Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
SW8040836_Historical File_20041124
F WATF Michael F. Easley, Governor y William G. Ross, Jr., Secretary f^ North Carolina Department of Environment and Natural Resources Alan W. Klimek, P.E. Director r Division of Water Quality November 24, 2004 Mr. Jon W. Rosborough, Director New Hanover County Airport Authority 1740 Airport Boulevard Wilmington, NC 28405 Subject: Stormwater Permit No. SW8 040836 Wilmington International Airport Master Plan High Density Project New Hanover County Dear Mr. Rosborough: The Wilmington Regional Office received a complete Stormwater Management Permit Application for Wilmington International Airport Master Plan on November 8, 2004. Staff review of the plans and specifications has determined that the project, as proposed, will comply with the Stormwater Regulations set forth in Title 15A NCAC 2H.1000. We are forwarding Permit No. SW8 040836 dated November 24, 2004, for the construction of the subject project. This permit shall be effective from the date of issuance until November 24, 2014, and shall be subject to the conditions and limitations as specified therein. Please pay special attention to the Operation and Maintenance requirements In this permit. Failure to establish an adequate system for operation and maintenance of the stormwater management system will result in future compliance problems. If any parts, requirements, or limitations contained in this permit are unacceptable, you have the right to request an adjudicatory hearing upon written request within thirty (30) days following receipt of this permit. This request must be in the form of a written petition, conforming to Chapter 150B of the North Carolina General Statutes, and filed with the Office of Administrative Hearings, P.O. Drawer 27447, Raleigh, NC 27611-7447. Unless such demands are made this permit shall be final and binding. If you have any questions, or need additional information concerning this matter, please contact Linda Lewis, or me at (910) 395-3900. Sincerely, Rick Shiver Regional Supervisor Surface Water Protection Section RSS/arl: S:IWQSISTORMWATIPERMIT1040836.nov04 cc: Eric Stumph, P.E., Talbert & Bright Tony Roberts, New Hanover County Building Inspections City of Wilmington Development Services Linda Lewis Wilini ngto� ss Regional Office Central Files North Carolina Division of Water Quality 127 Cardinal Drive Extension Wilmington Regional Office Wilmington, NC 28405- 3845 Phone (910) 395�3900 Customer Service 1-877-623-6748 FAX (910) 350-2004 Internet: h2o.enr.state,nc.us I\ionrthCarolina ,/l/,/) 4r,11i1, An Equal Opportunity/Affirmative Action Employer — 50°% Recycled/10°% Post Consumer Paper State Stormwater Management Systems Permit No. SW8 040836 STATE OF NORTH CAROLINA DEPARTMENT OF ENVIRONMENT AND NATURAL RESOURCES DIVISION OF WATER QUALITY STATE STORMWATER MANAGEIr"ENT PERMIT OVERALL LOW DENSITY DEVELOPMENT WITH ENGINEERED CONTROLS FOR POCKETS OF HIGH DENSITY In accordance with the provisions of Article 21 of Chapter 143, General Statutes of North Carolina as amended, and other applicable Laws, Rules, and Regulations PERMISSION IS HEREBY GRANTED TO New Hanover County Airport Authority Wilmington International Airport Master Stormwater Plan New Hanover County FOR THE construction, operation and maintenance of an overall low density project with dry detention ponds and grassed swales for treatment of the pockets of high density, as determined by the Division, in compliance with the provisions of 15A NCAC 2H .1000 (hereafter referred to as the "stormwater rules') and the approved stormwater management plans and specifications and other supporting data as attached and on file with and approved by the Division of Water Quality and considered a part of this permit. This permit shall be effective from the date of issuance until November 24, 2014, and shall be subject to the following specified conditions and limitations: I. DESIGN STANDARDS 1. This permit is for the Master Plan of development and is effective only with respect as to how the stormwater from the Airport property will be treated prior to discharge into surface waters, as described in the application and other supporting data. 2. The proposed method of treatment for the designated pockets of high density is extended dry detention basins with grassed swales to provide a minimum of 85% TSS removal. 3. Specific stormwater control measures will be permitted on a case by case basis. Design criteria for the proposed controls must be from the most recent version of the stormwater rules. A permit application or permit modification must be submitted and approved prior to development of any additional built -upon area within the 1620.8 acre airport property. 4. In order to maintain overall low density, the 1620.8 acre airport tract will be limited to no more than 486.2 acres of built -upon area. Currently, there are 260.6 acres of existing built -upon area, leaving 225.6 acres available for future development. Development of projects within those areas determined to be high density, or development which creates a pocket of high density, as determined by the Division, must provide dry detention basins in combination with grassed swales in accordance with the design criteria contained in the latest version of the stormwater rules. At the point where the overall built -upon area exceeds the limit of 486.2 acres, engineered controls will be required for all development that has taken place to date. Page 2 of 5 State Stormwater Management Systems Permit No. SW8 040836 5. The engineering report received on October 26, 2004, and the modified plan sheet #2 prepared by Talbert & Bright and received on November 8, 2004, delineates the existing high density pockets. All new built -upon area or redeveloped built -upon area within these pockets must be treated with an extended dry detention basin and grassed swale. Maintenance activities such as the repair or overlayment of runways are not redevelopment activities. The Division shall determine which proposed activities are considered maintenance and which are redevelopment, high density and low density. 6. The runoff from all built -upon area within the permitted future drainage areas of the designated pockets of high density within this project must be directed into the future permitted stormwater control systems. 7. There are no restrictions on the type of stormwater system that can be used at this project. However, the shallow water table prohibits the use of infiltration basins or trenches, and the FAA prohibits the use of engineered methods that create a permanent pool of water. 8. If new impervious areas are proposed, which are located adjacent to or in the same area as the delineated pre-1988 impervious areas, and which result in the creation of a pocket of high density as determined by the Division, then all of the runoff within that pocket of high density must be treated in a dry detention basin system unless the runoff from the pre-1988 area can be separated from the new area. If new built -upon area is proposed adjacent to or in the same area as existing post-1988 built -upon area, and which result in the creation of a pocket of high density, then all of the runoff within that pocket must be treated in a dry detention basin system. 9. All low flow channels in the dry detention basins must be stabilized with rip rap. Concrete channels are not allowed. 10. The bottom of any proposed extended dry detention basin must be at least 1' above the seasonal high water table. All due diligence must be exercised to find a suitable site that meets this requirement. If not, the system will not draw down as intended and may result in a permanent pool of water, contrary to FAA requirements. 11. The FAA has recommended that the plunge pool at the outlet structure of the dry detention basin be eliminated. This will increase the potential for clogging of the orifice, and will require a more frequent inspection schedule. 12. Projects submitted for approval under the low density option must demonstrate compliance with the low density criteria described in the latest version of the stormwater rules. Projects that have clustered built -upon area, collection systems, or which do not provide for sheet flow across at least 30' of grassed area will be considered high density. II. SCHEDULE OF COMPLIANCE 1. Once approved, the permitted stormwater management system shall be constructed in its entirety, vegetated and operational for its intended use prior to the construction of any built -upon surface. 2. During construction, erosion shall be kept to a minimum and any eroded areas of the system will be repaired immediately. 3. Access to the stormwater facilities for the purposes of inspection by DENR personnel and maintenance by airport personnel shall be maintained at all times. Page 3 of 5 State Stormwater Management Systems Permit No. SW8 040836 4. This permit shall become voidable unless the facilities are constructed in accordance with the conditions of this permit, the approved Master plan concept, the specifications, and other supporting data. 5. The permittee shall at all times provide the operation and maintenance necessary to assure the permitted stormwater system (dry detention basin and grassed swaies) functions at optimum efficiency. The Operation and Maintenance Plan must address the following items: a. Monthly inspections. More frequent inspection will be required if there is construction activity within the drainage area of the basin. b. Sediment removal. C. Mowing and revegetation of slopes. Woody vegetation must be removed. d. Immediate repair of eroded areas. e. Maintenance of all slopes in accordance with approved plans and specifications. f. Debris removal and unclogging of basin, outlet structure, orifice device, catch basins, piping and swales. g. Access to the outlet structure must be available at all times. 6. Records of maintenance activities must be kept and made available upon request to authorized personnel of DWQ. The records will indicate the date, the condition of the facility, any problems, the name of person performing the work and what preventative or corrective actions were taken. 7. Upon completion of construction, prior to issuance of a Certificate of Occupancy, and prior to operation of the permitted future facility, a certification must be received from an appropriate designer for the system installed certifying that the permitted facility has been installed in accordance with this permit, the approved plans and specifications, and other supporting documentation. Any deviations from the approved plans and specifications must be noted on the Certification. A modification may be required for those deviations. 8. If the future stormwater system is used as an Erosion Control device, it must be restored to design condition prior to operation as a stormwater treatment device, and prior to occupancy of the facility. 9. The permittee shall submit to the Director and shall have received approval for revised plans, specifications, and calculations prior to construction, for any modification to the approved stormwater plans, including, but not limited to, those listed below: a. Any revision to any item shown on the approved plans, including the stormwater management measures, built -upon area, details, etc., that has an impact on the permitted stormwater facility. b. Project name Change. C. Transfer of ownership. d. Redesign or addition to the approved amount of built -upon area or to the drainage area. e. Further subdivision, acquisition, lease or sale of all or part of the project area. The project area is defined as all property owned by the permittee, for which Sedimentation and Erosion Control Plan approval or a CAMA Major permit was sought. f. Filling in, altering, or piping of any vegetative conveyance shown on the approved plan. 10. The permittee shall submit final site layout and grading plans for all future development areas, to the Division prior to construction. Page 4 of 5 State Stormwater Management Systems Permit No. SW8 040836 11. A copy of the approved plans and specifications shall be maintained on file by the Permittee for a minimum of ten years from the date of the completion of construction. 12. The Director may notify the permittee when the permitted site does not meet one or more of the minimum requirements of the permit. Within the time frame specified in the notice, the permittee shall submit a written time schedule to the Director for modifying the site to meet minimum requirements. The permittee shall provide copies of revised plans and certification in writing to the Director that the changes have been made. III. GENERAL CONDITIONS 1. This permit is not transferable to any person or entity except after notice to and approval by the Director. The permittee is responsible for compliance with all permit conditions until the transfer is approved. 2. Failure to abide by the conditions and limitations contained in this permit may subject the Permittee to enforcement action by the Division of Water Quality, in accordance with North Carolina General Statute 143-215.6A to 143-215.6C. 3. The issuance of this permit does not preclude the Permittee from complying with any and all statutes, rules, regulations, or ordinances, which may be imposed by other government agencies (local, state, and federal) having jurisdiction. 4. In the event that the facilities fail to perform satisfactorily, including the creation of nuisance conditions, the Permittee shall take immediate corrective action, including those as may be required by this Division, such as the construction of additional or replacement stormwater management systems. 5. The permittee grants DENR Staff permission to enter the property during normal business hours for the purpose of inspecting all components of the permitted stormwater management facility. DENR staff shall identify themselves and the permittee shall provide an escort, as required by FAA requirements. 6. The permit may be modified, revoked and reissued or terminated for cause. The filing of a request for a permit modification, revocation and reissuance or termination does not stay any permit condition. 7. Unless specified elsewhere on the plans, permanent seeding requirements for the stormwater controls will follow the FAA Standard Specification for seeding, mulching and erosion control where they do not conflict with the intent of the North Carolina Erosion and Sediment Control Planning and Design Manual. 8. Approved plans and specifications for this project are incorporated by reference and are enforceable parts of the permit. 9. The permittee shall notify the Division any name, ownership or mailing address changes within 30 days. Permit issued this the 24th day of November 2004. NORTH CAROLINA ENVIRONMENTAL MANAGEMENT COMMISSION Alan W. Klimek, P.E., Director Division of Water Quality By Authority of the Environmental Management Commission Page 5 of 5 OFFICE USE ONLY '�( ate Received Feb Paid Permit f yNumber J State of North Carolina Department of Environment and Natural Resources Division of Water Quality STORMWATER MANAGEMENT PERMIT APPLICATION FORM This form may he photocopied for use as an original I. GENERAL INFORMATION 1. Applicants name (specify the name of the corporation, individual, etc. who owns the project): 2. Print Owner/Signing Official's name and title (person legally responsible for facility and compliance): Jon W. Rosborough, Airport Director 3. Mailing Address for person listed in item 2 above: 1740 Airport Blvd City: Wilmington State: NC Zip: 2 R4 n5 Telephone Number: ( 910 ) 3 41- 4 3 3 3 4. Project Name (subdivision, facility, or establishment name - should be consistent with project name on plans, specifications, letters, operation and maintenance agreements, etc): Wilmington International Airport Stormwater Master Plan 5. Location of Project (street address): 1740 Airport Blvd City: Wilmington County: New HannvPr 6. Directions to project (from nearest major intersection): Airport Blvd From N. 23rd St 7. Latitude: 3 4 ° -16 ' -14 " N Longitude: 7 7 - _ 5 4 1 _ q W of project 8. Contact person who can answer questions about the project: Name: Eric Stumph Telephone Number: ( 910 ) 763- 5350 Talbert & Bright and Julie Wilsey, Deputy Director Wilmington International Airport II. PERMIT INFORMATION: (910) 3 41- 4 3 3 3 1. Specify whether project is (check one): 3 New Renewal Modification Form SWU-101 Version 3.99 Page 1 of 4 2. If this application is being submitted as the result of a renewal or modification to an existing permit, list the existing permit number and its issue date (if known) 3. Specify the type of project (check one): _Low Density High Density Redevelop General Permit Other 4. Additional Project Requirements (check applicable blanks): _CAMA Major _C Sedimentation/Erosion Control _404/401 Permit X NPDES Stormwater Information on required state permits can be obtained by contacting the Customer Service Center at 1-877-623-6748. III. PROJECT INFORMATION 1. In the space provided below, summarize how stormwater will be treated. Also attach a detailed narrative (one to two pages) describing stormwater management for the project. The i5roposed Roadway will be crowned allowing stnrmwatPr to Rheet flow into either new-grasslin d swal a jacent to the road nr ex4:sting gra s Gwal.a Stormwater will flow through these swales to its histor c outfall pint 2. Stormwater runoff om this project d uns to ifie Cane Fear River basin. 3. Total Project Area: 1 6 9 Q 8__-acres 4. Project Built Upon Area: 16. 1 % 5. How many drainage areas does the project have? 1 6. Complete the following information for each drainage area. If there are more than two drainage areas in the project, attach an additional sheet with the information for each area provided in the same format as below. TJrairtage AcPa 1 i) �.4r�age A.'rea l Receiving Stream Name Receiving Stream Class S W Drainage Area 1620'.8 acres Existing Impervious* Area 260.6 acres 11 3 51 , 7 3 6 SF) Proposed Impervious*Area 2 acres 7 12 0 S % Impervious* Area (total) 16 2 RAW On -site Buildings NELVP On -site Streets On -site Parking On -site Sidewalks Other on -site Off -site Total: Total: * Impervious area is defined as the built upon area including, but not limited to, buildings, roads, parking areas, sidewalks, gravel areas, .etc. Form SWU-101 Version 3.99 Page 2 of 4 Wilmington International Airport Stormwater Master Plan Drainage Areas - Impervious Surfacing Drainage Area Number Totai Area - Acres Existing Impervious Area - Acres lExisting% Impervious 1 8.2 1.9 23% 2 11.4 1.0 9% 3 115.1 9.7 8% 4 62.6 15.9 25% 5 53.9 3.5 6% 6 122.7 57.3 47% 7 57.5 17.6 31 % 8 121.6 22.1 18% 9 59.3 12.4 21 % 10 189.9 40.7 21 % 11 102.9 3.2 3% 12 90.7 16.9 19% 13 207.0 46.0 22% 14 66.4 1.4 2% 15 63.21 3.0 5% 16 288.61 8.1 3% Total, Existing 1620.81 260.E 16% FUTURE: 1620.8 486.2 30% Note: Area 16 represents airport land along Smith Creek below areas 3,4,5,6,7 and 8. Wilmington International Airport Stormwater Master Plan Low Density Areas Two Areas are proposed as Low Density areas. "Low Density Stormwater management Area" - This area is cross hatched on Plan Sheet EX1.0. Total Area: 1100 Acres Existing Impervious Area 150 Acres Existing Percent Impervious 14% Maximum Additional Impervious Surfacing 180 Acres Maximum % Impervious 30% Drainage Area 9 - This area is depicted om Plan Sheet DA9. Total Area: 59.3 Acres Existing Impervious Area 12.4 Acres Existing Percent Impervious 21 % Future Impervious Surfacing Near Term 12.8 Acres Future % Impervious 22% 7. How was the off -site impervious area listed above derived?- All -areas derived from available mapping and aerial photography IV. DEED RESTRICTIONS AND PROTECTIVE COVENANTS The following italicized deed restrictions and protective covenants are required to be recorded for all subdivisions, outparcels and future development prior to the sale of any lot. If lot sizes vary significantly, a table listing each lot number, size and the allowable built -upon area for each lot must be provided as an attachment. 1. The following covenants are intended to ensure ongoing compliance with state stormwater management permit number as issued by the Division of Water Quality. These covenants may not be changed or deleted without the consent of the State. 2. No more than square feet of any lot shall be covered by structures or impervious materials. Impervious materials include asphalt, gravel, concrete, brick, stone, slate or similar material but do not include wood decking or the water surface of swimming pools. 3. Swales shall not be filled in, piped, or altered except as necessary to provide driveway crossings. 4. Built -upon area in excess of the permitted amount requires a state stormwater management permit modification prior to construction. 5. All permitted runoff from outparcels or future development shall be directed into the permitted stormwater control system. These connections to the stormwater-control system shall. be performed in a manner that maintains the integrity and performance of the system as permitted. By your signature below, you certify that the recorded deed restrictions and protective covenants for this project shall include all the applicable items required above, that the covenants will be binding on all parties and persons claiming under them, that they will run with the land, that the required covenants cannot be changed or deleted without concurrence from the State, and that they will be recorded prior to the sale of any lot. V. SUPPLEMENT FORMS The applicable state stormwater management permit supplement form(s) listed below must be submitted for each BMP specified for this project. Contact the Stormwater and General Permits Unit at (919) 733-5083 for the status and availability of these forms. Form SWU-102 Wet Detention Basin Supplement Form SWU-103 Infiltration Basin Supplement ✓Form SWU-104 Low Density Supplement Form S vb'U-105 Curb Outlet System Supplement Form SWU-106 Off -Site System Supplement Form SWU-107 Underground Infiltration Trench Supplement Form SWU-108 Neuse River Basin Supplement Form SWU-109 Innovative Best Management Practice Supplement Form SWU-101 Version 3.99 Page 3 of 4 VI. SUBMITTAL REQUIREMENTS Only complete application packages will be accepted and reviewed by the Division of Water Quality (DWQ). A complete package includes all of the items listed below. The complete application package should be submitted to the appropriate DWQ Regional Office. 1. Please indicate that you have provided the following required information by initialing in the space provided next to each item. • Original and one copy of the Stormwater Management Permit Application Form • One copy of the applicable Supplement Form(s) for each BMP • Permit application processing fee of $420 (payable to NCDENR) • Detailed narrative description of stormwater treatment/management • Two copies of plans and specifications, including: - Development/Project name - Engineer and firm - Legend - North arrow - Scale - Revision number & date - Mean high water line ,V/1f - Dimensioned property/project boundary Or 2),,v6)J'/0'J`b - Location map with named streets or NCSR numbers Original contours, proposed contours, spot elevations, finished floor elevations - Details of roads, drainage features, collection systems, and stormwater control measures -Wetlands delineated, or a note on plans that none exist Wetlands delineat.idn not - Existing drainage (including off -site), drainage easements, pipe sizes, runoff calculations' -available - Drainage areas delineated - Vegetated buffers (where required) VII. AGENT AUTHORIZATION If you wish to designate authority to another individual or firm so that they may provide information on your behalf, please complete this section. Eric M.. Stumph, P.E. Designated agent (individual or firm): Talbert & Bright. Inc. Mailing Address: 4 810 Shelley Drive City: Wilmington State: NC Zip: 284Q3 Phone: ( 910 ) 763-5350 Fax: ( 910 ) 762-6281 VIII. APPLICANT'S CERTIFICATION I, (print or type name of person listed in General Information, item 2) J on W . Ro sb orou gh certify that the information included on this permit application form is, to the best of my knowledge, correct and that the project will be constructed in conformance with the approved plans, that the required deed restrictions and protective covenants will be recorded, and that the proposed project complies with the requirements of 15A NCAC 2H .100 Signature: --, Date: ?—/— Form SWU-101 Version 3.99 Page 4 of 4 OFFIU USE ONLY Date Received Fee Paid Permit Number State of North Carolina Department of Environment and Natural Resources Division of Water Quality STORMWATER MANAGEMENT PERMIT APPLICATION FORM This form may be photocopied for use as an original I. GENERAL INFORMATION 1. Applicants name (specify the name of the corporation, individual, etc. who owns the project): New Hanover County Airport Authoritv 2. Print Owner/Signing Official's name and title (person legally responsible for facility and compliance): Jon W. Rosborough, Airport Director 3. Mailing Address for person listed in item 2 above: 1740 Airport Blvd City: Wilmington State: NC Zip: 2 R4 05 Telephone Number: ( 910 ) 3 41- 4 3 3 3 4. Project Name (subdivision, facility, or establishment name - should be consistent with project name on plans, specifications, letters, operation and maintenance agreements, etc.): Wilmington International Airport 5tormwater Master Plan 5. Location of Project (street address): 1740 Airport Blvd City: Wilmington 6. Directions to project (from nearest major intersection): Airport Blvd From N. 2 rd St. County: New Hanover 7. Latitude: 3 4 ° -16 ' -14 " N Longitude: 7 7 0 - 5 4 1 - 09 W of project 8. Contact person who can answer questions about the project: Name: Eric S tumnh Telephone Number: ( 910 ) 7 6 3 - 53 5 0 Talbert & Bright and Julie Wilsey, Deputy Director Wilmington International Airport II. PERMIT INFORMATION: (910) 3 41- 4 3 3 3 1. Specify whether project is (check one): _ New Renewal Modification Form SWU-101 Version 3.99 Page 1 of 4 2. If this application is being submitted as the result of a renewal or modification to an existing permit, list the existing permit number and its issue date (if known) 3. Specify the type of project (check one): . _Low Density High Density Redevelop General Permit Other 4, additional Project Requirements (check applicable blanks): _CAMA Major -X Sedimentation/Erosion Control _404/401 Permit X NPDES Stormwater Information on required state permits can be obtained by contacting the Customer Service Center at 1-877-623-6748. III. PROJECT INFORMATION 1. In the space provided below, summarize how stormwater will be treated. Also attach a detailed narrative (one to two pages) describing. stormwater management for the project . The bronosed Roadway will be crowned allowing stnrmwatcr to chant flow into either n w--grassl;ned swalPa adjacent to the rnad or xj�c in morass wal PG Stnrm aatcr- will fl nWthrQtLgh then-e swa1P-q to its histo c outfall int 2. Stormwater runok om this project d amns to tfie Cage Fear River basin. 3. Total Project Area: 1 6 2 0 $ acres 5. How many drainage areas does the project have? 4. Project Built Upon Area: 16 - -1—% 6. Complete the following information for each drainage area. If there are more than two drainage areas in the project, attach an additional sheet with the information for each area provided in the same format as below. Basin lnfcarmatiori :- - Area 1 - Min— -- -- -'' Draina c.Arc t G g. -- _ -`- - Receiving� Stream Name Receiving Stream Class S W Drainage Area 1620".8 acres Existing Impervious' Area 260.6 a c u e.s 11 3 51 7 3 6 SF) Proposed Impervious''Area J 2 acres (87.120 S % Impervious! Area (total) 1 16 2 Impervious* Surface Area On -site Buildings - ; Drainage .. -- l On -site Streets On -site Parking On -site Sidewalks Other on -site Off -site Total: I Total: imperious area is defined as the built upon area including, but not limited to, buildings, roads, parking areas, sidewalks, gravel areas, etc. Form SWU-101 Version 3.99 Page 2 of 4 7. How was the off -site impervious area listed above derived? All areas derived from available mapping and aerial photography IV. DEED RESTRICTIONS AND PROTECTIVE COVENANTS The following italicized deed restrictions and protective covenants are required to be recorded for all subdivisions, outparcels and future development prior to the sale of any lot. If lot sizes vary significantly, a table listing each lot number, size and the allowable built -upon area for each lot must be provided as an attachment. 1. The following covenants are intended to ensure ongoing compliance with state stormwater management permit number as issued by the Division of Water Quality. These covenants may not be changed or deleted without the consent of the State. 2. No more than square feet of any lot shall be covered by structures or impervious materials. Impervious materials include asphalt, gravel, concrete, brick, stone, slate or similar material but do not include wood decking or the water surface of swimming pools. 3. Swales shall not be filled in, piped, or altered except as necessary to provide driveway crossings. 4. Built -upon area in excess of the permitted amount requires a state stormwater management permit modification prior to construction. 5. Allpermitted runoff from outparcels or future development shall be directed into the permitted stormwater control system. These connections to the stormwater control system shall be performed in a manner that maintains the integrity and performance of the system as permitted. By your signature below, you certify that the recorded deed restrictions and protective covenants for this project shall include all the applicable items required above, that the covenants will be binding on all parties and persons claiming under them, that they will run with the land, that the required covenants cannot be changed or deleted without concurrence from the State, and that they will be recorded prior to the sale of any lot. V. SUPPLEMENT FORMS The applicable state stormwater management permit supplement form(s) listed below must be submitted for each BMP specified for this project. Contact the Stormwater and General Permits Unit at (919) 733-5083 for the status and availability of these forms. Form SWU-102 Wet Detention Basin Supplement Form SWU-103 Infiltration Basin Supplement I-"' Form SWU-104 Low Density Supplement Form SWU-105 Curb Outlet System Supplement Form SWU-106 Off -Site System Supplement Form SWU-107 Underground Infiltration Trench Supplement Form SWU-108 Neuse River Basin Supplement Form SWU-109 Innovative Best Management Practice Supplement Form SWU-101 Version 3.99 Page 3 of 4 VI. SUBMITTAL REQUIREMENTS Only complete application packages will be accepted and reviewed by the Division of Water Quality (DWQ). A complete package includes all of the items listed below. The complete application package should be submitted to the appropriate DWQ Regional Office. Please indicate that you have provided the following required information by initialing in the space provided next to each item. • Original and one copy of the Stormwater Management Permit Application Form • One copy of the applicable Supplement Form(s) for each BMP • Permit application processing fee of $420 (payable to NCDENR) • Detailed narrative description of stormwater treatment/management • Two copies of plans and specifications, including: - Development/Project name - Engineer and firm -Legend - North arrow - Scale Revision number & date Mean high water line IV/If Dimensioned property/project boundary A/or Di►WO?oIJ6T� - Location map with named streets or NCSR numbers t - Original contours, proposed contours, spot elevations, finished floor elevations - - Details of roads, drainage features, collection systems, and stormwater control measures - Wetlands delineated, or a note on plans that none exist Wetlands delineation not -Existing drainage (including off -site), drainage easements, pipe sizes, runoff calculations available - Drainage areas delineated - Vegetated buffers (where required) VII. AGENT AUTHORIZATION If you wish to designate authority to another individual or firm so that they may provide information on your behalf, please complete this section. Eric M. Stumph, P.E. Designated agent (individual or firm): Talbert & Bright. Inc Mailing Address: 4 810 Shelley Drive City: Wilmington State: NC Zip: Phone: ( 910 1 763-5350 VIIL APPLICANT'S CERTIFICATION I, (print or type name ofperson listed in General Information, item 2) Jon W . Rosborough certify that the information included on this permit application form is, to the best of my knowledge, correct and that the project will be constructed in conformance with the approved plans, that the required deed restrictions and protective covenants will be recorded, and that the proposed project complies with the requirements of 15A NCAC 2H .100 Signature, Date: ',iU Form SWU-101 Version 3.99 Page 4 of 4 Wilmington International Airport Stormwater Master Plan Drainage Areas - Impervious Surfacing Drainage Area Number Total Area - Acres Existing Impervious Area -Acres Existing % Impervious 1 8.2 1.9 23% 2 11.4 1.0 9% 3 115.1 9.7 .8% 4 62.6 15.9 25% 5 53.9 3.5 6% 6 122.7 57.3 47% 7 57.5 17.6 31 % 8 121.6 22.1 18% 9 59.3 12.4 21 % 10 189.9 40.7 21 % 11 102.9 3.2 3% 12 90.7 16.9 19% 13 207.0 46.0 22% 14 66.4 1.4 2% 15 63.2 3.0 5% 16 288.6 8.1 3% Total, Existing 1620.8 260.E 16% FUTURE: 1620.8 486.2 30% /�?rM � f 1 1 Note: Area 16 represents airport land along Smith Creek below areas 3,4,5,6,7 and 8. Wilmington International Airport Stormwater Master Plan Low Density Areas Two Areas are proposed as Love Density areas. "Low Density Stormwater management Area" - This area is cross hatched on Plan Sheet EX1.0. Total Area: 1100 Acres Existing Impervious Area 150 Acres Existing Percent Impervious 14% Maximum Additional Impervious Surfacing 180 Acres Maximum % Impervious 30% Drainage Area 9 - This area is depicted om Plan Sheet DA9. Total Area: 59.3 Acres Existing Impervious Area 12.4 Acres Existing Percent Impervious 21 % Future Impervious Surfacing Near Term 12.8 Acres Future % Impervious 22% ILM Airport Authority Carter T. Lambeth Chairman E.L. Mathews, Jr. Vice -Chairman Paul G. Burton Secretary Robert S. Rippy Harry W. Stovall, III Airport Director Jon W. Rosborough � CEIVED 19 November 2004 9 2004 Mr. Rick Shiver, Regional Supervisor ;g North Carolina Division of Water Quality 127 Cardinal Drive Extension Wilmington, NC 28405 Re: ILM State Stormwater Management Permit No. SW8 040836 Dear Mr. Shiver: Thank you and your staff for your review of our Stormwater Management Permit Application and providing us with a timely response enabling us to satisfactorily meet our construction timeline and notice to proceed on some very important projects at ILM. I am also grateful to you and your staff, and in particular, Ms. Linda Lewis for allowing us the opportunity to review the specific language of our permit prior to its formal implementation date. I, members of my management team and members of Talbert & Bright team have reviewed this document and concur with most of the specified conditions and limitations listed in the permit. There are a few areas where we have some need for clarification and respectfully submit the following information for your review and consideration for inclusion in the final specified conditions and limitations of our permit. I am addressing only those few areas that we ask you to reconsider. DESIGN STANDARDS 6. Clarification: We concur but want to confirm that the overlay or rehabilitation of existing pavement, such as rwy 6/24 does not constitute "redevelopment" unless there is a net increase in impervious surface. 7. Clarification: We are uncertain what this paragraph is requiring. Can you please provide us with more specific clarification? SCHEDULE OF COMPLIANCE 3. Clarification: Access by whom, our staff access or public access? There are very rigid FAA security requirements limiting access to -the airside of our property. We would have to provide the "public" with a security escort and we cannot guarantee access "at all times" due to our other responsibilities. We would certainly make every effort to accommodate as requested. 6. Clarification: Can you please provide us where we can reference this in the regulation in order for us to ascertain what specific activities must be kept and 1740 Airport Boulevard • Wilmington, NC 28405 • Phone: 910-341-4333 • Fax: 910-341-4365 • wwwfMIm.com ?) I for how long? This can be very labor intensive and we want to insure that we do what is expected. 7. Clarification: We assume that this requirement applies to individual projects and not the entire master plan. 9 Clarification: We assume that the ,language in this requirement applies only to construction permits. GENERAL, CONDITIONS 4. Suggestion: We concur with this overall but ask for language that would allow ILM to take immediate corrective action to the extent practical and/or to develop a corrective action plan and implementation schedule. 5. Clarification: We concur but as recommended in #3 under Schedule of Compliance above due to security regulations. 7. Suggestion: We suggest that you add the following to this paragraph: ---- Design Manual "or the FAA Standard Specifications for seeding, mulching and erosion control where they do not conflict with the intent of the NC Erosion and Sediment Control Planning and Design Manual." Other than these clarifications and/or suggestions we concur with the remaining language in the permit. Thank you for your clarification and consideration to these suggestions. And thank you again for your timely response. Sincerely, �r ' Jon . Rosborough Airport Director JWR/Jj cc: Steve Bright Julie Wilsey Carter Lambeth 1740 Airport Boulevard • Wilmington, NC 28405 • Phone: 910-341-4333 0 Fax: 910-341-4365 • wwwflyilm.com November 8, 2004 Ms. Linda Lewis Environmental Engineer North Carolina Department of Environment and Natural Resources 127 Cardinal Drive Extension Wilmington, NC 28405 RE: Wilmington International Airport Stormwater Master Plan NCDENR Stormwater Project No. SW8 040836 NOV 0 8 2004 AT 3-37-0084-30 TBI No. 3301-0305 Dear Linda: This will respond to your letter of November 1, 2004 requesting additional information regarding the referenced project. A copy of your letter is enclosed for ready reference. Responses are numbered to correspond with the comments in your letter. i . The New Hanover County Airport Authority is prepared to accept a master plan permit condition requiring that extended dry detention facilities and/or other appropriate controls be permitted and constructed prior to or concurrently with any proj ect determined to represent a pocket of high density development. Based on our conversation last week, we understand that such a condition is consistent with your request relative to a timeline for construction of future dry detention basins. We have prepared new plan sheet No. 2 for the Stormwater Master Plan set, which depicts existing pockets of high density development on airport property. The limits of those pockets are based on our discussions. The plan sheet also depicts existing built -upon surfaces, broken down between those developed prior to implementation of the North Carolina Stormwater Rules and those developed since implementation. We understand that any construction project outside the existing high density pockets will be permitted as either low density or high density, depending on the nature of the project. Development within the existing high density pockets will be permitted under the high density provisions. For those projects, it is our understanding that if the runoff from new or expanded built -upon surfaces is handled separately from runoff from existing built -upon surfaces, only the runoff from the new or expanded areas must be treated. From our discussions, we understand that if the runoff from new and existing built -upon surfaces is combined, treatment will be required for the entire combined runoff. 2. Concrete lined low flow channels were included in the Plan as they are considered to be more ENGINEERING & PLANNING CONSULTANTS WWW.TALBEP,TANDBRIGHT.COM 4810 SHELLEY DRIVE WILMINGTON, NC 28405 910.763.5350 FAX 910.762.6281 WILMINGTON, NORTH CAROLINA • CHARLOTTE. NORTH CAROLINA • RICHMOND, VIRGINIA Ms Linda Lewis Page 2 readily maintained in a condition which minimizes shallow standing water. Having reviewed the matter with airport officials, we will revise all references to the low flow channel to reflect rip rap lining in lieu of a concrete lining, as per your request. 