10-1037 039 230 1 6.8 0.5 10-10.23 10-01215 10-10% .1139 208 t 5.5 05 10-0125 10-1036 N140 115 1 15.0 1.0 10-1019 10-0125 10-1038 E140 230 1 7.5 1.0 10-1023 10-0125 10-1037 Utat 115 At 15.5 0j5 - 10-0125 10-1038 R181 1i61 z4u 200 1 (.0 8.8 M5 lu-lw� 10-0125, 10-1w N163 115 1 15.0 0.5 10-1019 10-0125 10-1638 E163 230 1 7.5 0.5 10-1023 10-0125 10-1037 1163 208 1 8.5 0-5 10-0125 10-1037 F-186 230 1 107. 10 10-1023 10-0126 10-1037 1165 Z)6 1 126 1.0 10-0125 10-1037 E165 230 1 9.8 1.6 10-1023 10-625 10-1037 1185 208 1 11.5 1.0 - 10-0125 10-1037 230 13.7 1.0 10-1,023 10-0125 16-1037 E188 230 1 14.0 1.5 1 (M 023 10-6125 10-1 O37 1188 208 1 16.8 1.5 10-0125 10-1038 El" 230 i it-i 20 10-0125 10m038 1189 208 1 20.5 2.0 10-1201 N264 115 1 SA 0.4 10-1019 10-0125 1 0-'l 037 E264 230 1 4.7 0.4 10-1023 10-0125 10-1036 N268 115 1 10A 0.5 10-1010 10-0126 10-10ST Ems 2,30 1 6-5 0.5 10-102-3 10-0125 10-1036 1286 206 1 4121. 0.5 104125 110-1038 N287 115 1 10.4 0.5 10-1019 10-6125 10-1037 E267 230 1 5.5 0.5 10-1023 10-0125 10-1036 1267 NASS 208 115 1 6.2 0.5 - 10-0125 10-1036 1 10.4 0.5 10-1019 10-0125 10A031 E266 230 1 56 0.5 10-1623 110-0125 10-1038 MS 208 1 62 0.5 10-012.5 10-1036 N270 115 1 15.0 1.0 10-1019 10-0125 10-1038 E270 230 1 7.5 1-0 10-1023 10-0125 10-1037 N282 11$ 1 103 as 10-1010 10-0125 1ID-1037 r=282 230 1 5.0 as 10-1023 1041.25 10.40m, 2112 208 1 $11 as - 10-0125 10-1036 E264 230 1 6'9 1.0 10-1023 10-0125 10-1037 1284 208 1 9.3 1.0 - 10-0125 10-1037 N,292 115 1 15.0 0.5 1071019 10-0125 10-16W E293 230 1 10.2 1.6 10-1023 10-0-25 4 0_1 037 1293 208 1 12.0 1.0 - 10-0125 10-1037 E294 .2130 1 131 1.5 10-1 Q23 40-0125 1D-103-7 1294 208 i 1 ?A 1'5 10-0125 10-1038 E295 230 t 17.1 2.0 10-0125 10-1038 1295 208 1 20.5 2.0 - - 10-1201 E404 230 1 12A 2 10-1023 10-0125 10-1037 1404 208 1 .14A 2.0 -10-0125 10-1037 E405 230 1 19.0 3.0 10-0125 10-1038 1405 208 i I 24-7 3.0 - i 10-1201 eum-L" or (5) modei pump. 0 Copyright 2007 Zoeller Co. All rights reserved, NOTICE TO INSTALLER: Instructions must remain with installation. SECTION: 320.200 FM2154 Supersedes Product infomlation presented here reflects n. consult a time of publication. Consult factory i! L regarftdlaL riciesor inconsistencies. RM TO. P.O BOX 16347• Loufsw7fe, KY 402W-0347 visit our Web site: SiAPTO. 3649 Cane Run Road • Lov< vft KY 4M#-1961 WWW.2oeller colrt (504 778-2731.1(SM 928-PUMP• FAX (504 774-3624 ZOEhLCR ON -SITE WASTEWATER PRODUCTS RISER INSTALLATION INSTRUCTIONS 1. Unpack risers and accessories and examine for any damage that may have occurred during shipping. 2. You may adjust the height on all risers by cutting the top of the riser between any two ribs. The bottom of the riser must remain flat to ensure maximum surface area for adhesive. 3. All covers require a Robertson square head driver for removal. Cast -In -Place Adapter (See FIG. 1): 1. Clean and dry the mounting surface on both the riser and adapter using PVC cleaner or lacquer thinner. 2. Apply a V bead of sealant to all mating surfaces be- tween risers and adapter. 3. Carefully place and align the riser and adapter as il- lustrated below. 4. Wipe excess sealant from the inside of the riser where possible. FIG.1 FLAT END OF RISER RING SK2294n Bolt Down Kit (See FIG. 2): 1. Clean and dry the mounting surface on both the riser and the septic tank Wash the top of the tank with de- tergent and water. Clean the riser's flat bottom flange with PVC cleaner or lacquer thinner to provide the best seal. 2. Apply a W bead of sealant to the riser's flat bottom flange. 3. Carefully align the riser over the hole in the tank and place the riser down on tank. 4. Drill four 318" holes 90 degrees apart. Locate the holes as close as possible to the riser (114" max.). Drill the holes at a slight angle to ensure getting as close as possible to the riser. Drill the hole deep enough to allow V of stud to be above the concrete. Example: if the stud is 2-318" long, drill the hole 1-31W deep. 5. Place the large fender washer on first, then the stan- dard washer followed by the nut and tighten. FIG. 2 w c:op yrLgrn etm coelLer co. An rights reserved. SKV"B Seal Ring (See FIG. 3):. 1. Clean and dry the mounting surface on both the riser ring and the septic tank: Wash the top of the tank with detergent and water. Clean the seal ring and riser with PVC cleaner or lacquer thinner to provide the best seal. 2. Position the seal ring on the septic tank, lining up the hole in the top of the tank with the hole in the mounting flange. Draw a line around the outside of the ring on the tank. 3. Remove the ring and apply foam in the area where the ring will set. Apply approximately a 2" bead of foam on the tank or two 1" beads, depending on how much area you have to set the ring on. 4. Position the seal ring back on the tank and apply mod- erate to firm pressure. 5. Apply approximately a 2" bead of foam at the base of the ring where the riser will sit. 6. Set the riser on the seal ring. Note: on short sections of riser, reach inside the riser and fill any voids between the riser and the seal ring. On long sections of riser, apply a second bead of foam to the vertical section of the seal ring before installing the riser. This will ensure there are no voids between the seal ring and the riser. 