Loading...
HomeMy WebLinkAboutSW8040836_Historical File_20081219OF WA1',c 94G Michael F. Easley, Governor 7 William G. Ross Jr., Secretary North Carolina Department of Environment and Natural Resources Coleen H. Sullins Director �. Division of Water Quality December 19, 2008 .ion Rosborough, Director New Hanover County Airport Authority 1740 Airport Boulevard Wilmington, NC 28405 Subject: Approved Plan Revision Wilmington International Airport Stormwater Master Plan Stormwater Project No. SW8 040836 New Hanover County Dear Mr. Rosborough: On December 18, 2008, the Wilmington Regional Office received a plan revision for Stormwater Management Permit Number SW8 040836. The revisions include the removal of 0.57 acres of existing BUA and the addition of 1.4 acres of new BUA, for a net increase of 0.85 acres of built -upon area, for a Temporary Concrete Batch Plant. The batch plant is a temporary structure located in Drainage Area #15, to be used to supply concrete for the Runway Rehabilitation project. DA #15 is currently designated as a low density area. The post -construction percent BUA in DA #15 will be 13%. It has been determined that a formal permit modification is not required for the proposed changes. We are forwarding you an approved copy of the revised plans for your files. Please add the new approved plan sheets to the previously approved plan set. Upon the demolition of the temporary batch plant, the removal of the BUA associated with it, and the restoration of the area to grass, the permittee shall notify the Division so that this approved plan revision can rescinded. Please be aware that all terms and conditions of the permit issued on November 24, 2004, and the subsequent approved plan revisions, remain in full force and effect. Please also understand that the approval of this revision to the approved plans for the subject State Stormwater Permit is done on a case -by -case basis. Any other changes to this project must be approved through this Office pri- `^ construction. The issuance of this plan revision does not preclude the permittee from complyin' with all other applicable statutes, rules, regulations or ordinances which may have jurisdiction over the proposed activity, and obtaining a permit or approval prior to construction. If you have any questions concerning this matter, please do not hesitate to call me at (910) 796-7215. Sincerely, Linda Lewis Environmental Engineer III ENB1arl: S:IWQSISTORMWATERIPERMIT1040836PRdec08 cc: Ronald Ruocco, P.E., WPC Engineering Julie Wilsey, Deputy Director ILM Tony Roberts, New Hanover County Building Inspections Linda Lewis Wilmington Regional Office Central Files le Carolina AAN11dill North Carolina Division of Water Quality 127 Cardinal Drive Extension Wilmington, NC 28405 Phone (910) 796-7215 Customer Service Wilmington Regional Office Iniernet: www.ncwateEqua)ily.org Fax (910) 350-2004 1-877-623-6748 An Equal Opportunity/Affirmative Action Employer— 50% Recycled/10% Post Consumer Paper 11 'IVT W C ENGINEERING.ENVIRONMIENTALDdA& CONSTRUCTION SERVICES i 7s51J�i---_- - !ISTE^:�P�SPOI:D-PEPIOR, Bt www.wpceng.com 6w'�o(t o�(3 December 12, 2008 Ms. Linda Lewis Environmental Engineering Specialist North Carolina Department of Environment and Natural Resources 127 Cardinal Drive Extension Wilmington, NC 28405 Request for Express Permit Review For Revision to Stormwater Master Plan for Wilmington International Airport, New Hanover County, Stormwater Permit No. SW8 0408236 Temporary Concrete Batch Plant R.C. Construction Company 1820 Gardner Drive Wilmington, NC WPC Project No. WPC2308.0137 Dear Linda Lewis; As follow up to our preliminary meeting on December 9a' please find attached the following documentation for an Express Permit Review along with the application fee. 1. Express Permit Review Application Form 2. Stormwater Narrative 3. Temporary Concrete Batch Plant Operational Description (Appendix I) 4. Built