Loading...
HomeMy WebLinkAboutSW6230603_Supplement-EZ Form_20230721 SUPPLEMENT-EZ COVER PAGE FORMS LOADED PROJECT INFORMATION 1 Project Name Aberdeen US 15-501 Dollar General 2 Project Area(ac) 2.19 3 Coastal Wetland Area(ac) 4 Surface Water Area(ac) 5 Is this project High or Low Density? High 6 Does this project use an off-site SCM? No COMPLIANCE WITH 02H.1003(4) 7 Width of vegetated setbacks provided(feet) 30' 8 Will the vegetated setback remain vegetated? N/A 9 If BUA is proposed in the setback,does it meet NCAC 02H.1003(4)(c-d)? 10 Is streambank stabilization proposed on this project? NUMBER AND TYPE OF SCMs: ' 11 Infiltration System 1 12 Bioretention Cell 13 Wet Pond 14 Stormwater Wetland 15 Permeable Pavement 16 Sand Filter 17 Rainwater Harvesting(RWH) 18 Green Roof 19 Level Spreader-Filter Strip(LS-FS) 20 Disconnected Impervious Surface(DIS) 21 Treatment Swale 22 Dry Pond 23 StormFilter 24 Silva Cell 25 Bayfilter 26 Filterra FORMS LOADED DESIGNER CERTIFICATION 27 Name and Title: C.Scott Brown,PE-Vice President 28 Organization: 4D Site Solutions,Inc 29 Street address: 409 Chicago Drive,Suite 112 30 City,State,Zip: Fayetteville,NC 28306 31 Phone number(s): 910-426-6777 32 Email: sbrown@4dsitesolutions.com Certification Statement: I certify,under penalty of law that this Supplement-EZ form and all supporting information were prepared under my direction or supervision;that the information provided in the form is,to the best of my knowledge and belief,true,accurate,and complete;and that the engineering plans, specifications,operation and maintenance agreements and other supporting information are consistent with the information provided here. Designer Signature of Designer Seal Date DRAINAGE AREAS r5 1 Is this a high density project? Yes 2 If so,number of drainage areas/SCMs _ 1 3 Does this project have low density areas? _ No 4 If so,number of low density drainage areas _ 0 Is all/part of this project subject to previous rule versions? No FORMS LOADED DRAINAGE AREA INFORMATION I Entire Site 1 4 Type of SCM Infiltration basin 5 Total drainage area(sq ft) 98,959 64902 6 Onsite drainage area(sq ft) 95,225 _ 61168 7 Offsite drainage area(sq ft) 3,734 3734 8 Total BUA in project(sq ft) 35001 sf 35001 sf New BUA on subdivided lots(subject to 9 permitting)(sq ft) New BUA not on subdivided lots(subject to 10 permitting)(sf) 34017 sf 34017 sf 11 Offsite BUA(sq ft) 984 sf 984 sf 12 Breakdown of new BUA not on subdivided lots: -Parking(sq ft) 23377 sf 23377 sf -Sidewalk(sq ft) -Roof(sq ft) 10640 sf 10640 sf -Roadway(sq ft) -Future(sq ft) -Other,please specify in the comment box below(sq ft) New infiltrating permeable pavement on 13 subdivided lots(sq ft) New infiltrating permeable pavement not on 14 subdivided lots(sq ft) Existing BUA that will remain(not subject to 15 permitting)(sq ft) 984 sf 984 sf 16 Existing BUA that is already permitted(sq ft) 17 Existing BUA that will be removed(sq ft) 18 Percent BUA 35% 54% 19 Design storm(inches) 1.0 in 1.0 in 20 Design volume of SCM(cu ft) 2933 cf 21 Calculation method for design volume simple ADDITIONAL INFORMATION Please use this space to provide any additional information about the 22 drainage area(s): INFILTRATION SYSTEM 1 Drainage area number 1 2 Minimum required treatment volume(cu ft) 2933 cf GENERAL MDC FROM 02H.1050 3 Is the SCM sized to treat the SW from all surfaces at build-out? Yes 4 Is the SCM located away from contaminated soils? Yes 5 What are the side slopes of the SCM(H:V or enter"Vertical'for trenches)? 3:1 _ 6 Does the SCM have retaining walls,gabion walls or other engineered side slopes? No 7 Are the inlets,outlets,and receiving stream protected from erosion (10-year storm)? Yes 8 Is there an overflow or bypass for inflow volume in excess of the design volume? Yes 9 What is the method for dewatering the SCM for maintenance? Pump(preferred) 10 If applicable,will the SCM be cleaned out after construction? Yes 11 Does the maintenance access comply with General MDC(8)? Yes _ 12 Does the drainage easement comply with General MDC(9)? Yes 13 If the SCM is on a single family lot,does(will?)the plat comply with General MDC(10)? N/A 14 Is there an O&M Agreement that complies with General MDC(11)? Yes 15 Is there an O&M Plan that complies with General MDC(12)? Yes 16 Does the SCM follow the device specific MDC? Yes 17 Was the SCM designed by an NC licensed professional? Yes INFILTRATION SYSTEM MDC FROM 02H.1051 18 Proposed slope of the subgrade surface(%) 0% 19 Are terraces or baffles provided? No 20 Type of pretreatment: Other Soils Data 21 Was the soil investigated in the footprint and at the elevation of the infiltration system? Yes 22 SHWT elevation(fmsl) 342.08 23 Depth to SHWT per soils report(in) 77.00 _ 24 Ground elevation at boring in soils report(fmsl) 348.50 25 Is a detailed hydrogeologic study attached if the separation is between 1 and 2 feet? N/A _ 26 Soil infiltration rate(in/hr) 0.10 27 Factor of safety(FS) (2 is recommended): 1.60 Elevations 29 Bottom elevation(fmsl) 345 ft 30 Storage elevation(fmsl) il 345.71 ft 31 Bypass elevation(fmsl) 348 ft For Basins Only 32 Bottom surface area(ft2) 7592 ft 33 Storage elevation surface area(ft2) 8010.ft For Trenches Only 34 Length(ft) 35 Width(ft) 36 Perforated pipe diameter,if applicable(inches) 37 Number of laterals 38 Total length of perforated piping 39 Stone type,if applicable 40 Stone porosity(%) 41 Is stone free of fines? 42 Is the stone wrapped in geotextile fabric? 43 Has at least one inspection port been provided? Volumes/Drawdown 44 Design volume of SCM(cu ft) 2933 cf 45 Time to draw down hours 46 hrs ADDITIONAL INFORMATION 46 Please use this space to provide any additional information about the infiltration system(s): Pretreatment for basin is through a grassed swale and grass overland flow Infiltration 1 11:49 AM 7/21/2023