3. We understand that the sample computations included in the technical appendix are not necessary to the issuance of a stormwater master plan permit. The computations were necessary to the overall scope and feasibility of the stormwater planning effort. The discussion regarding the "grandfather" status of the extended dry detention basin BMP and the guidance relative to future design submittals have been noted for future reference. 4. We will revise the term "high density threshold" to read "low density threshold." S. We take note of your recommendations regarding the separation between the bottom of dry detention basins and the seasonal high water table in the basin vicinity. 6. The shaded areas shown on plan sheet PR1.1 represent the approximate drainage areas tributary to the proposed extended dry detention basins. The Plan was developed to address the potential that much of the shaded area may ultimately be subject to high density development. However, the shaded areas are not intended to be formally designated high density pockets. It is possible that low density projects may occur in those areas in the interim before significant levels of high density development takes place. Most of Drainage Area 13 is included in the shaded area, with the exception of certain areas which are not expected to be redeveloped at a greater density than currently exists. We understand that a proposed hangar facility expansion located in Drainage Area 9 has been determined to result in a high density pocket, if developed as proposed. It is not clear whether the affected tenant will pursue the project under the high density provisions. We do not feel it is appropriate to designate the area as a high density pocket on the master plan; such designation is dependent on the detailed layout of any development proposal in that general vicinity. 7. In developing the layout of the proposed extended dry detention basins, we have attempted to maximize the flow distance from each inflow point to the low flow outlet control structure. The shortest flow line, located in extended dry detention basin No. 2, is over 300 feet. Multiple outlet structures were used for runoff events which exceed the water quality design storm of 1" of rainfall. The multiple outlet devices distribute the attenuated outflow from the larger storms to the, various historic discharge points in the vicinity of each basin. 8. The project wildlife review letter included as Appendix D to the report specifically recommends that the small permanent pool located at the dry detention basin outlet structure be minimized or eliminated. We have considered clogging potential in developing the conceptual design details. We propose to avoid use of a small permanent pool. This may Ms Linda Lewis Page require more frequent maintenance activities. If maintenance issues prove severe, a small pool can be retrofit as a last resort, necessitating increased wildlife monitoring. Once you have had the chance to review these responses to your comments, we will be happy to prepare the appropriate final revisions to the Plan documents. We trust that this response will represent a complete application. Please call if you have any questions. Sincerely, Eric M. Stumph, P.E. Enclosures c: Ms Julie Wilsey (w/enc.) Mr. Rusty Nealis (w/enc.) Mr. Lamar Sylvester (w/enc.) �QF WArF9p Michael F. Easley, Governor �G G William G. Ross, Jr., Secretary r North Carolina Department of Environment and Natural Resources Alan W. Klimek, P.E. Director Division of Water Quality November 1; 2004 Mr. Jon Rosborough, Director New Hanover County Airport Authority 1740 Airport Boulevard Wilmington, NC 28405 Subject: Request for Additional Information Stormwater Project No. SW8 040836 Wilmington International Airport Master Stormwater Plan New Hanover County Dear Mr. Rosborough: The Wilmington Regional Office received a Stormwater Management Permit Application for Wilmington International Airport Master Stormwater Plan on August 24, 2004. At the request of the Division of Water Quality, the permit was changed to an Express application, with a scheduled review date of October 26, 2004. 1 have today completed the review of this large, complex project. A preliminary review of that information has determined that the application is not complete. The following Information is needed to continue the stormwater review: 1. A timeline for the construction of any of the future dry detention basins will be required in the permit. Please be advised that the stormwater controls must be constructed prior to construction of the built -upon area associated with any new project that is determined to be a pocket of high density or any new project within the designated high density area. 2. Please revise the concrete lined low flow channel to rip rap, which will promote infiltration of some of the runoff through the bottom of the basin, as is the intent of the dry detention design. 3. Example calculations are not necessary. The design criteria in effect at the time the individual permits are applied for will be used. However, should the use of dry detention basins be banned in the future, the Division will honor the Master Plan Permit for their use at the airport due to the increased wildlife strike potential of other control measures, unless an equivalent alternative method is available. For future permits, and to save time, I would prefer that the calculations be summarized and page numbers referenced regarding the specifics of the design such as design storm; outlet option; required volume; how It was determined that the design volume has been provided in the proposed system; how the sediment storage volume was calculated, how the sediment storage level was determined; and how the orifice was sized to achieve the correct drawdown. A table of elevations, areas and volumes from the bottom of the basin to the storage elevation will be most helpful. 4. At the top of page 14 of the report, there appears to be a typo. The first sentence currently reads, "... overall built -upon area density in excess of the high density threshold would be required to hold a high density master plan permit. " The italicized "high" should be changed to read "low". North Carolina Division of Water Quality 127 Cardinal Drive Extension Phone (910) 395-3900 Customer Servicel-877-623-6748 Wilmington Regional Office Wilmington, NC 28405-3845 FAX (919) 733-2496 Internet h2o.enr.state.nc.us An Equal Opportunity/Affirmative Action Employer — 50% Recycled/10% Post Consumer Paper WorirCffiCarolina NatundY 5. A minimum separation of 1' must be provided between the bottom of the dry detention basin and the Seasonal High Water Table. Care should be exercised when selecting sites for dry detention to provide the greatest water table separation possible. Without at least 1' of separation, the basin will probably keep a shallow permanent pool and not draw down quickly enough, contrary to FAA requirements. 6. In addition to those areas identified as a pocket of high density on Sheet PR1.1, please add that part of Area 13 that is slated for business park development or redevelopment and Area 9. These areas exhibit clustered built -upon area and a piped collection system and will be required to provide treatment when the next project within these areas is proposed. 7. The relative position of inlet to outlet is important. Incoming runoff should enter at one end and the outlet structure should be positioned at the other. Shortcircuiting can be a problem with multiple inlets, some immediately adjacent the outlet structrure. Additionally, you have proposed both a primary outlet and a secondary outlet. 8. Please work on the details of the dry detention typical section and low flow outlet structures. It appears that the sediment will be allowed to accumulate over the outlet pipe causing potential clogging. Per the BMP manual, please specify a small plunge pool below the 24" RCP to keep it from clogging over with accumulated sediment. Please note that this request for additional information is in response to a preliminary review. The requested information should be received by this Office prior to November 8, 2004, or the application will be returned as incomplete. The return of a project will necessitate resubmittal of all required items, including the application fee. If you need additional time to submit the information, please mail or fax your request for a time extension to the Division at the address and fax number at the bottom of this letter. The request must indicate the date by which you expect to submit the required information. The Division is allowed 90 days from the receipt of a completed application to issue the permit. The construction of any impervious surfaces, other than a construction entrance under an approved Sedimentation Erosion Control Plan, is a violation of NCGS 143-215.1 and is subject to enforcement action pursuant to NCGS 143-215.6A. Please reference the State assigned project number on all correspondence. Any original documents that need to be revised have been sent to the engineer or agent. All original documents must be returned or new originals must be provided. Copies are not acceptable. If you have any questions concerning this matter please feel free to call me at (910) 395-3900. Sincerely, Linda Lewis Environmental Engineer RSS/arl: S:\W(JS\STORMWAnADDINFOl2004\040836master.nov04 cc: Eric Stumph, P.E., Talbert & Bright Linda Lewis ...La j:+4d October 26, 2004� Ms. Linda Lewis 04kj� Environmental Engineer North Carolina Department of Environment and Natural Resources 127 Cardinal Drive Extension Wilmington, NC 28405 RE: Wilmington International Airport OCT 2 6 2004 Stormwater Master Plan AIP 3-37-0084-30 TBI No. 3301-0305 Dear Linda: Enclosed for your review are supplemental materials for your review of the Stormwater Master Plan for the Wilmington International Airport. The materials reflect the items discussed at the project meeting of October 19, 2004. Enclosures are as follows (two copies each): 0 Revised report. 0 Revised plan sheets. 0 Revised application form. 0 Revised Low Density Supplement. 0 New Extended Dry Detention Basin Supplements. These materials reflect the key concepts discussed at the October 19 meeting, including a low density master plan permit, a 30% maximum overall built -upon area and pockets of high density development. Please call me if you have any questions or need additional information. Sincerely, Eric M.S. , . ,E. Enclosures E c: Ms Julie Wilsey (w/enc.) 0 C 1 2 6 M4 Mr. Rusty Nealis (w/enc.) Mr. Lamar Sylvester (w/enc.) ENGINEERING & PLANNING CONSULTANTS WWWTALBERTANDBRIGHT.COM 4810 SHELLEY DRIVE WILMINGTON, NC 28405 910.763.5350 FAX 910.762.6281 WILMINGTON, NORTH CAROLINA • CHARLOTTE. NORTH CAROLINA • RICHMOND, VIRGINIA To: From: Linda Lewis MEMORANDUM Valery Stephens A(P Date: October 20, 2004 Subject: Application Fee Refund Project Name: Now ".F. _e Project Number: SW8 040836 New Hanover County Dear Valerie: Please refund $420.00 to the below named person. The nature of the project modification did not require the $420.00 fee submitted. Check Number: 8590 Deposit Number: 133053 Deposit Date: 09-24-2004 Please make the check payable to and send to: W. Stephen Bright Talbett & Bright, ii�c. 4810 Shelley Drive Wilmington, NC 28405 Federal Tax ID Number: 56-1654376 Thank you for your speedy response. RSS/sks: S:IWQSISTORMWATIREFUND1040836.oct04 cc: Julie Wilsey Linda Lewis Wilmington Regional Office Central Files WILMINGTON INTERNATIONAL AIRPORT Wilmington, ITC ENGINEERING REPORT RECEIVED 00 2 6 2004 DWQ PROJ # APPROVED kO� �e NORTH CARO,INA ENVIRONMENTIk, WWAGEMENT COMMI'S�S��IO�N��e DIVISIONnjF WATER QuAUTY" ►,►►►ssauuarrrr�� O� GAS Z �p �6s.veaomrs � "F' � oF�SSrd,9 = s Q r rSFAL °y 02 4 :� o Q a M J � Stormwater_ Master Plan + PREPARED :FOR: New Hanover County Airport Authority Wilmington, North Carolina In ooperation With: -FEDERAL ANTIA"i".s N ADMINISTRATION .DTP 3-37-0084-30 and N01M-1 CA. -OLINA DEPARTMENT OF TRANSPORTAIJON DIVISION OF AVIATION Wilmington International Airport (ILM) J� Stormwater Master Plan Table of Contents ExecutiveSummary ............................................................................................ 1 Report I. Purpose................................................................................................. 3 II. Site Description.................................................................................... 3 III. Existing Drainage Patterns.................................................................. 5 IV. Airport Development and Redevelopment .......................................... 11 V. North Carolina Stormwater Rules ....................................................... 12 VI. New Hanover County Storm Water Management Ordinance .............. 15 VII. Wildlife Hazard Considerations........................................................... 15 VIII. Best Management Practices................................................................ 16 D(. Proposed BMP Design Criteria............................................................ 17 X. Proposed Stormwater Management Concepts ................................... 18 XI. Methodology........................................................................................ 23 XII. Implementation of Stormwater Controls ............................................ 24 XIII. Alternative Solutions and Plan Modification ........................................ 25 Figures • Fig. 1 - Vicinity Map • Table 1 - Soils • EX 1.0 - Existing Conditions Overall Map (Half Size Plan) • PR 1.1 - Stormwater Management - Centralized Concept (Half Size Plan) • PR 1.2 - Stormwater Management - Distributed Concept (Half Size Plan) • PH 1.1 - Stormwater Management - Distributed Concept Phasing (Half Size Plan) ARRendices A. 15A NCAC 021-1.1000 NC Stormwater Rules B. New Hanover County Stormwater Ordinance C. FAA AC 150/5200-33A, "Hazardous Wildlife Attractions on or Near Airports" D. USDA Wildlife Services Letter Report Dated June 4, 2004 E. NCDENR Stormwater BMP Manual (Excerpts) F. Cost Opinions Full Size Plans (Bound Separately) Technical Appendix (Bound Separately) • Computations TOC- Wilmington In terra tional Airport (ILM) Stormwater Master Plan Executive Summary This Stormwater Master Plan has been developed for the Wilmington International Airport, Wilmington, North Carolina. Preparation of the Plan was requested by the Wilmington office of the North Carolina Department of Environment and Natural Resources (NCDENR), pursuant to the North Carolina Stormwater Management Rules (15A NCAC 02H.1000). Development of the Plan has been funded by the Federal Aviation Administration (FAA). The Stormwater Master Plan is a planning tool for providing stormwater management infrastructure in support of anticipated development activities on airport property. Extended dry detention basins and grassed swales are proposed to address the stormwater quality requirements of the NC Rules for areas of "High Density" development at the airport. "High Density" development is expected to be concentrated on the west side of the airport, with an overall density of up to 65% built -upon surface in that area. The extended dry detention basins will also serve to address the peak flow attenuation criteria in the New Hanover County Storm Water Management Ordinance. New stormwater conveyance pipelines are proposed to address the capacity and depth limitations of the existing stormwater infrastructure on the west side of the airport. The proposed conveyance pipelines and extended dry detention basins will allow positive drainage of all airport stormwater away from the Wildcat Branch drainage system, which drains the Heritage Park neighborhood located on the west side of Blue Clay Road. Heritage Park suffers frequent nuisance flooding and occasional structural flooding. The tributary area to another marginal drainage system farther south along Blue Clay Road will be reduced. All diverted Stormwater from these areas will be conveyed to Smith Creek via existing outfalls located on airport property. The current overall density of built -upon area on airport property is approximately 16%, which is well under the 30% upper limit for "Low Density" under the North Carolina Stormwater Management Rules. The overall built -upon area on the airport property is expected to remain well below the 30% threshold level for the Page-1 Wilmington International Airport(ILM) )1-01 (k, Stormwater Master Plan foreseeable future. NCDENR officials have suggested a Stormwater Master Plan permit concept that designates the airport as a low density facility with pockets of high density development, until such time as the overall built -upon density exceeds 30%. Wildlife hazard issues have been considered in preparation of the Plan. In addition to a careful review of FAA Advisory Circular 150/5200-33A, "Hazardous Wildlife Attractants On or Near Airports," which was revised by FAA during the course of Plan preparation, the USDA Wildlife Services was consulted to interpret the FAA I criteria in the context of local conditions. Wildlife Services has advised that the Advisory Circular guidelines are applicable at the Wilmington International Airport and recommends the use of extended dry detention basins and grassed swales rather than wet detention basins at the airport. Design criteria for extended dry detention basins and grassed swales on airport property are proposed, derived from NCDENR design guides and the requirements of the Wildlife Advisory Circular. Two stormwater management concepts have been developed for the west side of the airport. The "centralized" stormwater management concept involves using two large extended dry detention facilities to serve the development areas on the west side of the airport. The "distributed" stormwater management concept involves using multiple smaller extended dry detention basins throughout the area. The two concepts represent the probable range in size and number of extended dry detention basin BMP's which may be implemented in support of high density developments at the airport. Cost opinions have been prepared for the two stormwater management concepts. A. phasing plan has been developed for the distributed concept, which demonstrates the potential for incremental construction of the proposed improvements, geared to the pace of development. The airport has initiated financial planning efforts with respect to implementation of this Plan. The airport seeks NCDENR concurrence with the stormwater management concepts presented in this plan. f Page-2 Wilmington International Airport ILM Stormwater Master Plan I. Purpose This Stormwater Management Plan has been developed for the Wilmington International Airport on behalf of the New Hanover County Airport Authority. The Plan provides guidance on stormwater management infrastructure improvements in support of development projects at the airport. A key objective of the Plan is to address the North Carolina Stormwater Management rules (15A NCAC 02H.1000) administered by the North Carolina Department of Environment and Natural Resources, Division of Water Quality (NCDENR). A copy of these rules is included in Appendix A. The Plan also considers the following: ■ New Hanover County Storm Water Management Ordinance (see Appendix B). ■ FAA Advisory Circular 150/5200-33A, Hazardous WI/d/ife Attractants On or NearAirporls (see Appendix C). The practical application of the Plan is to provide a technical framework for processing future NCDENR stormwater permits for individual development projects on airport property. Another objective of the Plan is to provide conceptual design of improvements to the stormwater conveyance infrastructure serving the westerly portion of airport property. This Stormwater Master Plan consists of this report, a set of plans depicting existing conditions and the conceptual design of proposed stormwater infrastructure improvements and a technical appendix containing supporting computations. Selected plan sheets have been reproduced at half size and bound into this report under the "Figures" tab for ready reference. TL Site Description The Wilmington International Airport is located in southeastern North Carolina, north of Wilmington in an unincorporated area of New Hanover County. Refer to Page-3 Wilmington International Airport (ILM) Stormwater Master Plan r Figure 1. The airport is owned and operated by the New Hanover County Airport Authority. Airport property lies within an area bounded by the Martin Luther King ,i Jr. Parkway, 23ro Street, Blue Clay Road, and North Kerr Avenue. The airport ` property encompasses over 1,600 acres. This Plan covers the entire airport property. Various adjoining parcels sharing common hydrology with airport property have been included in the planning efforts. Existing conditions and drainage infrastructure on and surrounding airport property are shown on full size plan sheets EX1.0 through EX 1.5. Sheet EX1.0 is included at half scale under the "Figures" tab of this report. The majority of airport property drains to Smith Creek, a tidal tributary of the Northeast Cape Fear River. A small area of airport property drains to Wildcat Branch, another tributary of the Northeast Cape Fear River. The Wilmington International Airport site has been used for aviation since the 1930's. During World War II, the site was requisitioned by the federal government for use as an army airfield. Much of the current airport infrastructure (including stormwater infrastructure) dates back to World War II era construction. Soils at the airport include fine sands, silts, and clays which range from well - drained to poorly drained. Table 1 (included under the "Figures" tab) lists soil associations found at the airport. Existing airport stormwater infrastructure includes a series of extensive closed (pipe and inlet) drainage systems, open channels, pipe culverts, and two stormwater management basins. Much of the drainage pipe serving airside (aircraft operating) areas has been rehabilitated over the past five years. These pipe systems are generally in good condition and adequately sized. The closed system serving the "land side" of the airline terminal complex is in generally good working condition, and adequately sized. By contrast, the system Page-4 ILMort Wilmington International Air JIII g p i � l\ Stormwater Master Plan of open channels, culverts, and smaller closed systems which drains the remainder of the western portion of airport property is generally in poor condition and of limited capacity. This area is currently sparsely developed and will require significant stormwater infrastructure improvements to accommodate future development. Two existing stormwater management basins were constructed on the airport during development of the airline terminal complex in the late 1980's. One is a small wet basin located near the Runway 6 approach. The tributary area to that basin is mostly unpaved. The other existing basin, located south of Runway 6-24, is larger and features a shallow permanent pool. The tributary area to that basin is moderately developed. Refer to plan sheets EX1.0 and EX1.4. III. Existing Drainage Patterns The airport property has been divided into 15 drainage sub -basins, corresponding to 15 points at which concentrated stormwater is discharged from the airport drainage system. These drainage sub -basins and discharge points are depicted on Plan Sheets EX1.0 through EX1.5. A description of each sub -basin follows: Sub -Basin 1 Sub -basin 1 is located in the northerly quadrant of the intersection of Airport Boulevard and North 23ro Street. This small (3.7 acres) sub -basin drains via a 24" culvert under 23'd Street. Existing ground cover includes roadway pavement and a large grassy area. Sub -Basin 2 Sub -basin 2 is located in the southerly quadrant of the intersection of Airport Boulevard and North 23'd Street. T his small (10.5 acres) sub -basin drains via two culverts (18" and 24'1 under 23ro Street. Existing ground cover includes roadway pavement and large expanses of grass and woods. Page-5 Wilmington International Airport (ILM) �II� Stormwater Master Plan Sub -Basin 3 Slab -basin 3 encompasses 114 acres extending from the intersection of Gardner Drive and Trask Drive to a point south of the intersection of Gardner Drive and Airport Boulevard. Existing ground cover in this sub -basin includes large areas of grass, wooded areas and several airport and leasehold buildings and associated parking areas. Most of the sub -basin drains via shallow open channels to a closed pipe system constructed during World War II. This closed pipe system drained a runway and associated taxiways which have since been removed. Airport Boulevard follows the alignment of the old runway, much of which remains intact east of the airline terminal complex. Except for a length of 42" diameter pipe replaced during construction of Airport Boulevard, the pipe system is believed to be in poor condition. Numerous sink holes along the pipe runs provide evidence of leaking pipe joints. This condition has been found in many of the old storm pipelines on the airfield. The existing pipeline, plus an additional shallow 18" diameter pipeline under Airport Boulevard, is adequately sized to handle the runoff from the sub -basin in its current condition, but is not adequate to drain the same area in a densely developed condition. System improvements should be undertaken in support of any significant development or redevelopment activity in the sub -basin. The outfall of sub -basin 3 is an existing open channel, more than 2,000 feet in length, which passes through a densely wooded area enroute to Smith Creek. The channel passes through a 36" culvert located adjacent to the airport sewer pump station. Sub -Basin 4 Sub -basin 4 comprises most of the land side of the airline terminal complex. The 63 acre sub -basin includes significant amounts of impervious surface (roadways, parking lots, roofs, pedestrian areas), but also includes large grassy open spaces. The sub -basin is drained by a large closed pipe system constructed for the terminal Page-6 Wilmington International Airport (ILM) Stormwater Master Plan r complex in the late 1980's. The system is generally of adequate capacity and is generally in good condition, with the exception of a few World War II era pipeline segments incorporated in the system. The outfall of sub -basin 4 is an existing open channel, more than 1,500 feet in length, which passes through a densely wooded area enroute to Smith Creek. Sub -Basin 5 Sub -basin 5 comprises 25 acres located between the airline terminal building and the approach to Runway 6. The sub -basin includes both impervious surfacing and grassy open space. The sub -basin features a small wet detention basin constructed in the late 1980's as part of the airline terminal complex. The sub - basin outfalls through an open channel to Smith Creek. Sub -Basin 6 Sub -basin 6 comprises 121 acres, including portions of the airline terminal complex and the west side general aviation area, as well as airfield pavement and grassy areas adjacent to Runway 6-24. The area is drained by a large closed pipe system which is a combination of World War II era pipe segments and newer segments. Many of the older pipe segments in this system have been rehabilitated over the last 5 years to address severe joint leakage and consequent subsurface soil erosion. The system is generally of adequate capacity to serve its tributary area. Sub -basin 6 drains to an existing wet detention basin before discharging via a twin 48" culvert to an open channel more than 700 feet in length, passing through a densely wooded area enroute to Smith Creek. Sub -Basin 7 Sub -basin 7 comprises 68 acres, which includes airfield pavement and grassy areas adjacent to both runways. The sub -basin is drained by a closed pipe system which is of adequate capacity. luny of the older pipe segments in this system have been rehabilitated over the last 5 years to address severe joint leakage and consequent subsurface soil erosion. Sub -basin 6 outlets to an open channel more than 700 Page-7 i Wilmington International Airport (ILM) Stormwater Master Plan feet in length, passing through a densely wooded area enroute to Smith Creek. Sub -Basin 8 Sub -basin 8 comprises 120 acres located in the southeasterly quadrant of the airport. The sub -basin includes the south side general aviation area, the FAA airport traffic control tower facility and the Army National Guard facility. Sub -basin 8 includes large areas of impervious surfacing, grassy open space and wooded areas. Sub -basin 8 is drained by closed pipe systems, swales and culverts, with several outfalls to the vast forested wetlands along Smith Creek. The sub -basin has been further subdivided into five smaller areas (8a through 8e), representing the various outfalls. Sub -basin 8a is drained by a closed pipe system, which is of adequate capacity. Many of the older pipe segments in this system have been rehabilitated over the last 5 years to address severe joint leakage and consequent subsurface soil erosion. Sub -Basin 9 Sub -basin 9 comprises 59 acres on the east side of the airport. It includes airfield pavement, aircraft hangars and grassy areas. Sub -basin 9 is drained by two closed pipe systems which are generally of adequate capacity. Many of the older pipe segments in this system have been rehabilitated over the last 5 years to address severe joint leakage and consequent subsurface soil erosion. The sub -basin drains via a 30" culvert under North Kerr Avenue. Sub -Basin 10 Sub -basin 10 comprises 209 acres on the east side of the airfield. The sub -basin includes airfield pavement and large areas of grassy open space. The lower reaches of the sub -basin are wooded. The sub -basin is drained by closed pipe systems, swales and culverts. A tributary of Smith Creek, sometimes known as Acorn Branch, passes through the sub -basin via triple barrel culverts under Taxiway B and Runway 6-24. The sub -basin, and Acorn Branch, drain via a triple 72" culvert under North Kerr Avenue. Page-8 Wilmington International Airport (ILM) J( Stormwater Master Plan The pipe systems in sub -basin 10 are generally of adequate capacity for existing conditions. Many of the older pipe segments in these systems have been rehabilitated over the last 5 years to address severe joint leakage and consequent subsurface soil erosion. Sub -Basin 11 Sub -basin 11 comprises 103 acres located in the northeasterly quadrant of the airport. The sub -basin is primarily grassy open space, plus a small area of airfield pavement. The sub -basin drains via swales to a 42" culvert under North Kerr Avenue. Sub -Basin 12 Sub -basin 12 comprises 91 acres located in the central portion of the airfield. Existing ground cover includes airfield pavement and large areas of grassy open space. The sub -basin is drained by a closed pipe system, which is generally of adequate capacity. Many of the older pipe segments in this system have been rehabilitated over the last 5 years to address severe joint leakage and consequent subsurface soil erosion. Sub -basin 12 discharges to an off -site channel which flows to Acorn Branch, upstream of Sub -basin 10. Sub -Basin 13 Sub -basin 13 comprises 207 acres located in the northerly portion of the airfield. The sub -basin includes airfield pavement, grassy open space, wooded areas and a developed area between Taxiway A and Trask Drive. The sub -basin is drained by closed pipe systems and open channels. Many of the older pipe segments in these systems have been rehabilitated over the last 5 years to address severe joint leakage and consequent subsurface soil erosion. The pipe system which drains the taxiway and runway areas of sub -basin 13 is generally of adequate capacity and is in good condition. The pipe systems which serve the north ramp and old airline terminal areas in the sub -basin vary in Page-9 l Wilmington International Airport ILM f Stormwater Master Plan condition from good to poor. The configuration of this system is poor. System improvements should be undertaken in support of any significant development or redevelopment activity in the sub -basin. Sub -basin 13 discharges to an off -site channel which flows to Acorn Branch, upstream of Sub -basin 10. Sub -Basin 14 Sub -basin 14 comprises 66 acres located in the northwest quadrant of the airport. The sub -basin is predominantly forested, with areas of grassy open space. Sub - basin 14 drains via a 42" culvert under the CSX railroad and Blue Clay Road. This culvert outlets to Wildcat Branch, a tributary of the Northeast Cape Fear River. The area immediately downstream of the culvert is a residential area known as Heritage Park, which is subject to frequent flooding. A study conducted in 2001 indicates that flow from the airport side of Blue Clay Road does not contribute substantially to the flooding problem in Heritage Park. The existing ground cover and low flow velocities on the airport land, coupled with a large storage volume available in the depression on the upstream end of the 42" culvert, result in minimal discharge to Wildcat Branch. Stormwater from any new development within sub -basin 14 should be directed away from the Wildcat Branch watershed, so as to avoid any potential increase in flooding in Heritage Park. Sub -Basin 15 Sub -basin 15 comprises 64 acres located on the west side of the airport. The sub - basin is largely forested, with the exception of the existing USDA and New Hanover " County facilities located near the intersection of Gardner and Hewlett Drives. Sub - basin 15 is drained by small closed pipe systems, ditches and culverts. These systems are generally small and of marginal capacity. The sub -basin outlet is a 30" culvert under the CSX railroad and Blue Clay Road. Downstream of Blue Clay Road, the discharge passes through an industrial area before passing under North 23rd Street. The capacity of this system is considered marginal. The sub -basin includes a 10 acre leasehold parcel upon which the 84 Lumber Company plans to build a contractor yard served by a rail spur. LPage-10 i Wilmington International Airport (ILM) J� Stormwater Master Plan IV. Airport Development and (Redevelopment Planning for development and redevelopment projects at the Wilmington International Airport is essentially a continuous process. Airport development plans evolve over time in response to user and. community needs, priorities and opportunities. Additionally, the airport anticipates growing demand for airport business park leasehold space. The following discussion presents a "snap shot" of near term and long term airport development concepts considered in this Stormwater Master Plan. General Aviation Expansion and enhancement of the general aviation facilities is a significant near term and continuing long term goal at the airport. New general aviation terminal building facilities, aircraft hangars, aircraft parking apron space, fuel storage facilities and automobile parking are needed to accommodate growing demand. The expansion and enhancement of general aviation facilities is planned on both the west side of the airport and the southeast side of the airport. Airline Terminal Complex The airport has recently completed a major remodeling project at the airline terminal. Strong growth in airline passenger counts is anticipated. Near term needs include passenger parking lot expansion and rental car lot expansion. In the long term, a second gate concourse and associated apron expansion are planned, as demand warrants. Air geld Near term projects on the airrieid include perimeter roadway improvements (safety and security access inside the airport fence), Runway 6-24 pavement rehabilitation, general aviation apron pavement rehabilitation and the installation of Instrument Page-11 Wilmington International Airport (ILM) Stormwater Master Plan Landing Systems (ILS) serving both ends of Runway 6-24. Longer term airfield improvements include additional airfield pavement rehabilitation projects (taxiways and aprons), taxiway widening/relocation projects and a potential 2,000 foot extension of Runway 6-24 and its parallel taxiway. Other Aviation Related Facilities Other anticipated or potential aviation related airport development/redevelopment i ! projects include large corporate aviation needs (such as larger air cargo or aircraft maintenance facilities), relocation of rental car servicing facilities, expansion/improvement of U. S. Customs facilities, and re -use of the old airline terminal building. Airport Business Park The airport is actively marketing airport business park leasehold sites on the west side of the airport for a variety of potential uses including office, hotel, light manufacturing, warehousing, wholesale and other compatible uses. A site has recently been leased to the 84 Lumber Company for a contractor lumber yard. V. North Carolina Stormwater Rules The North Carolina Stormwater Rules are codified at 15A NCAC 021-1.1000 and are administered by the North Carolina Department of Environment and Natural Resources, Division of Water Quality (NCDENR). The rules originally went into effect on January 1, 1988, and were amended in 1995. The rules require a stormwater permit for any development activity within a coastal county which requires a LAMA major development permit or a Sedimentation/Erosion Control Plan (required for land disturbances of one acre or more). Development is defined as any land disturbing activl4r, which increases the amount of built -upon area (i.e., pavement, gravel roads, roof tops) or which otherwise decreases the infiltration of precipitation into the soil. Page-12 I i i Wilmington International Airport (ILM) J � J� ! Stormwater Master Plan The Wilmington International Airport is located in coastal New Hanover County and drains to Smith Creek and the Northeast Cape Fear River. Smith Creek is classified as "C; Sw" (Aquatic Life, Secondary Recreation, Fresh, Swamp Waters) and the Northeast Cape Fear River is classified as "SC; Sw" (Aquatic Life, Secondary Recreation, Salt, Swamp Waters). In the absence of classification as "SA" (Market Shellfishing, Salt Water), "ORW" (Outstanding Resource Waters) or "HQW" (High Quality Waters), the requirements of 15A NCAC 02H.1005 (3) apply. Under this I paragraph, "Low Density" projects (i.e., projects for which structural stormwater controls are not required) are defined as developments having a built -upon area of 30 percent or less. Low Density projects must also feature stormwater runoff transported primarily by vegetated conveyances, a stormwater conveyance system which does not include a discrete stormwater collection system, and a 30 foot wide vegetative buffer adjacent to surface waters. "High Density" projects (i.e., projects for which structural stormwater controls are required) are projects involving more than 30 percent built -upon area. High density projects require stormwater control systems which must be wet detention ponds, infiltration systems or "alternative stormwater management systems," and which must be designed to control runoff from all surfaces generated by one inch of rainfall. Historically, development projects at the Wilmington International Airport have been permitted under the "Low Density" option, due to the overall built -upon surface area on airport property, which is well under 30 percent. In May of 2001, the local office of NCDENR advised the airport in writing that "additional built -upon area at the Airport cannot be permitted under the Low Density option until a Master Drainage Plan is submitted to and permitted by this office." The regulatory j basis for stormwater master plan permits is found at 15A NCAC 02H.1003 (h)(3). Officials from the Wilmington office of NCDENR have provided verbal guidance i regarding NCDENR policy and practice relative to master plan permits. The following discussion paraphrases that guidance. A facility may receive a master l plan permit under either high density or low density provisions. Facilities with an i { Page-13 4 Wilmington International Air ort ILM j Stormwater Master Plan overall built -upon area density in excess of the high density threshold would be required to hold a high density master plan permit. These facilities would be required to implement high density BMP controls for all development projects involving an increase in built -upon area. Facilities with an overall built -upon area density below the high density threshold would be allowed to hold a low density master plan permit, even if certain areas within the facility site are characterized as pockets of high density development. Facilities with a low density master plan permit would be allowed to construct development projects which are consistent with low density criteria without implementing high density BMP controls. For development projects characterized as pockets of high density development at facilities with a low density master plan, NCDENR would require implementation of high density BMP controls. NCDENR officials advise that three criteria are evaluated in making a determination as to whether a development project will be characterized as a pocket of high density development. The criteria for high density pockets are as follows: I. Built -upon surfaces in high density pockets are clustered (concentrated) together geographically within the facility site. 2. High density pockets are drained by stormwater collection systems. 