Upon Area Map and Calculation (Appendix II) 5. Pictures of Site (Appendix III) 6. Site Plan Existing Conditions 7. Site Plan Proposed Layout Please let me know if you have any questions or comments. Respectfully Submitted, WPC,,7zqc ' s.,ii�onald L. R°uq,Qe'o, P.E. Senior Environmental Project Engineer/Manager Cc: Julie Wilsey, ILM Mark Zehm, R.C. Construction Kenneth Scott Murchison, P.E. R.C. Construction 2401 NEVADA BLVD. • CHARLOTTE, NC 28273 • TEL 704.927.4000 • FAX 704.927.4001 CHARLESTON 0 CHARLOTTE 0 COLUMBIA • JACKSONVILLE • MYRTLE BEACH • SAVANNAH For DENR Use ONLY �PIMA Revis w North Carolina Department of Environment and Submit J�GA Natural Resources NCDENR Request for Express Permit Review Time: lAnft: FILL-IN all the information below and CHECK the Permit(s) you are requesting for express review. FAX or Email the completed form to Express Coordinator along with a completed DETAILED narrative site plan (PDF file) and vicinity may (same items expected in the eoplication Package of the project location. Please include this forrn in the application package. • Asheville Region Alison Davidson 828-296.4698:alison.davidsonCaDncmaiLnet • Fayetteville or Raleigh Region -David Lee 919-7914203, david./abncma(lnet • Mooresvil/e & -Patrick Grogan 704-663-3772 or pabickgropandncmailnet • Washington Region -Lyn Hardison 252-946.9215 orlyn.hardison(a)ncmall not • Wilmington Region -Janet Russell910-350.2004 orlanstrossell®ncmall.net NOTE: Project application received after 12 noon will be stamped in the following work day. Project Name:,ILM GENERAL AVIATION APRON/TAXI-LANE REH PHASE 2&3 County: New Hanover - Deleted; _ Applicant: MARK ZEHM Company. R.C. CONSTRUCTION COMPANY, INC. 1 Field Code Changed Address: 311 W. PARK AVE. City: GREENWOOD State: MS Zip: 38930- -- --� Phone: 910-574-7464 Fax:: Email: marirzehm@rcconstruction.net Physical Location:WILMINGTON AIRPORT NORTHEAST CORNER OF HEWLETT DRIVE AND GARDNER DRIVE Project Drains into SMITH CREEK waters -Water dassification OTHER (for classification see-hhttp:A2o.mlr.state.nauslbimslreoorts/reportsWB.html) Project Located in CAPE FEAR River Basin. Is project draining to class ORW waters? Y/N , within % mile and draining to class SA waters YIN or within 1 mile and draining to dass HQW waters? Y/N Engineer/Consultant RON RUOCCO, P.E. Company:,WPC. INC _ Dew, Address: 2401 NEVADA BLVD City. CHARLOTTE, State: NC Zip 28273-_ Field Code Changed Phone: 704-927-4000 Fax::704-927-4001 Email: rruocco cep .cam Field Code Changed SECTION ONE: REQUESTING A SCOPING MEETING ONLY ❑ Scoping Meeting ONLY ❑ DWQ, [IDCM, LR Deleted. ,❑-D- -❑_OTHER: Deleted: SECTION TWO: CHECK ONLY THE PROGRAM (S) YOU ARE REQUESTING FOR EXPRESS PERMITTING 401 Unit ❑ Stream Origin Determination: _ # of stream calls - Please attach TOPO map marking the areas in questions ❑ Interniftent/Perennial Determination: _ # of stream calls - Please attach TOPO map matKng the areas in questions ❑ 401 Water Quality Certification ❑ Isolated Wetland (linear ft or _acres) ❑ Riparian Buffer Authorization ❑ Minor Variance ❑ Major General Variance Q� State Stormwater ® General ❑ SFR, ❑Bkhd & Bt Rmp, ❑ Clear & Grub, ❑ Utility ® Low Density ❑ Law Density -Curb & Gutter _ # Curb Outlet Swales ❑ Off -site [SW _ (Provide pornit tl)] ❑ I ligh Density -Detention Pond _ # Treatment Systems ❑ High Density -Infiltration _ #Treatment Systems ❑ High Density -Bio- Retention _ # Treatment Systems ❑ High Density-Stormwater Wetlands _ # Treatment Systems [IHigh Density -Other _ # Treatment Systems /® MODIFICATION: ❑ Major ® Minor ® Revision SW 8040836(Provide pernitM ❑ Coastal Management ❑ Excavation & Fill ❑ Bridges & Culverts ❑ Structures Information ❑ Upland Development ❑ Marina Development ❑ Urban Waterfront ❑ Land Quality ❑ Erosion and Sedimentation Control Plan with _ acres to be disturbed.