7. Wait a minimum of one hour and backfill. Be careful not to damage the riser. Epoxy Mounting Risers (See FIG. 4): 1. Clean and dry the bottom flange on the riser and the mounting groove in the septic tank: wash the top of the tank with detergent and water. Clean the riser with PVC cleaner or lacquer thinner to provide the best seal. FIG. 3 :_ G4 SEALRM) Zr VMROUD OPERNG EWAM G FM SEALAW 3(r MAX ROUND OPENING 1 SK2Z91C 2&W MAX SQUARE OPENNS .2. Fill the groove in the tank half way with adhesive. (P/N 172-0019). Approximately 1 quart wilf work for a 24' or 30" diameter riser. 3. Position the riser down in the groove and apply pres- sure, submerging the bottom of the riser into to adhe- sive. Allow adhesive to dry to a firm, watertight seal. 4. Backfill with dirt after adhesive has set for 4 hours and within 24 houm. Be careful not to damage tenser. Lockable Latch (See FIG. 5): 1. Center the lid on the riser and install the mounting screws. 2. Drill two 7/16" holes 1' from the edge of the lid approxi- mately 45 degrees from the screws and 180 degrees from each other. The hole should penetrate the lid and the first rib of the riser. 3. If the lock will be below grade, a V pipe or larger, cut 6" long (fumished by others) with 3" on one side removed, must be installed next to the riser to allow access to the padlock. 4. Install the stainless steel pins and washers into the 7/16" diameter pin holes. Install padlocks (supplied by oth- ers) through the hole in the end of the pins. Pipe Seals (See FIG. 6): 1. Drill the appropriate size hole in the side of the riser tube. 2. Place the pipe seal in the riser with the largest diameter inside the riser. 3. To ease pipe installation, lubricate the seal with a mild soap solution such as dish washing liquid. After the pipe is installed, clean off any lubricant. FIG. 4 EPDXY FIG.5 -- rPD OPEAMR I FIG.6 WD 1WLous ("YDMP3{) M uD PE LOCK GUARD iaDcauro R. SKMa 0 Copyright 2008 Zoeller Co. All rights reservad. GROOVE RECOMMENDED Pipe Seals Nominal Hole Saw Pipe Size Diameter 3/8" IPS 1" 1/2" IPS 1-1/4" 3/4" IPS 1-114" 1" IPS 1-3/4" 1-1/4* IPS 2" 1-1/2"IPS 2.1/2" 2" IPS 3" 3" IPS 4" 4" IPS 5" SKMD Vk 4L'W1ry)UMP6 SKY �i�i7e! s Product h& oration presented here rdeuts upnditlons art time of publica0on. Consultfa lory regarding dis Rndes or Inconslstenatrs. �Ar P,UMP llT_ M 7b: POL BOX 16347 • Lodswlk KY 402W4W SNIP 7a: 360 Cane R&I Rood ° Loreauft. KY AMII-1961 (502) 778-2731.1(800) 928-RW- FAX M07a 774-3624 SECTION: 4.10.125 FM1597 1104 Supersedes 0204 visit our web site: www.zaeailercom a ,JEMA-4X WATERTIGHT JUNCTION BOXES ECONOMY (Field Assembled) Model 10-0770 PVC Plastic box with removable coverfor use in sewage, effluent, dewatering, or corrosive environ- ments. Box is 4' X 4' X 7 deep. Box is field drilled for maximum flexibility in each installation. - 10-0770 Box includes 2 OF cord seals for 12 or 14 gage OF able and 3 round cord seals for 16-3,16-2,18-3, or 18-2 SO We cords. 4 10-0776 Box includes one V47 PVC conduit adapter and 3 round cord seals for 16-3,16-2, 18-3,18-2 SO type cords. 10-0777 Box includes one V4' PVC conduit adapter and 4 round cords seals for 16-3,16-2, 18-3,18-2 SO type cords. 10-0778 Box includes one 3s' PVC conduit adapter and 5 round cord seals for 16-3,16-2, 18.3,18-2 SO type cords. DELUXE (Factory Assembled) UL Listed and CSA Certified high impact, corrosion resistant, weatherproof thermoplastic enclosure with flexible PVC gasket and brass screws. Preassembled at the factory for convenience and ease of installation. Pump Model Type "L" "W" "H" Hub Size Cord Grips Part No. 51, 53, 55, 57, 59, 98,2 7, Simplex 4' V 4° V4 ' 4 Small & 1 Plug 10-1398 161(except 115V),163 (except 115V),165,185,186 Simplex 4' 4' 4' 1 W 4 Sma1 & 1 Plug 10-1399 (3 phase),188 (3 phase),189 Simplex 6' 6' 4' 1 T 4 Small & 1 Plug 10-1402 (460 & 575V), 264, 266, 267, 268, 270, 282, 284, 293, 294 (3 Phase), 295 (460V & 575V only), 404 (230/460/575V 3 per), 405 (230/4601575V 3 phase) and all effluent STEP Slrn*xf Duplex 6' 6' 4' 1° 5 Small & 1 Plug 10-1401 Duplex 6' 6' V 1' 6 Small & 1 Plug 10-1633 Duplex 6' 6' 4' 2' 5 Small & 1 Plug 10-1403 Systems. 161 (115V), 163 (115V),186 (single p hase ),188 (single Simplex 6' 6' 4' 1 h' 3 Small,1 Large & 1 Plug 10-1404 phase),189 (200 & 230V), i I 191, 292,294 (single phase), 295 (200 & 230 404 (single �� (� phase & 200V 3 phase), 405 Duplex 6' 6 4 ° 2' 4 Small, 2 Large & 1 Plug 10-1405 (single phase & 200V 3 phase). Note: Small cord grips are for 16 ga. and 18 ga. cable. Large cord grips are for 12 ga. 4 oonducbor cable and 14 ga. 4 conductor cable. 