3. Built -upon surfaces in high density pockets do not drain by sheet flow across vegetated surfaces. This Stormwater Master Plan is based on overall low density with anticipated pockets of high density development. The existing runway and taxiway complex on the airfield are considered to be consistent with low density criteria because the buiit-upon surfaces are distributed through the site and the built -upon surfaces drain by sheet flow over large grass areas. The runway and taxiway complex is served by a stormwater collection system which predates the Stormwater Rules and which collects the runoff Page-14 i Wilmington International Airport (ILM) J� Stormwater Master Plan downstream of the sheet flow areas. VI. New Hanover County Storm Water Management Ordinance New Hanover County adopted a Storm Water Management Ordinance on ( September 5, 2000. A copy of the ordinance is included as Appendix B. The ordinance requires peak flow attenuation for new development in the County such f that peak flow rates for post -development conditions do not exceed peak flow rates for pre -development conditions for 2-year, 10-year and 25-year storm events. For redevelopment activities, the ordinance requires peak flow attenuation for a 10- year event. The design of extended dry detention basins on the airport must satisfy these requirements. VII. Wildlife Hazard Considerations Wildlife activity on and in the vicinity of airports presents a serious hazard to aviation safety. On May 1, 1997, the Federal Aviation Administration (FAA) issued Advisory Circular No. 150/5200-33, "Hazardous Wildlife Attractants On Or Near Airports," (the "Wildlife AC'J. A draft revision of this document was issued by FAA on January 30, 2004. The revised AC, designated as No. 150/5200-33A, was issued on July 27, 2004. A copy of the current AC is included in Appendix C. The Wildlife AC was developed by FAA from a nation-wide perspective. During development of the scope of work for the Stormwater Master Plan project, the wildlife hazard issue relative to stormwater BMP design was recognized as a key issue in development of the Plan. It was considered prudent to review wildlife concerns from a local, site specific perspective as well as in the nation-wide context of the Wildlife AC. The United States Department of Agriculture, Wildlife Services, has provided this local perspective, based on site visits to the airport and ` discussions with Talbert & Bright and airport staff. A letter report summarizing the i findings and recommendations of Wildlife Services is included in Appendix D. Page-15 i Wilmington International Airport (ILM) J J� Stormwater Master Plan The Wildlife Services report states that the guidance of the Wildlife AC is applicable to the Wilmington International Airport. The report strongly advocates avoidance of wet detention basins and recommends the use of extended dry detention basins for stormwater management. The report provides further recommendations relative to the design details for extended dry detention basin and grassed swale BMP's on the airport. The Wildlife AC provides guidance on the design of stormwater detention basins on airports. Specifically, the AC stipulates the use of steep -sided, narrow, linearly shaped (dry) detention basins with a maximum detention time of 48 hours for the design storm. VIII. Best Management Practices Most large development projects in coastal southeastern North Carolina utilize wet detention basins as the primary stormwater BMP. Use of wet basins for the Wilmington International Airport was actively studied during plan preparation, however due to the wildlife hazard issue, it has been determined that stormwater management at the Wilmington International Airport should be accomplished primarily with a combination of extended dry detention basins and grassed swales needed to meet the required 85% pollutant removal efficiency stipulated under North Carolina stormwater rules. NCDENR has assigned a removal efficiency of 50% to the extended dry detention BMP and 35% to the grassed swale BMP. The extended dry detention basins will also serve to meet the peak discharge attenuation requirements of the New Hanover County Storm Water Management Ordinance. Wet detention basins, extended detention wetlands, pocket wetlands, bioretention areas, infiltration devices, and other BMPs which involve a permanent pool of open water, water quality draw -down times exceeding 48 hours, and/or artificial wetland Page-16 i Wilmington International Airport (ILM) J � J� Stormwater Master Plan type conditions will be excluded from consideration at the Wilmington International Airport. These BMPs are generally expected to create conditions that attract wildlife species which are hazardous to aviation. In accordance with the Wildlife AC, creation of these potential attractants of hazardous wildlife must be avoided. IX. Proposed BMP Design Criteria Design criteria specific to the Wilmington International Airport have been developed for extended dry detention basins and grass swales. The criteria are based on the requirements set forth in the North Carolina Stormwater Rules, guidance in the NCDENR Stormwater BMP Manual (see Appendix E), the requirements of the New Hanover County Storm Water Management Ordinance and the requirements of FAA AC 150/5200-33A, "Hazardous Wildlife Attractions on or Near Airports". The following is a list of criteria developed using the previously mentioned documents: Extended Dry Basins 1. The basin should be steep -sided, narrow, and linearly -shaped. 2. Capture the runoff from a 1" rainfall and release over a period of 48 hours. 3. Provide a minimum flow length -to -basin width ratio of 3:1 4. Provide side slopes in the range of 3:1 to 4:1 (horizontal: vertical). 5. Install outlet orifice in an enclosed structure with a sump. Provide a trash rack on the inlet to the structure. Do not provide an open permanent pool. 6. Provide a rip -rap or concrete lined low -flow channel from inlet to outlet with a minimum depth of one (1) foot. 7. Slope basin bottom at a 2% preferred and 1% minimum grade toward low flow channel. i 8. Provide heavy equipment access for clean -out and maintenance. 9. Provide excess storage in the lower levels of the basin amounting to 20% of the 1" rainfall event runoff volume. 10. Provide for peak flow attenuation above the 1" storm storage, in accordance with the New Hanover County Storm Water Management Page-17 i Wilmington International Airport (ILM) J � Stormwater Master Plan Ordinance. 11. Provide for seeding the basin bottom side slopes and berms with common Bermuda grass or other appropriate mix. Seed mixture shall not contain any i form of millet, rye grass or other large seed producing grasses. 12. Stabilize the basin within 14 days of construction completion. 13. To the extent possible, position the bottom of the basin above the seasonal high water table. 14. Provide for safe conveyance of a 100-year storm event. Grassed Swales 1. Swales will typically be located upstream of extended dry detention basins. 2. Provide a 0.2% minimum to 4.0% maximum longitudinal slope. 3. Provide side slopes no steeper than 3:1 (horizontal: vertical) with 5:1 preferred. The swale cross section should be triangular or parabolic. 4. Swale bottom should be located above the seasonal high water table. 5. Swales should be designed for ready mowing with standard mowing equipment. 6. Flow velocity should be limited to 2 feet per second for the 2-year design flow and a non -erosive velocity for the 10-year design flow. 7. An attempt shall be made to provide 100 linear feet of swale per acre of drainage area. No less than 50 linear feet of swale per acre shall be i provided. 8. Provide for seeding the swale with common Bermuda grass or other appropriate mix. Seed mixture shall not contain any form of millet, rye grass or other large seed producing grasses. i 9. Stabilize the swale within 14 days of construction completion. X Proposed Stormw►ater Management Concepts This plan presents two solutions to stormwater management for the west side of the Wilmington International Airport. These two solutions include a centralized Page-18 i Wilmington International Airport (ILM) Stormwater Master Plan stormwater management concept and a distributed stormwater management concept. Both concepts will require construction of new stormwater conveyance pipelines to serve the west side of the airport property. Discussion of each concept is included in the following sections. The extended dry detention basin and stormwater conveyance pipeline designs included and depicted in this Plan have been developed to the conceptual design level only. Final design, supported by topographic survey, wetlands delineation and subsurface exploration efforts, must be undertaken for all facilities prior to construction. The extended dry detention basin designs have been developed with an assumed development density of 65% built -upon area for extended dry detention basin No. 1 and for the distributed concept example basin. An assumed density of 60% was used in the design of extended dry detention basin No. 2. Centralized Stormwater Management Concept The Centralized Stormwater Management Concept involves stormwater conveyance to centralized stormwater detention facilities for treatment and control of peak flows. This concept is depicted on Figure/Plan Sheet PR1.1. In the centralized concept, two large extended dry detention basins would be constructed to serve the future built -upon areas on the west side of the airport. Extended dry detention basin No. 1 would be located south of Airport Boulevard and is sized to capture and treat runoff from approximately 328 acres. The area draining to this basin includes the airport business park development/redevelopment, the airline terminal facility expansion and the GA apron expansion/redevelopment area. Conveyance of stormwater from the individual project sites will be through a new stormwater conveyance system included as part of this master plan. Stormwater will discharge from basin No. 1 through four outlet control structures located at existing airport outfali points. Page-19 Wilmington In terns tional Airport (ILM) Stormwater Master Plan Outfall structures are sized to limit flow into downstream channels to predevelopment peaks to minimize any erosion or degradation of the existing channels. Three of the outfall points flow through open channels to Smith Creek. The other outfall point will be through an existing culvert under 23'd Street. Extended dry detention basin No. 2 would be located west of Runway 17-35, with a portion of the basin located between the Runway and Taxiway "A" and the second portion of the basin located north of Taxiway "A". These two basin areas will be interconnected with a 60" pipe. Extended dry detention basin No. 2 is .sized to capture and treat runoff from approximately 164 acres and will be used to provide treatment for stormwater runoff from the General Aviation facilities expansion area and other aviation related or commercial development along Trask Drive, north of the existing General Aviation area. Stormwater will discharge from basin No. 2 through three outlet control structures connected to existing stormwater pipelines. Concrete or rip -rap low flow channels will be constructed in the bottom of both basin No. 1 and No. 2 to help maintain a dry basin bottom as required by the Wildlife AC and to facilitate maintenance. Both extended dry detention basins are designed to treat the runoff from a 1" rainfall event, along with attenuating the peak flow leaving the airport property for 2-year, 10-year and 25-year storm events. The basins will also be able to safely convey a 100-year storm event. Computations are included in the technical appendix. Distributed Stormwater Management Concept The Distributed Stormwater Management Concept is based on the idea that stormwater is detained and treated locally at each project site and then conveyed off airport property. This concept is depicted on Figure/Plan Sheet PR1.2. The distributed concept will be used only for the approximately 328 acres of land which drain to extended dry detention basin No. 1 in the centralized concept. Anticipated development in this area includes airport business park development, airline terminal facility expansion and general aviation facility expansion. The 164 acres Page-20 i Wilmington International Airport (ILM) Stormwater Master Plan of land discussed in the centralized stormwater management concept that drains to i extended dry detention basin No. 2 will also drain to this basin in the distributed concept. One example extended dry detention basin design has been completed for the distributed concept. The example basin would serve the general aviation, long term parking and rental car parking expansion projects. Computations are included in the technical appendix. Individual extended dry detention basins have been sized approximately for each development area, using a ratio of basin area to tributary area developed from the example basin design. An outlet control structure will be constructed in each basin to control flow into the stormwater conveyance system included as part of this master plan. The extended dry detention basins sized for the master plan are based on the idea that each development area will have one basin. The actual number, location and size of the distributed basins will depend on the nature and scope of individual airport and tenant projects as they arise. Concrete or rip -rap lined low flow channels will be constructed in the bottom of all basins to help maintain a dry basin bottom as required by the Wildlife AC and to facilitate maintenance. All dry detention basins will be designed to treat the runoff from a 1" rainfall event, along with attenuation of the peak flow leaving the airport property for the 2-year, 10-year and 25-year storm events. The basins will also be able to safely convey the 100-year storm event. Stormwater Conveyance Pipelines Both the centralized concept and the distributed concept will require construction of stormwater conveyance pipelines to collect and convey runoff from the 328 acre development area tributary to extended dry detention basin No. 1. The conveyance system consists of three pipelines (A, B and C) located within the ti Business Park Development area. Conveyance system A will be used to carry runoff from the GA terminal expansion area, airline terminal expansion area and I Page-21 Wilmington In terra tional Airport (ILM) J� Stormwater Master Plan the portion of the Business Park Development area north of Hewlett Drive and east of Gardner Drive. Conveyance system B will be used to carry runoff from the Business Park Development area north of Airport Boulevard, east of Gardner Drive and south of Hewlett Drive. Conveyance system C will be used to carry runoff from the Business Park Development area north of Airport Boulevard, west of Gardner Drive and extending north to drain the existing forested depression to be used as a detention basin located adjacent to Blue Clay Road. The size of the conveyance system pipelines varies based on the management concept. For both concepts, the conveyance system is sized to convey 25-year storm flows with minimal surcharge (hydraulic grade line no more than 2 feet above the pipe crown). For the centralized concept, the pipelines will be larger than for the distributed concept since they will be required to convey runoff directly from the development area without any peak flow attenuation. The pipelines will outlet into extended dry detention basin No. 1 which will treat and attenuate the flow prior to leaving the Airport. For the distributed concept, the pipelines will be smaller than for the centralized concept since they will convey the attenuated stormwater flows from the distributed basins. The pipelines will outlet into a distribution system that will distribute the runoff to existing Airport outfall pipes and channels. Cost Opinions for Stormwater Management Concepts Cost opinions have been developed for the stormwater management concepts developed for the west side of the Airport. These cost opinions are intended solely as budgetary planning tools. More detailed cost opinions should be developed for individual system components during the project design development process to verify budgetary considerations. The total cost opinion for the centralized concept, in 2004 dollars, is $9.7 Million. The total cost opinion for the distributed concept, in 2004 dollars, is $10.7 Million. Page-22 Wilmington International Airport (ILM) J� Stormwater Master Plan Cost opinion worksheets are presented in Appendix "F". Construction of infrastructure improvements for both stormwater management concepts can be phased to spread implementation costs over a period of time as development progresses. The distributed concept can be more readily phased than the centralized concept. A phasing plan (plan sheet PH1.1) has been prepared for the distributed concept. The plan presents four phases of construction. Costs for each phase have been divided between Airport costs and tenant costs. Phase one would include expansion of the existing airline terminal parking lot and expansion of the existing general aviation area. The work would include construction of an extended dry detention basin for each development area which would initially outlet into the existing drainage conveyance system (and ultimately into the new conveyance system). The cost of the basins would be an Airport cost. Phase one would also include development of two business park sites directly south of Airport Boulevard which would also require extended dry detention basins for each development area. Construction of these stormwater basins would be a tenant cost. The distributed concept phasing then progresses to the north in three additional increments. XI. Methodology ' The SCS unit hydrograph method has been used for project hydrology, implemented using PondPack software from Haestad Methods, Inc. CN and time of concentration data were developed using SCS TR-55 methods. The hydrologic soil groups for the various soil units on the airport were taken from the Appendix A listing of TR-55. The SCS soil map for New Hanover County was used to identify soil units. For soils with multiple hydrologic soil groups, the lowest (most well drained) group was used. The SCS type II! 24-hour rainfall distribution was used. Rainfall depths were "taken from the New Hanover County Storm Water Design Manual. FHWA pipe culvert hydraulic data and standard weir and orifice hydraulic methods were employed. Pipeline hydraulic grade fines were computed using Page-23 i Wilmington International Airport (ILM) J� I Stormwater Master Plan StormCad software, also from Haestad Methods, Inc. For extended dry detention basin design, the runoff volume for the one inch rainfall event was estimated using the Schueler equation: Rv=.009(I)+.05 The required 20% sediment storage was computed based on this volume, and was assumed to occupy the lowest level of the basin on either side of the low flow channel. For the PondPack model, this volume was subtracted from the stage - storage curve. The SCS method yields very low runoff volumes for a one -inch 24- hour rainfall, due to the standard initial abstraction. Therefore, a higher 24-hour rainfall was input into the PondPack model such that the model would generate a runoff hydrograph with a volume equal to that predicted by the Schueler equation. This hydrograph was then routed through the basin in order to size the dewatering device to drain the runoff from the equivalent 1" design storm in approximately 48- hours (this detention time is consistent with the minimum required to meet NCDENR criteria and the maximum consistent with the Wildlife AC). The drain time was taken as the difference in time from the start of outflow to the end of outflow in the basin routing outflow hydrograph. Reservoir routings were completed for 2- year, 10-year, 25-year and 100-year rainfall events as well, in order to size the peak attenuation storage and outlet structures, confirm pre- versus post - development peak discharge control, and confirm the safe passage of a 100-year event. XII. Implementation of Stormwater Controls Stormwater controls will be implemented on an incremental basis as high density development involving a net increase in built -upon area occurs. It is not the intent of the Airport Authority to implement BMP's to serve areas that are already developed as of the date of this Plan, nor for redevelopment of such areas (to the Page-24 Wilmington International Airport (ILM) J � J� ' Stormwater Master Plan extent that such redevelopment does not result in a net increase in impervious surfacing). XIII. Alternative Solutions and Plan Modification This Plan has been developed based on analysis, study and consultation with airport staff. It presents workable solutions to the long term storm water management needs of the airport. The plan is conceptual in nature. Implementation of the Plan will depend in large part on the exact nature, magnitude and sequence of development projects which move forward, and on funding resources which become available for construction of stormwater improvements. Nothing in this plan is intended to limit or restrict the airport or its current or prospective tenants with respect to pursuing alternative or modified stormwater management solutions in various locations. Page-25 Yr.r+.+��^'^�e.� •-ryy„R t r ,. a�wrlat+._, k•,�x. '� � 'i_ t �.•^. � � . r i l : � t - �. l�`st'7}.;�•+'•�!' ff��^)!�� Y,:-. '+-- +' � i?�,'" 1 c ` i - � +i ,�Y � p a '. Siiw7h J f 2♦�1' i J/ f w y� li" �'l `1�2J 7 '.1{ .^•� n, - _ ,r�l Ilk 1117 ♦. ;3 • i e• a �a,, R 1 . f �4 �. F t"♦ 1 '='^" �..a Virgf�'p ('J�' -� � }. > F I �R � 't �.Y l .+yy ... �*� � -�-G/�q r � .T�. rYj, � ..f), ,^ -� Y. ' `�•��jt f�/� - � {I �Fl%, b�.. '� 's . '4�•t •'e♦r. .,,, `� a� � �'� e. a-,y \. . ;- a 6--j,.�`, ' S` ♦• ��` R'. - R v r _ 1 7� a � , )I�c7�i. r � r' � �' � .� �, rA ,���`� . / of �t 1 • x r t � ..r y. 2ir R} yy tsl s: c rt aCF,` .Q Vic,.i,� .� ` xS+:. (y �l r L' a L, L'•e ♦. �.+ { .>•'t a +,..1 1 [ I 7'ai. f _ . �.... �i�r i .+r %. r �f � h +'� r, �J 7 l 45 { c¢}' !. f', �Y, • 1P •6 : , A Y�sr„ 1l 1 9 I .>" _ �'+..� { 'hi aL i .+ r (� �� A J- 4' �•," ' .r _.R�.!'*>•'F . ,^'k • � �� `�.y' �} L �. fi "° 1 . )r y `�r� 'i`-•8)" .�`. �:. Jf Nt 1_ t•'ao t - v ^, ` _ !a ea,1 �� . L Jw�., tr-\ • / ♦ ,N,1 )� -': tw y �� \�\t�`/f:�i]' y ! .'�} '.� ~ ^`:it ,'�[f�/•� i[ �, \S'....�, �"'�-.fir' \`•��y r '_ae P� �. 'r } ,'.�•`y,3 ' -�yr�,.�� /� ::r i, � �.f 1.•I �.e a, � ^�^x' �'� _ \ '� �„• f i a- � '. '�.:.y 'f .1r'h.��� � ,� L ` rt �. 4 fLZ��• t IjVj,. � -,t'7• -.may - - `yam' a^ _Ia, y �. � y _ ¢• • � Y-.. ) ti r � e r�'Te �. �� ��'ry� 14 .'. it _ e t. s •rfi -��� C,.,,,,jy��.�-'i. '�$ "'.•,r.°.a :� y „t. _, ' ,� _ y�'.� ,' i" +_ fi f ��+"y' .: • 1"5>., i a. r�,J'>�1 l 1� �{'* i ' ai ii .. ■ t . - ° a `i � y � 'ar t . i +a"•q'. ' i - to J � � r_....- t •: •' ,,,,,,� :• d.!'4�,WF ,: � �T " � i s �� ,i'?� 1 r' , •� P.•„c�; �;y ,� '^x�°` �� i l + r\ .. jai. :i)• _,,,,.ae.• cw�q.� L `Rif ' �7 { a4� .� � Y` '� �!'�F ,� � " ° �r+�•�,�rR�� " F � ` � � .- 4 i' - � � M• R t � 1si� R TALBERT & BRIGHT Wilmington International Airport SHMMM&PLMOMIOMaoU"n Figure 1 4510 SHIMMY ORNE W11WIN TIA xc 26105 Wilmington, North Carolina VICINI�"Y MAP FAX: 910-762-8261 MOND 910-763-SM Date: AUGUST, 2004 Drawn By: JMM Symbol Hydrologic Soil Name Group Be Ba meade A Bp Borrow Pit -- JO Johnston D Le Leon B/D* Ls Lynchburq C No Norfolk B/D* On Onslow B/D* Pn Pante o B/D* Ra Rains B/D* Se Seagate D* St Stallings C Wr I Wri htsboro I C *- First soil group denotes drained condition while the second denotes undrained condition. Sources: New Hanover County Soil Map Exhibit A, SCS TR55, 2nd Ed., 6/86 Oil , N IL "M"% rz - Ono le ,T at !1�'S QlNiltlq /01s31N1 TO 111111111101 M A 01IM IOB OONY! dl� MA W MIN s11sI01UE NIRISD Rm NIO TIE FlIa�CNN sIO1sR1Nt PR sttNlY 0. TIE IDIMMM =W PM UIONI THE CIK IIIEIIOAO AID MM UN IIaIO BID N: !MINI sell A CINCK TIILTIE AIiONIN ROMI CNx N 71E EISISDIIID DNNaIDn 71Ni ssL I1l11NR ONCII IIIN: NI011 AM= PIIONRIY 7NN111N1 THE CULVlIIr ME A11AED �NICIOIAN FlIOII THE Nl1sGI0E IMINI IsaaeoNDDo MR) TIE PlarCe® ®170NN0 sir 0110010111 NSIN TO Nt FL= Upw Ca1lIillOfl w � NK DETNnIOII NINII sarNo TIE AWL y ®oaNno oE1NII1ow sIINp 1O NNAN. MNII uooflonTloll WNf NE INOENINr am EIIlIR CF NNDw- NCIDIO N 11111 1A sUAiJICSD DIIM a TINw m mm ®ONICEI•IIIM. 19IIlJDIn Nlr OEIMIMI NINI v NFU I= N/IlJIIUL ISINIIdpPIIw NYCLMN EISMI.N1 Cs sRIIMDIIs NNIIICN4 OMINE TlJSNW. IaICEnNe oEMIaIOII ©Imoa41111111111 Pl IMII® ETOPRIIwON s ©oNOI /IINIIDN/� CN.NIIdAL NIYBAPIEIR FAIN NIMOPa w O" I1N■oI NIE OUE111 NE © ! AIEI1� 7N\NIIL v y M_ i .ram,,, � •'' 1 ©4 c STORMWATM -� CONVEYANCE PIP SYSTEM C ice; %I 0 p e °o 0 0 '� o •'1 � 4I !l M .o 0 n s � wN 0 U �O a O 7b o W = &:An o ° B u •, . s� o` o 0 0 o OQ 0 : 0 0 0� `• e i a B 9.0 a 6 IL 0, < 8 A 131 w Z 1� rr _ C .l Z .. s� Z NOTE , r S THEM PLANS DEPICT CONCEPTUAL STOR11R9ATER i O MANAGEMENT IMPROVEMENTS INTENDED TO SUPPORT �1 1 DEVELOPMENT AND REDEVELOPMENT ACTIMTIES ON o AIRPORT PROPERTY. THESE PUNS REPRESENT A iCONCEPTUALINTENDED S�DESICNCTION.. � AND erg :�cT r r- NC ARMY ; •��.. ' © NATIONAL" GUARD od 04 ti Drm�n RaY E ado 250 0 No low I am*w rya momomm A� CREEK :` •• SCALE IN FEET � I-o7oet . �•�. RR1.1 QDOfINO FnlNil® OlPIE/M to I M A N:IBOION TEOOIEl1lINl E M OUIIET EUOICnNE ON m n NIo HE HM7P0lED atonNraEll P!E =M Ot 1IR !MIEN OUIIET HH: WM 11E OHI MRIIaAo AND N cw Q 010 m HHm NI111 A 0 N WK ILA Rm ONLY N = HIfDOINp Im N<L PIEIBR NNgM1iE Hall ANFORT H10PlJlIY lIMI0lI0B W MM W MIIEE ALOMN MpQ10N Hall lIE NJiaOE wIIN IelouoNl000 NIo 11E HIOPO� oamlo MET oO6lllotl a to t HIltO uFal 00111E110N or onoom NK ol16IlI0Il m �No 1IE AWL ®OOE1N0 OETDl110N MMI 10 IBM/L dwl MDDNpg10N ww N: IND®rIIIT N w BI9R OF N01/NMR NOINII®N MlIMGIN IINNIOON MIINI = � A L O�ML fXi®H!o ORT OEIOIIION MINI IF MW HMt Po1ORML IEOEYBAPIl�R NMDLMN ElQMgNON of EIHNIOIA sumC & AMPORr OAAaNE 7HYllL HICl11B e�allllsDll OImposLoPI 1Ng21E0 oolllllEON at © aIIEIe Awral0ll II9Avm ftft ON.IIICML Omrm PWN OdlWMW/ O04 IiNiR !IE oU © 11l�I60P1l a OLD _ NEA 1O LEGEND AFORT oc1mj@ T OR INDEMOD AM NO 10 UM DEsaN M w um Aa One" oN am oERNiI B49N wr ARPORT PROPERTY I BMY ORMW AREA 10 PROPO lOnW D DRY oE7E1 M BARN OM AN AEA 70 PROPO MBM mu oE1E,," BAST in Mi /- E GD !�CONVEYAHM PIPE svmm C ,t A .0 p °o 0 L o� 4 08 0 .o 0 e o � ' � MM 8 F,-•I � 00 0 e W � z s o C--^7 OJ�O 0 r• � g /•• OOO 4i O K % o � , 0 0 � 0 - o a 23 ~ F }.� IK m ol �. NOTE THESE PLANS DEPICT CONCEPTUAL STOWWATER J Q O MANAGEMENT IMPROVEMENTS INTENDED TO SUPPORT DEVELOPMENT AND REDEVELOPMENT ACTIVITIES ON �oQo AIRPORT PROPERTY. THESE PLANS REPRESENT A CONCEPTUAL LEVEL OF DESIGN. AND ARE NOT INTENDED FOR CONSTRUCnObl. NC ARMY • •��. c 1 GUARD 9 f � z Gs41e>t ve l4wi / F „,, i Dft ARM o� o Rq1 500 P50 0 500 ,ow 15M°iaaid E11B ProJp, Na aam-0� SCALE IN FEET SMI� CREEK j�1 ,•_ 500' NwdNo. '�...�' PP1.2 PHAZ I DE%UAPMDff PHAIE I COMMENT PHAZ M DE%ILCPMW FHM ri CEMMEW Ex,BEED DRY OEM= MH H06 2 PHAW A MY CETORM MN N06 2 PRAM 0 ALVW DEVELOPMOff OR OD FADrALOPMW ARFA AND AKIPCIPAIM UK CEINW7M O E==Q FC;r.= 08FREEM TC M Lff AS DETBOM OAST EXMM OR PBM9 XT DE19mm mm PROP� sTclomm 0MYETAM PM UM ANWW PROPOM PRCPOW EXTENM Off RAM a N L,K,jmmff'ml pop I birwom'" (3 Pr4r Air 04 0U) z OK 00 j5:Q F= k tK s, z z Pl NOTE jj THESE PLANS DEPICT CONCEPTUAL STORMWATER MANAGEMENT IMPROVEMENTS IN704M 70 SUPPORT DEVELOPMENT AND REDEVELOPMENT ACTIVITIES ON AIRPORT PROPERTY. THESE PLAINS FOMENT A CONCEPTUAL LEVEL Or DESIGN, AND AM W-1 INIIENDW FOR CONSTRUCTION. NC ARMY GUARDNATIONAL r 9` SFAL 024IN maw w" > . ...... j go* 500 150 0 500 1000 1sxpK SMITH CFF-EK SCALE IN FEET I'- 501Y soft No. PH1.1 ENR ENVIRONMENTAL MANAGEMENT COMMISSION TI5A • 02H 1000 SECTION .1000 - STORMWATER MANAGEMENT 15A NCAC 02H .1001 STORMWATER MANAGEMENT POLICY The rules in this Section set forth the requirements for application and issuance of permits for stormwater management systems in accordance with G.S. 143-215.1(d) and 15A NCAC 2H .0200. These requirements to control pollutants associated with stormwater runoff apply to development of land for residential, commercial, industrial, or institutional use but do not apply to land management activities associated with agriculture or silviculture unless specifically addressed in special supplemental classifications and management strategies adopted by the Commission. History Note: Authority G.S. 143-214.1; 143-214.7, 143-215.3(a)(1); Eff. January 1, 1988; Amended Eff. September 1, 1995. 15A NCAC 02H .1002 DEFINITIONS The definition of any word or phrase in this Section shall be the same as given in Article 21, Chapter 143 of the General Statutes of North Carolina, as amended. Other words and phrases used in this Section are defined as follows: (1) "Built -upon Area" means that portion of a development project that is covered by impervious or partially impervious cover including buildings, pavement, gravel roads and parking areas, recreation facilities (e.g., tennis courts), etc. (Note: Wooden slatted decks and the water area of a swimming pool are considered pervious). (2) "CAMA Major Development Permits" mean those permits or revised permits required by the Coastal Resources Commission according to 15A NCAC U Sections .0100 and .0200. (3) "Certificate of Stormwater Compliance" means the approval for activities that meet the requirements for coverage under a stormwater general permit for development activities that are regulated by this Section. (4) "Coastal Counties" include Beaufort, Bertie, Brunswick, Camden, Carteret, Chowan, Craven, Currituck, Dare, Gates, Hertford, Hyde, New Hanover, Onslow, Pamlico, Pasquotank, Ponder, Perquimans, Tyrrell, and Washington. (5) "Curb Outlet System" means curb and gutter installed in a development which meets low density criteria [Rule .1003(d)(1) of this Section] with breaks in the curb or other outlets used to convey stormwater runoff to grassed swales or vegetated or natural areas and designed in accordance with Rule .1008(g) of this Section. (6) "Development" means any land disturbing activity which increases the amount of built -upon area or which otherwise decreases the infiltration of precipitation into the soil. (7) "Drainage Area or Watershed" means -the entire area contributing surface runoff to a single point. (8) "Forebay" means a device located at the head of a wet detention pond to capture incoming sediment before it reaches the main portion of the pond. The forebay is typically an excavated settling basin or a section separated by a low weir. (9) "General Permit" means a "permit" issued under G.S. 143-215.1(b)(3) and (4) authorizing a category of similar activities or discharges. (10) "Infiltration Systems" mean stormwater control systems designed to allow runoff to pass or move (infiltrate%xfiltrate) into the soil. (11) "Notice of Intent" means a written notification to the Division that an activity or discharge is intended to be covered by a general permit and takes the place of "application" used with individual permits. (12) "Off -site Stormwater Systems" mean stormwater management systems that are located outside the boundaries of the specific project in question, but designed to control stormwater drainage from that project and other potential development sites. These systems shall designate responsible parties for operation and maintenance and may be owned and operated as a duly licensed utility or by a local government. NORTH CAROLINA ADMINISTRATIVE CODE Eietive Lumber 1 19r, Page 1 of 13 ENR ENVIRONMENTAL MANAGEMENT COMMISSION TBA: 025.1000 (13) "On -site Stormwater Systems" mean the systems necessary to control stormwater within an individual development project and located within the project boundaries. (14) "Redevelopment" means any rebuilding activity which has no net increase in built -upon area or which provides equal or greater stormwater control than the previous development (stormwater controls shall not be allowed where otherwise prohibited). (15) "Seasonal High Water Table" means the highest level that groundwater, at atmospheric pressure, reaches in the soil in most years. The seasonal high water table is usually detected by the mottling of the soil that results from mineral leaching. (16) "Sedimentation/Erosion Control Plan" means any plan, amended plan or revision to an approved plan submitted to the Division of Land Resources or delegated authority in accordance with G.S. 113A-57. (17) "Stormwater" is defined in G.S. 143, Article 21. (18) "Stormwater Collection System" means any conduit, pipe, channel, curb or gutter for the primary purpose of transporting (not treating) runoff. A stormwater collection system does not include vegetated swales, swales stabilized with armoring or alternative methods where natural topography or other physical constraints prevents the use of vegetated swales (subject to case -by -case review), curb outlet systems, or pipes used to carry drainage underneath built -upon surfaces that are associated with development controlled by the provisions of Rule .1003(d)(1) in this Section. (19) "10 Year Storm" means the surface runoff resulting from a rainfall of an intensity expected to be equaled or exceeded, on the average, once in 10 years, and of a duration which will produce the maximum peak rate of runoff, for the watershed of interest under average antecedent wetness conditions. (20) "Water Dependent Structures" means a structure for which the use requires access or proximity to or siting within surface waters to fulfill its basic purpose, such as boat ramps, boat houses, docks, and bulkheads. Ancillary facilities such as restaurants, outlets for boat supplies, parking lots and boat storage areas are not water dependent uses. (21) "Wet Detention Pond" means a structure that provides for the storage and control of runoff and includes a designed and maintained permanent pool volume. (22) "Vegetative Buffer" means an area of natural or established vegetation directly adjacent to surface waters through which stormwater runoff flows in a diffuse manner to protect surface waters from degradation due to development activities. The width of the buffer is measured horizontally from the normal pool elevation of impounded structures, from the bank of each side of streams or rivers, and from the mean high water line of tidal waters, perpendicular to the shoreline. (23) "Vegetative Filter" means an area of natural or planted vegetation through which stormwater runoff flows in a diffuse manner so that runoff does not become channelized and which provides for control of stormwater runoff through infiltration of runoff and filtering of -pollutants. The -defined length of the filter shall be provided for in the direction of stormwater flow. IEstory Note: Authority G.S. 143-213; 143-214.1; 143-214.7,• 143-215.3(a)(1); Eff. January 1, 1988, Amended E, fJ.' December 1, 1995, September 1, 1995. 