(CK # (for DENR use)) SECTION THREE - PLEASE CHECK ALL THAT IS APPLICABLE TO YOUR PROJECT (for both scoping and express meeting roguest) Wetlands on Site ❑ Yes ❑ No Wetlands Delineation has been completed: ❑ Yes ❑ No US ACOE Approval of Delineation completed: ❑ Yes ❑ No Received from US ACOE ❑ Yes ❑ No Fee Sell[ for multinin nermits: Mh•ekff Buffer Impacts: ❑ No ❑ YES: _acm(s) Isolated wetland on Property ❑ Yes ❑ No 404 Application in Process w/ US ACOE: ❑ Yes ❑ No Permit For DENR use only TMe/=n Aw......9 SUBMITTAL DATES Fee SUBMITTAL DATES Fee CAMA ; Variance { MaJ; Min) $ SW HD, LD, U Gen) I $ 401: $ LOS I $ Stream Deter— $ NCDENR EXPRESS September 2008 Stormwater Narrative Temporary Concrete Batch Plant for ILM General Aviation Apron/Taxi-lane Rehab Phase 2 &3 See the following attachments: Appendix I: Temporary Concrete Batch Plant Operational Description Appendix U: BUA Map with Calculation Appendix III: Picture Map with Pictures of the Site Site Plan of Existing Conditions Site Plan of Proposed Layout 1. General Information a. Name: Temporary Concrete Batch Plant for ILM General Aviation/Taxi- lane Rehab Phase 2 &3 b. Location: 1820 Gardner Drive, Wilmington, New Hanover (Note: This project is located in Drainage Area Number 15 of the Wilmington International Airport Master Plan, Stormwater Permit No. SW8 040836.) c. Acres in Tract: 4.79 (Site of New Temporary Concrete Batch Plant) d. Acres Being Disturbed: 0.85 e. Acres in Wetlands: Not applicable f. Ownership: The site is owned and managed by the New Hanover County Airport Authority, 1740 Airport Boulevard, Wilmington, NC, 28405. g. Description of Development Proposal: Set-up of a temporary concrete batch plant for concrete needed for the Rehab Phase 2 & 3 (See attached Appendix I and II) 1. Existing Stormwater Permits: This is a requested to revise the existing Stormwater Master Plan, Permit No. SW8 040836 for Wilmington International Airport, New Hanover County. h. Built Upon Area: 13% (See Attached Appendix II) i. Site Plans: See Attached Site Plans for Existing Site Conditions as well as Proposed Layout Plan. Note that a existing gassed swales, as well as the armored trenches (See Appendix IJ). Note that a Temporary Silt Fence has been erected on the site, and a Truck Washout Pit is planned to be constructed. DEC 15 2008 j. Proposed Waste Water Treatment & Water Supply: The water to the temporary concrete batch plant is local tap water. The wastewater is generated durine the truck washout. The truck washout wastewater will be collected in the new Truck Washout Pit. The collected wastewater will be reused during the bed preparation and concrete pour for dust suppression and bed preparation. k. Historic Sites: Not applicable. 1. Disclose Any/All Non -Compliance Issues with DENR Agencies: There are no known non-compliance issues with this project. 2. Stormwater Information a. River Basin: Cape Fear, Stream Classification & Index Number: Smith Creek, CFP23, 18-74-63, J27SE7, C; SW (From Bims) b. Stormwater Design: Low Density, Commercial, and State Stormwater c. Proposed Total % Impervious Surface: 13% (See Attached Annendix II) d. Number of Proposed Treatment Measures:, Truck Washout Pit bermed and ramped to prevent stormwater inflow, Silt Fence for sediment removal, Grassed Swales, Armored Trenches, and Forested Depression. e. Will All Built Upon Area Be Collected: All stormwater from BUAs are mitigated by the previously mentioned treatment measures. f. Identify Whether or Not the Project Has Buffer Requirements & Whether or Not Development Is Proposed Within A Buffer: This portion of the project is temporary (approximately 6 months) duration buffers have not been investigated. g. Coastal Management Areas of Environmental Concern: Not applicable. h. Disclose Whether or Not Off -Site Runoff Is Coming Onto The Site or Into The Proposed BMP: No off site runoff comes onto the site. i. Discuss Whether Road Construction Across Other Property Is Necessar;- To Access This Project: Not Applicable. j. If An On -Site Evaluation Of The Soils Has Been Done, Discuss Infiltration Rates, Seasonal High Water Table, etc., and Include Date 2 1. a 6 2008 Of Site Evaluation (This Is Required For Infiltration Projects): Not applicable. k. Is The Department of Transportation Requiring The Construction Of A Turn Lane Or Road Widening Associated With The Project: Not applicable. 