0 Copyright 2004 Zoeller Co. All rights reserved. SK2193B SEWAOEMASTE JUNCTION BOXES NEMA-4X Junction Boxes are electrical enclosures that are watertigtd, dust -tight, and corrosion resistant. Boxes are completely assembled with cord seals and terminal strip for easy field wiring. Pump Model Type -L- "IN" -H- Cord Grips Part No. 611, 621, 631 Simplex 6" 6- 47/e° 1 each -Pump 104"' 641, 651, 661 3 each -Floats Duplex 8- 8' 43T each - Pump 4 each- Floats 4 10-1015 (under 20 AMPS) 651,661 Simplex 6- 6- Oe 3 each - Floats 1 each - Pump 10-M7 Duplex 8- 8- 4W 4 each - Pump 10-1016 (20 AMPS & up) 4 each - Floats GASKET COVER SENSOR CORD GRIPS PUMP CORD GRIPS S¢ED PER PUMP REQUIREMENTS -A B `TARTER FITS 1 112" PVC FEMALE SLIP FITTING IN BACK FLOAT CORD GRIPS .312 TO.375 DUL SK1739 'A Starter kit is required for all single phase model 611, 621, 631, 641, and 651 pumps. A Starter kit consists of the single phase capacitors and relay required to run the pump. These components are shipped loose and are installed into the pump's control panel. Starter 10t PIN Pump Model 10-0914 611/621 10-0915 631/641 10-1434 1 651 ` Ka T0: P.O. BOX law Laufavlk, KY 40256 0AIWWbdwm of.. SlP3fi19 CaneIiiZ ( r ieao1195 � A"w YMCr Is9�il. wwr.megercom PPAof)w !O r�+xr g77s �ltae 0 Copyright 2004 Zoeller Co. All rights reserved. WVL /� � a SECTION: 4,10.060 4L1ry AW,P�,/9 ky 147.29FM0477 1006 Product information presented ® Supersedes here reflects conditions at time )7LI ) ff ll . 09M of publication. Consult factory - regarding discrepancies or inconsistencies. til4111 70_ P.O. BOX 16347• Loursndle, KY 40256-0347 visit our web site. Sri TO. 3649 Cane Run Road • Loui 016, KY 402114961 WWW.Mellex ram (502) 778-2731.1(800) 928-PUMP - FAX (502) 774,3624 SWITCH -DATE PIGGYBACK VARIABLE LEVEL FLOAT SWITCH (VLFS) Converts nonautomatic pump to automatic pump. • Simple installation. • Adjustableftiable level. • Standard 15' and 20' SNOW CPE cord with molded plug. 10-0055 and 10-0065 -10' cord standard. • Float is constructed of durable PVC/polypropylene encasing variable level switch. • Standard - normally open (NO) ("pumps down"). • Optional - Normally closed available (NC) ("pumps up"). Consult Factory. • Maximum operating temperature for 10-0748 -120"F (49°C). All other switches -140°F (60°C). 13 Amp Maximum Normally Open (NO) 10-0055 -115V -19 10-0034 -115V -16 10-0035 - 230V -16 10-0063 -115V - 20' 10-0706 -230V- 20' Normally Closed (NC) 10-0065 -115V -10' 10-0037 -115V -16 10-0062 - 230V -16' • Float is omnidirectional (no "UP" side). • Includes mounting damp. • Designed for EFFLUENT, SEWAGE and DEWATERING applications. • Variable level boat switch, for use in 18" minimum diameter basins. • 10-0748 - 25' cord standard, no molded plug. Can be used as a control switch to operate an external magnetic or com- bination starter on three phase pumps. • Vertical piggyback float switch. Ideal for narrow diameter basins. 6%' maximum cycle range. • Use recommendation chart for switch selection. SINGLE PIGGYBACK VARIABLE LEVEL FLOAT SWITCH 15 Amp Maximum Normally Open (NO) 10-0032 -115V -15' 10-0033 - 230V -1 F 10-0705 -115V - 20' 10-0559 - 230V - 20' Normally Closed (NC) 10-0064 -115V -15' SINGLE PIGGYBACK VERTICAL FLOAT SWITCH 13 Amp Maximum Normally Open (NO) Vertical 10-2041-115V -10' 10-2042 -115V -16 10-2043 -115V - 20' 20 Amp Maximum Normally Open (NO) 10-0748-115V/230V - 25' C 9..d� C• . MA& Note: AN variable level float switches in this section are mechanic* acti- vated and do not contain mercury. DOUBLE PIGGYBACK VARIABLE LEVEL FLOAT SWITCH Mechanical 10-1964 -115V -13 Amp -15' 10-1965 - 230V -13 Amp -15' Mercury 10-0229 - 115V - 15 Amp - 15' 10-0230 - 230V -12 Amp -15' a�3 Mercury products are not approved for sale in: CA ,CT, Sp • ME, RI. Effective 1 /1107-V F, 711107-IL; 111/08-NY scni- product,a, not b, P lar restrictions will apply. Plem review latest IMERC exacey as pcctured. sefcatiortforadditional information- 0 Copyright 2006 Zoeller Co. A0 rights reserved. SINGLE PUMP PLUG DOUBLE PIGGYBACK CORMSPM ALIMMMTION PIGGYBACK OPERACORDS SECURED W DISCFifiRGE PIPE M�- r-I G A TOPKI LEVELLEyg- RIMPRIGw,K r _ SVNTCHPLUG rLOArfiR rive OPERATION cLnPs 9OFP ® LEVEL SK305A SK308A 5K30ae ZOELLER PIGGYBACK VARIABLE LEVEL FLOAT SWITCH RECOMMENDATIONS FOR ZOELLER PULP COMPANY PUMPS SWITCH PUMP - MODEL SWITCH SPECIFICATIONS ING USE WITH ZOELLER PUMP MODEL NUMBERS NO. RANGE 10-0055 10' Cord, Single Piggyback 6" Min. 'N' Models - 53, 55, 57, 59, 98, 137, 139, 140, 264, 266, 267, 268 & 282 (See Note 2). 115V,1 PH,13A 36' Max. 10-0034 15' Cord, Single Piggyback 115V,1 PH,13A Max. 10-0063 20' Cord, Single Piggyback 115V 1 PH,13A 10-0032 15' Cord, Single Piggyback 6" Min. 'N' Models-161,163, 270 & 292 (See Note 2). 115V 1 PH,15A 36' Max. 10-0705 20 Cord, Single Piggyback 115V,1 PH,15A 10-1964 15' Cord, Double Piggyback 1' Min. 'N' Models - 53, 55, 57, 59, 98, 137, 139,140, 161, 163,264, 266, 267, 268, 270, 282 & 292 (See 115V,1 PH,15A 48' Max. Notre 2). 10-0035 15' Cord, Single Piggyback 6' Min. 'E' Models - 53, 55, 57, 59, 98,137,139,140,161,163,165,185, 264, 266, 267, 268, 270, 282, 230V 1 PH,13A 36' Max. 284 & 293 (See Note 2). 'I" Models - 137,139,161,163,165,185,282,284 & 293 (See Note 2). 20' Cord, Single Piggyback 10-0706 230V,1 PH,13A 'AE" Models -189, 295 & 405. 10-0033 15' Cord, Single Piggyback 6' Min. "E" Models - 186,188,294,404 & 820 (See Note 2). 230V 1 PH,15A 36" Max. '1' Model - 404. 10-D559 20' Cord, Single Piggyback 23OV,1 PH,15A 15' Cord, Double Piggyback 1' Min. 'E" Models - 53, 55, 57, 59, 98,137,139,140,161,163,165,185, 264, 266, 267, 268, 270, 282, 10-1965 230V 1 PH,13A ` 8' Max. 284 & 293 (See Note 2). "I" Models - 137,139,161,163,165,185,282,284 & 293 (See Note 2). 