15A NCAC 02H .1003 STORMWATER MANAGEMENT: COVERAGE: APPLICATION: FEES (a) The intent of the Commission is to achieve the water quality protection which low density development near sensitive waters provides. To that end, the Director, by applying the standards in this Section shall cause development to comply with the antidegradation requirements specified in 15A NCAC 2B .0201 by protecting surface waters and highly productive aquatic resources from the adverse impacts of uncontrolled high density development or the potential failure of stormwater control measures. (b) To ensure the protection of surface waters of the State in accordance -nth G.S. 143-214.7, a permit is required in accordance with the provisions of this Section for any development activities which require a CAMA major development permit or a Sedimentation/Erosion Control Plan and which meet any of the following criteria: NORTH CAROLINA ADMINISTRATIVE CODE Effosove peamber 1.1"9 Page 2 of 13 ENR ENVIRONMENTAL MANAGEMENT COMMISSION TI SA • 02H 1000 (1) development activities located in the 20 coastal counties as defined in Rule .1002(4) of this Section; (2) development activities draining to Outstanding Resource Waters (ORW) as defined in 15A NCAC 2B .0225; or (3) development activities within one mile of and draining to High Quality Waters (HQW) as defined in 15A NCAC 2B .0101(e)(5). Projects under a common plan of development shall be considered as a single project and shall require stormwater management in accordance with this Section. Local governments with delegated Sedimenta- tion/Erosion Control Programs often implement more stringent standards in the form of lower thresholds for land area disturbed. In these situations, the requirements of this Rule apply only to those projects that exceed the state's minimum area of disturbance as outlined in G.S. 113A-57. Specific permitting options, including general permits for some activities, are outlined in Paragraph (d) of this Rule. (c) Development activity with a CAMA major development permit or a Sedimentation/Erosion Control Plan approved prior to January 1, 1988 are not required to meet the provisions of these Rules unless changes are made to the project which require modifications to these approvals after January 1, 1988. (d) Projects subject to the permitting requirements of this Section may be permitted under the following stormwater management options: (1) Low Density Projects: Projects permitted as low density projects must be designed to meet and maintain the applicable low density requirements specified in Rules .1005 through .1007 of this Section. The Division shall review project plans and assure that density levels meet the applicable low density requirements. The permit shall require recorded deed restrictions and protective covenants to ensure development activities maintain the development consistent with the plans and specifications approved by the Division. (2) High Density Projects: Projects permitted as high density projects must be designed to meet the applicable high density requirements specified in Rules .1005 through .1007 of this Section with stormwater control measures designed, operated and maintained in accordance with the provisions of this Section. The permit shall require recorded deed restrictions and protective covenants to ensure development activities maintain the development consistent with the plans and specifications approved by the Division. Stormwater control measures and operation and maintenance plans developed in accordance with Rule .1008 of this Section must be approved by the Division. In addition, NPDES permits for stormwater point sources may be required according to the provisions of 15A NCAC 2H .0126. (3) Other Projects: Development may also be permitted on a case -by -case basis if the project: (A) controls runoff through an off -site stormwater system meeting provisions of this Section; (B) -:a s redevelopment which meets the requirements of this Section to the maximum extent practicable; (C) otherwise meets the provisions of this Section and has water dependent structures, public roads and public bridges which minimize built -upon surfaces,, divert stormwater away from surface waters as much as possible and employ other best management practices to minimize water quality impacts. (4) Director's Certification: Projects may be approved on a case -by -case basis if the project is certified by the Director that the site is situated such that water quality standards and uses are not threatened and the developer demonstrates that: (A) the development plans and specifications indicate stormwater control measures which shall be installed in lieu of the requirements of this Rule; or (B) the development is located such a distance from surface waters that impacts from pollutants present in stormwater from the site shall be effectively mitigated. (5) General Permits: Projects may apply for permit coverage under general permits for specific types of activities. The Division shall develop general permits for these activities in accordance with Rule .1013 of this Section. General Permit coverage shall be available to activities including, but not limited to: NORTH CAROLINA ADMINISTRATIVE CODE E ye Domaher 1 M Pace 3 of 13 ENR ENVIRONMENTAL MANAGEMENT COMMISSION TBA: • 025.1000 (A) construction of bulkheads and boat ramps; (B) installation of sewer lines with no proposed built -upon areas; (C) construction of an individual single family residence; and (D) other activities that, in the opinion of the Director, meet the critera in Rule .1013 of this Section. Development designed to meet the requirements in Subparagraphs (d)(1) and (d)(3) of this Paragraph must demonstrate that no areas within the project site are of such high density that stormwater runoff threatens water quality. (e) Applications: Any person with development activity meeting the criteria of Paragraph (b) of this Rule shall apply for permit coverage through the Division. Previously issued Stormwater Certifications (issued in accordance with stormwater management rules effective prior to September 1, 1995) revoked due to certification violations must apply for pemut coverage. Stormwater management permit applications, project plans, supporting information and processing fees shall be submitted to the appropriate Division of Environmental Management regional office. A processing fee, as described in Paragraph (f) of this Rule, must be submitted with each application. Processing fees submitted in the form of a check or money order shall be made payable to N.C. Department of Environment, Health, and Natural Resources. Applications which are incomplete or not accompanied by the processing fee may be returned. Permit applications shall be signed as follows: (1) in the case of corporations, by a principal executive officer of at least the level of vice-president, or his authorized representative; (2) in the case of a partnership, by a general partner and in the case of a limited partnership, by a general partner, (3) in the case of a sole proprietorship, by the proprietor; (4) in the case of a municipal, state or other public entity by either a principal executive officer, ranking official or other duly authorized employee. The signature of the consulting engineer or other agent shall be accepted on the application only if accompanied by a letter of authorization. (f) Permit Fees: (1) For every application for a new or revised permit under this Section, a nonrefundable application processing fee in the amount stated in Subparagraph (f)(2) of this Paragraph shall be submitted at the time of application. (A) Each permit application is incomplete until the application processing fee is received; (B) No processing fee shall be charged for modifications of permits when initiated by the Director, (C) A processing fee of forty dollars ($40.00) shall be charged for name changes; (D) No processing fee shall be required for name changes associated with the initial transfer of property from the developer to property owner or responsible party. .fw - Any subsequent changes in ownership shall be subject to the name change processing fee in Part (C) of this Paragraph. (2) Schedule of Fees Permit Application Processing Fee New Timely Applications/ Renewals Modifications/ Without Rate Renewal Modifications Low Density $225 N/A High Density 385 225 Other 225 N/A Director's Certification 350 N!A General Permits 50 N/A NORTH CAROLINA ADMINISTRATEU CODE Mufiye Decombar 1 1995 Page 4 of 1 ENR ENVIRONMENTAL MANAGEMENT COMMISSION TBA: 02H.1000 (g) Supporting Documents and Information. This Paragraph outlines those supporting documents and information that must be submitted with stormwater applications. Additional information may also be applicable or required. The applicant shall attempt to submit all necessary information to describe the site, development and stormwater management practices proposed. The following documents and information shall be submitted with stormwater applications: (1) two sets of detailed plans and specifications for the project; (2) plans and specifications must be dated and sealed as outlined in Rule .10080) of this Section and show the revision number and date; (3) general location map showing orientation of the project with relation to at least two references (numbered roads, named streams/rivers, etc.) and showing the receiving water (a USGS map preferable); (4) topographic map(s) of the project area showing original and proposed contours and drainage patterns; (5) delineation of relevant boundaries including drainage areas, seasonal high water table, wetlands, property/project boundaries and drainage easements; (6) existing and proposed built -upon area including roads, parking areas, buildings, etc.; (7) technical information showing all final numbers, calculations, assumptions, drawing and procedures associated with the stormwater management measures including but not limited to: built -upon area, runoff coefficients, runoff volume, runoff depth, flow routing, inlet and outlet configuration (where applicable), other applicable information as specified; (8) operation and maintenance plan signed by responsible party; (9) recorded deed restriction and protective covenants. As an alternative proposed deed restriction and protective covenants and a signed agreement to provide final recorded articles shall be accepted when final documents are not available at the time of submittal. (h) Permit Issuance and Compliance: Stormwater management permits shall be issued in a manner consistent with the following: (1) Stormwater management permits issued for low density projects shall not require permit renewal. (2) Stormwater management permits issued for projects that require the construction of engineered stormwater control measures shall be issued for a period of time not to exceed 10 years. Applications for permit renewals shall be submitted 180 days prior to the expiration of a permit and must be accompanied by the processing fee described in Paragraph (f) of this Rule. (3) Stormwater management permits shall be issued to the developer or owner and shall cover the entire master plan of the project ("stormwater master plan permit"). The master plan permit shall include specifications for stormwater management measures associated with each individual lot or property within the project. (4) -Any individual or =-entity found to be in noncompliance with the provisions of a stormwater management permit or the requirements of this Section is subject to enforcement procedures as set forth in G.S. 143, Article 21. History Note: Authority G.S. 143-214.1; 143-214.7,• 143-215.1(d); 143-215.3(a)(1), Eff. January 1, 1988; Amended E, . December 1, 1995, September 1, 1995. 15A NCAC 02H .1004 STATEWIDE STORMWATER GUIDELINES Ifistory Note: Authority G.S. 143-214.1; 143-214.7, 143-215.3(a)(1); 143-215.8A; Ef. . January 1, 1988; Repeated Eff. September 1, 1995. 15A NCAC 02H .1005 STORMWATER REQUIREMENTS: COASTAL COUNTIES NORTH CAROLINA ADMINISTRATIVE CODE Effctivc DwAmh u• 1. 19" Page 5 of 13 ENR ENVIRONMENTAL MANAGEMENT COMMISSION TBA• 02H 1000 All development activities within the coastal counties which require a stormwater management permit in accordance with Rule .1003 of this Section shall manage stormwater runoff as follows: (1) development activities within the coastal counties draining to Outstanding Resource Waters (ORW) shall meet requirements contained in Rule .100' of this Section; (2) development activities within one-half mile of and draining to SA waters or unnamed tributaries to SA waters: (a) Low Density Option: Development shall be permitted pursuant to Rule .1003(d)(1) of this Section if the development has: (i) built -upon area of 25 percent or less; or proposes development of single family residences on lots with one-third of an acre or greater with a built -upon area of 25 percent or less; (ii) stormwater runoff transported primarily by vegetated conveyances; conveyance system shall not include a discrete stormwater collection system as defined in Rule .1002 of this Section; (iii) a 30 foot wide vegetative buffer. (b) High Density Option: Higher density developments shall be permitted pursuant to Rule .1003(d)(2) of this Section if stormwater control systems meet the Mowing criteria: (i) no direct outlet channels or pipes to SA waters unless permitted in accordance with 15A NCAC 2H .0126; (ii) control systems must be infiltration systems designed in accordance with Rule .1008 of this Section to control the runoff from all surfaces generated by one and one-half inches of rainfall. Alternatives as described in Rule .1008(h) of this Section may also be approved if they do not discharge to surface waters in response to the design storm; (iii) runoff in excess of the design volume must flow overland through a vegetative filter designed in accordance with Rule .1008 of this Section with a minimum length of 50 feet measured from mean high water of SA waters; (3) development activities within the coastal counties except those areas defined in Items (1) and (2) of this Paragraph: (a) Low Density Option: Development shall be permitted pursuant to Rule .1003(d)(1) of this Section if the development has: (i) built -upon area of 30 percent or less; or proposes development of single family residences on lots with one-third of an acre or greater with a built -upon area of 30 percent or less; (ii) stormwater runoff transported primarily by vegetated conveyances; conveyance system shall not include a discrete stormwater collection system as defined in Rule .1002 of this Section; (iii) a 30 foot wide vegetative buffer. (b) High Density Option: Higher density developments shall be permitted pursuant to Rule .1003(d)(2) of this Section if stormwater control systems meet the following criteria: (i) control systems must be infiltration systems, wet detention ponds or alternative stormwater management systems designed in accordance with Rule .1008 of this Section; 00 control systems must be designed to control runoff from all surfaces generated by one inch of rainfall. History Note: Authority G.S. 143-214.1; 143-214.7,• 143-215.1; 143-215.3(a); Ef): September 1, 1995. 15A NCAC 02H .1006 STORMWATER REQUIREMENTS: HIGH QUALITY WATERS All development activities which require a stormwater management permit under Rule .1003 of this Section and are within one mile of and draining to waters classified as High Quality Waters (HQW) shall manage NORTH CAROLINA ADMINISTRATIVE CODE E.i16tfivae Deimmher i 1999 Page 6 of 13 ENR ENVIRONMENTAL MANAGEMENT COMMISSION TI M • 02H 1000 stormwater runoff in accordance with the provisions outlined in this Rule. More stringent stormwater management measures may be required on a case -by -case basis where it is determined that additional measures are required to protect water quality and maintain existing and anticipated uses of these waters. (1) All waters classified as WS-1 or WS-11(15A NCAC 2B .0212 and .0214) and all waters located in the coastal counties (Rule .1005 of this Section) are excluded from the requirements of this Rule since they already have requirements for stormwater management. (2) Low Density Option: Development shall be permitted pursuant to Rule .1003(c)(1) of this Section if the development has: (a) built -upon area of 12 percent or less or proposes single family residential development on lots of one acre or greater, (b) stormwater runoff transported primarily by vegetated conveyances; conveyance system shall not include a discrete stormwater collection system as defined in Rule .1002 of this Section; (c) a 30 foot wide vegetative buffer. (3) High Density Option: Higher density developments shall be permitted pursuant to Rule .1003(c)(2) of this Section if stormwater control systems meet the following criteria: (a) control systems must be wet detention ponds or alternative stormwater management systems designed in accordance with Rule :1008 of this Section; (b) control systems must be designed to control runoff from all surfaces generated by one inch of rainfall. History Note: Authority G.S. 143-214.1; 143-214.7;143-215.1; 143-215.3(a); E . September 1, 1995, Amended Eff. December 1, 1995. 15A NCAC 02H .1007 STORMWATER REQUIREMENTS: OUTSTANDING RESOURCE WATERS All development activities which require a stormwater management permit under Rule .1003 of this Section and which drain to waters classified as Outstanding Resource Waters (ORW) shall manage stormwater runoff in accordance with the provisions of this Rule. Water quality conditions shall clearly maintain and protect the outstanding resource values of waters classified as Outstanding Resource Waters (ORW). Stormwater management strategies to protect resource values of waters classified as ORW shall be developed on a site specific basis during the proceedings to classify these waters as ORW. The requirements of this Rule serve as the minimum conditions that must be met by development activities. More stringent stormwater management measures may be required on a case -by -case basis where it is determined that additional measures are required to protect water quality and maintain existing and anticipated uses of these waters. (1) Freshwater ORWs: Development activities which require a stormwater management permit under Rule .1003 of this Section and which drain to freshwaters classified as ORW shall manage stormwater runoff as follows: (a) Low Density Option: Development shall be permitted pursuant to Rule .1003(d)(1) of this Section if the development has: (i) built -upon area of 12 percent or less or proposes single family residential development on lots of one acre or greater; (ii) stormwater runoff transported primarily by vegetated conveyances; conveyance system shall not include a discrete stormwater collection system as defined in Rule .1002 of this Section; and (iii) a 30 foot wide vegetative buffer. (b) High Density Option: Higher density developments shall be pemutted pursuant to Rule .1003(d)(2) of this Section if stormwater control systems meet the following criteria: (i) control systems must be wet detention ponds or alternative stormwater management systems designed in accordance with Rule .1008 of this Section; and NORTH CAROLINA AD3CMSTRATIEVE CODE Eifeetive Dweinher 1 1M Page 7 of 13 ENR ENURONMENTALIVIANAGEMENT COMMISSION T15A• 02H 1000 (ii) control systems must be designed to control runoff from all surfaces generated by one inch of rainfall. (2) Saltwater ORWs: Development activities which require a stormwater management permit under Rule .1003 of this Section and which drain to saltwaters classified as ORW shall manage stormwater runoff as follows: (a) Within 575 feet of the mean high water line of designated ORW areas, development activities shall comply with the low density option as specified in Rule .1005(2)(a) of this Section. (b) Projects draining to saltwaters classified as ORW that impact the Areas of Environmental Concern (AEC), determined pursuant to G.S. 113A-113, shall delineate the ORW AEC on the project plans and conform to low density requirements as specified in Rule .1005(2)(a) of this Section within the ORW AEC. (c) After the Commission has received a request to classify Class SA waters as ORW and given permission to the Director to schedule a public hearing to consider reclassification and until such time as specific stormwater design criteria become effective, only development which meets the requirements of Rule .1003(d)(3)(A), (B) and (C)-and Rule .1005(2)(a) of this Section shall be approved within 575 feet of the mean high water line of these waters. History Note: Authority G.S. 143-214.1; 143-214.7; 143-215.1; 143-215.3(a); Eff. September 1, 1995. 15A NCAC 02H .1008 DESIGN OF STORMWATER MANAGEMENT MEASURES (a) Structural Stormwater Control Options. Stormwater control measures which may be approved pursuant to this Rule and which shall not be considered innovative include: (1) Stormwater infiltration systems including infiltration basins/ponds, swales, and vegetative filters; (2) Wet detention ponds; and (3) Devices approved in accordance with Paragraph (h) of this Rule. All stormwater management structures are subject to the requirements of Paragraph (c) of this Rule. (b) Innovative Systems. Innovative measures for controlling stormwater which are not well established through actual experience may be approved on a demonstration basis under the following conditions: (1) There is a reasonable expectation that the control measures will be successful; (2) The projects are not located near Ifigh Quality Waters (IIQW); (3) Monitoring requirements are included to verify the performance of the control measures; and (4) Alternatives are available if the control measures • fail and shall be required when the Director determines that the system has failed (c) General Engineering Design Criteria For All Projects. (1) The size of the system must take into account the runoff at the ultimate built -out potential from all surfaces draining to the system, including any off -site drainage. The storage volume of the system shall be calculated to provide for the most conservative protection using runoff calculation methods described on pages A.1 and A.2 in "Controlling Urban Runoff: A Practical Manual For Planning And Designing Urban BMPs" which is hereby incorporated by reference not including amendments. This document is available through the Metropolitan Washington (D.C.) Council of Governments at a cost of forty dollars ($40.00). This method is also described in the Division's document "An Overview of Wet Detention Basin Design." Other engineering methods may be approved if these methods are shown to provide for equivalent protection; (2) All side slopes being stabilized with vegetative cover shall be no steeper than 3:1 (horizontal to vertical); (3) All stormwater management structures shall be located in recorded drainage easements for the purposes of operation and maintenance and shall have recorded access easements NORTH CAROLINA ADMINISTRATIVE CODE Ef r8je#VC DettnkhW 1 Page 9 of 13 ENR ENVIRONMENTAL MANAGEMENT COMMISSION T15A: 02H.1000 to the nearest public right-of-way. These easements shall be granted in favor of the party responsible for operating and maintaining the stormwater management strictures; (4) Vegetative filters designed in accordance with Paragraph (f) of this Rule are required from the overflow of all infiltration systems and discharge of all stormwater wet detention ponds. These filters shall be at least 30 feet in length, except where a mini*n„**+ length of 50 feet is required in accordance with Rule .1005(2)(b)(iii) of this Section; (5) Stormwater controls shall be designed in accordance with the provisions of this Section. Other designs may be acceptable if these designs are shown by the applicant, to the satisfaction of the Director, to provide equivalent protection; (6) In accordance with the Antidegradation Policy as defined in 15A NCAC 2B .0201, additional control measures may be required on a case -by -case basis to maintain and protect, for existing and anticipated uses, waters with quality higher than the standards; and (7) Stormwater control measures used for sedimentation and erosion control during the construction phase must be cleaned out and returned to their designed state. (d) Infiltration System Requirements. Infiltration systems may be designed to provide infiltration of the entire design rainfall volume required for a site or a series of successive systems may be utilized. Infiltration may also be used to pretreat runoff prior to disposal in a wet detention ponds. The following are general requirements: (1) Infiltration systems shall be a minimum of 30 feet from surface waters and 50 feet from Class SA waters; (2) Infiltration systems shall be a minimum distance of 100 feet from water supply wells; (3) The bottom of infiltration systems shall be a minimum of two feet above the seasonal high water table; (4) Infiltration systems must be designed such that runoff in excess of the design volume by-passes the system and does not flush pollutants through the system; (5) Infiltration systems must be designed to completely draw down the design storage volume to the seasonal high water table under seasonal high water conditions within five days and a hydrogeologic evaluation may be required to determine whether the system can draw down in five days; (6) Soils must have a minimum hydraulic conductivity of 0.52 inches per hour to be suitable for infiltration; (7) Infiltration systems must not be sited on or in fill material, unless approved on a case -by -case basis under Paragraph (h) of this Rule; (8) Infiltration systems may be required on a case -by -case basis to have an observation well to provide ready inspection of the system; (9) If runoff is directed to infiltration systems during construction of the project, the system must be restored to design specifications after the project is complete and the entire drainage area is stabilized. (e) Wet Detention Pond Requirements. These practices may be used as a primary treatment device or as a secondary device following an infiltration system. Wet detention ponds shall be designed for a specific pollutant removal. Specific requirements for these systems are as follows: (1) The design storage volume shall be above the permanent pool; (2) The discharge rate from these systems following the one inch rainfall design storm shall be such that the draw down to the permanent pool level occurs within five days, but not in less than two days; (3) The design permanent pool level mean depth shall be a minimum of three feet and shall be designed with a surface area sufficient to remove 85 percent of total suspended solids. The design for 85 percent total suspended solids removal shall be based on "Methodology for Analysis of Detention Basins for Control of Urban Runoff Quality" which is hereby incorporated by reference not including subsequent amendments. This document is available from the U.S. Environmental Protection Agency (Document number EPA440/5-87-001) At no cost; (4) The inlet stricture must be designed to minimize turbulence using baffles or other appropriate design features and shall be located in a manner that avoids short circuiting in the pond; NORTH CAROLINA ADMINISTRATIVE CODE 1 19" Page 9 of 13 EAU ENVIRONMENTAL MANAGEMENT COMMISSION TISA• 02H 1000 (5) Pretreatment of the runoff by the use of vegetative filters may be used to minimize sedimentation and eutrophication of the detention pond; (6) Wet detention ponds shall be designed with a forebay to enhance sedimentation at the inlet to the pond; (7) The basin side slopes for the storage volume above the permanent pool shall be stabilized with vegetation down to the permanent pool level and shall be designed in accordance with Subparagraph (c)(2) of this Rule; (8) The pond shall be designed with side slopes no steeper than 3:1 (horizontal to vertical); (9) The pond shall be designed to provide for a vegetative shelf around the perimeter of the basin. This shelf shall be gently sloped (6:1 or flatter) and shall consist of native vegetation; (10) The pond shall be designed to account for sufficient sediment storage to allow for the proper operation of the facility between scheduled cleanout periods. (f) Vegetative Filter Requirements. Vegetative filters shall be used as a non-structural method for providing additional infiltration, filtering of pollutants and minimizing stomlwater impacts. Requirements for these filters are as follows: (1) A distribution device such as a swale shall be used to provide even distribution of runoff across the width of the vegetative filter; (2) The slope and length of the vegetative filter shall be designed, constructed and maintained so as to provide a non -erosive velocity of flow through the filter for the 10 year storm and shall have a slope of five percent or less, where practicable; and (3) Vegetation in the filter may be natural vegetation, grasses or artificially planted wetland vegetation appropriate for the site characteristics. (g) Curb Outlet Systems. Projects that meet the low density provisions of Rules .1005 through .1007 of this Section may use curb and gutter with outlets to convey the stormwater to grassed swales or vegetated areas prior to the runoff discharging to vegetative filters or wetlands. Requirements for these curb outlet systems are as follows: (1) The curb outlets shall be located such that the swale or vegetated area can carry the peak flow from the 10 year storm and the velocity of the flow shall be non -erosive; (2) The longitudinal slope of the swale or vegetated area shall not exceed five percent, where practicable; (3) The side slopes of the swale or vegetated area shall be no steeper than 5:1 (horizontal to vertical). Where this is not practical due to physical constraints, devices to slow the rate of runoff and encourage infiltration to reduce pollutant delivery shall be provided; (4) The minimum length of the swale or vegetated area shall be 100 feet; and (5) In sensitive areas, practices such as check dams, rock or wooden, may be required to increase detention time within the swale or vegetated area. (h) Alternative Design Criteria. In addition to the control measures outlined in Paragraphs (b), (d), (e), (f) and (g) of this Rule, stormwater management systems -consisting of other control options or series of control options may be approved by the Director on a case -by -case basis. This approval shall only be given in cases where the applicant can demonstrate that the Alternative Design Criteria shall provide equal or better stormwater control, equal or better protection of waters of the state, and result in no increased potential for nuisance conditions. The criteria for approval shall be that the stormwater management system shall provide for 85 percent average annual removal of Total Suspended Solids and that the discharge rate from the system meets one of the following: (1) the discharge rate following the one -inch desiga storin shall be such that the runoff volume draws down to the pre -storm design stage within five days, but not less than two days; or (2) the post development discharge rate shall be no larger than predevelopment discharge rate for the one year 24 hour storm. (i) Operation and maintenance plans. Prior to approval of the development by the Division an operation and maintenance plan or manual shall be provided by the developer for stormwater systems, indicating the operation and maintenance actions that shall be taken, specific quantitative criteria used for determining when those actions shall be taken, and who is responsible for those actions. The plan must clearly indicate the steps that shall be taken and who shall be responsible for restoring a stormwater system to design specifications if a failure occurs and must include an acknowledgment by the responsible party. NORTH CAROLINA ADMINISTRATIVE CODE __ L9*edyeDftenkbwI.IMPage 10 of 13 ENR ENVIRONMENTAL MANAGEMENT COMMISSION T15A• 02H 1000 Development must be maintained consistent with the requirements in these plans and the original plans and any modifications to these plans must be approved by the Division. 0) System Design. Stormwater systems must be designed by an individual who meets any North Carolina occupational licensing requirements for the type of system proposed. Upon completion of construction, the designer for the type of stormwater system installed must certify that the system was inspected during construction, was constructed in substantial conformity with plans and specifications approved by the Division and complies with the requirements of this Section prior to issuance of the certificate of occupancy. History Note: Authority G.S. 143-214.1; 143-214.7, 143-215.1; 143-215.3(a); E,,�`.' September 1, 1995. 15A NCAC 02H .1009 STAFF REVIEW AND PERMIT PREPARATION (a) The staff of the permitting agency shall conduct a review of plans, specifications and other project data accompanying the application and shall determine if the application and required information are complete. The staff shall acknowledge receipt of a complete application. (b) If the application is not complete with all required information, the application may be returned to the applicant. The staff shall advise the applicant by mail: (1) how the application or accompanying supporting information may be modified to make them acceptable or complete; and (2) that the 90 day processing period required in G.S. 143-215.1 begins upon receipt of corrected or complete application with required supporting information. (c) If an application is accepted and later found to be incomplete, the applicant shall be advised how the application or accompanying supporting information may be modified to make them acceptable or complete, and that if all required information is not submitted within 30 days that the project shall be returned as incomplete. History Note: Authority G.S.143-215.1; 143-215.3(a); E.. September 1, 1995. 15A NCAC 02H .1010 FINAL ACTION ON PERMIT APPLICATIONS TO THE DIVISION (a) The Director shall take final action on all applications not later than 90 days following receipt of a complete application and with required information. All permits or renewals of permits and decisions denying permits or renewals shall be in writing. (b) The Director is authorized to: (1) issue a permit containing such conditions as are necessary to effectuate the purposes of G.S. 143, Article 21; (2) issue permit containing time schedules for achieving compliance with applicable water quality standards and other legally applicable requirements; (3) deny a permit application where necessary to effectuate: (A) the purposes of G.S. 143, Article 21; (B) the purposes of G.S. 143-215.67(a); (C) rules on coastal waste treatment, disposal, found in Section .0400 of this Subchapter, (D) rules on "subsurface disposal systems," found in 15A NCAC 18A .1900. Copies of these Rules are available from the Division of Environmental Health, P.O. Box 29535, Raleigh, North Carolina 27626-0535; and (E) rules on groundwater quality standards found in Subchapter 2L of this Chapter. (4) hold public meetings when necessary to obtain additional information needed to complete the review of the application. The application will be considered as incomplete until the close of the meeting record. (c) If a permit is denied, the letter of denial shall state the reason(s) for denial and any reasonable measures which the applicant may take to make the application approvable. (d) Permits shall be issued or renewed for a period of time deemed reasonable by the Director. NORTH CAROLINA ADMINISTRATIVE CODE December L 9 M page 11 of 13 ENR ENVIRONMENTAL MANAGEMENT COMMISSION TI5A • 02H 1000 History Note: Authority G.S. 143-215.1; 143-215.3(a); Eff. September 1, 1995. 15A NCAC 02H .1011 MODIFICATION AND REVOCATION OF PERMITS Any permit issued by the Division pursuant to these Rules is subject to revocation, or modification upon 60 days notice by the Director in whole or part for good cause including but not limited to: (1) violation of any terms or conditions of the permit; (2) obtaining a permit by misrepresentation or failure to disclose fully all relevant facts; (3) refusal of the permittee to allow authorized employees of the Department of Environment, Health, and Natural Resources upon presentation of credentials: (a) to enter upon permittee's premises on which a system is located in which any records are required to be kept under terms and conditions of the permit; (b) to have access to any copy and records required to be kept under terms and conditions of the permit; (c) to inspect any monitoring equipment or method required in the permit; or (d) to sample any discharge of pollutants; (4) failure to pay the annual fee for administering and compliance monitoring. History Note: Authority G.S. 143-215.1; 143-215.3(a); Eff. September 1, 1995. 15A NCAC 02H .1012 DELEGATION OF AUTHORITY For permits issued by the Division, the Director is authorized to delegate any or all of the functions contained in these Rules except the following: (1) denial of a permit application; (2) revocation of a permit not requested by the permittee; or (3) modification of a permit not requested by the permittee. History Note: Authority G.S. 143-215.3(a); Eff. September 1, 1995. 15A NCAC 02H .1013 GENERAL PERMITS (a) In accordance with the provisions of G.S. 143.215.1(b)(3) and (4), general permits may be developed by the Division and issued by the Director for categories of activities covered in this Section. All activities in the State that received a "Certificate of Coverage" for that category -from the Division shall be deemed covered under that general permit. Each of the general permits shall be issued individually under G.S. 143-215.1, using all procedural requirements specified for state permits including application and public notice. Activities covered under general permits, developed in accordance with this Rule, shall be subject to the same standards and limits, management practices, enforcement authorities, and rights and privileges as specified in the general permit. Procedural requirements for application and permit approval, unless specifically designated as applicable to individuals proposed to be covered under the general permits, apply only to the issuance of the general permits. After issuance of the general permit by the Director, activities in the applicable categories may request coverage under the general permit, and the Director or his designee shall grant appropriate certification. General permits may be written to regulate categories of other activities that all: involve the same or substantially similar operations; have similar characteristics; require the same limitations or operating conditions; require the same or similar monitoring; and in the opinion of the Director are more appropriately controlled by a general permit. (b) No provision in any general permit issued under this Rule shall be interpreted to allow the permittee to violate state water quality standards or other applicable environmental standards. (c) For a general permit to apply to an activity, a Notice of intent to be covered by the general permit must be submitted to the Division using forms provided by the Division and, as appropriate, following the application procedures specified in this Section. If all requirements are met, coverage under the general NORTH CAROLINA ADMRGST A IVE CODE ' FJ&ctfw Dmmhw 1 19" Page 12 of 13 ENR ENVIRONMENTAL MANAGEMENT COMMISSION TI SA • 02H 1000 permit may be granted. If all requirements are not met, a long form application and full application review procedure shall be required. (d) General permits may be modified and reissued by the Division as necessary. Activities covered by general permits need not submit new Notices of Intent or renewal requests unless so directed by the Division. If the Division chooses not to renew a general permit, all facilities covered under that general permit shall be notified to submit applications for individual permits. (e) All previous state water quality permits issued to a facility which can be covered by a general permit, whether for construction or operation, are revoked upon request of the permittee, termination of the individual permit and issuance of the Certification of Coverage. (f) Anyone engaged in activities covered by the general permit rules but not permitted in accordance with this Section shall be considered in violation in G.S. 143-215.L (g) Any individual covered or considering coverage under a general permit may choose to pursue an individual permit for any activity covered by this Section. (h) The Director may require any person, otherwise eligible for coverage under a general permit, to apply for an individual permit by notifying that person that an application is required. Notification shall consist of a written description of the reason(s) for the decision, appropriate permit application forms and application instructions, a statement establishing the required date for submission of the application, and a statement informing the person that coverage by the general permit shall automatically terminate upon issuance of the individual permit. Reasons for requiring application for an individual permit may be: (1) the activity is a significant contributor of pollutants; (2) conditions at the permitted site change, altering the constituents or characteristics of the site such that the activity no longer qualifies for coverage under a general permit; (3) noncompliance with the general permit; (4) noncompliance with Commission Rules; (5) a change has occurred in the availability of demonstrated technology or practices for the control or abatement of pollutants applicable to the activity; or (6) a determination that the water of the stream receiving stormwater runoff from the site is not meeting applicable water quality standards. (i) Any interested person may petition the Director to take an action under Paragraph (h) of this Rule to require an individual permit. 6) General permits may be modified, terminated, or revoked and reissued in accordance with the authority and requirements of Rules .1010 and .1011 of this Section. History Note. Authority G.S. 143-215.1; 143-215.3(a); Eff. September 1, 1995. NORTH CAROLINAARAIMSTRATiVE CODE FJbK&e Dscemdwr 1 IM Page 13 of 13 ijik„� +,.. NEW HANOVER COUNTY STORM WATER MANAGEMENT ORDINANCE ADOPTED SEPTEMBER 5, 2000 NEW HANOVER COUNTY STORM WATER MANAGEMENT ORDINANCE AND STORM WATER DESIGN MANUAL, ADOPTED SEPTEMBER 59'2000 By action of the New Hanover County Planning Board at its September 5, 2000 meeting, the following Storm Water Management Ordinance and Storm Water Design Manual were adopted. NEW HANOVER COUNTY STORM WATER MANAGEMENT ORDINANCE ADOPTED SEPTEMBER 59 2000 SECTION TITLE PAGE ENACTMENT 1 PREAMBLE 1 SECTION I Authority 1 SECTION II Jurisdiction 1 SECTION III Title 1 SECTION IV Purposes 1 SECTION V Objectives 1 SECTION VI .Policies 2 SECTION VII Definitions 3 SECTION VIII Right -of -entry 7 SECTION IX Assessments for Regional Projects 7 SECTION X New Development g SECTION XI Illicit Discharges and Improper Disposal 11 SECTION XII Industrial and Related Activities 13 SECTION XIII Enforcement 13 SECTION XIV Appeals 17 NHC Storm Water Management Ordinance Adopted September 5, 2000 NEW HANOVER COUNTY STORM WATER MANAGEMENT ORDINANCE ENACTMENT An ordinance establishing regulations for storm water management within the County of New Hanover, North Carolina and for the administration, enforcement, and amendment thereof, in accordance with the poivisions of the North Carolina Statutes 153-A Article I inclusive. PREAMBLE WMMAS, in order to promote the health, safety and general welfare and to safeguard the natural and man made resources of the County by regulating the quality and quantity of storm water runoff, it is desirable and�necessary to adopt the Storm Water Management Ordinance far. the unincorporated areas of New Hanover County as hereinafter set forth. NOW THEREFORE, be it ordained by the County of New Hanover, North Carolina as follows: SECTION I Authority The provisions of this ordinance are adopted under the authority granted by the General Assembly ofNorth Carolina. (General Statutes 153-A, Article 18) SECTION II Jurisdiction The regulations set forth in this ordinance shall be applicable to all territory within the unincorporated areas of the County. of New Hanover and shall govern the development and use of land and structures therein. SECTION III Title . . This ordinance shall be'lmown as the New Hanover County Storm Water Mane ement Ordinance. SECTION IV Purposes The purpose of this ordinance is to protect andpromote the public health, safety and general welfare, and to safeguard the natural and man-made resources of the County by regulating storm water runoff. This purpose is- accomplished by imposing conditions and requirements upon m0stmg and Jr —'posed de-velop ii ac4ivities; and'by establishing procedures by which these requirements and conditions are to be administered and enforced. SECTION V Objectives The objectives of this ordinance are: 0) To establish the County's storm water management program (2) To identify areas prone to flooding; (3). To prevent the creation of new flood prone areas; (4) To reduce the discharge of pollutants to the maximum extent practicable by controlling storm water discharge rates and encouraging the use of best management practices, Page 1 NHC Storm Water Management Ordinance Adopted September 5, 2000 structural and/or nonstructural storm water quantity and quality control measures and other provisions; (5) To reduce erosion associated with storm water runoff; (6) To provide for the inspection and proper maintenance of structural and nonstructural storm water facilities- (7) To prohibit non -storm water discharges and require the removal of illicit discharges; (8) To prevent improper disposal of materials that degrade water quality; (9) To permit sampling and monitoring for pollutants such as those associated with illicit discharges, improPer disposal, industrial and construction activities, and the application of pesticides, and fertilizers; and (10) To provide for the enforcement of the County's storm water management program. SECTION VI Policies 6.1 General The County has a role in the management of storm water through authorization, planning, construction, operation and maintenance of facilities to reduce theadverse effects of storm water runoff and to satisfy state and federal statutes and regulations. 