3 DEC 1 5 2008 Appendix I: Temporary Concrete Batch Plant Operational Description at the Wilmington Airport. (revised 12-11-2008) Reference: Project Name: ILM general Aviation Apron/Taxi-lane Rehab Phase 2 U, Project ID: NewHa-2009-005 The following is general information and specifications about the project from Kenneth S. Murchison, P.E. (General Superintendent with R.C. Construction Co. Inc.). Total Project: 7600 cubic yards Temporary Plant: Vince Hagan Central Mix Concrete Batch Plant, Model number HT-10300, rated for 275 to 300 cubic yards per hour, concrete dumped into standard trucks. Project Schedule: 10 Surface Preparation: 4-6 weeks, 1t Pour: 1-3 days, 2"d Surface Preparation: 4-6 weeks, 2"d Pour: 1-3 days, 3`d Surface Preparation: 4-6 weeks, 3`d Pour: 1-3 days. Total Pour Days with contingency = 10 maximum. Total Project duration with contingency 6 months. Description of Pour: 3 trucks will be loaded and dumped repeatedly during the day. Truck washout will occur only at the end of the day due to the proximity of the plant to the actual pours. Predicted volume of washout water is 50 gallons per truck per day, or 150 gallons per pour day, or 1,500 gallons Total Project. Proposed Disposition of Truck Washout Wastewater: Collected in a sediment basin on site and reused as dust suppression, and bed preparation. Will not be allowed to discharge as stormwater. Proposed Disposition of Stormwater: Stormwater runoff from the site will be mitigated in accordance with the approved Erosion and Sediment Control Plan with modifications and performance reservations as described in the Letter of Approval dated October 29, 2008 from Carol Miller CPESC Regional Engineer, Land Quality Section to Julie Wilsey with the New Hanover County Airport Authority. APPENDIX II: 0 TOTAL UP -DATED Built Upon Area (BUA) for Drainage T Area Number 15 of the Stormwater Master Plan: Total Drainage Area 15: 63.20 acres Original 10/26/2004 Plan BUA: 3.00 acres 84 Lumber Site BUA: 4.40 acres New Temporary Concrete Batch Plant: ............ 0.85 acres Total Proposed BUA: 8.25 acre' % BUA: 13% — jxj A nage Area 15: 63.20 acr u 2008 84 LUMBER SITE located at the Corner of Blue Clay Road and Hall Drive Total IO acres with 4.396 acres BUA 0. - 1 New Concrete Batch Plant BATCH PLANT Built Upon Area (BUA) for Specific Site I N � Total Drainage Area for Site 4.79 acres W a� Demo'ed ILM Maintenance Bldg: 0.23 acres I _ Demo'ed Stone Road 0.07 acres f Demo'ed Concrete Pads 0.02 acres w= •• " Demo'ed Stone Parking Area 0.23 acres New Washout Pit 0.02 acres _ Total Credit 0.57 acres New Impervious Surface 1.40 acres �1 — Credit -0.57 acres , k O Contingency 0.02 acresZf! . o Subtotal 0.85 acres „».���"""��.,�,, WILMINGTON INTERNATIONAL AIRPORT M •'�. ..... WILMINGTON, NORTH CAROLINA' X -ITALBERT & BRIGHT fez N �, °yes = STORMWATER MASTER PLAN —�. c II f (o• i 'c �__' fi rn A. y ENGINEERING & PLANNING CONSLIUAN?S N i N �+ ''•, y.,,,••o,,;.�•"�?�,r' EnIJ I ING CONDI � ONS — OVERALL NIT' 1 GENERAL REVISION ��D SHEJIEY DRIVE WILMINGTON, NO 2B4G5 g e SIN"n•xnuw.aaa`,� REV. N0. DESCRIPTION ODA,lE4 FAX.- 410-762-828"• EMAIL TRILMOTBIILM.COPHONE 910-761=6350 REVISIONS WI LM i N Map of Pictures for ,t-emporary t oncrew pawn Plant at Wilmington Airport APPENDIX III: EXISTING PAVED DRIVEWAY CONSTRUCTION ENTRANCE TEMPORARY SILT FENCE EXISTING GRASSED SWALE EXISTING DITCH DRAINAGE CULVERT Pic no. 8 w US FORE ST SER/ICE -� Pic no. 7 v Pic no. 5 Pic no. 6 DEC, x G 2008 0 N Temporary Concrete Batch Plant Approximate Location Pic no. 4 f / ' ILM MAINTENANCE BUILDI Pic no. 3 Pic no. 2 _ Iiey�le D. Pic no. 1 . � rive t k 4)r � } � � �� � � ' ~ � . •� . . . . . . . . . . . . � .. _ \\����//\�: �� ...... . . . . . . . . . . . . . . . . %;wNK ...... .... ..... ..... Al {�. -+''}r•.