25' Cord, Wired in Pump 9" Min. "E" Models -189, 295 & 405 (See Note 2). 10-0748 Switch 115V or 23OV, 24' Max. 'I' Models - 188,189,294,295,405 & 820 (Sea Note 2). i 1 PH, 20A(See Note 3). 1 1 I Motes: canrox 1) Use the Single pbgybac type only with a 10-0333 simplex pump control box. All Installation of controls, protection devices and wiring should be done by a qualified 2) Remove plug I present and use with 'Junction Box' 10-OW2when field wiring is required licensed electrician. All slechical and safety codes should be followed including the 3) Maximum operating temperature for 10-0748 -120'F (49'C); OR other switches -140'F (60'C). most recent riational Electrical Code (NEC) and the occupational Safety and Health 4) For Duplex Systems, use with appropriate panel (See FMO712). For Simplex Systems, use with Act (OSHA)L appropriate panel (See FM1228). 0 Copyright 2006 Zoeller Co. AN rights reserved. S'TORN WATER NAlI/EAT/VE FOR ABC ,, roRE TowN oF BEaUFOANr Town ofAftw fort Carteret County March 23, 2007 ACE JN; 06-083 Appian Consulting Engineers, PH PO Box 7966 Rocky Mount, NC 27804 (252) 972-7703 (252) 972-7638 (Pax) `,r�unnfit CARD C off' ....... ;Q 9" SEAL = 029958 - ''i��%� FNG � NEAR . • ��..;`�`` i`,'��w, soy, iV;- �', STORMWATER NARRATIVE GENERAL The owner wishes to construct an ABC store at their property, located approximately 1.5 miles north from the intersection of NC 101 and Hwy 70 along Hwy. 70 in Carteret County. The site is currently outside of the Town of Beaufort limits. The site is currently adjacent to vacant lands to the north, south and west of the property. The east side (across the street) contains a shopping center that has been developed within the last 20 years. The site is within the 0.5 mile radius and drains to Turner Creek, classified as SA HQW. The site will be treated using an infiltration basin near the rear of the property. BACKGROUND The site contained (2) homes that were constructed in the 1970's and were vacant. The ABC store is planning to move their retail store operations to the new site and within the next two years develop additional area to the back for office space and warehouse. Both will be completed together as Phase 2 of the project. PROPOSEDIMPROVEMENTS The new building will be added with associated parking and sidewalks. The project is approximately 0.82 acres in size with 0.71 acres consisting of imperviousness. The project will direct runoff to the two proposed holding basins at the front of the property that has been sized for the 1.5" storm. The water will be piped to a pump tank, which will pump the water to the rear of the property to the designed infiltration basin. The basin has been sized for the additional capacity to account for future development of the site. Calculations for the basin size needed for the current development as well as the projected future development has been completed to ensure adequate size of the basin for future use. Erosion control for this site has already been obtained for the installation of the basin at the rear of the property with the installation of silt fence, permanent seeding and water bars for the installation of the force main along the northern property line. All calculations for the site development (including drawdown times, impervious area, drainage area, volume computation, etc. will be submitted to substantiate the capacity of the proposed infiltration basin. Stormwater Management Permit Application - Infiltration Basin Supplement Section III: Justification for Items: f. The easement will be submitted and recorded in the future for the site. p. Benchmark is unnecessary as the drop inlets have sumps that will provide for sediement collection. ABC Store - Beaufort P.02 1 r FE:b—Ol-07 11 :42A /�fjj�i���,, r 4 � �� r/ 0� NCDM North Carolina Department of Environment and Natural Resources 127 Cardinal Drive. lAfli rnk*on NC 25405 (910) 796-7307 FAX (910) 360-2004 D Request for Express Permit Review rJT � 00 P'; RLL4N all information below and CHECK required Pem*s). '�C-e FAX or email to Cameron. Weavendncmar'i.net along with a narrative and vicinity nun of the project location. Projects must be submitted by 9.00 A.M. of the review date, unless prior arrangements are made. APPLIQMT Name C1 �;�..ACiT Company 6A9MwjT ccl.0r':r womp nF A"ttorbuc, 13a Aah&Q&b - AddressIp 111t`6 rAk CitylStateltC _dap 2851e County' PROJECT Name �� 6,wzb -'2Wf1 [: L-;(� PROJECT SYSTEM(S) TRIBUTARY TO Gt�(STREAM NAME) WjbM a&je— RIVER BASIN State or National Environmental Policy Act (SEPA, NEPA) - EA or EIS Required ❑ Yes'0 No .. ❑ STMA1111 ORIGIN Determinaton; # of stream calls; Stream Name �STORNWATER ❑ Low Density ❑ High Density -Detention Pond ❑ High Density -Other weWoft MUM -be❑ Low Density -Curb A Gutter 0 High Density -infiltration ❑ Off Site ❑ COASTAL ❑ Excavation & Fdl ❑ Brides & Culverts ❑ Structures Information MANAGEMENT ❑ Upland Development ❑ Manna Development ❑ Urban Waterfront LANDQUALITY - P,Emsim and Sedimentation Control Plan wdh LS wM*/I am to be disturbed. WETLANDS (401) Wetlands on Property Yes ❑ No Isolated Wetlands on Property ❑ yes bd No - Check all that aDnl y Wands M 9e Impacted ❑ Yes rx No Weband Impacts: Acre(s)Wetlands Delineation has been compl [gYes ❑ No ❑ Buffers Impacted: -Acre(s) USACOE AWmval of Dawaiyal ca�[]Yes, Ye�s ❑ No 404 Application in process wN ONo l Permit received from USACE ❑Yes ❑No 401 Application required ❑YesNo If Yes, ❑ Regular ❑ Express Additional fees, not io exceed 50% of the original Express Review permit applcadon fee, may be charged for subsequent review da to the Insu!ffiaency of the permit applications. SUBMITTAL DATES: Fee Split for multiple permits: SW $ CAMA LQS $ 401 $ Total Fee Amount $ Feb-01-07 11:43A P . 