6.2 Property Owner Responsibility It shall be the responsibility of individual property owners of land within the unincorporated area of the County, whether developed or undeveloped, to maintain storm water conveyance facilities, such as waterways, streams, creeks, &khes, swales, channels, canals, conduits and culverts, and storm water control facilities, such as ponds and lakes within their property. Where conditions of existing storm water facilities are determined to be deficient and a public nuisance, and the property owner fails to correct the deficiencies after being notified by the County, the County may arrange for the deficiencies to -be corrected and recover all costs thereto from the property owner. However, the recovery of costs from property owners is subject to appeal as described in Section MV. 6.3 New Development It is the policy of the County that all land within the unincorporated areas of the County to be developed, shall have sufficient storm water management controls to provide adequate protection of life, property and natural resources. To .this end, as a m;,_ ,—,•,,,m, all land disturbing activity subject to this ordinance, shall Provide -sufficient management Of pod -development runoff from the 2-year, 10-year, and 25-Year frequency storms such that the discharge rates of post -development storumter runoff do not exceed the pre - development rates. 6A Redevelopment 'It is the policy of the County that an'land within the unincorporated areas of the County to be redeveloped shall improve storm water management controls of the site as currently developed, in order to better provide protection of life, property and natural resources. To this end, as a minimum, any redevelopment activity subject to this ordinance shall provide sufficient management of post -redevelopment runoff from the 10-year frequency storm such that the discharge rate of post -redevelopment storrowater runoff does not exceed the pre-development.rates. 6.5 Limitations of Ordinance This ordinance does not imply that properties within the unincorporated area shall always be free from flooding or flood damage, surface water stagnation or non point source pollution or that all flood control and water treatment projects to control the. quantity and quality of runoff can be constructed cost-effectively. Nothing whatsoever in this Page 2 NSC Storm Water Management Ordinance Adopted September 5, 2000 ordinance should be construed as or be deemed to create additional duties on the part of the County of New Hanover or hold the County liable for any damages incurred in a flood or from -adverse water quality due to Storm water runoff. Nothing in this ordinance shall be deemed to waive the County's immunity, or defenses under state law or reduce the need or necessity for flood insurance. 6.6 Consistency with County, State and Federal Rules and Regulations The reguirements of this ordinance shall be enacted, administered and enforced consistently with the requirements of New Hanover County, the State of North Carolina and the Federal Government for controlling storm water quality and quantity. If the requirements of this ordinance are found to conflict with other rules and regulations of New Hanover County -or the rules and regulations of the State Of North Carolina and the Federal Government, the more stringent or higher requirements shall govern. SECTION VII Definitions 7.1 General (1) For the purpose of this ordinance, certain berms or words used herein shall be interpreted as -follows: 7.2 Tense and Number (1) The present tense includes the future tense, and the future tense.. includes the present tense. (2). The singular number includes the plural number, the plural number includes the singular number. 7.3 Word Interpretations (1) The word `may" is permissive.. (2) The words "shall" and "will" are mandatory,. (3) The word "County" shall mean the County of New Hanover, North Carolina. (4) The words "Planning: Board" shall mean New Hanover County Planning Board. (5) The words ."County Commissioners" shall mean the County Commissioners of New Hanover County, North Carolina. (6) The word `person" includes fitYL4 association, organization, partnership, host, cOMPanY, m' corporation, as well as an individual. (7) Words not defined in this manual shall be defined by the -latest version' of the Webster's Dictionary. 7.4 Definitions APPlicant. The owner of a site who executes the forms required for requesting the authorization to constrict a project pursuant to this ordinance. Application: Application form to be submitted by applicant requesting the authorization of the County to construct a project pursuant to this ordinance. Authoritation-To-Cdnstruct: Following the satisfactory review of the application form and supporting documents whereby the County. ends that the application and supporting documents are consistent with the requirements of this ordinance, the County will issue an Authorization To-Construet. Best management pracace M"): A structural or nonstructural management_ based practice used Singularly or in combination to reduce non -point source inputs to receiving waters in order to achieve water quality protection goals. BUM -upon area: That portion of a development project that is covered by impervious or partially impervious cover including buildings, pavement, gravel and turf (for pedestrian or vehicular use), recreation facilities (e..g. tennis courts), etc. (Note: wooden slatted decks and the water area of a swimming pool are not considered built -upon area.) Wage 3 NSC Storm Water Management Ordinance Adopted September 5, 2000 Certificate of Completion:. Signed, sealed and dated certificate prepared by an authorized design professional which states that the construction authorized by the authorization -to -construct as issued by the County has been completed. Certif sate of Occupancy: The certificate from the New Hanover County Inspections Department allowing the occupancy of a building. Connection: Any ditch, pipe, or other device for the diversion or transmission Of storm drainage which will in any way affect the operation or maintenance of the receiving storm water conveyance. Design Professional.• Storm water systems must be designed by an individual who meets the North Carolina occupational licensing requirements for the type of storm water system proposed. Detention: The collection and storage of storm water runoff with subsequent discharge to surface waters. Developed Land: Parcels altered from a natural state by construction or installation of impervious surfaces. For new construction, the County shall consider parcels developed upon the issuance of the Authorization -To -Construct Pursuant to this ordinance. Developer. A person engaged in land, site, or building development. Drainage Nuisance. Unapproved obstructions of swales, ditches, culverts, Pipes, or other storm water conveyances shall constitute a drainage nuisance. Excavation: Any act, or the conditions resulting therefrom, by which soil, earth, sand, gravel, rock or similar material is cut into, dug, quarried, uncovered, removed, displaced or relocated. Facility: Shall mean a storm water management facility, and shall include all land, materials, and appurtenances used in construction and operation of said facility. Facilities include, but are not necessarily limited to, constructed wetlands, infiltration systems, retention ponds, detention ponds, .grassed swales, ditches, etc. Fill.' Any act ar the conditions resulting therefrom, by which soil, earth, sand, gravel, rock or any similar material is deposited, placed, pushed, pulled or transported. Floodpldn:. AW area susceptible to being im undated by water from any source. For the purposes of this ordinance all development activity govern by this ordinance shall be evaluated for the flood conditions anticipated for the 100-year frequency stomr. Garbage: Animal and vegetable refiise resulting from the handling, preparation, .cooking and consumption of food, including a minimum amount of liquid :necessarily incident thereto. k _ 'Grading." Any act causing disturbance of the earth. This shallinclude but not be limited to any excavating, filling, stockpiling or earth materials, grubbing, root mat or topsoil disturbance, or any combination of such Having control over. Shall mean but not be limited to any person using, transferring, storing, or transporting a hazardous material immediately prior to release of such hazardous material on the land or into the air or the waters. gazru'dous rat &I - Any substance which, when discharged in any quantity, may Prat an eminent and substantial danger to -the public health or welfare or to the environment. Hazardous material response: The sending of .fire department resources to abate hazardous materials which endanger the health or safety of persons or the environment. Illicit Discharge: Any discharge to a municipal separate storm sewer that is not composed entirely of storm water except discharges pursuant to a NPDES Permit (other than the NPDES permit for discharges from the municipal separate "storm sewer) and discharges resulting from firefighting activities. Impervious: Any material that impedes or prevents the natural filtration of water into the soil. Page 4 NHC Storm Water Management Ordinance Adopted September 5, 2000 Impervious Surface Areas: Areas of impervious material including but are not limited to roofs, driveways, patios, sidewalks, parldng areas, tennis courts, concrete or asphalt streets, crushed stone, and gravel. Imperviousness: The degree to which a site is impervious, Infiltration: The recharge of storm water runoff into the subsurface soil. Lana DisturbingAdivity: Any earth movement and land use changes which may result in soil erosion or the movement of sediments into waters or onto other lands, including, but not limited to, tilling, clearing, grading, excavating, stripping, filling and related activities, and the covering of land surfaces with any structure or impermeable material. Except, mowing and bush hogging operations, which not disturb the .root mat shall not be considered land disturbing activity.. Municipal Separate Storm Sewer: A storm water conveyance or system of conveyances (including roads with drainage systems, municipal streets, catch basins, curbs, gutters, ditches, manmade channels, or storm drains). Natlonal Pollutant Discharge Elimination System (NPDES): A permitting system established by Section 4o2 of the Clean Water Act. NPDES permits are issued by the State of North Carolina for discharges directly to the surface waters of the state. . Natural Ground Surface: The ground surface in its original state before any land disturbing activity. New Development: Any activity for which a building permit or a grading Permit is required, or where any Land Disturbing Activity'occurs, except for the construction of a single family home not govern by the New Hanover County Subdivision Ordinance. Off -Site Facility: With respect to any particular properly, shall mean a storm water management facility serving said property but not located a said Party On- to Facility: With respect to any particular property, shall mean a storm water management facility serving the subject.property and located thereon. Owner: The owner or owners of a site on which land disturbing activity is, will, or has been done. Permit: Any and all permits required by federal, state and local ordinances, and regulations. Permittee: Any person to whom a permit is issued. Person: Any individual, corporation, partnership, joint venture, agency, unincorporated association, municipal corporation, County, state, or federal agency or any combination thereof. Phased Development: The development of land by phasing over an extended period of time. Post -Development State: A site in its proposed condition following the completion of a development activity. Pre -Development state: A site in its natural condition prior to any development activity. Private Facility: Any storm water management facility not owned and operated by the County. Public Facility: Any storm water management facility owned and operated by New Hanover County, Municipalities or State of North Carolina. redevelopment.• The substantial modification of existing developed areas, not to include hiterior remodeling or modifications which do not include substantial modifications to the impervious surface of the facility. Mention: The collection and storage of storm water runoff without subsequent discharge to surface waters. Sediment Control (Land Disturbance) Permit: The sediment control permit issued by the New Hanover County or the State of North Carolina authorizing land disturbing activities in accordance with applicable ordinances and regulations. Page 5 NSC Storm Water Management Ordinance . Adopted September 5, 2000 Single -Family Residential Use. One residential structure on one parcel containing only one housing unit. Site: That portion of land, lot or parcel of land, or combination of contiguous lots or parcels of land upon which land disturbing activity is to be performed. Site expansion: The addition of new building(s), structures, parking lot(s), or any other new impervious surface to the site. Construction of any new unpervious surface on an area previously impervious, which does not meet the definition of redevelopment, as defined in this section shall be considered as expansion. . Storm Water Conveyance: Any feature of the landscape or earth, manmade or natural, which carries water in a concentrated flow. Storm Frequency: The average recurrence interval, in years, between rainfall events which equal or exceed the given event, The magnitude and frequency of the anticipated rainfall events are based on statistical data recorded and maintained by the National Climatic Data Center. For example a 2-year frequency storm is a storm of an intensity expected to occur on the average, at least once in two (2) years, andof a duration which will produce the peak rate of runoff for the watershed of interest. Storm Water Design Manual The current storm water design manual of New Hanover County available for purchase from the County. Storm Water Discharge: Conveyance of storm water discharge into waters of the United States. Storm Water Management.- The qualitative and quantitative measures for controlling storm water runoff. Qualitative controls consist of vegetative, structural, and other measures which control or treat pollutants carried by surface runofL Quantitative controls consist of vegetative and structural measures which control.the increased volume and rate of surfacc runoff caused by Haan made.changes to the land and have the effect of maintaining the predevelopment patterns of flood magnitude and frequency. Storm Water Management Plan: A plan designed in accordance with the New Hanover County Storm Water Design Manual to minimize flooding, water quahty imPRcts and erosion, prevcnt off site sedimentation and manage storm water runoff, submitted as a prerequisite to obtaining an Authorization -To. Construct. The plan shall be prepared and designed in accordance with this ordinance, all other County regulations, and applicable state and federal laws and regulations. Storm Water System: All man-made structures or natural features within the New Hanover County that serve to provide for. -conveyance of.storm water runoff water resulting from natural storm events. Components of the storm water system include but are not limited to swales, ditches, pipes, channels, creeks, ponds, weirs, culverts, manholes, swales, inlet structures, res, and infiltration fields. SupportingDocuments: Plans, profiles, details, specifications, calculations, deeds, easements, covenants, operation and maintenance plans, maps .delineating the 404 wetlands on the site signed by the U.S. Army Corps of Engineers, sons investigation data, and other such material as may be required by the County to review the "Application for Authorization -To -Construct" for a project pursuant to this ordinance. Undeveloped Land. • Land that does not meet the definition of developed land. Water Course Or Drainage way: Any natural or artificial water curse, including, but not limited to: streams, rivers, creeks, ponds, lakes, ditches, .channels, canals, conduits, culverts, drains, waterways, gullies, ravines, or washes in which waters flow in a definite direction or course, either continuously or intermittently, and including any area adjacent thereto which is subject to inundation by reason of overflow of flood wager. Wetlands (404 Wetlands): Wetlands means those areas defined by the U.S. Army Corps of Engineers as Jurisdictional 404 wetlands. Page 6 NHC Storm Water Management Ordinance Adopted September 5, 2000 SECTION VIII Right -of -entry 8.1 General The County shall have right -of -entry on or upon the property of any person subject to this ordinance and any construction authorization issued hereunder. The County shall be provided ready access to all parts of the premises for the purposes of inspection, monitoring, sampling,inventory, records examination and copying, and the performance of any other duties necessary to determine compliance with this ordinance. 81 'Where a person has security measures in force which require -proper identification and clearance before entry into its premises, the person shall make necessary arrangements with its security guards so that, upon presentation of suitable identification, the County will be permitted to enter without delay for the purposes -of performing specific responsibilities. 8.3 The County shall have the right to set up on the persons property such devices as are necessary to conduct sampling and/or metering of .the person's operations as it applies to this ordinance. 8.4 Any temporary or Permanent obstruction to safe and easy access to the areas to be inspected and/or monitored shall be removed promptly by the person at the written or verbal request of the County, The costs of clearing such access shall be bonne by the person. 8.5 The County may inspect the, facilities of any user in older to ensure compliance with tins ordinance. Such inspection shall be made with the consent of the owner, manager, or signatory official. If such consent is refused the County may -seek issuance or an administrative search warrant. SECTION EK Assessments for P.,eanal.Projects 9.' ProPeM owners of single-family homes, townhouses and condominium properties can request that County Commissioners approve a resolution that allows stoma water improvement costs to be assessed against -the property as a lien. 9.2 The County Commissioners shall determine winch storm water improvements inside shalt be provided and the type of solution, either piping or non piping, for the improvement. The Commissioners shall likewise determine the amount of construction cost to be borne by the petitioners and the amount, if any, to be borne by the County. 9.3 Unless pardaily or completely funded by the .County, the assessment formula for storm water improvements shall be set at a rate that recovers one hundred (100) percent of the construction cost; including engineering, labor and materials. 9.4 The assessments shall be payable in equal installments, which installments will bear interest at a rate to be fixed in the assessment resolution not to exceed the annual rate allowed by law. Such interest shall begin from the crate of confirmation of the assessment roll; Provided, that any such assessment may be paid in full in cash without the addition of interest within thirty (30) days from the date of publication of the notice of the confirmation of the assessment roll. The first of the installments with interest thereon shall become due and payable thirty (30) days after the publication of the notice hereinabove required to be published, and one (1) subsequent installment with interest Page 7 NHC Storm Water Management Ordinance Adopted September 5, 2000 thereon shall be due and payable on the same day of the month until the assessments have been paid in full. 9.5 Property owners of single family homes, townhouses and condominium properties may also request County Commissioners adopt a resolution providing that certain storm water imFrovement projects be funded entirely by Tine County. Projects will be qualified relative to -availability of budgeted funds and the County shall determine the type of storm water improvement solution to be applied Project eligibility for one hundred (100) percent funding slxall be determined, based on criteria which includes, but is not. limited to (1) the degree drainage is contributing to- a public safety and/or health hazard; (2) relative amount of public storm water runoff being conveyed by drainage. system; (3) anticipated negative environmental impacts (required mitigation); and (4) consistency with an approved storm water master plan. 9.0 The County Commissioners may adopt a resolution to establish storm Water/Drainage districts that may be funded by a district tax providing, revenues collected within a district are used within the district for the enhancement of the districts storm water management, maintenance or expansion. SECTION X New Development Storm water runoff measures for new development shall be designed; constructed and maintained by the owner of the property in accordance with the provisions of this ordinance. 10.1 Applicability (1) Any development activity that will result in the accumulati f tho (2) (3) (4) (5) (10,000) square feet or more of ' ono ten usand m�gervious surface area on any site, other than a single-family residence in any development not regulated by the New Hanover County Subdivision Ordinance, is required to obtain a written "Authorization -To. Construct" from the County. Any redevelopment activity which disturbs less than one acre that will result in no additional impervious surface area is not required to obtain a written "Authorization To -Construct" from the County. Any redevelopment activity for a site with ten thousand (10,000) square feet or more of existing impervious surface area which will result in more than three thousand (3,000) square feet of additional impervious su>�ee area is required to obtain a written "Authorimtion To -Construct" from the : k County Any redevelopment activity for a site with less than ten thousand (10,000) square feet of existing impervious surface area which will result in additional impervious surface area shall be required to obtain a written."Authorization.To- .Conatruct' from the County if the total area of impervious surface exceeds thirteen thousand (13,000). square feet. The relocation of impervious surfaces shall be allowed within the project, A:o land-distrsrbirg activity may begin on a site meeting the requirements of subsection 10.l(1) and subsection 10.1(2) until the provisions of this ordinance have been satisfied and the County has issued an "Authorization To -Construct" for the land -disturbing activity. Whenever a site is redeveloped as set forth in subsection 10.1(2), storm water management shall be proVided in accordance with the provisions the, redevelopment sectiorls(s) of this ordinance for the entire site, even if the redevelopment activity results id less impervious area than previously existed on the site. When a building on a site is redeveloped, or completely replaced, then the new impervious area shall includg the total impervious area after redevelopment Whenever a site is expanded as set forth in subsection 10.10) of this section, the expanded portion of the facilities shall comply with this ordinance. Whenever the expansion equals or exceeds fifty (50) percent of the existing development, the Page 8 NSC Storm Water Management, Ordinance Adopted September 5, 2000 project shall be considered'Wdevelopment" and the entire project shall be required to comply with this ordinance. (6) All projects subject to the provisions of this ordinance shall require the issuance of an "Authorization -To -Construct! ' by the County before receiving approvals of preliminary plats for subdivisions, and building permits for non -subdivision projects. -(7) . The construction of single-family residences on single family lots of record and valid Preliminary subdivision plans on the effective date of this ordinance shall be exempt from this ordinance. 10.2 . Duty and Responsibility of the owner It shall be the duty and responsibility of all property owners, in order to abate and prevent nuisances resulting from improper drainage, to provide at their own expense a proper and adequate -drainage system of their respective premises in accordance with the provisions of this ordinance. 10.3 . Application for "Authorization -To -Construct" A person desiring to develop or redevelop land subject to the provisions of this ordinance shall request an "Authorization To -Construct" by submitting a completed application form, application. feei.supporting documents, and certifications to the County. Upon finding that the request is consistent with the provisions of this ordinance, the County will issue an Authorization=Toyconstruct". (1) Application Form: The application form for an "Authorization -To -Construct' may be obtained from the County. (2) Application Fees: Application fees shall be based on a fee schedule approved by the County Commissioners. (3) Supporting Documents: Supporting documents shall be submitted with the application. The supporting documents shall consist of the following: a) Naaative Statement which describes the b) Copy of Deed(s), proposed development, c) Two. (2) Sets of Plans which show the existing site conditions and the proposed site improvements. d) Calculations e) Operation and Maintenance Plan (4) Design Professional's Certification The design professional preparing the plans, specifications and other supporting documents subject to the provisions of this ordinance shall be, responsible for PrePanng the Pam, specifications and other supporting documents in accordance with the r+equkemeents of tip ondiaance and the New-Hajoer County Storm —Wailer Design Manual. The design professional shall certify on the plans and the application that the proposed impmvemenu shown on the plans have been designed in accordance with the ordinance and manuaL (5) Owner Certification The owners) of the property to be developed or redeveloped shall certify on the plan and the application the following: a) Ownership of the property b) Acceptance of responsibility to comply with the requirements of the New Hanover County Storm Water Management Ordinance c) Project will be constructed in accordance with plan =d the requirements of the applicable ordinances and rules of New Hanover County, the State of North Carolina and the federal goveanment d) Proposed storm water management facilities will be operated aid maintained in accordance with plan and the requirements of the applicable ordinances and rules of Now Hanover County, the State of North Carolina and the federal government e) Ownership and responsibility to operate and maintain posed staomr water management facilities shall not be transferred from owner without the written Page 9 NHC Storm Water Management Ordinance Adopted September. 5, 2000 authorization of the County. Owner shall record a. notice of issuance of the Authorization -To -Construct in a font acceptable to the County. 10.4 County Review The application and supporting documents shall be reviewed by the County. Upon satisfactory review of the application form and supporting documents whereby the County finds that the application and supporting documents are consistent with the requirements of this ordinance, the County will issue an Authorization -To -Construct. If no action is taken by the County within the time limits specified in the Design Manual the Project will be deemed to have been approved and the County will immediately issue an Authorization -To -Construct. 10.5 Limitation of County Review The review of the application and supporting documents by the County shall be to determine if the request submittal is complete and in accordance with the requirements of this ordinance. Nothing whatsoever in the review should be construed as or be deemed to create additional duties on the part of the County of New Hanover that are the responsibilities of the Owner and the design professional. 10,6 Construction Authorization Conditions AuthorizationTo-Construct shall include the following conditions: (1) All other local, state and federal permits will be obtained before starting work (2) All construction will be in accordance with the "Authorization To -Construct". (3) Modifications may be requested, but may not be constructed without the issuance of a revised "Authorization To -Construct". (4) The owner shall arrange for adequate construction observation by a design Professional who shall, upon project completion, certify to the completion of the work in accordance with the "Authorization To -Construct". (5) The County may visit the project and observe the progress of the work However nothing whatsoever in the visit and observation of theproject should be construed as or be deemed to create additional duties on .the part of the County of New Hanover that are the responsibilities of the Owner and the design professional. 10.7 Construction Completion Certifications Upon completion of the construction required by the "Authorization -To -Construct", the owner shall deliver to the County the design professional's certification. The design professional shall adequately observe the progress of the construction work the "Authorization To-Constm uired by ' a #1ie:satisfactory of the work.the design professional shall prepare a certification to the owner that the work required by the "Authorization To -Construct" has been completed. 10.8 Final Plat and/or Certificate of Occupancy The County shall not allow final plats to be recorded and certificates of occupancies to be issued for any projects) until the County has accepted the construction completion certification, or until a surety in the form and amount acceptable to the County has been Posted by the owner. Certificates of occupancies cannot be issued until temporary and/or pennaneat drainage facilities have been installed and have been certified as being sufficient to protect the proposed improvements by the design professional. The surety is not to exceed i 10% of file cost of the temporary and/or permanent facilities covered within this ordinance and approved within the "Authorization- To -Construct". 10.9 Operation ark Maintenance Program The owner shall be responsible for the operation and maintenance of the storm water facilities. In the event repairs are needed to the storm water facilities, the owner(s) of record, as ascertained from the New Hanover County Tax Record or such other public documents that the County staff may choose to examine, shall be responsible for making the repairs. Page 10 NHC Storm Water Management Ordinance Adopted. September 5, 2000 10.10 Transfer of Ownership Authorization for Storm Water Facilities Falling Within Common Areas of a Development Ownership of storm water facilities falling within the common areas of a development shall not be transferred without the written authorization of the County. The application form to transfer ownership may be obtained from the County Attorney. The application fee for requesting authorization to change ownership shall be based on a fee schedule approved by the County Commissioners. The supporting documents shall include the following: (1) Existing deed(s) and easement(s) (2) Proposed deed(s) and easement(s) (3) Existing "Authorization-To-Constnrce , application and supporting documents (4) Any previous. completion certifications (5) A certification from a design professional that the project has been inspected within last thirty days and was found to be in compliance with the requirements of the "Authorization -To -Construct" (6) A certification by the proposed owner(s) that ownership of the storm water facilities will be accepted by the proposed owner, if ownership transfer is authorized by the County. In addition proposed owner certification shall state that the proposed owners) will continue to operate and maintain the facilities in accordance with the conditions, obligations and duties of the "Authorization To-Construce' and this ordinance. . 10.11 Transfer of Ownership of Storm Water Facilities.Not Falling Within Common Areas of a Development Ownership of storm water :facilities, including but not limited to: grassed swales, ditches and water carrying devices, that fall within the deeded areas of an individual parcel or home site shall be transferred with the passing of a general warranty deed without the written authorization of the County. The deed restrictions are to state that the owner will continue to operate and maintain the facilities in accordance with the conditions, . obligations and duties of the "Authorization -To -Construct" and this ordinance. Acceptance of the general warranty deed shall be a certification that the proposed owner(s) will continue to operate and maintain the facilities in accordance with the conditions, obligations and duties of the "Authorization -To -Construct" and this ordinance. ,SECTION XI, Illicit Discharges and Improper Disposal 11.1 Prohibited Discharges. (1) Illicit Connections a) It shall be unlawful to use any stream or watercourse to carry•off water from any Idtchen sink, lavatory, toilet, floor drain, shower, bathtub or privy, or to carry off any fluid of an offensive or dangerous nature. No water or refuse from any - industrial, commercial or institutional process, including uncontaminated water used for heating or cooling; shall be discharged in any stream or watercourse by any person until such person has obtained the appropriate local, state and federal permits. . b) Street and Utility Construction Plans for all public and private streets. and utilities shall be submitted to the County for review. Construction of streets and utilities shall not start until an "Authorization To -Construct" has been issued. Work performed pursuant to an "Authorization To -Construct" shall be inspected and certified as complete to the. County by the design professional. c) It shall be unlawful,- willfully or negligently to injure, deface, mutilate, destroy, tamper or interfere with the County sewer system. Page 11 NHC Storm Water Management Ordinance Adopted September 5, 2000 (2) Improper DisposaL It shall be unlawful for any person to discharge non -storm water to any storm water conveyance with the exception of the following: a) Water line flushing b) Diverted stream flows c) Rising ground waters d) Uncontaminated ground water infiltration (as defined at 40CFR 35.2005(20))to separate storm sewers e) Uncontaminated pumped ground water discharges from potable water sources fl Foundation drains g) Air conditioning condensation h) Irrigation water i) Springs J) Water from crawl space pumps k) Footing drains 1).. Lawn watering m) Car washing at one's residence, not for hire n) Flows from riparian habitats and wetlands o) Dechlorinated.$wimming pool discharges P) Street wash wafters q) Discharges from firefighting (3). Litter and Refuse Control It shall be unlawful to throw, place or deposit any refuse in any street, public place, on any private property, or in any conveyance within the County, except in garbage receptacles. It shall be unlawful for any person to throw any garbage, refuse, grass, Shrubbery, tree clippings, bottles, cans or containers of any kind upon the street right-of-ways or any storm water conveyance, or upon the private premises of another without the permission of the owner or person in control of the premises, or upon any public property. (4) Organic Waste a) It shall be the duty of the property owner to keep piled leaves out of the gutter, inlet, catch basin, or side ditch b) It shall be unlawful to place stumps or any organic materials on any property, public or private, except in those specific public areas designated for such use by the Count' m' on Private property with the approval of the owner of the PropertY- c) It shall be unlawful to place grass clippings, leaves, tree and shrub clippings, or any other yard wastes in any street, storm drain, stream, storm water conveyance,. or any other location where concentrated -storm water flows will wash such wastes into the storm sewers. d) No Privy, animal pen or stable of any kind shall be permitted to stand so near any stream, ditch, drain, or storm water conveyance of any kind that the droppings therefrom will run into such stream, ditch, drain, or storm water conveyance or in any way poison or contaminate the water therein; nor shall the urine from anY Privy, animal pen or stable of any kind be allowed to fall or be ciapdod. into any stream, ditch, drain, or storm water conveyance. e) While maintaining adequate erosion control measures and compliance -with Federal and State wetland regulations, every owner and every person in Possession of any premises across or through which any stream or open ditch runs, or on which any body of water is impounded shall keep the banks, bottoms and edges free and clear of all vegetation which mig'aht grow in, on or overhang into the water in such stream, ditch or other body of water and which thereby results in impeding.the flow, creating stagnation, and/or impacting the water . body's performance for water quantity or quality control. Every owner and evert' Person in possession of any premises across .or through which any stream or open ditch rums, or on which any body of water is impounded shall not apply fertilize in excessive amounts in or around these areas so as to cause vegetative growth at an rate or in a manner that will cause or Page 12 .NHC- Storm Water Management Ordinance Adopted September 5, 2000 result in impeding the flow; creating stagnation and/or impacting the water body's performance for water quantity or quality control or at a rate that could be considered an illicit discharge or create problems of a similar nature off site. 11.2 Spill Response (1) Purpose and Authority. The County shall have the authority to -summarily abate, control and contain hazardous materials, which are emitted into the environment in such a manner as to endanger the health or safety of the general public or the environment. The County shall have the authority to enter public or private property with or without the owner's consent, to respond to such hazardous materials emergencies. The County shall determine the type, amount and quantity of equipment and personnel required to -adequately abate, control and contain all hazardous materials which are emitted into the environment. (2) Responsibility, fees and charges. The property owner and/or the person. exercising :control Over the hazardous materials that create the hazardous material emergency shall be held financially liable for the response, control, containment; equipment, and materials costs incurred by the County fire department during the emergency. The Property owe' and/or person exercising control over such hazardous material, may Provide personnel to assist abatement, removal and remedial measures, provided such personnel have been adequately equipped and trained pursuant to the requirements of state and federal laws.. -The County shall not be liable for the use of outside personnel. Assistance shall consist of any or all of the following: a) Informing fire department personnel of all matters pertaining -to the incident; b) SUPPlYing emergency response plan information for'the site; c) Supplying emergency response equipment; personnel and materials. The property owner and/or the person exercising control over the hazardous materials shall be responsible for the costs of abatement, control and containment of hazardous material responses or fire incidents involving hazardous materiaL Failure Of the property owner and/or the person exercising control over the hazardous materials to pay the County for the charges shall give the County a right to levy a .lien upon the land or the premises where the hazardous material emergency arose andthe levy shall be collected in the sme manner as unpaid taxes pursuant to the authority of N.C.G.S. (3) Fire incidents involving hazardous materials. In fire incidents- that involve hazardous materials or an exposure to hazardous materials, no fee will be assessed for resources normally associated with firefightiqg operations. SECTION XII Industrial and Related Activities 12.1 Review of storm water pollution prevention plans The County may review the storm water pollution prevention plans required under a facility's NPDES storm water duchargepermit when outf dl monitoring or the illicit discharge/improper disposal program locates a suspected violator. SECTION X H Enforcement 13.1 Violations Any of the following shall be a violation of this ordinance and shall be subject to the enforcement remedies and penalties provided by this article and by state law: (1) Development without permit. , To engage in arty development or redevelopment, subject to the jurisdiction of this ordinance without all required "Authorization -To - Construct", certificates, or other forms of authorization as set forth in this ordinance. (2) Development inconsistent with permit. To engage in any development, use, construction remodeling or other activity of any nature in any way inconsistent with Page 13 NSC Storm Water Management Ordinance Adopted September 5, 2000 any approved required "Authorization -To -Construct" certificate, or other form of authorization granted for such activity. (3) Violation by act or omission. To violate, by act or omission, any term, variance, modification, condition, or qualification placed by the County or its agent boards upon any required permit, certificate, or other form of authorization of the use, development, or other activity upon land or improvements thereon. (4) Use in violation. To erect, construct, reconstruct, alter, repair, convert, maintain, or use any building or structure or to use any Ind -in violation or contravention of this Ordinance or any other regulation made under the authority conferred thereby. (5) Continuing a violation. To continue any of the above violations is a separate and distinct offense each day. 13.2 Civil penalties (1) Illicit Connections (a) Any person who is found responsible for an illicit connection shall receive a notice of violation when the connection is discovered. The person shall have thirty (30) days to remove the connection. At the end of that time if the connection has not been removed, the County may enter the property and take measures necessary to remove the connection and perform whatever cleanup or abatement is necessary. If the person fails to remove the connection in the time prescribed, the County may petition the superior court of justice, for the issuance of an injunction to compel removal and payment; however, removal of the illicit connection. shall be immediately upon the determination of the County that the connection poses an imminent threat_ to public health. (b) If any person who previously has .been found to have an illicit connection reconnects to the municipal separate storm sewer; he shall be assessed a civil penalty not to exceed five thousand dollars ($5,000.00). - The penalty shall increase by twenty-five percent (25%) of the previous penalty amount for every subsequent illicit connection made by the same person.. The penalty shall be in addition to the cost of cleanup and abatement. If the person has or is required to have a-stonn water discharge permit from the North Carolina Division of Environmental Management, the County shall alert the appropriate state authorities of the.violation. In determining the amount of the penalty the County shall consider the following: . 