� ��/' �l „/ ��' ram/ I' � �„� ,� �" jr -,�'"�r�'� r"� ~ram ,�,•"�.r''�� "''��'�,�' .�'�,.�� V,. �iK �J��i~J�,�J-.r-.f .,r�� .� � �.�' � .� ,•' .l �ti� ''fit ; !: �_•'� rr ol �!-`'�.� �-.� �•r' � n� y� � +� � `` � �.�.��r -ram. '�!' 3' ..� - . r_�•— r K'zf� ■ AL. z O_ U D m z O U U W W U z O U Q m O n W z O Q m z Q ry Q = w oQ n z m r� n w Q O ry D Q Q U O <zoz %- Q Q 0QO wz Owe zz w Q=zo O z °- - c z .... O l o. z O i- CD� m Q. zJ m > 4 Q ry w z w CD i ._......_.._....... ter'--=.�.L,.�.......... _.__._. 50 Yak - 24HO4)9 yak Et/ i! _ .J (8-03.1c) D1RT art 9727cT> 727D-S� c. R77nnA-7Z�� `/®E.. o F OA;St� 00 7 W A -16k - 2-o -- 3 r- - x 117 F Fop- 5ov; - -oxi;�r, 4 �! VY-- h ;: ►- IS ` X = 3co. 3 1�G— act ► t. ,, � - t �» - 6 -t.. CZ 1MMSCE W ToTkt- tlot., vsc- h= j.+-' V- 309' VOL - �, ,� ,•� 1Z �2 .�. --�:� USE k = 1, d2 ` X - �: 4 NfOL 30.E-44-2' z DEL 1200� u � o N A� w 3 of 7 q Q v �ow m_ A[i UM M fmJOKitN cc cc o _cc_ m mmmnl r�.uLWF �wwww NoFFs=_! W YIW UL. _TO DIRT RNA Wr .04,J =- �'x3�'� �.�� � 972�T3 > 7'27D.5�. a� ToTf l-- VOL- C)F 4 f�� 30, 638gy t�Ei d t�E UA` -.. self ---f ViJ FOP— Y - 24-HoOL -W j6 0 h -- I. IS' X = 3a,3' �oL 1-f'r'" ! t f"_ 978.7a G TbTAt, \jQu : g72fT3 t 2.fo7. 3$F6 3= u5E �)= 1.�- ;.r 3o, a' USE h= ji4Z,' x_ 30.sel r z� vu ;S r a 4 3888a:_ N(q any=mm K �nmmyy m_ -0T,, m rj �f�I�9 OOD000 ^. yCy CCCC nmmmmn L LZr=&,Ld.ML --rl- f-,jF 57 = Vol- OF L6rA*\/O 4- OF- OA:S-,qOJT WA r,� E IDC`1�14c- VIAI-15fL l7ok- 50%?&AA-24-Hw� A;.stj &jc,� Ul.SC h-� 1.*Z' ), yz 2t+2-k r ?c)f4 , V% h -- I. IS' Y, =- 30. 3 , �OLZ' , 1.!5:- 978-7bpr' 'DO-1 I W4`16-9-- E-&-NMD DIJ Rim--i& --A-L- Mb 2.4--rinoiL iAol Evz7-r,-- 3 TOTAt- Vot. :! �72-ft /-a 3 u5L- �:t 1.+' )(.7 so, a' Ve)L 3 4� 12-12, 2 - -Y . ss-�� 1,/j USE k 1, 4z r y r 3d, S4, TL I IN W R m9ww w m=_�o oom�mN 'r., rt1T nmmvi w 9000t�iO D9DYY �9999�J about:blank Thanks, I'll be on the lookout! Ron Ruocco wrote: -----Original Message ----- From: Ron Ruocco (mailto:rruocco@wpceng.com] Sent: Thursday, December 11, 2008 3:24 PM To: 'Janet Russell' Cc: rruocco@wpceng.com; KSMurch@aol.com; markzehm@rcconst.net Subject: RE: ILM General Aviation - Plan Revision Submittal Package Janet, You should receive the total package on Monday 12-15. Best regards. Ron Ruocco (704-927-4000, M: 803-984-1786) -----Original Message ----- From: Janet Russell(mailto:Janet.Russell@ncmail.net] Sent: Thursday, December 11, 2008 2:26 PM To: Ron Ruocco; markzehm@rcconstruction.net Subject: ILM General Aviation - Plan Revision December 11, 2008 *ILM General Aviation - Plan Revision* Gentlemen: We are in receipt of your Express Request. In light of the fact that you have already had a scoping meeting with Linda Lewis, another in -person meeting is not being required. Please submit your plan revision package so that we receive it on Monday, *December 15, 2008.* The package should be addressed to Linda Lewis 6 Janet Russell, Express Permitting, 127 Cardinal Drive Extension, Wilmington, NC 28405. By putting my name on the package with Linda's it should clue our mail sorters to the fact that it is an "Express" project that needs to get to Linda immediately. The Express fee for a plan revision is $500.00 made payble to NC DENR. Please respond to this email and let me know that you plan to get the package to us sometime on Monday, the 15th. Do not hesitate to call me if you have any questions, 910 796-7421. Thanks, Janet Russell Express Coordinator 1 of 1 12/11/2008 4:11 PM RE: Walgreeds @ Carolina Beach Subject: RE: Walgreen's @ Carolina Beach From: "Michael Newman" <mnewman@pmcharlotte.com> Date: Wed, 10 Dec 2008 17:25:20 -0500 To: "'Janet Russell"' <Janet.Russell@ncmail.net> Janet, Thanks for processing my request. However