03' INFILTRATION SITE VISIT REQUEST Name of the Project:- Wf'I or- MLJ-rgF� Location (attach a Gear vicinity map): Str d d&eM SR number, c inunity, etc. Directions from the nearest major intersection: IE " Consultant Name: Consultant Contact information: 2 '1'72 fax, email, etc. #1 #2 #3 #4 #5 #6 #7 #8 Existing ground elev. a@basin/trench= 4 15 67,5 SHWT elev.= L2" �•5� SHWT plus 2' (max. bottom elev.)= (a.y Date/Time of Soils Investigation: ZqM O!'z— Zf ZwU Summary/Comments: All proposed infiltration areas and existing, active utility lines located within the proposed basinitrench must be marked and flagged. If these areas are not flagged, the Sorts Scientist reserves the right to decline to do the investigation. if the proposed infiltration system capable a ill be breakinglocated through the of existing pavement and there is no open area nearby, equipment us layer must be provided. The soils investigation does not take the place of a soils report prepared by an appropriate professional. The Soils Scientist will only verify the soil conditions that are reported in the Soils Report, and make a determination as to the suitability of the site to meet the infiltration design requirements under NCAC 21-1.1000, and assumes no liability should the system fail_ wk Feb-01-07 11:43A P_04 INTRODUCTION Project: ABC Store —Town of Beaufort Owner: Carteret County Board of Alcoholic Beverages Address: 410 Live Oak Street Beaufort, NC 28516 Site Local: US Hwy 70 Site Acres: 8.32 Acres Zoning: B-1 Usage: Currently Vacant This project will consist of a new building for the ABC store in the Town of Beaufort. The existing officetwarehouse and store location is proposed to be closed and moved to the new location, approximately 1.5 miles north from the intersection of NC 111 and US Hwy 70. This is considered Phase 1 of the development with future phases to develop an office building and area warehouse building. The additional phases will be included in the overall sizing of sewer and water usage. They will not be utilized in any other calculation, such as site disturbance, imperviousness of the property, etc. EXISTING CONDITIONS The existing site currently contains two houses (both abandoned) within the front of the'property, with the majority of the property to the back wooded. Soils: .Majority is Tomotley (Tm) as Sandy Loam. Drainage: Site drains to Turner Creek, approximately 0.5 miles to the east. Turner Creek classed as SA;HQW and is within the White Oak River Basin. Water: Existing 8" waterline on east side of Hwy 70 (opposite side). An existing well is also onsite that will be abandoned. Sewer. Force Main (approx. 8") on same side as property. An existing septic system is located onsite for the existing houses that will be abandoned. Wetlands: Existing wetlands are located on the property and have been flagged. No disturbance is proposed at this time. Buffers: Site is not located within any state mandated buffers. Streams: No streams are located onsite. AEC: No AEC onsite. Historic: Property is not within a historic district or classification. Permits Obtained: • NCDENR Erosion & Sedimentation Control: Carte-2007-218 • USCOE Notification of Jurisdictional Determination: 200600624 Feb-01-07 11:43A P.05 PROPOSED CONDITIONS Site Conditions: The site will consist of two entrance drives, a parking lot that consists of 22 standard parking spaces and 1 loading bay per Town of Beaufort development code. The other information is as follows: New Building: 6,992 sf total (5,492 sf Retail/1,500 sf storage) -Phase 1 Sewer: Currently shown as onsite septic 5 employees (max) x 25 gallonsiday = 125 gallons/day flow. The sewer is proposed to be designed and coordinated with Carteret County Health Department. Water: A proposed well is to be located by Carteret County Health Department. The existing well to be abandoned. Drainage: Proposed drainage to be infiltration basins under parking lot. These drainage areas to capture 1 inch runoff and divert remaining flow to existing drainage ways near property. Imperviousness: Ex. Impervious Area = 0.066 Ac (0.80% of total) Pro. Impervious Area = 0.78 Ac (9.37% of total) Wetlands: No wetlands disturbance will take place onsite. Therefore, 401/404 permit has not been applied for. Wetlands delineated by Jimmy Powell of Powell Surveying Company. Other: No outstanding compliance issues are present. This project was treated as high density per section 15A NCAC 2H .1005, even though the site is classified as low density by the regulations. The BMPs were designed per section 15A NCAC 2H .1008 for infiltration basins. The soils report for the basins are attached for review. Stormwatw Design information: Per section .1005 of