1) The degree and extent of the harm to the natural resources, to the public health, or to the public or private property resulting from the violation; 2) The duration and gravity of the violation; . _ w... 3) The effect on:ground or surihc mater quality or on air quality, 4) The cost of rectifying the damage; 5) The amount. of money saved by noncompliance; 6) Whether the violation was .committed willfully or intentionally; .n The prior record of the violator in complying or failing to comply with the storm water quality management Program; and 8) The costs of enforcement to New Hanover County. (2) Improfefl3isosal (a) Process wastewater. Any person who is found to have improperly disposed of Process wastewater to the municipal separate storm sewer shall be assessed a civil penalty not to exceed five thousand dollars ($5,000.00). In determining the amount of the penalty the County shall consider the following: 1) The degree and extent of the harm to the natural resources, to the public health, or to the public or private property resulting from the violation; 2) The duration and gravity of the violation; 3) The effect on ground or: surface water quality or on air quality, 4) The cost of rectifying the damage; 5) The amount of money saved by noncompliance; 6) Whether the violation was committed willfully or intentionally; Page 14 NHC Storm Water Management Ordinance . Adopted September 5, 2000 7) The prior record of the violator in complying or failing to comply with the storm wafer quality management program; and - .8) The costs of enforcement to Now Hanover County. b) Bulk sales. Any person who is found to have improperly disposed of any substance that was purchased at a bulk sales location which, upon discharge to the municipal separate storm sewer system or drainage network, would have an adverse impact on water quality or cause the County to be in noncompliance with any applicable environmental permit shall be assessed a civil penalty not to exceed five thousand dollars ($5,000.00)._ In determining the amount of the Penalty the County shall consider the following: . 1) The degree and extent of the harm to the natural resources, to the public health, or to the public or private property resulting from the violation; 2) The duration and gravity of the violation; 3) The effect on ground or surface water quality or on air quality; 4) The cost of rectifyingthe damage; 5) The amount of money savedby noncompliance; 6) Whether the. violation was committed willfully or intentionally, 7) The prior record of the violator in complying or failing to comply with the storm water quality management program; and 8) . The costs of enforcement to New Hanover County. c) Household products. Any person who is found to have imprbperly disposed of any substance that was purchased- over-the-counter for household, in quantities considered normal for household purposes, which, upon discharge to the municipal separate storm sewer system or drainage network, would have an adverse impact on water quality or cause the County to be in noncompliance with any applicable environmental permit shall be assessed a civil penalty not to exceed five hundred dollars ($500.00). in determining the amount.of he civil..-. penalty the County shall consider the following: 1) The degree and extent of the harm to the natural resources, to the public health, or to the public or private property resulting from the violation; 2) The duration and gravity of the violation; 3) The effect on.ground or surface wafer quality or on air quality; 4) The cost of rectifying the damage, 5) The amount of money saved by noncompliance; 6) Whether the violation was committed willfully or intentionally; 7) The prior record of the violator in complying or failing to comply with the storm water quality management program; and - 4.. The costs of enferc f "to New Hanover.County.. d) Yard waste. An �- ty` y person who is found to have improperly disposed of leaves, grass clippings, or other yard wastes shall be assessed a civil penalty not to exceed five hundred dollars ($500.00). In determining the amount of the penalty the County shall consider the following: 1) The degree and extent.of the harm to the natural resources, to the public health, or to the public or private property resulting from the violation; 2) The duration and gravity of the violation; 3) The effect on ground or surface water quality or on air quality; 4) The cost of rectifying the damage; 5) The amount of money saved by noncompliance; 6) Whether the violation was committed willfully or intentionally; 7) The prior record of the violator in complying or failing to comply with the storm water quality management program; and 8) the costs of enforcement to New Hanover County. e) Repeat violation. If a person is found to be responsible for more than one (1) instance of improper disposal, the penalty shall increase by twenty-five percent (25%) of the previous penalty amount for each. subsequent improper disposal. The penalties shall be additional to the cost of clean-up and abatement. Page 15 NSC .Storm Water Management Ordinance Adopted September. 5, 2000 f) Failure to report. The Penalty assessed for any of the above violations shall be increased by twenty-five percent (25%) of the amount assessed for any spill not properly reported by the violator once he has knowledge of the violation, (3) In the event there are subsequent penalties assessed by the state against the County for improper disposal or illegal dumping, or illicit connection into the municipal separate storm sewer system, caused by any person, such Pierson shall be assessed the equivalent amount of civil penalty; 13.3 Public Nuisances (1) Nuisances. The following enumerated and described conditions are found, deemed and declared to constitute a detriment, danger and hazard to the health, safety, morals and general welfare of the inhabitants of the County and are found, deemed and . declared to be public nuisances.wherever the same may exist and the creation, maintenance, or failure to abate any nuisances is hereby declared unlawful: a) Any condition which constitutes a breeding ground or harbor for rats, mosquitoes, harmful insects, or other pests. b) Any open place of concentration of combustible items such as mattresses, boxes, paper, automobile tires and tubes, garbage, trash, refuse, brush, old clothes, rags, or any other- combustible materials or objects of a liko nature. c) An open Place of collection of garbage, food waste, animal waste, or any other rotten or putrescible matter of any land. d) Any furniture, appliances, or metal products of any kind or nature openly kept which have jagged edges of metal or glass, or areas of confinement. e) Any condition which blocks, hinders,: or obstructs in any way the natural flow of branches, streams, creeks, surface waters, ditches, or drams, to the extent that the premises is not free from standing water. (2) Notice to abate, emergency abatement by .Counts. If any person shall violate the Provisions Of this ordinance, it shall be the duty of the County to give notice to the owner or to any person in possession of the subject property, directing that all unlawful conditions existing thereupon be abated within. ten (10) days from the date of such notice or within ten (10) days from the date of a final decision if appealed to the County Manager, provided, that it in the opinion of the County, the unlawful condition is such that it is of imminent danger or peril to the public, then an authorized representative of the County may, without notice, proceed to abate the same, and the cost thereof shall be charged against the properly. (3) Abatement by Couniy, why ouamerfails to abate. Upon the failure of the owner nr person in possession of any premises to abate any unlawful condition existing thereupgat.within.ten (10) da�hall be the fluty of a& orized representative of the County to cause the removal and abatement of such unlawful condition. 13.4 Remedies Any or all of the following procedures may be used to enforce the provisions of this ordinance: (1) Injunction. Any violation of this ordinance or of any condition, order, requirement, or reanedyadoptedPursuant hereto r,iay be restrained, corrected, abated, mandated, or enjoined by other appropriate proceeding pursuant to state law. (2) Civil Penalties. Any person who violates any provision of this ordinance shall be subject to the assessment of a civil penalty. (3) Dental ofpermit. The County shall withhold or deny any permit, certificate, or other authorization on any land, building, structure, or use in which there is an uncorrected violation of a provision of this ordinance, or of a condition or qualification of a Permit, certificate, or other authorization previousiy granted. (4) Conditional permit or temporary certificate. The County may condition the authorizations of any permit or certificate upon the correction of the deficiency, Payment of civil penalties within a specified time, or the posting of a compliance security approved by appropriate government authority. Page 16 NHC Storm Water Management Ordinance Adopted September 5, 2000 (5) Revocation ofpermit. The County may revoke and require the return of a permit or certificate by notifying the permit holder in writing, stating the reason for the revocation. Permits or certificates shall be'revoked for any substantial departure from the approved application plans, or specifications; refusal or failure to comply with the requirements of state or local law; or for false statements or misrepresentations made in 3ccuring the pemuif or certificate. Any permit or certificate mistakenly .issued in violation of any applicable state or local law may also be revoked. (6) Criminal penalties. Any violation of this ordinance shall be a misdemeanor or infraction as provided by NCGS 14-4. Each violation shall be subject to a fine not to exceed five hundred dollars ($500.00). () Notification of the state enforcement officials a) Industrial and related facilities. When the County discovers an apparent violation of an industrial or related facility's NPDES storm water discharge permit, the County shall notify the appropriate state officials immediately. b) Construction sites. If the County discovers an apparent violation of the NPDES storm water discharge permit required by the state for sites with land -disturbing activity greater than five (5) acres, he shall report the violation immediately to the appropriate. state gfficials. c) Abatement. When the discharge from a facility interferes significantly with the municipal separate storm sewer, and the facility fails to take appropriate actions upon notification by the County, the County may take immediate and appropriate measures to control the problem whether or not the facility is violating its NPDES permit and recover the cost from the facility. (8) Judicial enforcement. When any person is in violation of the provisions of this ordinance, the County, through the County Attorney, may petition the superior court of justice for the issuance of a restraining order or a pre lrminafy and permanent injunction which restrains or compels the activities in question. SECTION XIV Appeals 14.1 Appeal Hearing (1) Any person assessed a civil penalty or ordered to abate a nuisance under this ordinance shall have the right to a hearing before flee county Manager or Managers designee upon making a written demand to the County Manager specifying the issues to be contested, within fourteen (14) days following receipt of the assessment or abatement notice. (2) finless such written _ pis made within the time specified herein, the action shall be final and binding. (3) The County Manager or Manager's designee shall make a final decision on the contested penalty or abatement notice within thirty (30) days of the receipt of the written demand for a hearing. (4) The County Manager or Manager's designee shall transmit a copy of the decision.by registered or certified mail. (5) The decision of tic Ctfun y Manager or Manager's designee shall be considered The final administrative action for the purposes of judicial review. Provided, however, a person assessed a penalty or ordered to abate a nuisance may petition the Board of County Commissioners requesting review of the County Manager's final decision. The petition must be presented to the Clerk of the Board within five (5) days following receipt of the County Manager's final decision. Any review by the Board sball be solely at its discretion. 14.2 Judicial review Any person may seek judicial review of a final administrative decision by the County Manager or Manager's designee by filing a petition for writ of certiorari within thirty (30) days after receipt of notice by registered or certified mail, but not thereafter, with the Superior Court of New Hanover County and with a copy to the County Manager of New Hanover County. Page 17 a U.S. Department of Transportation Advisory circular Federal Aviation Administration Subject: HAZARDOUS WILDLIFE ATTRACTANTS Date: July 27, 2004 AC No: 150/5200-33A ON OR NEAR AIRPORTS Initiated by: AAS-300 Change: 1. PURPOSE. This Advisory Circular (AC) provides guidance on certain land uses that have the potential to attract hazardous wildlife on or near public -use airports. It also discusses airport development projects (including airport construction, expansion, and renovation) affecting aircraft movement near hazardous wildlife attractants. Appendix 1 provides definitions of terms used in this AC. 2. APPLICABILITY. The Federal Aviation Administration (FAA) recommends that public -use airport operators implement the standards and practices contained in this AC. The holders of Airport Operating Certificates issued under Title 14, Code of Federal Regulations (CFR), Part 139, Certification of Airports, Subpart D (Part 139), may use the standards, practices, and recommendations contained in this AC to comply with the wildlife hazard management requirements of Part 139. Airports that have received Federal grant-in-aid assistance must use these standards. The FAA also recommends the guidance in this AC for land -use planners, operators of non -certificated airports, and developers of projects, facilities, and activities on or near airports. 3. CANCELLATION. This AC cancels AC 150/5200-33, Hazardous Wildlife Attractants on or near Airports, dated May 1, 1997. 4. PRINCIPAL CHANGES. This AC contains the following major changes: a. Reorganized outline of the AC. b. Expanded Table 1 to include updated information from the Special Report for the FAA, Ranking the Hazard Level of Wildlife Species to Clvil Aviation in the USA: Update #9, July 2, 2003" c. Removed Table 2, which outlined the distances between certain airport features and any on - airport agricultural crops, and relocated the discussion of on -airport agricultural activities to Paragraph 2-6. d. Added text about the basis for separation distances between wildlife hazards and airport movement areas and added Figure 1 depicting the separation distances. e. Added options for wetland mitigation for impacts from airport projects, including mitigation banking. f. Further recognized the importance of the Wildlife Hazard Management Plan (WHMP). 5. BACKGROUND. Information about the risks posed to aircraft by certain wildlife species has increased a great deal in recent years. Improved reporting, studies, documentation, and statistics clearly show that aircraft collisions with birds and other wildlife are a serious economic and public safety problem. While many species of wildlife can pose a threat to aircraft safety, they are not equally hazardous. Table 1 ranks the wildlife groups commonly involved in damaging strikes in the United States according to their relative hazard to aircraft. The ranking is based on the 47,212 records in the FAA National Wildlife Strike Database for the years 1990 through 2003. These hazard rankings. in conjunction with site -specific WHAs, will help airport operators determine the relative abundance and use patterns of wildlife species and help focus hazardous wildlife management efforts on those species most likely to cause problems at an airport. AC 150/5200-33A 7/27/2004 Most public -use airports have large tracts of open, undeveloped land that provide added margins of safety and noise mitigation. These areas can also present potential hazards to aviation if they encourage wildlife to enter an airport's approach or departure airspace or air operations area (AOA). Constructed or natural areas --such as poorly drained locations, detention/retention ponds, roosting habitats on buildings, landscaping, odor -causing rotting organic matter (putrescible waste) disposal operations, wastewater treatment plants, agricultural or aquaculture activities, surface mining, or wetlands —man provide wildlife with ideal locations for feeding, loafing, reproduction, and escape. Even small facilities, such as fast food restaurants, taxicab staging areas, rental car facilities, aircraft viewing areas, and public parks, can produce substantial attractions for hazardous wildlife. During the past century, wildlife -aircraft strikes have resulted in the loss of hundreds of lives worldwide, as well as billions of dollars in aircraft damage. Hazardous wildlife attractants on and near airports can jeopardize future airport expansion, making proper community land -use planning essential. This AC provides airport operators and those parties with whom they cooperate with the guidance they need to assess and address potentially hazardous wildlife attractants when locating new facilities and implementing certain land -use practices on or near public -use airports. 6. MEMORANDUM OF AGREEMENT BETWEEN FEDERAL RESOURCE AGENCIES. The FAA, the U.S. Air Force, the U.S. Army Corps of Engineers, the U.S. Environmental Protection Agency, the U.S. Fish and Wildlife Service, and the U.S. Department of Agriculture - Wildlife Services signed a Memorandum of Agreement (MOA) (final signature July 2003) to acknowledge their respective missions in protecting aviation from wildlife hazards. Through the MOA, the agencies established procedures necessary to coordinate their missions to address more effectively existing and future environmental conditions contributing to collisions between wildlife and aircraft (wildlife strikes) throughout the United States. These efforts are intended to minimize wildlife risks to aviation and human safety while protecting the Nation's valuable environmental resources. DAVID L. BENNETT Director, Office of Airport Safety and Standards ll 7/27/2004 AC 150/5200-33A Table 1. Ranking of 25 species groups as to relative hazard to aircraft (1=most hazardous) based on three criteria (damage, major damage, and effect -on -flight), a composite ranking based on all three rankings, and a relative hazard score. Data were derived from the FAA National Wildlife Strike Database, January 1990-April 2003.1 Ranking by criteria Species group Composite Relative p g p Damage Major 5 Effect on ranking2 hazard score3 damage flights Deer 1 1 1 1 100 Vultures 2 2 2 2 64 Geese 3 3 6 3 55 Cormorants/pelicans 4 5 3 4 54 Cranes 7 6 4 5 47 Eagles 6 9 7 6 41 Ducks 5 8 10 7 39 Osprey 8 4 8 8 39 Turkey/pheasants 9 7 11 9 33 Herons 11 14 9 10 27 Hawks (buteos) 10 12 12 11 25 Gulls 12 11 13 12 24 Rock pigeon 13 10 14 13 23 Owls 14 13 20 14 23 H. lark/s. bunting 18 15 15 15 17 Crows/ravens 15 16 16 16 16 Coyote 16 19 5 17 14 Mourning dove 17 17 17 18 14 Shorebirds 19 21 18 19 10 Blackbirds/starling 20 22 19 20 10 American kestrel 21 18 21 21 9 Meadowlarks 22 20 22 22 7 Swallows 24 23 24 23 4 Sparrows 25 24 23 24 4 Nighthawks 23 25 25 25 1 1 Excerpted from the Special Report for the FAA, "Ranking the Hazard Level of Wildlife Species to Civil Aviation in the USA: Update #1, July 2, 2003". Refer to this report for additional explanations of criteria and method of ranking. 2 Relative rank of each species group was compared with every other group for the three variables, placing the species group with the greatest hazard rank for > 2 of the 3 variables above the next highest ranked group, then proceeding down the list. 3 Percentage values, from Tables 3 and 4 in Footnote 1 of the Special Report, for the three criteria were summed and scaled down from 100, with 100 as the score for the species group with the maximum summed values.and the greatest potential hazard to aircraft. 4 Aircraft incurred at least some damage (destroyed, substantial, minor, or unknown) from strike. 5 Aircraft incurred damage or structural failure, which adversely affected the structure strength, performance, or flight characteristics, and which would normally require major repair or replacement of the affected component, or the damage sustained makes it inadvisable to restore aircraft to airworthy condition. s Aborted takeoff, engine shutdown, precautionary landing, or other. iii AC 150/5200-33A TABLE OF CONTENTS 7/27/2004 SECTION 1. GENERAL SEPARA 1 ION CRITERIA FOR HAZARDOUS WILDLIFE ATTRACTANTS ON OR NEAR AIRPORTS..............................................1 1-1. INTRODUCTION.......................................................................................................1 ................ 1-2. AIRPORTS SERVING PISTON -POWERED AIRCRAFT.........................................................1 1-3. AIRPORTS SERVING TURBINE -POWERED AIRCRAFT.......................................................1 1-4. PROTECTION OF APPROACH, DEPARTURE, AND CIRCLING AIRSPACE ........................1 SECTION 2. LAND -USE PRACTICES ON OR NEAR AIRPORTS THAT POTENTIALLY ATTRACT HAZARDOUS WILDLIFE......................................................... 3 2-1. GENERAL..................................................................................................................................3 2-2. WASTE DISPOSAL OPERATIONS..........................................................................................3 2-3. WATER MANAGEMENT FACILITIES...................................................................................... 5 2-4. WETLANDS...............................................................................................................................6 2-5. DREDGE SPOIL CONTAINMENT AREAS............................................................................... 8 2-6. AGRICULTURAL ACTIVITIES..................................................................................................8 2-7. GOLF COURSES, LANDSCAPING AND OTHER LAND -USE CONSIDERATIONS...............8 2-8. SYNERGISTIC EFFECTS OF SURROUNDING LAND USES.................................................9 SECTION 3. PROCEDURES FOR WILDLIFE HAZARD MANAGEMENT BY OPERATORS OF PUBLIC -USE AIRPORTS...........................................11 3.1. INTRODUCTION..............................................................................................................................11 3.2. COORDINATION WITH USDA WILDLIFE SERVICES OR OTHER QUALIFIED WILDLIFE DAMAGE MANAGEMENT BIOLOGISTS............................................................................11 3-3. WILDLIFE HAZARD MANAGEMENT AT AIRPORTS: A MANUAL FOR AIRPORT PERSONNEL.......................................................................................................................11 3-4. WILDLIFE HAZARD ASSESSMENTS, TITLE 14, CODE OF FEDERAL REGULATIONS, PART139................................................................................................................. 11 3-6. WILDLIFE HAZARD MANAGEMENT PLAN(WHMP)............................................................11 3-6. LOCAL COORDINATION.......................................................................................................12 3-7. COORDINATION/NOTIFICATION OF AIRMEN OF WILDLIFE HAZARDS ............................12 SECTION 4. FAA REVIEW OF PROPOSED LAND -USE CHANGES ..........................13 4-1. FAA REVIEW OF PROPOSED LAND -USE CHANGES........................................................13 4-2. WASTE MANAGEMENT FACILITIES....................................................................................13 4-3. OTHER LAND -USE PRACTICE CHANGES..........................................................................14 APPENDIX 1. DEFINITIONS OF TERMS USED IN THIS ADVISORY CIRCULAR..15 iv 7/27/2004 AC 150/5200-33A SECTION 1. GENERAL SEPARATION CRITERIA FOR HAZARDOUS WILDLIFE ATTRACTANTS ON OR NEAR AIRPORTS. 1-1. INTRODUCTION. When considering proposed land uses, airport operators, local planners, and developers must take into account whether the proposed land uses, including new development projects, will increase wildlife hazards. Land -use practices that attract or sustain hazardous wildlife populations on or near airports can significantly increase the potential for wildlife strikes. The FAA recommends the minimum separation criteria outlined below for land -use practices that attract hazardous wildlife to the vicinity of airports. Please note that FAA criteria include land uses that cause movement of hazardous wildlife onto, into, or across the airport's approach or departure airspace or air operations area (AOA). (See the discussion of the synergistic effects of surrounding land uses in Section 2-8 of this AC.) The basis for the separation criteria contained in this section can be found in existing FAA regulations. The separation distances are based on (1) flight patterns of piston -powered aircraft and turbine -powered aircraft, (2) the altitude at which most strikes happen (78 percent occur under 1,000 feet and 90 percent occur under 3,000 feet above ground level), and (3) National Transportation Safety Board (NTSB) recommendations. 1-2-AIRPORTS SERVING PISTON -POWERED AIRCRAFT. Airports that do not sell Jet -A fuel normally serve piston -powered aircraft. Notwithstanding more stringent requirements for specific land uses, the FAA recommends a separation distance of 5,000 feet at these airports for any of the hazardous wildlife attractants mentioned in Section 2 or for new airport development projects meant to accommodate aircraft movement. This distance is to be maintained between an airport's AOA and the hazardous wildlife attractant. Figure 1 depicts this separation distance measured from the nearest aircraft operations areas. 1-3-AIRPORTS SERVING TURBINE -POWERED AIRCRAFT. Airports selling Jet A fuel normally serve turbine -powered aircraft. Notwithstanding more stringent requirements for specific land uses, the FAA recommends a separation distance of 10,000 feet at these airports for any of the hazardous wildlife attractants mentioned in Section 2 or for new airport development projects meant to accommodate aircraft movement. This distance is to be maintained between an airport's AOA and the hazardous wildlife attractant. Figure 1 depicts this separation distance from the nearest aircraft movement areas. 1-4.PROTECTION OF APPROACH, DEPARTURE, AND CIRCLING AIRSPACE. For all airports, the FAA recommends a distance of 5 statute miles between the farthest edge of the airport's AOA and the hazardous wildlife attractant if the attractant could cause hazardous wildlife movement into or across the approach or departure airspace. AC 150/5200-33A 7/27/2004 Figure 1. Separation distances within which hazardous wildlife attractants should be avoided, eliminated, or mitigated. y y y W y W W\ W W \ y W W y W y W y W W W W W W y W y�- W W W W W W\\y W \ y W W W W W W I W W ..... W y W W W \W W W\ W W W W W W W W W W Wiy y y W W y W� W\\W W W fir?\ W W W W W W W \ W y \ Wyy WI11W IyW W \ WSW y W W tl W W Iy W �• '�• �' W \y W W W W I W WI W W \ y W y�• W y I W W I W W I W W y W W I W y W W W .4 W W IW WI y � yW1 WW IWW W W W IW Why W W � WWI yW Wy PERIMETER A W W IWW W W ti WWI W W y1 W W W W LW WWW\WWW\ yW yIW y�yW W W \ W r y W y W W W y\\ y W W W y W W W W W W W W . W W W y W W W y W W W Y y W y W 4 W W `�W �4 W-�. Wes. y� y'm W Y,-��P 1• W y W W W W y W W W W W W W W y W W WyWW W W W W W W WWiPERIMEMROWW WWyWyWy y W W W W y W WWW W W W W W W W W y V. W y .L y W W y W W W W y . W W J. W W �., W W y W W y W y V, W W y y y W y W W W W y y y W y y W y W y W W W W PERIMETER A: For airports serving piston -powered aircraft, hazardous wildlife attractants must be 5,000 feet from the nearest air operations area. PERIMETER B: For airports serving turbine -powered aircraft, hazardous wildlife attractants must be 10,000 feet from the nearest air operations area. PERIMETER C: 5-mile range to protect approach, departure and circling airspace. 2 7/27/2004 AC 150/5200-33A SECTION 2. LAND -USE PRACTICES ON OR NEAR AIRPORTS THAT POTENTIALLY ATTRACT HAZARDOUS WILDLIFE. 2-1.GENERAL. The wildlife species and the size of the populations attracted to the airport environment vary considerably, depending on several factors, including land -use practices on or near the airport. This section discusses land -use practices having the potential to attract hazardous wildlife and threaten aviation safety. In addition to the specific considerations outlined below, airport operators should refer to Wildlife Hazard Management at Airports, prepared by FAA and U.S. Department of Agriculture (USDA) staff. (This manual is available in English, Spanish, and French. It can be viewed and downloaded free of charge from the FAA's wildlife hazard mitigation web site: hftp:/IWildlife-mitigaflon.tc.faa.gov.). And, Prevention and Control of lildl/f+e Damage, compiled by the University of Nebraska Cooperative Extension Division. (This manual is available online in a periodically updated version at: ianrwww.unl.edu/wildlife/solutions/handbook/.) 2-2.WASTE DISPOSAL OPERATIONS. Municipal solid waste landfills (MSWLs) are known to attract large numbers of hazardous wildlife, particularly birds. Because of this, these operations, when located within the separations identified in the siting criteria in Sections 1-2 through 1-4, are considered incompatible with safe airport operations. a. Siting for new municipal solid waste landfills subject to AIR 21. Section 503 of the Wendell H. Ford Aviation Investment and Reform Act for the 21st Century (Public Law 106- 181) (AIR 21) prohibits the construction or establishment of a new MSWL within 6 statute miles of certain public -use airports. Before these prohibitions apply, both the airport and the landfill must meet the very specific conditions described below. These restrictions do not apply to airports or landfills located within the state of Alaska. The airport must (1) have received a Federal grant(s) under 49 U.S.C. § 47101, et. seq.; (2) be under control of a public agency; (3) serve some scheduled air carrier operations conducted in aircraft with less than 60 seats; and (4) have total annual enplanements consisting of at least 51 percent of scheduled air carver enplanements conducted in aircraft with less than 60 passenger seats. The proposed MSWL must (1) be within 6 miles of the airport, as measured from airport property line to MSWL property line, and (2) have started construction or establishment on or after April 5, 2001. Public Law 106-181 only limits the construction or establishment of some new MSWLs. It does not limit the expansion, either vertical or horizontal, of existing landfills. NOTE: Consult the most recent version of AC 150/5200-34, Construction or Establishment of Landfills Near Public Airports, for a more detailed discussion of these restrictions. b. Siting for new MSWLs not subject to AIR 21. If an airport and MSWL do not meet the restrictions of Public Law 106-181, the FAA recommends against locating MSWLs within the separation distances identified in Sections 1-2 through 14. The separation distances should be measured from the closest point of the airport's P.OA to the closest planned MSWL cell. c. Considerations for existing waste disposal facilities within the limits of separation criteria. The FAA recommends against airport development projects that would increase the number of aircraft operations or accommodate larger or faster aircraft near MSWL operations located within the separations identified in Sections 1-2 through 1-4. In addition, in accordance with 40 CFR 258.10. owners or operators of existing MSWL units that are located within the separations listed in Sections 1-2 through 1-4 must demonstrate that the unit is designed and operated so it does not pose a bird hazard to aircraft. (See Sections 4-3(b) and 4-3(c) of this AC for a discussion of this demonstration requirement.) AC 150/5200-33A 7/27/2004 d. Enclosed trash transfer stations. Enclosed waste -handling facilities that receive garbage behind closed doors; process it via compaction, incineration, or similar manner; and remove all residue by enclosed vehicles generally are compatible with safe airport operations, provided thev are not located on airport property or within the Runway Protection Zone (RPZ). These facilities should not handle or store putrescible waste outside or in a partially enclosed structure accessible to hazardous wildlife. Trash transfer facilities that are open on one or more sides; that store uncovered quantities of municipal solid waste outside, even if only for a short time; that use semi trailers that leak or have trash clinging to the outside; or that do not control odors by ventilation and filtration systems (odor masking is not acceptable) do not meet the FAA's definition of fully enclosed trash transfer stations. The FAA considers these facilities incompatible with safe airport operations if they are located closer than the separation distances specified in Sections 1-2 through 14. e. Composting operations on or near airport property. Composting operations that accept only yard waste (e.g., leaves, lawn clippings, or branches) generally do not attract hazardous wildlife. Sewage sludge, woodchips, and similar material are not municipal solid wastes and may be used as compost bulking agents. The compost, however, must never include food or other municipal solid waste. Composting operations should not be located on airport property. Off -airport property composting operations should be located no closer than the greater of the following distances: 1,200 feet from any AOA or the distance called for by airport design requirements (see AC 150/5300-13, Airport Design). This spacing should prevent material, personnel, or equipment from penetrating any Object Free Area (OFA), Obstacle Free Zone (OFZ), Threshold Siting Surface (TSS), or Clearway. Airport operators should monitor composting operations located in proximity to the airport to ensure that steam or thermal rise does not adversely affect air traffic. On -airport disposal of compost bv-Droducts should net hw conducted for the reasons stated in 2-3f. f. Underwater waste discharges. The FAA recommends against the underwater discharge of any food waste (e.g., fish processing offal) within the separations identified in Sections 1-2 through 1-4 because it could attract scavenging hazardous wildlife. g. Recycling centers. Recycling centers that accept previously sorted non-food items, such as glass, newspaper, cardboard, or aluminum, are, in most cases, not attractive to hazardous wildlife and are acceptable. h. Construction and demolition (C&D) debris facilities. C&D landfills do not generally attract hazardous wildlife and are acceptable if maintained in an orderly manner, admit no putrescible waste, and are not co -located with other waste disposal operations. However, C&D landfills have similar visual and operational characteristics to putrescible waste disposal sites. When co -located with putrescible waste disposal operations, C&D landfills are more likely to attract hazardous wildlife because of the similarities between these disposal facilities. Therefore, a C&D landfill co -located with another waste disposal operation should be located outside of the separations identified in Sections 1-2 through 1-4. i. Fly ash disposal. The incinerated residue from resource recovery power/heat-generating facilities that are fired by municipal solid waste, coal, or wood is generally not a wildlife attractant because it no longer contains putrescible matter. Landfills accepting only fly ash are generally not considered to be wildlife attractants and are acceptable as long as they are maintained in an orderly manner, admit no putrescible waste of any kind, and are not co - located with other disposal operations that attract hazardous wildlife. Since varying degrees of waste consumption are associated with general incineration (not resource recovery power/heat-generating facilities), the FAA considers the ash from general incinerators a regular waste disposal by-product and, therefore, a hazardous wildlife attractant if disposed of within the separation criteria outlined in Sections 1-2 through 1-4. 