I spoke with the developer and he would like to wait and resubmit our storm water application until he has the final approval from the tenant. This way we do not have any future changes. I respectfully withdraw my request for Express Review until sometime in the future. I will send you another request for express review once we have the final approval. Thanks for your time & cooperation. Please contact me if you have any questions. Thanks, Michael Newman PM Engineering, Inc. 4601 Charlotte Park Dr., Suite 160 Charlotte, NC 28217 (704) 521-9973 x501 Voice (704) 521-9974 Fax (888) 521-9973 Toll Free -----Original Message ----- From: Janet Russell[mailto:Janet.Russell@ncmail.net) Sent: Wednesday, December 10, 2008 2:33 PM To: Michael Newman; bmitchener@collett.biz Subject: Walgreen's @ Carolina Beach December 10, 2008 *Walgreen's @ Carolina Beach* Gentlemen: The Express Starmwater submittal meeting has been scheduled with *Malcolm Doney on December 16, 2008 at 11:00 AM} here in the Wilmington Regional Office. Mr. Mitchener, the applicant, is not required to attend the meeting in person, but can be available by conference call to recap the meeting at the conclusion. Please respond ASAP to confirm and reserve the meeting date and time. Thanks, Janet Russell Express Coordinator 1 of 1 12/11/2008 8:43 AM Emailing: Express Request Oct.pdf Subject: Emailing: Express Request Oct.pdf From: "Ron Ruocco" <rruocco@wpceng.com> Date: Thu, 11 Dec 2008 07:28:01 -0500 To: "'Janet Russell"' <Tanet.RusselIc@i ncmail.net> CC: <mxocco@wpceng.com> Ms. Janet Russell, See attached Request for Express Permit Review. Does this answer enough questions to get us a date? Ron Ruocco (704-927-4000, M: 803-984-1786) Express Request Oct.pdf Content -Type: application/pdf Content -Encoding: base64 1 of 1 12/11/2008 8:53 AM (1r� 1� 5 — `� ` `' f For DENR Use ONLY M rT Lu Re,e.rer�1 North Carolina Department of Environment and Sbm1L 2— 5 VIA Natural Resources Time: tLNS1 1 n U '\ 1 2 Is- NCDENR Request for Express Permit Review --- .: O5 FILL-IN all the Information below and CHECK the PermM(s) you are requesting for express review. FAX or Email the completed form to Express Coordinator along with a completed DETAILED narrative site plan iPDF file) and vicinity metro [same Items expected in the application package , 2--CA of the project location. Please include this form in the application package. _ � • Asheville Region Alison Davidson 828-298-4698;allson.davidson®ncmallnet W ,Ij cz' • Fayetteville or Raleigh Region -David Lee 919-791.4203, david lepOwmail net • Mooresville & -Patrick Grogan 704-W34772 oryat►IckamnanAmmall net s/► c ^r • Washington Region -Lyn Hardison 252-946.9215 or ivn.hardisoiOncmail net • Wilmington Region -Janet Russell 910-350-2004 orianeLmssell5mmall.net NOTE: Project application received after 12 noon will be stamped in the following work day. Project Name: JLM GENERAL AVIATION APRQN AXI-LANE REH PHASE 283 _ _ _ _County_ Now Hanover Deleted: — Applicant MARK ZEHM Company: R.C. CONSTRUCTION COMPANY. INC. Fier Code changed Address: 311 W. PARK AVE. City: GREENWOOD , State: MS Zip: 38930 — — Phone: 910574-7464 Fax:: - - Email: markzehm@rcconstrucdon.net Physical Locaflon:WILMINGTON AIRPORT NORTHEAST CORNER OF HEWLETT DRIVE AND GARDNER DRIVE Project Drains into SMITH CREEK waters -Water classification OTHER (for classification see-hbJlh2o enr state nc uslbims/regorts/reoorbW6 htm0 Project Located in CAPE FEAR River Basin. Is project draining to class ORW waters? Y/N , within'% mile and draining to class SA waters YIN. or within 1 mile and draining to loss HOW waters? Y/N Engineer/Consultant: RON RUOCCO. P.E. Company: WPC�INC_ Deleted: Address: 2401 NEVADA BLVD City: CHARLOTTE. State: NC Zip 28273-- — Field Code Changed Phone: 704-927-4000 Fax::704-927-4001 Email: rruocco@JWQpLlo.co-%_ _ _ _ _ _ _ SECTION ONE: REQUESTING A SCOPING MEETING ONLY Field cope changed ❑ Scoping