the stormwater regulations, the site shall detain the 1.5" runoff, bypassing the remaining flow. Typically, the 1 year, 24 hour storm is the 1" runoff and for this development, the 1 year, 24 hour storm predevelopment was also maintained and met for the posdevelopment runoff. A total of two infiltration ponds were required based on the flow volume. The infiltration ponds consists of clean, #57 stone under the paved parking lot. Pervious concrete allows for flow to enter the infiltration pond system and the main drainage from the pond relies on soil infiltration. A soils report has been completed on this site and is attached for your review. The stone is wrapped in filter fabric and is placed within a non -compacted soil location. The total number items needed are as follows: 3 Feb-01-07 11:44A P.06 • Total Pervious Concrete: 171 sf at 8" thick 4,000 psi air entrained Total Stone for infiltration Basins: 9,830 cf of 857 stone. The infiltration ponds were also designed with an emergency spillway at the parking lot locations as well as an underdrain to remove water should the infiltration fail or become overloaded on high volumes of rain. Emergency Spillway: • Designed to allow only 2.04- of water detention on top of pervious concrete Overflows/bypasses remaining runoff through concrete flume. • Spillway size is 2' curb opening per detail shown on plans. Underdrain: • Designed to allow for 2-5 day detention of water prior to exit through the pipe with use of V dia. holes in various amounts. Designed to allow removal of excess water from system above the normal storage level using 1 'IN dia. holes on riser barrel within the infiltration ponds. • Cleanouts placed within the infiltration ponds to allow for access to clean and visually see if system is working (i.e., water being detained too long in the system). • Material and size: 6" solid wall PVC for a total length of 165 LF with 3 cleenouts Feb 01-07 11:44A P . 0 7F VICINITY MAP NOT TO SCALE Feb-01-07 11:42A P_01 TO: Cameron Weaver PA re 211107 OMAMTM E N"EEFA PA OWL MUMMAL i 87RUMML C " w ? t`9ti Slet�ti�i tisE EMIIMONMEMML 3Mvd=8 Number ofp"" to thi/ow this purge: WITH: NCDENR - Wilmington Regional Otfrce FAX NO.: 910-350-2004 FROM: Peter W. Sokalski ire ABC Store • Beaufort Express Permit Neview Kequest CON NENTS Mr. Weaver, URGENT PLEASE REPL r AS REQUESTED Thank you for taking the time to talk with me on this project. The attached is the request, the infrltration site visit request, and the project summary/questionnaire. Please call me if you have any additional questions for the project. Thank you and l hope to hear from you soon. Past Offte Ow 7966 Rocky Arount North Carolina 27804 (20) 972-7M3 Fax (252) 972-MO 225 HHh6orough Street, Sairle 260 ACE 0-20 Raleigh, Nb►th Carolina 2r608 (919) 833-261t Fax (919J 823-2499 O., W R 6 Michael F. Easley, Governor William G. Ross Jr., Secretary North Carolina Department of Environment and Natural Resources Alan W. Klimek, P.E. Director Division of Water Quality January 30, 2007 Mr. Robert D. Shipp, Supervisor/General Manager Carteret County ABC Board 410 Live Oak Street Beaufort, NC 28516 Subject: Request for State Stormwater Management Permit Application ABC Store Beaufort Stormwater Project No. SW8061245 Carteret County Dear Mr. Shipp: On December 8, 2006, the Wilmington Regional Office received a copy of an Erosion Control Plan for the subject project. The North Carolina Administrative Code requires any project that must receive either Sedimentation and Erosion Control Plan approval and/or a CAMA Major permit to apply for and receive a Stormwater Management Permit by the Division of Water Quality. Any construction on the subject site, prior to receipt of the required permit, will constitute a violation of 15A NCAC 2H.1000 and may result in appropriate enforcement action by this Office. Either a Stormwater Permit Application Package including 2 sets of plans, completed application form, fee, and supporting documentation, or a written response regarding the status of this project and the expected submittal date must be received in this Office no later than March 1, 2007. Failure to respond to this request may result in the initiation of enforcement action, and construction may experience a subsequent delay. The NPDES 010000 Federal Stormwater Permit that accompanies the Erosion Control Plan approval letter must NOT be considered the Coastal Stormwater Management Permit, which will be signed by the Water Quality Supervisor. Please reference the Project Number above on all correspondence. If you have any questions, please call me at (910)-796-7215, or email me at linda.lewis@ncmail.net. Sincerely, Linda Lewis Environmental Engineer ENB/arl: S:IWQSISTORMWATERISTORMSUB1061245.jan07 cc: Carteret County Building Inspections Peter Sokalski, Appian Consulting Engineers Wilmington Regional Office File Central Files Doug Huggett WN&ai Zy North Carolina Division of Water Quality 127 Cardinal Drive Extension Wilmington, NC 28405 Phone (910) 796-7215 Customer Service Wilmington Regional Office Internet: www.ncwatergualiiy.org Fax (910) 350-2004 1-877-623-6748 Re: ABC Store - Beaufort Subject: Re: ABC Store - Beaufort From: Linda Lewis <linda.lewis@ncmail.net> Date: Tue, 23 Jan 2007 17:43:00 -0500 To: Peter Sokalski <psokalski@appianengineers.com> CC: Cameron Weaver <cameron.weaver@ncmail.net> Unfortunately, we are not in a position in the regular program to offer that kind of turnaround time. I have a backlog of at least 50 permits, and am running late on reviewing those as it is. Even our Express program is scheduled out to mid -February. Express may still be your best option, but that service will cost you $2000 for a low density or offsite project, or $4000 for a high density project. Please contact Cameron Weaver (cc'd on this email) for information on having the project accepted into the Express program and getting a review date. Linda Peter Sokalski wrote: Ms. Lewis, Thank you for taking the time to review the project for the ABC Store proposed for the Town of Beaufort. I have resent the package to you for review and comments and was wondering if there is any possible way I can get the plans reviewed by this weekend. I know that that is asking for the moon, but I am in a time crunch and realized that I did not get this information back to you as I needed to. I need help to try and get the owner what he needs for the project. I understand that that is outside of the norm for procedure and that you are a busy person as well, but I am hoping that you might be able to help me out of a jam. Please let me know if there is anything else I need to get to you for the project approval. Thank you for your time and effort and I hope to hear from you soon. I call tomorrow as well to make sure that you have received the package. **Peter W. Sokalski, PE** **Appian**** Consulting Engineers, PA** //841 S. Wesleyan Blvd.// //P.O. Box 7966// //Rocky Mount, NC 27804// //(252) 972-7703// //(252) 972-7638 fax// 1 of 1 1/23/2007 5:47 PM Michael F. Easley, Governor William G. Ross Jr., Secretary North Carolina Department of Environment and Natural Resources Alan W. Klimek, P.E. Director Division of Water Quality December 15, 2006 Robert D. Shipp Carteret County ABC Board 410 Live Oak Street Beaufort, NC 28516 Project Name: ABC Store Beaufort County: Carteret County Project Number: SW8 not assigned Dear Mr. Shipp: Your recent stormwater management permit application and check #15650 for the $420.00 application fee are being returned because the application lacked the necessary basic elements to accept it for review. The plans and any other documentation that were submitted have been discarded or recycled, as appropriate. Please address the following noted deficiencies and provide the requested information: ® The project is located in Carteret County, which is within the jurisdiction of the Wilmington Regional Office. The application was addressed to the Washington Regional Office and forwarded to Wilmington. Please submit the revised application directly to the Wilmington Office. ® The project as proposed does not meet the intent of low density development. Low density development depends on more than just meeting a BUA limit. Please redesign with acceptable high density stormwater management measures. Since this site is, within % mile of and draining to SA waters, infiltration will be required. ® The Division is unable to give any BUA credit or volume credit for the permeable pavement system because an infiltration system is being proposed beneath it. The infiltration system must be located outside of the permeable pavement area in order to obtain a volume reduction credit to size the system. If the infiltration system remains beneath the permeable pavement, the full runoff volume generated by a 1.5" design storm over the permeable pavement area must be accounted for as if it was 100% impervious. ® Your high density application should include the application fee, form SWU-101, the appropriate infiltration basin or trench supplement form, sealed design calculations, 2 sets of revised plans, and a soils report. ® Please complete the attached infiltration site visit request form in order to have the soils at the site verified by the Division's Regional Soils Scientist. This evaluation does not take the place of an investigation performed by a suitable professional at your expense. The Division cannot schedule the soils verification visit until the site is evaluated by your professional and the soils report has been submitted. ® The soils report must include an estimate of the Seasonal High Water Table elevation, soil type, and expected long-term infiltration rate for the project. Please fill in one column in Section II I.6 of the application for each proposed stormwater measure. For low density, only one column is necessary. ® Please delineate the drainage area(s) to each of the proposed stormwater system(s). Please include a lump sum BUA allotment for the future development shown on the plans. One Ncif Carolina Atura!!y North Carolina Division of Water Quality 127 Cardinal Drive Extension Wilmington, NC 28405 Phone (910) 796-7215 Customer Service Wilmington Regional Office Internet: www.ncwateNuality.org Fax (910) 350-2004 1-877-623-6748 An Equal Opportunity/Affirmative Action Employer— 50% Recycled/10% Post Consumer Paper Mr..Shipp December 15, 2006 Page 2 of 2 Please