4 7/27/2004 AC 150/5200-33A 2-3.WATER MANAGEMENT FACILITIES. Drinking water intake and treatment facilities, stormwater and wastewater treatment facilities, associated retention and settling ponds, ponds built for recreational use, and ponds that result from mining activities often attract large numbers of potentially hazardous wildlife. To prevent wildlife hazards. land -use developers and airport operators may need to develop management plans, in compliance with local and state regulations, to support the operation of stormwater management facilities on or near all public -use airports to ensure a safe airport environment. a. Existing stormwater management facilities. On -airport stormwater management facilities allow the quick removal of surface water, including discharges related to aircraft deicing, from impervious surfaces, such as pavement and terminal/hangar building roofs. Existing on -airport detention ponds collect stormwater, protect water quality, and control runoff. Because they slowly release water after storms, they create standing bodies of water that can attract hazardous wildlife. Where the airport has developed a WHMP in accordance with Part 139, the FAA requires immediate correction of any wildlife hazards arising from existing stormwater facilities located on or near airports, using appropriate wildlife hazard mitigation techniques. Airport operators should develop measures to minimize hazardous wildlife attraction in consultation with a wildlife damage management biologist. Where possible, airport operators should modify stormwater detention ponds to allow a maximum 48-hour detention period for the design storm. The FAA recommends that airport operators avoid or remove retention ponds and detention ponds featuring dead storage to eliminate standing water. Detention basins should remain totally dry between rainfalls. Where constant flow of water is anticipated through the basin, or where any portion of the basin bottom may remain wet, the detention facility should include a concrete or paved pad and/or ditch/swale in the bottom to prevent vegetation that may provide nesting habitat. When it is not possible to drain a large detention pond completely, airport operators may use physical barriers, such as bird balls, wires grids, pillows, or netting, to deter birds and other hazardous wildlife. When physical barriers are used, airport operators must evaluate their use and ensure they will not adversely affect water rescue. Before installing any physical barriers over detention ponds on Part 139 airports, airport operators must get approval from the appropriate FAA Regional Airports Division Office. The FAA recommends that airport operators encourage off -airport stormwater treatment facility operators to incorporate appropriate wildlife hazard mitigation techniques into stormwater treatment facility operating practices when their facility is located within the separation criteria specified in Sections 1-2 through 1-4. b. New stormwater management facilities. The FAA strongly, recommends that off -airport stormwater management systems located within the separations identified in Sections 1-2 through 1-4 be designed and operated so as not to create above -ground standing water. On - airport stormwater detention ponds should. be designed, engineered, constructed, and maintained for a maximum 48—hour detention period for the design storm and remain completely dry between storms. To facilitate the control of hazardous wildlife, the FAA recommends the use of steep -sided, narrow, linearly shaped water detention basins. When it is not possible to place these ponds away from an airport's AOA, airport operators should use physical barriers, such as bird balls, wires grids, pillows, or netting, to prevent access of hazardous wildlife to open water and minimize aircraft -wildlife interactions. When physical barriers are used, airport operators must evaluate their use and ensure they will not adversely affect water rescue. Before installing any physical barriers over detention ponds on Part 139 airports, airport operators must get approval from the appropriate FAA Regional Airports Division Office. All vegetation in or around detention basins that provide food or cover for hazardous wildlife should be eliminated. If soil conditions and other requirements allow, the FAA encourages the use of underground stormwater infiltration systems, such as French drains or buried rock fields, because they are less attractive to wildlife. AC 150/5200-33A 7/27/2004 c. Existing wastewater treatment facilities. The FAA strongly recommends that airport operators immediately correct any wildlife hazards arising from existing wastewater treatment facilities located on or near the airport. Where required, a WHMP developed in accordance with Park 139 will outline appropriate wildlife hazard mitigation techniques. Accordingly, airputt operators should encourage wastewater treatment facility operators to incorporate measures, developed in consultation with a wildlife damage management biologist, to minimize hazardous wildlife attractants. Airport operators should also encourage those wastewater treatment facility operators to incorporate these mitigation techniques into their standard operating practices. In addition, airport operators should consider the existence of wastewater treatment facilities when evaluating proposed sites for new airport development projects and avoid such sites when practicable. d. New wastewater treatment facilities. The FAA strongly recommends against the construction of new wastewater treatment facilities or associated settling ponds within the separations identified in Sections 1-2 through 1-4. Appendix 1 defines wastewater treatment facility as "any devices and/or systems used to store, treat, recycle, or reclaim municipal sewage or liquid industrial wastes." The definition includes any pretreatment involving the reduction of the amount of pollutants or the elimination of pollutants prior to introducing such pollutants into a publicly owned treatment works (wastewater treatment facility). During the site -location analysis for wastewater treatment facilities, developers should consider the potential to attract hazardous wildlife if an airport is in the vicinity of the proposed site, and airport operators should voice their opposition to such facilities if they are in proximity to the airport. e. Artificial marshes. In warmer climates, wastewater treatment facilities sometimes employ artificial marshes and use submergent and emergent aquatic vegetation as natural filters. These artificial marshes may be used by some species of flocking birds, such as blackbirds and waterfowl, for breeding or roosting activities. The FAA strongly recommends against establishing artificial marshes within the separations identified in Sections 1-2 through 1-4. f. Wastewater discharge and sludge disposal. The FAA recommends against the discharge of wastewater or sludge on airport property because it may improve soil rmolsture and quality on unpaved areas and lead to improved turf growth that can be an attractive food source for many species of animals. Also, the turf requires more frequent mowing, which in turn may mutilate or flush insects or small animals and produce straw, both of which can attract hazardous wildlife. In addition, the improved turf may attract grazing wildlife, such as deer and geese. Problems may also occur when discharges saturate unpaved airport areas. The resultant soft, muddy conditions can severely restrict or prevent emergency vehicles from reaching accident sites in a timely manner. 2-4. WETLANDS. Wetlands provide a variety of functions and can be regulated by local, state, and Federal laws. Normally, wetlands are attractive to many types of wildlife, including many which rank high on the list of hazardous wildlife species (Table 1). NOTE: If questions exist as to whether an area qualifies as a wetland, contact the local division of the U.S. Army Corps of Engineers, the Natural Resources Conservation Service, or a wetland consultant qualified to delineate wetlands. a. Existing wetlands on or near airport property. If wetlands are located on or near airport property, airport operators should be alert to any wildlife use or habitat changes in these areas that could affect safe aircraft operations. At public -use airports, the FAA recommends immediately correcting, in cooperation with local, state, and Federal regulatory agencies, any wildlife hazards arising from existing wetlands located one or near airports. Where required, a WHMP will outline appropriate wildlife hazard mitigation techniques. Accordingly, airport operators should develop measures to minimize hazardous wildlife attraction in consultation with a wildlife damage management biologist. 7/27/2004 AC 150/5200-33A b. New airport development. Whenever possible, the FAA recommends locating new airports using the separations from wetlands identified in Sections 1-2 through 1-4. Where alternative sites are not practicable, or when airport operators are expanding an existing airport into or near wetlands, a wildlife damage management biologist, in consultation with the U.S. Fish and Wildlife Service, the U.S. Army Corps of Engineers, and the state wildlife management agency should evaluate the wildlife hazards and prepare a WHMP that indicates methods of minimizing the hazards. c. Mitigation for wetland impacts from airport projects. Wetland mitigation may be necessary when unavoidable wetland disturbances result from new airport development projects or projects required to correct wildlife hazards from wetlands. Weiland mitigation must be designed so it does not create a wildlife hazard. The FAA recommends that wetland mitigation projects that may attract hazardous wildlife be sited outside of the separations identified in Sections 1-2 through 1-4. (1) Onsite mitigation of wetland functions. The FAA may consider exceptions to locating mitigation activities outside the separations identified in Sections 1-2 through 1-4 if the affected wetlands provide unique ecological functions, such as critical habitat for threatened or endangered species or ground water recharge, which cannot be replicated when moved to a different location. Using existing airport property is sometimes the only feasible way to achieve the mitigation ratios mandated in regulatory orders and/or settlement, agreements with the resource agencies. Conservation easements are an additional means of providing mitigation for project impacts. Typically the airport operator continues to own the property, and an easement is created stipulating that the property will be maintained as habitat for state or Federally listed species. Mitigation must not inhibit the airport operator's ability to effectively control hazardous wildlife on or near the mitigation site or effectively maintain other aspects of safe airport operations. Enhancing such mitigation areas to attract hazardous wildlife must be avoided. The FAA will review any onsite mitigation proposals to determine compatibility with safe airport operations. A wildlife damage management biologist should evaluate any wetland mitigation projects that are needed to protect unique wetland functions and that must be located in the separation criteria in Sections 1-2 through 1-4 before the mitigation is implemented. A WHMP should be developed to reduce the wildlife hazards. (2) Offsite mitigation of wetland functions. The FAA recommends that wetland mitigation projects that may attract hazardous wildlife be sited outside of the separations identified in Sections 1-2 through 1-4 unless they provide unique functions that must remain.onsite (see 2- 4c(1)). Agencies that regulate impacts to or around wetlands recognize that it may be necessary to split wetland functions in mitigation schemes. Therefore, regulatory agencies may, under certain circumstances, allow portions of mitigation to take place in different locations. (3) Mitigation banking. Wetland mitigation banking is the creation or restoration of wetlands in order to provide mitigation credits that can be used to offset permitted wetland losses. Mitigation banking benefits wetland resources by providing advance replacement for permitted wetland losses; consolidating small projects into larger, better -designed and managed units; and encouraging integration of wetland mitigation projects with watershed planning. This last benefit is most helpful for airport projects, as wetiand impacts mitigated outside of the separations identified in Sections 1-2 through 1-4 can still be located within the same watershed. Wetland mitigation banks meeting the separation criteria offer an ecologically sound approach to mitigation in these situations. Airport ope atcrs should work with local watershed management agencies or organizations to develop mitigation banking for wetiand impacts on airport property. AC 150/5200-33A 7/27/2004 2-5.DREDGE SPOIL CONTAINMENT AREAS. The FAA recommends against locating dredge spoil containment areas (also known as Confined Disposal Facilities) within the separations identified in Sections 1-2 through 1-4 if the containment area or the spoils contain material that would attract hazardous wildlife. 2-6.AGRICULTURAL ACTIVITIES. Because most, if not all, agricultural crops can attract hazardous wildlife during some phase of production, the FAA recommends against the used of airport property for agricultural production, including hay crops, within the separations identified in Sections 1-2 through 1-4. . If the airport has no financial alternative to agricultural crops to produce income necessary to maintain the viability of the airport, then the airport shall follow the crop distance guidelines listed in the table titled "Minimum Distances between Certain Airport Features and Any On -Airport Agricultural Crops" found in AC 150/5300-13, Airport Design, Appendix 19. The cost of wildlife control and potential accidents should be weighed against the income produced by the on -airport crops when deciding whether to allow crops on the airport. a. Livestock production. Confined livestock operations (i.e., feedlots, dairy operations, hog or chicken production facilities, or egg laying operations) often attract flocking birds, such as starlings, that pose a hazard to aviation. Therefore, The FAA recommends against such facilities within the separations identified in Sections 1-2 through 1-4. Any livestock operation within these separations should have a program developed to reduce the attractiveness of the site to species that are hazardous to aviation safety. Free -ranging livestock must not be grazed on airport property because the animals may wander onto the AOA. Furthermore, livestock feed, water, and manure may attract birds. b. Aquaculture. Aquaculture activities (i.e. catfish or trout production) conducted outside of fully enclosed buildings are inherently attractive to a wide variety of birds. Existing aquaculture faclitles/activitles within the separations listed in Sections 1-2 through 1-4 must have a program developed to reduce the attractiveness of the sites to species that are hazardous to aviation safety. Airport operators should also oppose the establishment of new aquaculture facilities/activities within the separations listed in Sections 1-2 through 1-4. c. Alternative uses of agricultural land. Some airports are surrounded by vast areas of farmed land within the distances specified in Sections 1-2 through 1-4. Seasonal uses of agricultural land for activities such as hunting can create a hazardous wildlife situation. In some areas, farmers will rent their land for hunting purposes. Rice farmers, for example, flood their land during waterfowl hunting season and obtain additional revenue by renting out duck blinds. The duck hunters then use decoys and call in hundreds, if not thousands, of birds, creating a tremendous threat to aircraft safety. A wildlife damage mahagement biologist•should review, in coordination with local farmers and producers, these types of seasonal land uses and incorporate them into the WHMP. 2-7.GOLF COURSES, LANDSCAPING AND OTHER LAND -USE CONSIDERATIONS. a. Golf courses. The large grassy areas and open water found on most golf courses are attractive to hazardous wildlife, particularly Canada geese and some species of gulls. These species can pose a threat to aviation safety. The FAA recommends against construction of new golf courses within the separations identified in Sections 1-2 through 1-4. Existing golf courses located within these separations must develop a program to reduce the attractiveness of the sites to species that are hazardous to aviation safety. Airport operators should ensure these golf courses are monitored on a continuing basis for the presence of hazardous wildlife. If hazardous wildlife is detected, corrective actions should be immediately implemented. b. Landscaping and landscape maintenance. Depending on its geographic location, landscaping can attract hazardous wildlife. The FAA recommends that airport operators 7/27/2004 AC 150/5200-33A approach landscaping with caution and confine it to airport areas not associated with aircraft movements. A wildlife damage management biologist should review all landscaping plans. Airport operators should also monitor all landscaped areas on a continuing basis for the presence of hazardous wildlife. If hazardous wildlife is detected, corrective actions should be immediately implemented. Turf grass areas can be highly attractive to a variety of hazardous wildlife species. Research conducted by the USDA Wildlife Services' National Wildlife Research Center has shown that no one grass management regime will deter all species of hazardous wildlife in all situations. In cooperation with wildlife damage management biologist, airport operators should develop airport turf grass management plans on a prescription basis, depending on the airport's geographic locations and the type of hazardous wildlife likely to frequent the airport Airport operators should ensure that plant varieties attractive to hazardous wildlife are not used on the airport. Disturbed areas or areas in need of re -vegetating should not be planted with seed mixtures containing millet or any other large -seed producing grass. For airport property already planted with seed mixtures containing millet, rye grass, or other large seed producing grasses, the FAA recommends disking, plowing, or another suitable agricultural practice to prevent plant maturation and seed head production. • Plantings should follow the specific recommendations for grass management and seed and plant selection made by the State University Cooperative Extension Service, the local office of Wildlife Services, or a qualified wildlife damage management biologist. Airport operators should also consider developing and implementing a preferred/prohibited plant species list, reviewed by a wildlife damage management biologist, which has been designed for the geographic location to reduce the attractiveness to hazardous wildlife for landscaping airport property. c. Airports surrounded by wildlife habitat. The FAA recommends that operators of airports surrounded by woodlands, water, or wetlands refer to Section 2.4 of this AC. Operators of such airports should provide for a WHA conducted by a wildlife damage management biologist. This WHA is the first step in preparing a WHMP, where required. d. Other hazardous wildlife attractants. Other specific land uses or activities (e.g., sport or commercial fishing, shellfish harvesting, etc.), perhaps unique to certain regions of the country, have the potential to attract hazardous wildlife. Regardless of the source of the attraction, when hazardous wildlife is noted on a public -use airport, airport operators must take prompt remedial action(s) to protect aviation safety. 2-8.SYNERGISTIC EFFECTS OF SURROUNDING LAND USES. There may be circumstances where two (or more) different land uses that would not, by- themselves, be considered.. hazardous wildlife attractants or that are located outside of the separations identified in Sections 1-2 through 1-4 that are in such an alignment with the airport as to create a wildlife corridor directly through the airport and/or surrounding airspace. An example of this situation may involve a lake located outside of the separation criteria on the east side of an airport and a large hayfield on the west side of an airport, land uses that together could create a flyway for Canada geese directly across the airspace of the airport. There are numerous examples of such situations; therefore, airport operators and the wildlife damage management biologist must consider the entire surrounding landscape and community when developing the WHMP. AC 150/5200-33A Intentionally Left Blank 10 7/27/2004 7/27/2004 AC 150/5200-33A SECTION 3. PROCEDURES FOR WILDLIFE HAZARD MANAGEMENT BY OPERATORS OF PUBLIC -USE AIRPORTS. 3.1. INTRODUCTION. In recognition of the increased risk of serious aircraft damage or the loss of human life that can result from a wildlife strike, the FAA may require the development of a Wildlife Hazard Management Plan (WHMP) when specific triggering events occur on or near the airport. Part 139.337 discusses the specific events that trigger a Wildlife Hazard Assessment (WHA) and the specific issues that a WHMP must address for FAA approval and inclusion in an Airport Certification Manual. 3.2. COORDINATION WITH USDA WILDLIFE SERVICES OR OTHER QUALIFIED WILDLIFE DAMAGE MANAGEMENT BIOLOGISTS. The FAA will use the WHA conducted in accordance with Part 139 to determine if the airport needs a WHMP. Therefore, persons having the education, training, and expertise necessary to assess wildlife hazards must conduct the WHA. The airport operator may look to Wildlife Services or to qualified private consultants to conduct the WHA. When the services of a wildlife damage management biologist are required, the FAA recommends that land -use developers or airport operators contact a consultant specializing in wildlife damage management or the appropriate state director of Wildlife Services. NOTE: Telephone numbers for the respective USDA Wldlife Services state offices can be obtained by contacting USDA Wildlife Services Operational Support Staff, 4700 River Road, Unit 87, Riverdale, MD, 20737-1234, Telephone (301) 734-7921, Fax (301) 734-5157 (http-l/www aphis usda gov/wsll. 3-3.WILDLIFE HAZARD MANAGEMENT AT AIRPORTS: A MANUAL FOR AIRPORT PERSONNEL. This manual, prepared by FAA and USDA Wildlife Services staff, contains a compilation of information to assist airport personnel in the development, implementation, and evaluation of WHMPs at airports. The manual includes specific information on the nature of wildlife strikes, legal authority, regulations, wildlife management techniques, WHAs, WHMPs, and sources of help and information. The manual is available in three languages: English, Spanish, and French. It can be viewed and downloaded free of charge from the FAA's wildlife hazard mitigation web site: http•//wildlife-mitigation tc faa gov/. This manual only provides a starting point for addressing wildlife hazard Issues at airports. Hazardous wildlife management is a complex discipline and conditions vary widely across the United States. Therefore, qualified wildlife damage management biologists must direct the development of a WHMP and the implementation of management actions by airport personnel. There are many other resources complementary to this manual for use in developing and implementing WHMPs. Several are listed in the manual's bibliography. 3-4. WILDLIFE HAZARD ASSESSMENTS, TITLE 14, CODE OF FEDERAL REGULATIONS, PART 139. Part 139.337(b) requires airport operators to conduct a Wildlife Hazard Assessment (WHA) when certain events occur on or near the airport. Part_ 139.337 (c) provides specific guidance as to what facts must be addressed in a WHA. 3-5.WILDLIFE HAZARD MANAGEMENT PLAN (WHMP). The FAA will consider the results of the WHA, along with the aeronautical activity at the airport and the views of the airport operator and airport users, in determining whether a formal WHMP is needed, in accordance with Part 139.337. If the FAA determines that a WHMP is needed, the airport operator must formulate and implement a WHMP, using the WHA as the basis for the plan. The goal of an airport's Wildlife Hazard Management Plan is to minimize the risk to aviation safety, airport structures or equipment, or human health posed by populations of hazardous wildlife on and around the airport. 11 AC 150/5200-33A 7/27/2004 The WHMP must identify hazardous wildlife attractants on or near the airport and the appropriate wildlife damage management techniques to minimize the wildlife hazard. It must also prioritize the management measures. 3-6. LOCAL COORDINATION. The establishment of a Wildlife Hazards Working Group (WHWG) will facilitate the communication, cooperation, and coordination of the airport and its surrounding community necessary to ensure the effectiveness of the WHMP. The cooperation of the airport community is also necessary when new projects are considered. Whether on or off the airport, the input from all involved parties must be considered when a potentially hazardous wildlife attractant is being proposed. Airport operators should also incorporate public education activities with the local coordination efforts because some activities in the vicinity of your airport, while harmless under normal leisure conditions, can attract wildlife and present a danger to aircraft. For example, if public trails are planned near wetlands or in parks adjoining airport property, the public should know that feeding birds and other wildlife in the area may pose a risk to aircraft. Airport operators should work with local and regional planning and zoning boards so as to be aware of proposed land -use changes, or modification of existing land uses, that could create hazardous wildlife attractants within the separations identified in Sections 1-2 through 1-4. Pay particular attention to proposed land uses involving creation or expansion of waste water treatment facilities, development of wetland mitigation sites, or development or expansion of dredge spoil containment areas. At the very least, airport operators must ensure they are on the notification list of the local planning board or equivalent review entity for all communities located within 5 miles of the airport, so they will receive notification of any proposed project and have the opportunity to review it for attractiveness to hazardous wildlife. 3-7.COORDINATION/NOTIFICATION OF AIRMEN OF WILDLIFE HAZARDS. If an existing land -use practice creates a wildlife hazard and the land -use practice or wildlife hazard cannot be immediately eliminated, airport operators must issue a Notice to Airmen (NOTAM) and encourage the land -owner or manager to take steps to control the wildlife hazard and minimize further attraction. 12 7/27/2004 AC 150/5200-33A SECTION 4. FAA NOTIFICATION AND REVIEW OF PROPOSED LAND -USE PRACTICE CHANGES IN THE VICINITY OF PUBLIC USE AIRPORTS. 4-1. FAA REVIEW OF PROPOSED LAND -USE PRACTICE CHANGES IN THE VICINITY OF PUBLIC USE AIRPORTS. a. The FAA discourages the development of waste disposal and other facilities, discussed in Section 2, located within the 5,000/10,000-foot criteria specified in Sections 1-2 through 1-4. b. For projects that are located outside the 5,000/10,000-foot criteria but within 5 statute miles of the airport's AOA, the FAA may review development plans, proposed land -use changes, operational changes, or wetland mitigation plans to determine if such changes present potential wildlife hazards to aircraft operations. The FAA considers sensitive airport areas as those that lie under or next to approach or departure airspace. This brief examination should indicate if further investigation is warranted. c. Where a wildlife damage management biologist has conducted a further study to evaluate a site's compatibility with airport operations, the FAA may use the study results to make a determination. 4-2. WASTE MANAGEMENT FACILITIES. a. Notification of nowlexpanded project proposal. Section 503 of the Wendell H. Ford Aviation Investment and Reform Act for the 21st Century (Public Law 106-181) limits the construction or establishment of new MSWL within 6 statute miles of certain public use airports, when both the airport and the landfill meet very specific conditions. See Section 2-2 of this AC and AC 150/5200-34 for a more detailed discussion of these restrictions. The Environmental Protection Agency (EPA) requires any MSWL operator proposing a new or expanded waste disposal operation within 5 statute miles of a runway end to notify the appropriate FAA Regional Airports Division Office and the airport operator of the proposal (40 CFR 258, Criteria for Municipal Solid Waste Landfills, Section 258.10, Airport Safety). The EPA also requires owners or operators of new MSWL units, or lateral expansions of existing MSWL units, that are located within 10,000 feet of any airport runway end used by turbojet aircraft, or within 5,000 feet of any airport runway end used only by piston -type aircraft, to demonstrate successfully that such units are not hazards to aircraft. (See 4-2.b below.) When new or expanded MSWLs are being proposed near airports, MSWL operators must notify the airport operator and the FAA of the proposal as early as possible pursuant to 40 CFR 258. b. Waste handling facilities within separations Identified In Sections 1-2 through 1-4. To claim successfully that a waste -handling facility sited within the separations identified in Sections 1-2 through 1-4 does not attract hazardous wildlife and does not threaten aviation, the developer must establish convincingly that the facility will not handle putrescible material other than that as outlined in 2-2b. The FAA strongly recommends against any facility other than that as outlined in 2-2b (enclosed transfer stations). The FAA will use this information to determine if the facility will be a hazard to aviation. c. Putrescible-Waste Facilities. In their effort to satisfy the EPA requirement, some putrescibie- waste facility proponents may offer to undertake experimental measures to demonstrate that their proposed facility will not be a hazard to aircraft. To date, no such facility has been able to demonstrate an ability to reduce and sustain hazardous wildlife to levels that existed before the 13 AC 150/5200-33A 7/27/2004 putrescible-waste landfill began operating. For this reason, demonstrations of experimental wildlife control measures may not be conducted in an airport's AOA. 4-3.OTHER LAND -USE PRACTICE CHANGES. As z matter of policy, the FAA encourages operators of public use airports who become aware of proposed land use practice changes that may attract hazardous wildlife within 5 statute miles of their airports to promptly notify the FAA. The FAA also encourages proponents of such land use changes to notify the FAA as early in the planning process as possible. Advanced notice affords the FAA an opportunity (1) to evaluate the effect of a particular land -use change on aviation safety and (2) to support efforts by the airport sponsor to restrict the use of land next to or near the airport to uses that are compatible with the airport. The airport operator, project proponent, or land -use operator may use FAA Form 7460-1, Notice of Proposed Construction or Alteration, or other suitable documents similar to FAA Form 7460-1 to notify the appropriate FAA Regional Airports Division Office. Project proponents can contact the appropriate FAA Regional Airports Division Office for assistance with the notification process. It is helpful if the notification includes a 15-minute quadrangle map of the area identifying the location of the proposed activity. The land -use operator or project proponent should also forward specific details of the proposed land -use change or operational change or expansion. In the case of solid waste landfills, the information should include the type of waste to be handled, how the waste will be processed, and final disposal methods. a. Airports that have received Federal grant-in-aid assistance. Airports that have received Federal grant-in-aid assistance are required by their grant assurances to take appropriate actions to restrict the use of land next to or near the airport to uses that are compatible with normal airport operations. The FAA recommends that airport operators to the extent practicable oppose off -airport land -use changes or practices within the separations identified in Sections 1-2 through 1-4 that may attract hazardous wildlife. Failure to do so may lead to noncompliance with applicable grant assurances. The FAA will not approve the placement of airport development projects pertaining to aircraft movement in the vicinity of hazardous wildlife attractants without appropriate mitigating measures. Increasing the intensity of wildlife control efforts is not a substitute for eliminating or reducing a proposed wildlife hazard. Airport operators should identify hazardous wildlife attractants and any associated wildlife hazards during any planning process for new airport development projects. b. Additional coordination. If, after initial review by the FAA, questions remain about the existence of a wildlife hazard near an airport, airport operators should consult a wildlife damage management biologist. Such questions may be triggered by a history of wildlife strikes at the airport or the proximity of the airport to a wildlife refuge, body of water, or similar feature known to attract wildlife. Once identified, such questions require resolution prior to the project's implementation. 14 7/27/2004 AC 150/5200-33A Appendix 1 APPENDIX 1. DEFINITIONS OF TERMS. USED IN THIS ADVISORY CIRCULAR. 1. GENERAL. This appendix provides definitions of terms used throughout this AC. 1. Air operations area. Any area of an airport used or intended to be used for landing, takeoff, or surface maneuvering of aircraft. An air operations area includes such paved areas or unpaved areas that are used or intended to be used for the unobstructed movement of aircraft in addition to its associated runway, taxiways, or apron. 2. Airport operator. The operator (private or public) or sponsor of a public -use airport. 3. Approach or departure airspace. The airspace, within 5 statute miles of an airport, through which aircraft move during landing or takeoff. 4. Bird balls. High -density plastic floating balls that can be used to cover ponds and prevent birds from using the sites. 5. Certificate holder. The holder of an Airport Operating Certificate issued under Title 14, Code of Federal Regulations, Part 139. 6. Construct a new MSWL. To begin to excavate, grade land, or raise structures to prepare a municipal solid waste landfill as permitted by the appropriate regulatory or permitting agency. 7. Detention ponds. Storm water management ponds that hold storm water for short periods of time, a few hours to a few days. 8. Establish a new MSWL. When the first load of putrescible waste is received on -site for placement in a prepared municipal solid waste landfill. 9. Fly ash. The fine, sand -like residue resulting from the complete incineration of an organic fuel source. Fly ash typically results from the combustion of coal or waste used to operate a power generating plant. 10. General aviation aircraft. Any civil aviation aircraft not operating under 14 CFR Part 119, Certification: Air Carriers and Commercial Operators. 11. Hazardous wildlife. Species -of wildlife (birds-, mmals, reptiles),..including feral animals and domesticated animals not under control, that are associated with aircraft strike problems, are capable of causing structural damage to airport facilities, or act as attractants to other wildlife that pose a strike hazard 12. Municipal Solid Waste Landfill (MSWL). A publicly or privately owned discrete area of land or an excavation that receives household waste and that is not a land application unit, surface impoundment, injection well, or waste pile, as those terms are defined under 40 CFR § 257.2. An MSWL may receive other types wastes, such as commercial solid waste, non -hazardous sludge, small -quantity generator waste, and industrial solid waste, as defined under 40 CFR § 258.2. An MSWL can consist of either a stand alone unit or several cells that receive household waste. 13. New MSWL. A municipal solid waste landfill that was established or constructed after April 5, 2001. 14. Plston-powered aircraft. Fixed -wing aircraft powered by piston engines. 15 AC 150/5200-33A Appendix 1 16 7/27/2004 15. Piston -use airport. Any airport that does not sell Jet -A fuel for fixed -wing turbine -powered aircraft, and primarily serves fixed -wing, piston -powered aircraft. Incidental use of the airport by turbine -powered, fixed -wing aircraft would not affect this designation. 'However, such aircraft should not be based at the airport. 16. Public agency. A State or political subdivision of a State, a tax -supported organization, or an Indian tribe or pueblo (49 U.S.C. § 47102(15)). 17. Public airport. An airport used or intended to be used for public purposes that is under the control of a public agency; and of which the area used or intended to be used for landing, taking off, or surface maneuvering of aircraft is publicly owned (49 U.S.C. § 47102(16)). 18. Putrescible waste. Solid waste that contains organic matter capable of being decomposed by micro-organisms and of such a character and proportion as to be capable of attracting or providing food for birds (40 CFR §257.3-8). 19. Putrescible-waste disposal operation. Landfills, garbage dumps, underwater waste discharges, or similar facilities where activities include processing, burying, storing, or otherwise disposing of putrescible material, trash, and refuse. 20. Retention ponds. Storm water management ponds that hold water for several months. 21. Runway protection zone (RP2). An area off the runway end to enhance the protection of people and property on the ground (see AC 150/5300-13). The dimensions of this zone vary with the airport design, aircraft, type of operation, and visibility minimum. 22. Scheduled air carrier operation. Any common carnage passenger -carrying operation for compensation or hire conducted by an air carrier or commercial operator for which the air carrier, commercial operator, or their representative offers in advance the departure location, departure time, and arrival location. It does not include any operation that is conducted as a supplemental operation under 14 CFR Part 119 or as a public charter operation under 14 CFR Part 380 (14 CFR § 119.3). 23. Sewage sludge. Any solid, semi -solid, or liquid residue generated during the treatment of domestic sewage in a treatment works. Sewage sludge includes, but is not limited to, domestic septage; scum or solids removed in primary, secondary, or advanced wastewater treatment process; and a material derived from sewage sludge. Sewage does not include ash generated during the firing of sewage sludge in a sewage sludge incinerator or grit and screenings generated during preliminary treatment of dammstic sewage in a treatment works. (40 CFR 257.2) 24. Sludge. Any solid, semi -solid, or liquid waste generated form a municipal, commercial or industrial wastewater treatment plant, water supply treatment plant, or air pollution control facility or any other such waste having similar characteristics and effect. (40 CFR 257.2) 25. Solid waste. Any garbage, refuse, sludge, from a waste treatment plant, water supply treatment plant or air pollution control facility and other discarded material, including, solid liquid, semisolid, or contained gaseous material resulting from industrial, commercial, mining, and agricultural operations, and from community activities, but does not include solid or dissolved materials in domestic sewage, or solid or dissolved material in irrigation return flows or industrial discharges which are point sources subject to permits under section 402 of the Federal Water Pollution Control Act, as amended (86 Stat. 880), or source, special nuclear, or by product material as defined by the Atomic Energy Act of 1954, as amended, (68 Stat. 923). (40 CFR 257.2) 26. Turbine -powered aircraft. Aircraft powered by turbine engines including turbojets and turboprops but excluding turbo -shaft rotary -wing aircraft. 