Meeting ONLY ❑ DWQ, ❑ DCM, JJ DLR, j] OTHER: Deleted: SECTION TWO: CHECK ONLY THE PROGRAM (S) YOU ARE REQUESTING FOR EXPRESS PERMITTING ❑ 401 Unit ❑ Stream Origin Determination: _ # of stream calls - Please attach TOPO map marking the areas in questions ❑ Intermi#entlPerennial Determination: _ # of stream calls - Please attach TOPO map marking the areas in questions ❑ 401 Water Quality Certification ❑ Isolated Welland (_linear it or _acres) ❑ Riparian Buffer Authorization ❑ Minor Variance ❑ Major General Variance ® State Stormwater ® General ❑ SFR, ❑Bkhd & Bt Rmp, ❑ Clear & Grub, ❑ Utility ® Low Density ❑ Low Density -Curb & Gutter _ # Curb Outlet Swales ❑ Off -site [SW,_ (Provide permit ti)] ❑ High Densi"etention Pond _# Treatment Systems ❑ High Density -Infiltration _#Treatment Systems ❑ High Density -Bio-Retention _ # Treatment Systems ❑ High Density-Stommater Wetlands _ # Treatment Systems El High Density -Other _# Treatment Systems /® MODIFICATION: [I Major ® Minor ® Revision SW 8040836(Prouldepema q ❑ Coastal Management ❑ Excavation & Fill ❑ Bridges & Culverts ❑ Structures Information ❑ Upland Development ❑ Marina Development ❑ Urban Waterfront ❑ Land Quality ❑ Erosion and Sedimentation Control Plan with _ acres to be disturbed.(CK # (for DENR use)) SECTION THREE - PLEASE CHECK ALL THAT IS APPLICABLE TO YOUR PROJECT (for both scoping and express meeting request) Wetlands on Site ❑ Yes ❑ No Wetlands Delineation has been completed: ❑ Yes ❑ No US ACOE Approval of Delineation completed: ❑ Yes ❑ No Received from US ACOE ❑ Yes ❑ No Fee SDlafor multlDleDermita: (Checks Buffer impacts: ❑ No ❑ YES: _acre(s) Isolated wetland on Property ❑ Yes ❑ No 404 Application in Process w/ US ACOE: ❑ Yes ❑ No Permit For DENR use only Thhd Far SUBMITTAL DATES I Fee SUBMITTAL DATES Fee CAMA 1 $ 1 Variance ( Maj; Min) $ SW HD, 129 LD, 0 Gen) 1 $ 401: $ LQS 1 $ 1 Stream Deter,_ $ NCDENR EXPRESS September 2008 D E C E I V E DEC 10 2008 DWQ F'ROJ #�r. Airport - Temporary Batch plant Subject: Airport - Temporary Batch plant From: Linda Lewis 4inda.lewis@ncmail.net> Date: Tue, 09 Dec 2008 11:07:11 -0500 To: Janet Russell <Tanet.Russell@ncmail.net> Janet: As a result of my meeting today, the Airport will be submitting a request to schedule an Express review of a Plan Revision ($500.00) to their Master Plan for the construction of the Temporary Batch Plant, which is needed for the runway rehab project which we exempted. I'd like to schedule their direct submittal (no additional meeting needed) for me to review on either Monday December 15 or Thursday December 18. Thanks, Linda �ECEI�ED UEC 10 2ppg PROJ # awc) 1 of 1 12/11/2008 8:54 AM State of North Carolina Department of Environment and Natural Resources Wilmington Regional Office Michael F. Easley, Governor FAX COVER SHEET William G. Ross, Jr., Secretary Date: C) No. Pages (excl. cover): Express Permitting To: RIc"'o <--cL c-) From: Sandra Exum ` Phone (910) 796-7265 Fax: �� �` �o� 2 yc6 J Fax: (910) 350-2004 Re: Hard Copy to follow 127 Cardinal Drive Extension, Wilmington, NC 28405 9 (910) 796-7215 o An Equal Opportunity Affirmative Action Employer [Fwd: Re: Express Review for Wilmington Airport Concrete Batch Plant] Subject: [Fwd: Re: Express Review for Wilmington Airport Concrete Batch Plant] From: Linda Lewis <linda.lewis@ncmail.net> Date: Wed, 17 Dec 2008 12:30:57 -0500 To: Ron Ruocco <rruocco@wpceng.com> CC: Julie Wilsey <jwilsey@flyilm.com> Mr. Ruocco: In addition to the previous email, I also notice that this project is proposing to remove 0.57 acres of BUA. Please provide 2 copies of a drawing clearly identifying the structures that will be removed and their individual BUA amount. Linda Subject: Re: Express Review for Wilmington Airport Concrete Batch Plant From: Linda Lewis <linda.lewis@ncmail.net> Date: Wed, 17 Dec 2008 12:14:16 -0500 To: rruocco@wpceng.com CC: Julie Wilsey <jwilsey@flyilm.com> Mr. Ruocco: The only thing missing