resubmit the permit application package to the address below. Note that the 90- day statutory permit review time begins upon receipt of a complete application. If you have any questions, please do not hesitate to call me at (910) 796-733.5. Sincerely, Linda Lewis Environmental Engineer cc: Peter Sokalski, P.E., Appian Engineering Linda Lewis ENB/arl: S:\WQS\STORMWATER\RETURN\ABCBeaufort.dec06 RCDENR North Carolina Department of Environment and Natural Resources Division of Land Resources James D. Simons, PG, PE Land Quality Section Michael F. Easley, Governor Director and State Geologist William G. Ross Jr., Secretary December 8, 2006 LETTER OF RECEIPT OF EROSION CONTROL PLAN Carteret County ABC Board n Robert D. Shipp, Supervisor/ General Manager /j►� 410 Live Oak St /G1'� Beaufort, NC 28516 ne 7 RE: Project Name: ABC Store Beaufort 1�+ IVED Project ID: Carte2007218 County: Carteret, Beaufort, Hwy 70 0FC 0 8 2006 River Basin: White Oak Submitted By: Appian Consulting Engineers Date Received by LQS: December 8, 2006 Plan Type: NEW Dear Robert D. Shipp: This office has received a soil erosion and sediment control plan for the project listed above which was submitted as required by the North Carolina Sedimentation Pollution Controi Act (G.S. i 13A-57 (4)'). The Act requires that all persons disturbing an area of one or more acres of land must obtain approval of a soil erosion control plan prior to the commencement of the land -disturbing activity (G.S. 113A-54(d) (4)). The Act further states that this plan must be filed a minimum of 30 days prior to the activity and the approving authority must approve or disapprove the submitted plan within 30 days of receipt. Failure of the approving authority to approve or disapprove the submitted plan within the 30-day period will be deemed approval of the plan. Commencement or continuation of a land -disturbing activity under the jurisdiction of this Act prior to the approval of an erosion and sediment control plan is a violation of the Act. The approval of an erosion and sediment control plan is conditioned on the applicant's compliance with Federal and State water quality laws, regulations and rules. If you have questions please do not hesitate to contact this office. Your cooperation in this matter is appreciated and we look forward to working with you on this project. Sin' zae Trent Land Quality Section cc: Peter Sokalski, Appian Consulting Engineers LQS-WiRO; SWS-WiRO Wilmington Regional Office 127 Cardinal Drive Ext., Wilmington, North Carolina 28405-3845 • Phone: 910-796-7215 / FAX: 910-350-2004 Thursday, November 30, 2006 ;atee 9 Vi1a os b;. isa ink rl 10, Lei# "Vas F, F, {{ �'3'S.s.' F�ngt `{tee, B° Irr3 a.s 4'y`NEin a c; r' 8 Re: ABC Store - P-Pauro.rt L�ii{tli?�t`r�rf'% !1? t"t:✓'i7°Ft( i'r`':i?7i Dear S'ir or 14ta :atW ru I� iEl t4`I DEC 12006 The ABC Store - Beaufort project is located in Carteret County along US Hwy 70 between just outside of the Town of Beaufort limits. We are sending you the following attached items for review and process by your office: • (2) sets of associated Plans and details • (2) sets of Site Calculations • $420 Application Fee • (1) Stormwater Management Permit Application • 0) Low Density Supplement form Please review the attached permits and plans. If you should have any questions regarding any of the information provided, please do not hesitate to contact us. Thank you for your time and effort on this project? Sincerely, 4 P --n Consulting Engineers, P.A. eter . S E. Attachments CC: File G:1Appian Projects - Shared Folders106083 ABC Store - Beaut'orilEngineering Qephi-etterskl 1-30-06 Ltr to NCDENR with stormwater permit.doc 841 South Wesleyan Boulevard • P.O. Box 7966 • Rocky Mount, NC 27804 •(252) 972-7703 •(252) 972-7638 (Fax) weWdes. www.apoianengineers.com a www.construction-detaii.com Email: admin@appianengineers.com X pc) �5 �F�FIER OF TRANSMITTAL IIF IN ApPiAn CONSULTING ENGINEER$, PA CIVIL, MUNICIPAL & STRUCTURAL ENGINEERS COMPREHENSIVE ENVIRONMENTAL SERVICES 841 S. Wesleyan Boulevard P.O. Box 7966 Rocky Mount. North Carolina 27803 Telephone (252) 972-7703 Fax (252) 972-7638 e-mail:._._ Web: AppianEngineers.com I DRTE: November 30, 2006 I APPIAN JOB NO.: 06-083 1 Water Quality Section Washington Regional Office 943 Washington Square Mall Washington, NC 27889 DEC — 12006 GENTLEMEN: We are sending you ® herewith ❑ under separate cover: SUBMITTAL FOR: CODE FOR APPROVAL 1 FOR YOUR USE 2 AS REQUESTED 3 BID TAB DISTRIBUTION 4 ❑ APPROVED PERMITS 5 ❑ ACTION CODE APPROVED A ❑ APPROVED AS NOTED B ❑ NOT APPROVED C ❑ REVISE AND RESUBMIT D ❑ PLEASE SIGN AND RETURN E ❑ PRINT COPIES I (REVISION NO. OR DATE) WING NUMBER DESCRIPTION I CODE 1 Stornw ater Management Permit 1 Low Density Supplement Form 2 Sets of Plans and Calculations 1 Appian Check# $420 Fee REMARKS. Attached are the stormwater management permit application and fee for your review and approval. Please call me if you have any questions. Thank you! Sent by: First Class Mail ❑ UPS Next Day / AM 10 UPS Next 2nd Day ❑ Federal Express ❑ Faxed ❑ Hand Delivered ❑ Pick Up ❑ ff enclosures received are Purl as lfsfed above, Undly notify at once Thank you. By Received By //. 3D . 0�' Q Date cc: File