HomeMy WebLinkAboutSW6230603_Stormwater Narrative_20230721 $P\ 4Dsite
; solutions
civil engineering I land surveying
Aberdeen US 15-501 Dollar General Storm Water Narrative
Currently undeveloped, the site is to be utilized for as a new retail store with the
associated parking area. In its current condition the site drains generally from the
northwest to southeast.
Storm water will be collected within the property via paved and grassed swales which
will convey the runoff into the proposed infiltration basin. The grassed swale will serve
as the pretreatment before entering the basin. The basin will infiltrate the 1 yr 24 hr
storm event within the 72 hour time period as required by manual. The infiltration basin
has been designed in accordance with the latest NCDEQ MDC Stormwater Design
Manual.
t
409 Chicago Drive, Suite 112, Fayetteville, NC 28306
office 1910-426-6777 fax 1910-426-5777
On time,every time. I www.4Dsitesolutions.com