from the application package are the post -construction drawings that clearly show the extent of the gravel area and the dimensions of the proposed BUA. The drawings that were submitted show only the concrete bases for the conveyor systems and do not show any dimensions. Please add dimensions and highlight the gravel that will be laid. Please submit 2 sets of the revised plans. Since this is a relatively minor addinfo request, I have elected not to charge a fee. Please submit the plans by Friday morning, December 19, 2008, as I will be on Christmas vacation after that. thanks Linda rruocco@wpceng.com wrote: Hello Ms. Linda Lewis, I hope all is well. I just wanted to check to see if you have had a chance to look at the Express Review Submittal for the Wilmington Airport Temporary Concrete Batch Plant. We met with you last Tuesday 12-9, and the Express Review Submittal Package was reported to be signed for on Monday 12-15 at 10:00 AM. Best regards. Ron Ruocco (M:803-984-1786) Re: Express Review for Wilmington Airport Concrete Batch Plant.eml Content -Type: message/rfc822 Content -Encoding: 7bit 1 of 1 12/17/2008 12:35 PM Re: Express Review for Wilmington Airport Concrete Batch Plant Subject: Re: Express Review for Wilmington Airport Concrete Batch Plant From: Linda Lewis <linda.lewis@ncmail.net> Date: Wed, 17 Dec 2008 12:14:16 -0500 To: rruocco@wpceng.com CC: Julie Wilsey <jwilsey@flyilm.com> Mr. Ruocco: The only thing missing from the application package are the post -construction drawings that clearly show the extent of the gravel area and the dimensions of the proposed BUA. The drawings that were submitted show only the concrete bases for the conveyor systems and do not show any dimensions. Please add dimensions and highlight the gravel that will be laid. Please submit 2 sets of the revised plans. Since this is a relatively minor addinfo request, I have elected not to charge a fee. Please submit the plans by Friday morning, December 19, 2008, as I will be on Christmas vacation after that. thanks Linda rruoccoUceng.com wrote: Hello Ms. Linda Lewis, I hope all is well. I just wanted to check to see if you have had a chance to look at the Express Review Submittal for the Wilmington Airport Temporary Concrete Batch Plant. We met with you last Tuesday 12-9, and the Express Review Submittal Package was reported to be signed for on Monday 12-15 at 10:00 AM. Best regards. Ron Ruocco (M:803-984-1786) 1 of 1 12/17/2008 12:14 PM co r- LA N 0 Q N Nt 0% N co r- +ca co to mi ra !I® z �«- z INO CO) 4 aoo,0 0� N �r s— j s;� August 22, 2007 Ms. Linda Lewis Environmental Engineer NCDENR 127 Cardinal Drive Extension Wilmington, NC 28405 RE: Wilmingtor. International Airport Customs Area Drainage Rehabilitation - Phase 1 TBI No. 3301-0504 Dear Linda: Enclosed please find one set of plans for the Customs Area Drainage Rehabilitation — Phase 1 project to be undertaken at the Wilmington International Airport. This project includes replacement and rehabilitation of a failed drainage system in the vicinity of the old airline terminal. The old terminal building has been demolished and a new International Terminal/U.S. Customs building will be constructed in that location next year. This project, together with the new international terminal, will result in no increase in built upon area at the airport. The rehabilitated drainage system will discharge at the existing outfall location. It is our expectation that this project is consistent with the Airport's Stormwater Master Plan Permit No. SW8 040836. If you have any questions or comments regarding this project, please let me know. Sincerely, John M. Mass E. Enclosures q UG 2 �1) C: Ms. Julie Wilsey, Deputy Airport Director ENGINEERING & PLANNING CONSULTANTS ra", .rNT%441 :i1:1�17:1'.ileii�KK�7L1 4810 SHELLEY DRIVE WILMINGTON, NC 28405 910.763.5350 FAX 910.762.6281 WILMINGTON, NORTH CAROLINA • CHARLOTTE, NORTH CAROLINA • RICHMOND, VIRGINIA