7/27/2004 AC 150/5200-33A Appendix 1 27. Turbine -use airport. Any airport that sells Jet -A fuel for fixed -wing turbine -powered aircraft 28. Wastewater treatment facilibl. Any devices and/or systems used to stare, treat, recycle, or reclaim municipal sewage or liquid industrial wastes, including Publicly Owned Treatment Works (POTW), as defined by Section 212 of the Federal Water Pollution Control Act (P.L. 92-500) as amended by the Clean Water Act of 1977 (P.L. 95-576) and the Water Quality Act of 1987 (P.L. 100-4). This definition includes any pretreatment involving the reduction of the amount of pollutants, the elimination of pollutants, or the alteration of the nature of pollutant properties in wastewater prior to or in lieu of discharging or otherwise introducing such pollutants into a POTW. (See 40 CFR Section 403.3 (o), (p), & (q)). 29. Wildlife. Any wild animal, including without limitation any wild mammal, bind, reptile, fish, amphibian, mollusk, crustacean, arthropod, coelenterate, or other invertebrate, including any part, product, egg, or offspring thereof (50 CFR 10.12, Taking, Possession, Transportation, Sale, Purchase, Barter, Exportation, and Importation of Wildlife and Plants). As used in this AC, wildlife includes feral animals and domestic animals out of the control of their owners (14 CFR Part 139, Certification of Airports). 30. Wildlife attractants. Any human -made structure, land -use practice, or human -made or natural geographic feature that can attract or sustain hazardous wildlife within the landing or departure airspace or the airport's AOA. These attractants can include architectural features, landscaping, waste disposal sites, wastewater treatment facilities, agricultural or aquaculture activities, surface mining, or wetlands. 31. Wildlife hazard. A potential for a damaging aircraft collision with wildlife on or near an airport. 32. Wildlife strike. A wildlife strike is deemed to have occurred when: a. A pilot reports striking 1 or more birds or other wildlife; b. Aircraft maintenance personnel identify aircraft damage as having been caused by a wildlife strike; c. Personnel on the ground report seeing an aircraft strike 1 or more binds or other wildlife; d. Bird or other wildlife remains, whether in whole or in part, are found within 200 feet of a runway centerline, unless another reason for the animal's death is identified; e. The animal's presence on the airport had a significant negative effect on a flight (i.e., aborted takeoff, aborted landing, high-speed emergency stop, aircraft left pavement area to avoid collision with animal) (Transport Canada, Airports Group, (Mldl/fe Control Procedures Manual, Technical Publication 11500E, 1994). 2. RESERVED 17 AC 150/5200-33A Appendix 1 Intentionally Left Blank 18 7/27/2004 USDA aw United States Department of lgriculture Animal and Plant 4ealth Inspection iervice Wildlife Services AD (USDA WS) ISC Box 6006 t3LDG 4223 Rifle Range RD MCAS Cherry Point, NC ,9533-0006 ,252) 4664964 telephone (252) 46&2000 fax ISN extension: 582 begiermJ@cherrypoint.usmc.mil FOR OFFICIAL USE ONLY 04 June 2004 Mr. Eric M. Stumph, P.E. Talbert & Enright, Inc. 4810 Shelley Drive Wilmington, NC 28405 RE: Wilmington International Airport Storm water Master Plan: Executive Summary of USDA Wildlife Services recommendations. Introduction, background authority: This correspondence references the Wilmington International Airport (ILM) Storm water Master Plan that your firm is handling at the behest of the airport. Specifically, this executive summary details the North Carolina. Program of USDA Wildlife Services (WS) assessment and comments related to project meetings and visits to the site during February, March and May of 2004. This work also fuflls a portion of the work as outlined in the Cooperative Services Agreement signed during late .Ianum y 2004 between Talbert & Bright, Inc. and the North Carolina Program of USDAIAPHISIWS The primary statutory authority by which our program operates is the Animal Damage Control Act of 1931, as amended (7 U.S.C. 426-426c, 46 Stat 1468), which authorizes WS to manage migratory bird damage. Additionally, the Rural Development, Agriculture, and Related Agencies Appropriations Act of 1988 authorizes and directs the Secretary of Agriculture to cooperate with states, individuals, public and private agencies, organizations, and institutions in the control of nuisance mammals and birds deemed injurious to the public. The ability of WS to render a professional opinion in this matter stems from our relationship with the Federal Aviation Administration (FAA) as defined by the memorandum of understanding between our two agencies (MOUNo. 12-34-71- 0003) and a new memorandum of agreement to address aircraft -wildlife strikes signed by several federal agencies (e-g., FAA, USACE, etc.) that conduct work related to this topic. The biological opinions and comments related to this project are in part guided by information contained in the current FAA Advisory Circular I5015200-33, "Hazardous Wildlife Attractants On or Near Airports' ; the draft FAA Advisory Circular of the same title (i. e., AC 15015200-33A) and my training as a professional wildlife biologist trained in assessing wilagtfe damage management situations It is my understanding that the draft advisory circular mentioned above will become current by the end of this year with little tono change in language or content APHIS PrOn rig American Agriculture i Equal opportunity Employer I Wilmington International Airport FOR OFFICIAL USE ONLY 2 Storm water Master Plan General project backgrounck Specifically, ILM seeks to. expand existing propeny for development. Storm water manager rent nay be required to maintain water quality. at developed sites and associated areas per existing local and state environmental regulations. Talbert & Bright,, IncAs engaged to provide storm water pdar Wng. Qptions to achieve warier quality, needs in accordance with Best Management Practices guidance given by the North Carolina Department of Environment and Natural Resources. WS was asked to comment on proposed storm water management planning options (i. e., detention structures) as they may relate to potential wildlife hazards to aviation WS was engaged through a cooperative service agreement to provide this assistance to Talbert & Bright, Inc. Executive Summary of Recommendzilons: R M is located in a coastal estuarine environment near Wilmington, -North Carolina. Given this location the area lies within the eastern migratory bird flyway generally as recognized by the natural resources profession and U. S. Fish and Wildlife Service. Certain sections of the airport are bordered by Smith Creek. The creek is subject to tidal influence. Some areas subject to tidal influence are in the approach/ departure airspace of the facility. This setting coupled with wildlife/ habitat observations collected during two site visits .by WS are such that the guidance contained in FAA Advisory Circular (AC) 150/5200-33 and the draft revision of the AC (150/5200-33A) are applicable to this project. WS strongly recommends that wet detention basins be avoided for use as stormwater management structures at II,M. Permanent wet detention basins would contain pooled water thereby creating habitat. for birds hazardous to aviation, specifically waterfowl and gulls. An increase in this habitat type will increase the risks posed by wildlife hazardous to aviation. The risk will be elevated by attracting wildlife to areas near the movement area of the airport. The existing FAA strike record, for the airport, indicates that gulls and waterfowl (i.e., Hooded mergansers) have been involved in previous bird/ aircraft strike events at the airport. If wet basins are employed, they will require significant mitigation response from the airport. Mitigation would include excluding wildlife from the basins through the use of exclusion - devices (e.g., floating balls, grid wiring, and/ or floating covers) or through the development of a more intensive wildlife hazard abatement program (i.e., harassment of wildlife by airport personnel). Mitigation measures may not be as effective as outright avoidance of the open water wildlife attractant. Existing wet basins on the airport should be diligently monitored for wildlife use as per guidance in past siteMsit letter reports. The wet detention basins on non -airport land near the approach of runway 17 should be monitored for wildlife in a similar manner. It is recommended that the airport contact neighboring landowners in this area to discuss wildlife use of these sites and develop a suitable management plan. The basins are currently used by wildlife hazardous to aviation (i.e., Canada geese) to an unknown extent. Wilmington International Airport FOR OFFICIAL USE ONLY 2 Storm water Master Plan WS recommends that extended dry detention basins be employed for use as storm water management structures at ILM. The lack of open water for extended periods of time (i.e., wet detention basins) serves to exclude water as an additional habitat feature at the airport. This in turn; lessens the overall risk.posed'by the presence'of wildlife,hazardous to aviation that. may seek to .use the area if water wis present. The North Carolina design'guidelines -for extended dry detention %earns call fbr a`small permanent pool at fhe outtet device to reduce clogging..,WS recommends that this feature be minimized or- eliminated' to reducepotential wildlife risks. If this feature is retained the structure(s) should be' monitored,forwildlife use. If wildlife hazardous to aviation are observed utilizing these areas mitigation measures' should be in place to respond to lessen the risk to aviation safety. It is advisable that areas where dry detention basins are employed meet suitable water table and soil conditions such that typical storm water draw down can be achieved. When non- typical storm events occur it is recommended that mitigation measures be in place whereas the structures can be monitored for wildlife use. .If wildlife hazardous to aviation are observed using the structures at this time mitigation measures should be employed. Vegetation maintenance is key to successful long-term use of dry detention basins. Established vegetation in the basins will potentially amend soil conditions such that soil water retention may become problematic. Moist soils are more difficult to mechanically maintain and may also act to provide more. foraging and cover opportunities for wildlife. Given the presence of gulls' in the FAA strike record, at ITS the use of turfed: swales for storm water management at ELM should be limited to shallow swales with gentle side slopes and a bottom which dries out between 'rainfall events. Similar to the observation -in the last paragraph, the moist soil conditions that form in some turfed swales and ditches may lead to more foraging opportunities for wildlife hazardous to aviation. Mechanical maintenance of these structures may be more difficult given moist soils. White-tailed. deer presence is documented in the FAA strike record at ELM. Areas that are more difficult to maintain will have increased vegetation that will provide cover for deer thereby placing deer in close proximity to the movement area. Deer are one of the most hazardous wildlife species related to aviation in the United States. If you -have any specific questions, please use my contact information on this correspondence. Sinter y, Michael J. Begier, Wil a iologist Airport Safety Coordinator - North Carolina Wildlife Services mjheV-er@AMpoint.uftnc.mil ndh.kgier a p his usda.gfia STORMWATER BEST MANAGEMENT PRACTICES A1"ioiii lu ri NCDENR N.C. -Department of Environment and Natural Resources Division of Water Quality Water Quality Section April 1999 500 copies of this public document were printed at a cost of $690.90, or $1.36 per copy. Introduction Management of nonpoint source pollution is a stated goal of the 1987 Water Quality Act. An important source of these pollutants is stormwater runoff from urban and developing areas. This runoff has the potential to degrade water quality in all types of waters,: including, among others, those classified as water supply watersheds, shellfish areas and nutrient sensitive waters. The management. of stormwater runoff through nonstructural controls (e.g. low density developments) is the preferred method of reducing pollution from urban areas.. In cases where low density is not feasible, engineered stormwater controls .are viable solutions to reducing.pollution. However, proper design of these engineered solutions is essential fouadequate pollutant removal. In turn, dissemination of technical information to both engineers and local officials.on the.design and maintenance of engineered solutions is equally important. Design and review of stormwater best management practices (BMPs) as an engineered solution for. stormwater management are the subject of this Division of Water Quality (DWQ) document. DWQ's approach to water quality management of stormwater in surface drinking water supply watersheds, the twenty coastal.counties and'areas near High Quality Waters and Outstanding -Resource Waters is based first on minimizing impervious surfaces and, secondly, on treating stormwater runoff from these surfaces. The rules contained within .15A NCAC 2H .1000 for wet detention basins provide information on the appropriate volume of runoff to be controlled and. the- corresponding basin size and configuration. North Carolina's Stormwater Management rules also allow for the construction of alternative BMPs that meet the pollutant removal design standard of 85%removal of total suspended solids (TSS): This document. is. meant to supplement the rules in the North Carolina Administrative Code by explaining the stormwater BMPs that will be allowed,.their design criteria, and their assumed TSS removal. These guidelines are not meant to replace these rules. The stormwater BMPs that will be reviewed and their assumed TSS removal efficiencies, if designed according to the following specifications, are: B1V1fiP Wet Detention Basins Extended Detention Wetlands Pocket-Wedands . Sand Filters Bioretention Area Grassed Swales Extended Dry Detention Filter Strips Infiltration Devices Assumed US Removal 85% 85% 35% 85% 85% 35% 50% 25% - 40% 85% The BMPs can be used alone or in combination to achieve the required pollutant removal of 85% TSS. As experience grows in the use and effectiveness of the devices, other BMPs or other specifications may be allowed. DWQ will continue to review and modify both the design and the removal efficiencies and will modify them as needed. - Innovative and/or proprietary BMPs may be approved on a case -by -case basis. 5.0 Grassed Swa les 5.1 - Introduction Grassed Males are shallow trapezoidal or parabolic earthen channels covered with a dense growth of a hardy grass such as Reed Canary or Tall Fescue. Grassed swales are sometimes classed as a We of biofilter because the vegetation on the swale takes up some pollutants and helps. filter sediment'and other solid particles out of the runoff. These channels convey stormwater and provide.some stormwater management for small. storms by retarding peak flow rates, lowering velocities of runoff and by infiltrating nmoff water into the soil. Swales are -used primarily in single-family residential developments, at the outlets of road culverts, and as highway medians. Enhanced grassed swales are ordinary swales with small check dams and wide basins along their course (Schueler, et al 1992). The check clams and -the wide areas create small pools of water, which slow the water's flow; encourage the water to infiltrate into the soil and.enhance pollutant removal. Figure l6 shows an example of -an enhanced grass swale. The Erosion and Sediment Control' Planning and Design Manual for North Carolina describes the process of swale design'in detail, and the designer should consult it for general design and vegetation.. specifications. When a swale is designed and installed for the. purpose of water quality protection in addition to the basic purpose of transporting stormwater, the design velocities are. lower. The requirements for reduced velocities are to allow a greater contact time with the vegetation and to allow for more infiltration. Grassed swales have a long history of use for stormwater conveyance, and they normally provide long- term water quality protection. However, because of their limited pollutant removal ability, grassed swales are not a sufficient means to reach the 85% TSS removal requirement. They cam be used as one -of a series of BMPs that when combined with other'BMPs can provide sufficient protection to surface waters: An example would-be a development that used a combination of grassed swales and extended dry detention to achieve the required 85% TSS removal. For -the purposes of satisfying the requirements for stormwater treatment found in NCAC 15A 2H.1000, a properly designed and constructed grass swale is assumed to have a TSS removal of 35%. 5.2 'General Characteristics Grassed swales have had mixed results in*removing particulate pollutants such as sediment and trace metals. They are generally. unable to remove significant amounts of soluble plant nutrients. Swales have proven to be very reliable with few failures. However, formation of gullies or thinning of the vegetative cover will reduce pollutant removal and cause the swale to fail -as a pollutant -removing device. 5.3 Advantages The primary advantages of grassed swales include relatively low construction and maintenance costs, increased infiltration, additional wildlife habitat in some cases, elimination of curbs and gutters which collect and deliver pollutants to receiving waters, and a pleasing appearance In areas with low amounts of 66 impervious surface, such as single-family residential areas, curbs and gutters can be replaced by swales, resulting in increased stormwater pollutant removal and improved aesthetics. 5.4 Disadvantages Disadvantages of swales include limited pollutant removal, increased nutrient concentrations in runoff due to fertilization of the grass in the swales; and standing water, which may cause safety, odor and/or mosquito problems. &5 Costs Swales cost less to construct than curbs,.gutters, and underground pipes; however, swales take up more land area. The costs of maintaining swales are usually minimal. However, special maintenance such as extensive sediment removal or erosion repair may becom expensive. 5.6 Design Requirement* • Longitiidinal slope should be in the.range -of 2 to 4%. If slope along the flow path exceeds 4%, then checkdams must be installed to reduce the effective slope to below 4%. • Side. slopes should be no greater than 3:1 horizontal to vertical. - • Maximum runoff velocity 1lwuld be 2 fps for.the peak runoff oft'he 2-year storm. • Design must also nonerosively pass the peak runoff rate from the 10-year storm. • . Length of &wale shall be at least 100 feet per acre of drainage area. • A. vegetation plan shalt be pftpared in accordance with the recommendations found'in the Erosion ASediment Control planuing. and Desisa Nfanital. • Swales should be stabilized within 14 days of swale construction. - Other general recommendations for design and construction of grassed swales for pollutant removal are: • Swales should be constructed on permeable, noncompacted soils. • Swales should be sited in areas where the seasonal high water table is at least one. foot below the bottom of the swale. - • Swales. should not carry dry -weather flows or c0nstatt flows of water; and • Swales should have short contact tittles or short grass height. .5.7 Maintenargc* Swale -maintenance basically involves normal grass management activities such as mowing and resodding when necessary and periodic sediment removal, if significant deposition occurs. Maintenance shall be performed as follows: • At least once annually, remove excess sediment, especially from the upstream edge, to maintain original contours and grading. 68 • At least once annually, repair any erosion and-regrade the swale to ensure that the runoff flows evenly in a thin sheet through the swale. • At least once annually, inspect vegetation and revegetate the swale to maintain a dense growth of vegetation. • Grassed swales shall be mowed at least twice annually to a maximum height of six inches. 5.8 RWerences 1. Arnold, J.A., ed. D.E. Line, S.W. Coffey, and J. Spooner.1993. Stormwater Management Guidance Manual. North Carolina Cooperative Extension Service and North Carolina Division of Environmental Management. Raleigh, NC .2. Berman,.Laurel, C. Hardine, N. Ryan, and J.D. Thorne, P.E. 1991. Urban Runoff: Water Quality Solutions. The American Public Works Association Research Foundation. 58 pp. .3. Birch, P.B., Ph.D..and H.E. Pressley (eds.)1992.. Stormwater Management Manual .for the Puget Sound Basin. Review Draft. Dept. of Ecology. Publication.number 90-73. 4. Gibb, A., B. Bennett,. and A. Birkbeck. 1991. Urban Runoff Quality and Treatment: A Comprehensive Review. File number 2-51-246(242). British Columbia Research Corporation. Vancouver, British Columbia. 5. North Carolina Department of Environment, Health, and Natural Resources, Division of Land Quality. Raleigh, NC: September 1988. Erosion and Sediment Control Planning and Design Manual. 6. Schueler, T.R., P. A. Kumble, and M. A. Heraty. 1992. A Current Assessment of Urban Best Management Practices: Techniques for -Reducing Non Point Source Pollution in the Coastal Zone. Publication number 92705. Metropolitan Washington Council of Governments. Washington, DC. 127 pp. 7. Schueler, T.R. 1987..Controlling Urban Runoff A Practical Manual for Planning and Designing Urban BMPs. Publication number 87703. Metropolitan Washington Council of Governments. Washington, DC. 275. pp. .8: Stake, P. aud"B. Urbonas. 1990. Sto=mwater Detention For Drainage, Water Quality, and CSO Management. Prentice Hall, Inc. Englewood Cliffs, NJ. 338 pp. 9. U.S. EPA.1990. Urban Targeting and BMP Selection. Information and Guidance Manual for State Nonpoint Source Program.8taff Engineers and Managers. The Terrene Institute. EPA No. 68-CS-0034. 54.pp. 10. U.S. EPA. 1992. Stormwater Management for Industrial Activities: Developing Pollution Prevention Plans and Best Management'Practices.' Office of Water. Government Institutes, Inc. Rockville, MD. 11. Urbonas, B. and L.A. Roesner, eds.1996. Urban'Runoff Quality —Impact and Quality Enhancement Technology. American Society of Civil Engineers. New York, NY. 477 pp: 69 12. WhipPle, W., N.S. Grigg, T. Grizzard, C. W. Randall, R. P. Shubinski, and L. S. Tucker. 1983. Stormwater Management in Urbanizing Areas. Prentice Hall, Inc. Englewood Cliffs, NJ. 234 pp. 70 6.0 Extended Dry Detention Basins 6.1 introduction Dry detention basins are also called dry ponds, dry detention ponds and detention basins. These basins have been the workhorse for control of stormwater peak flows in other states and in some areas of North Carolina for years; hence, there is a fair body of knowledge to assist in their design and operation. Their use as a water quality BMP is less well understood, and what data exists seems to suggest that basins designed only for .peak flow attenuation do not provide significant water quality benefits. Extended dry detention basins are similar to conventional dry basins, but provide for a longer detention time for a more frequent storm. ltigure 17 shows an example of an, extended dry detention basin. The conventional design of dry detention basins is to simply hold or detain stormwater for a short interval of time, at least 24 hours, to reduce the peak flows in the receiving water. The -basin should dry out between storms. Primary design.values for detention basins are the detention time (which is the amount of time the stormwater is held in the basin before being discharged) and the basin volume (which `determines the amount of runoff that can be held for the desired length of time). With the present emphasis on,improving stormwater quality, new basins are designed to remove pollutants and existing basins can be modified to enhance pollutant removal. Extended dry detention basins designed according to the chteria.provided herein are assumed to achieve a 50% TSS removal rate. Since dry detention basins have not been demonstrated to.provide the level of pollutant removal that is required under 15A NCAC 21 LIO00 they must be'used in combination with other BMPs such as grassed swales'to achieve 85% TSS removal. 6.2 Advantages Dry detention basins are usually not.limited by terrain or soils. They ptrn+ide excellent streambank erosion protection and treatment of stormwater when -used in combination with other stormwater control practices such as wetlands or when retrofitted with permanent pools. Modified dry basins can provide wetlands and wet meadows for animal habitat'if the basins incorporate permanent pools and proper landscaping. 6.3 Disadvantages Dry extended detention basins are usually considered unattractive by residents. Poorly maintained basins can create nuisance odors, breed insects and collect trash. Poorly located basins can remove valuable animal habitat and degrade streams and forests. Dry basins require a fair amount of land area, depending on the terrain of the land and are normally placed where they cannot be easily seen as most residents consider them unattractive. 71 6.4 Costs Detention basins are inexpensive compared to other stormwater control practices when tinily construction costs are considered. If land costs are high, then they can become one of the more expensive stormwater BWs. Maintenance costs are higher than many other practices. 6.5 Design Requirements P Extended dry detention basins capture the runoff .from the 1-year 24-hour storm and release it over a period of 48 hours or capture the runoff from the 1 inch storm and allow it to draw down over a period of 2 to S days. • Minimum flow length' to Width ratio of 3:1: • Side slopes of the pond should be no steeper than 3:1 horizontal to vertical. • Extended detention basins niust include a.smail permanent pool near the outlet orifice to reduce clogging and keep floating debris away from the'outlet. • - Cleanout access must. be provided that is sufficient for heavy machinery. • There must be a.drain that will completely empty the basin for cleanout. • . Any additional peak flow control that the local government requires must be met. • There must be vegetation plan prepared by a NC licensed professional. Consideration must be given to the grasses specified due to the frequent inundations. • The basin must be stabilized with.14 days of constmctiotL This might be in the form of .final vegetation, or a temporary -means of.providing stabilization until the vegetation'becomes established. • If the basin was, used.during-construction as a sediment basin'or-trap, then the basin must be cleaned out, graded, and vegetated within. l4-days of the completion of construction. • In addition to the detention volume; the design must provide for the sediment storage that is equal to 20% of the detention volume. • Inlet and outlet channels should be protected from scoter during high flows from large storms. Standard erosion control measures work very well. The Land Quality Section of the North Carolina Department of Environment and Natural Resources and the US Department of Agriculture Natural Resource Conservation Service (SCS) can provide valuable information on erosion and sediment control techniques. The previous illustration, Figure 17, shows a cross-section of an. extended retention pond that would .meet the above criteria. It shows the use of an inverted pipe orifice that is submerged in the small permanent pool. This allows.a more consistent prediction of drawdown time, and provides some protection from clogging. 6.6 Additional Design Considerations: Sediments can be resuspended by the incoming runoff. Therefore it is recommended that there be either an additional plunge pool at the inlet of the basin or sufficient measures such as riprap to disperse the energy. A forebay to capture sediment.can minimize cleanout problems. It is a good idea to provide adequate access for equipment to.be used for cleanout. Also, paving or flexible revetment in the forebay can allow for rapid access and quick sediment removal by heavy equipment. 73 Consideration should be given to the soil type of the site of the basin. Uncompacted, natural soils will provide the best media for vegetation and will introduce less sediment in the incoming water. The seasonal high water table should be at least 1 foct below the bottom of thie extended dry detention basin. 6.7 Maintenance Dry basins require frequent mowing and unclogging of outlets. Poorly designed basins with steep side slopes may be -hazardous to mow with power.equipment creating difficult and/.or expensive maintenance. Trash, debris and sediment accumulation is rapid in most basins, requiring frequent cleaning. Detention basins usually do not normally fall structurally; however, many dry.detention basins are not functioning as designed mainly because they do not empty completely between storms. This reduces the effective storage volume and detention time for incoming storm flows Maintenance. Requirements are as follows: • All grassed areas of an extended dry detention basin should be mowed at least'twice annually.. • :Extended dry detention basins will tend to collect debris, and it should be removed whenever:it accumulates, or at least twice annually. . • The basin should be inspected annually after -a rain event to ensure that it is operating as designed. - At a minimum, items that should be included in the annual inspection and addressed are: 1. clogging of the outlet or too rapid a release, 2. erosion on the banks, '3. erosion afthe inlet and outlet, 4. sediment -accumulation and the need for removal, 5: condition of the emergency spillway, and 6. woody vegetation in the embankment. 6.8 . beak Fiom Reduction Dry. detention basins are normally used to reduce peak flows from storms of varying recurrence frequency. ' Their pollutant removal potential is enhanced when used in conjunction with permanent pools, wetlands, etc. .6.9 References 1. Arnold, J.A., ed. D.E. Line, S.W. Coffey,.and J. Spooner. 1993. Stormwater Management Guidance Manual: North Carolina Cooperative Extension. Service and North Carolina Division of IRPA-tonmental Management. Raleigh, NC 2. Berman, Laurel, C. Hartline, N. Ryan, and J.D. Thorne, P.E. 1991. Urban Runoff Water Quality Solutions. The American Public Works Association Research Foundation. 58 pp. 3. Birch, P.B. Ph.D. and HE. Pressley (eds:)1992. Stormwater Management Manual for the Puget Sound Basin. Reviewbraft. Dept. of Ecology. Publication number 90-73. 74 4. Gibb, A., B. Bennett, and A. Birkbeck. 1991- Urban Runoff Quality and Treatment: A Comprehensive Review. File number 2-51-246(242). British Columbia Research Corporation. Vancouver British Columbia. 5. North Carolina Department -of Environment, Health, and Natural Resources, Division of Land Quality, Raleigh, NC. September 1988..Erbsion and Sediment Control Planning and Design Manual. .6. Shueler, TX,.P.A.'Kumble, and M.A.1jeraty. 1992. A Current Assessment of Urban test Management Practices: Techniques for Reducing Non Point Source Pollution in the'Coastal Zone. Publication number 92705. Metropolitan Washington Council of Governments. Washington, D.C:127 PP. 7. Shueler, T. R.1987. Controlling Urban Runoff: A Practical Manual for Planning and Designing Urban BMPs. Publication number.87703. Metropolitan Washington Council of Governments, Washington, D.C. 275 pp. 8.- Stahre, P. and B: Uftnas. 1990. Stormwater Deintion For Drainage, Water Quality and CSO Management.. Prentice Hail, 'Inc. Englewood Cliffs. NJ. 338 pp. 9. U.S.°EPA. 1990. Urban Targeting and.BMP Selection. Information and Guidance Manual for State Nonpoint Source Program Staff L+ngineers and Managers. The Terr me Institute. SPA No, 68-C8-0034. 54 Pp. 10: U.S. EPA. 1992_ Sto iiwater Management for Industrial Activities:. Developing Pollution Prevention Plans and Best Management Practices. Office of Water. Government Institutes, Inc. Rockville, MD. 11. Urbobas, B. and L.A. Roesner, ids. 1986.. Urban Runoff Quality -= Impact and Quality Enhancement Technology.. American Society of Civil Engineers. New York, NY. 477 pp. 12. Whipple, W., N.S..Gregg, T. Grizzard, C. `gV.'Randall, R.P. Shubinski, and L.S. Tucker. 1985. Stormwater Management in Urbanizing Areas. Prentice Hall, Inc. Englewood.Cliffs. NJ. 234 pp. 75 Cost Opinion Phased Distributed System Stormwater Master Plan Wilminaton International Airport Wilmington., North Carolina TB I # 3301-0305 Tuesday, August 10, 2004 Engineer's Opinion of Probable Cost Description Airport Cost Tenant Cost Phase I - Tenant (39 ac) $ 455,000.00 Phase I - Parking Lot Expansion (13 ac) $ 218,400.00 Phase I - GA Apron Expansion (15 ac) $ 206,830.00 Total Phase I Cost (67 ac) $ 425,230.00 $ 455,000.00 Phase II - Tenant (102 ac) $ 1,040,650.00 Phase II - Conveyance System - Tenant $ 1,918,605.00. Total Phase II Cost (102 ac) $ 1,918,605.00 $ 1,040,650.00 Phase III - Tenant (47 ac) $ 496,600.00 Phase III - Conveyance System - Tenant $ 1,331,200.00 Phase III -Airline Terminal (61 ac) $ 436,475.00 Total Phase III Cost (108 ac) $ 1,767,675.00 $ 496,600.00 Phase IV - Conveyance System - Tenant $ 399,100.00 Total Phase IV Cost (37 ac) $ 399,100.00 Area A - Ext. Dry Det.Basin - Airport (108 ac) $ 1,643,005.00 Area B - Ext. Dry Det. Basin - Tenant (56 ac) $ 535,730.00 Innerconnection Between Basins $ 261,300.00 Total Fact. Dry Detention Basin No. 2 (164 ac) $ 1,904,305.00 $ 535,730.00 Total Cost $ 6,414,915,007 ,414,915.00 $ 2,527,980.00 Cost Opinion Distributed System Stormwater Master Plan Wilmington International Airport Wilmington, North Carolina TB I # 3301-0305 Tuesday, August 10, 2004 Engineer's Opinion of Probable Cost Item Quantity Unit Unit Price Ext. Total Example Ext. Dry Det. Basin (Distributed) 10 EA $456,950.00 $4,569,500.00 Extended Dry Detention Basin No. 2 1 EA $2,440,035.00 $2,440,035.00 Conveyance Pipe System A (Distributed) 1 EA $717,600.00 $717,600.00 Conveyance Pipe System B (Distributed) 1 EA $132,275.00 $132,275.00 Conveyance Pipe System C (Distributed) 1 EA $2,799,030.00 $2,799,030.00 Total $10,658,440.00 Cost Opinion Centralized System Stormwater Master Plan Wilmington International Airport Wilmington., North Carolina TBI # 3301-0305 Tuesday, August 10, 2004 Engineer's Opinion of Probable Cost Item Quantity Unit Unit Price Ext. Total Extended Dry Detention Basin No. 1 1 EA $2,693,730.00 $2,693,730. 00 Extended Dry Detention Basin No. 2 1 EA $2,440,035.00 $2,440,035.00 Conveyance Pipe System A (Centralized) 1 EA $1,137,500.00 $1,137,500.00 Conveyance Pipe System B (Centralized) 1 EA $172,575.00 $172,575.00 Conveyance Pipe System C (Centralized) 1 EA $3,255,200.00 $3,255,200.00 Total $9,699,040.00 Extended Dry Detention Basin No Stormwater Master Plan Wilmington International Airport Wilmington, North Carolina TB I # 3301-0305 Tuesday, August 10, 2004 Engineer's Opinion of Probable Cost Item Quantity Unit Unit Price Ext. Total Mobilization 1 LS $150,000.00 $150,000.00 Clearing and Grubbing 15 AC $5,000.00 $75,000.00 Unclassified Excavation 235,000 CY $5.00 $1,175,000.00 Temporary Silt Fence 7,500 LF $3.00 $22,500.00 Rip Rap Inlet Protection 1 EA $600.00 $600.00 18" DIP w/End Cap 100 LF $60.00 $6,000.00 24" RCP 150 LF $80.00 $12,000.00 36" RCP 200 LF $100.00 $20,000.00 48" RCP 250 LF $150.00 $37,500.00 60" RCP 50 LF $300.00 $15,000.00 6' DIA MH 1 EA $10,000.00 $10,000.00 18" RCP Headwall 1 EA $2,000.00 $2,000.00 24" Flared End Section w/Conc. Collar and Trash Grate 1 EA $3,000.00 $3,000.00 24" RCP Headwall 1 EA $2,500.00 $2,500.00 36" RCP Headwall - Double 2 EA $5,000.00 $10,000.00 48" RCP Headwall - Double 2 EA $6,000.00 $12,000.00 60" RCP Headwall _ 2 EA $6,000.00 $12,000.00 Low Flow Channel (4' Bottom Width) 3400 LF $100.00 $340,000.00 Rip Rap 240 CY $50.00 $12,000.00 Demo. Drainage Structures 1 LS $10,000.00 $10,000.00 Fence Relocation 2500 LF $30.00 $75,000.00 Roadway Restoration 1 LS $20,000.00 $20,000.00 Seeding 20 AC $1,500.00 $30,000.00 Mulching 20 AC $1,000.00 $20,000.00 Subtotal $2,072,100.00 Design, Permitting, CA, Etc. $621,630.00 Total $2,693,730.00 Extended Dry Detention Basin No. 2 Stormwater Master Plan Wilmington International Airport Wilmington, North Carolina TBI # 3301-0305 Tuesday, August 10, 2004 Engineer's Opinion of Probable Cost Item Quantity Unit Unit Price Ext. Total Mobilization 1 LS $140,000.00 $140,000.00 Unclassified Excavation 100,000 CY $5.00 $500,000.00 Temporary Silt Fence 6,500 LF $3.00 $19,500.00 Rip Rap Inlet Protection 2 EA $600.00 $1,200.00 18" DIP w/End Cap 50 LF $60.00 $3,000.00 24" RCP 150 LF $80.00 $12,000.00 30" RCP 50 LF $95.00 $4,750.00 60" RCP 2,410 LF $300.00 $723,000.00 4' DIA MH 1 EA $6,000.00 $6,000.00 5' DIA MH 1 EA $8,000.00 $8,000.00 6' DIA MH 2 EA $10,000.00 $20,000.00 18" RCP Headwall 1 EA $2,000.00 $2,000.00 24" Flared End Section w/Conc. Collar and Trash Grate 1 EA $3,000.00 $3,000.00 24" RCP Headwall 1 EA $2,500.00 $2,500.00 30" RCP Headwall 1 EA $2,500.00 $2,500.00 60" RCP Headwall 3 EA $6,000.00 $18,0 00.00 60" RCP Headwall - Double 2 EA $12,000.00 $24,000.00 Low Flow Channel (4' Bottom Width) 2500 LF $100.00 $250,000.00 Demo. Drainage Structures 1 LS $65,000.00 $65,000.00 Taxiway Restoration 1 LS $30,000.00 $30,000.00 Roadway Restoration 1 LS $5,000.00 $5,000.00 Seeding 15 AC $1,500.00 $22,500.00 Mulching 15 AC $1,000.00 $15,000.00 Subtotal $1,876,950.00 Design, Permitting, CA, Etc. $563,085.00 Total $2,440,035.00 Conveyance Pipe System A (Centralized) Stormwater Master Plan Wilmington International Airport Wilmington, North Carolina TBI # 3301-0305 Tuesday, August 10, 2004 Engineer's Opinion of Probable Cost Item Quantity Unit Unit Price Ext. Total Mobilization 1 LS $55,000.00 $55,000.00 Temporary Silt Fence 4000 LF $3.00 $12,000.00 54" RCP 650 LF $200.00 $130,000.00 72" RCP 1200 LF $500.00 $600,000.00 10' DIA MH 3 EA $20,000.00 $60,000.00 72" Headwall/Endwall 1 EA $8,000.00 $8,000.00 Seeding 4 AC $1,500.00 $6,000.00 Mulching 4 AC $1,000.00 $4,000.00 Subtotal $875,000.00 Design, Permitting, CA, Etc. $262 500.00 Total $1,137,500.00 Conveyance Pipe System B (Centralized) Stormwater Master Plan Wilmington International Airport Wilmington, North Carolina TBI # 3301-0305 Tuesday, August 10, 2004 Engineer's Opinion of Probable Cost Item Quantity Unit Unit Price Ext. Total Mobilization 1 LS $15,000.00 ` 1-0o0.00 Temporary Silt Fence 1000 LF $3.00 $3,000.00 54" RCP 460 LF $200.00 $92,000.00 8' DIA MH 1 EA $15,000.00 $15,000.00 54" Headwall/Endwall 1 EA $4,000.00 $4,000.00 Seeding 1.5 AC $1,500.00 $2,250.00 Mulching 1.5 AC $1,000.00 $1,500.00 Subtotal $132,750.00 Design, Permitting, CA, Etc. $39,825.00 Total $172,575.00 Conveyance Pipe System C (Centralized) Stormwater Master Plan Wilmington International Airport Wilmington, Forth Carolina TBI # 3301-0305 Tuesday, August 10, 2004 Engineer's Opinion of Probable Cost Item Quantity Unit Unit Price Ext. Total Mobilization 1 LS $150,000.00 $150,000.00 Clearing and Grubbing 6 AC $5,000.00 $30,000.00 Temporary Silt Fence 12000 LF $3.00 $36,000.00 48" RCP 2000 LF $150.00 $300,000.00 60" RCP 1400 LF $300.00 $420,000.00 72" RCP 2700 LF $500.00 $1,350,000.00 8' DIA MH 3 EA $15,000.00 $45,000.00 10' DIA MH 7 EA $20,000.00 $140,000.00 72" Headwall/Endwall 1 EA $8,000.00 $8,000.00 Seeding 10 AC $1,500.00 $15,000.00 Mulching 10 AC $1,000.00 $10,000.00 Subtotal $2,504,000.00 Design, Permitting, CA, Etc. $751,200.00 Total $3,255,200.00 Conveyance Pipe System A (Distributed) Stormwater Master Plan Wilmington International Airport Wilmington, North Carolina TBI # 3301-0305 Tuesday, August 10, 2004 Engineer's Opinion of Probable Cost Item Quantity Unit Unit Price Ext. Total Mobilization 1 LS $41,000.00 $41,000.00 Temporary Silt Fence 4000 LF $3.00 $12,000.00 48" RCP 620 LF $150.00 $93,000.00 60" RCP 1150 LF $300.00 $345,000.00 8' DIA MH 3 EA $15,000.00 $45,000.00 60" Headwall/Endwall 1 EA $6,000.00 $6,000.00 Seeding 4 AC $1,500.00 $6,000.00 Mulching 4 AC $1,000.00 $4,000.00 Subtotal $552,000.00 Design, Permitting, CA, Etc. $165,600.00 Total 1 $717,600.00 Conveyance Pipe System B (Distributed) Stormwater Master Plan Wilmington International Airport Wilmington, North Carolina TBI # 3301-0305 Tuesday, August 10, 2004 Engineer's Opinion of Probable Cost Item Quantity Unit Unit Price Ext. Total Mobilization 1 LS $8,000.00 $8,000.00 Temporary Silt Fence 1000 460 LF LF $3.00 $150.00 $3,000.00 $69,000.00 _ 48" RCP 8' DIA MH 1 EA $15,000.00 $15,000.00 48" Headwall/Endwall 1 EA $3,000.00 $3,000.00 Seeding 1.5 AC $1,500.00 $2,250.00 Mulching 1.5 AC $1,000.00 $1,500.00 Subtotal $101,750.00 Design, Permitting, CA, Etc. $30,526.00 Total $132,275.00 Conveyance Pipe System C (Distributed) Stormwater Master Plan Wilmington International Airport Wilmington, North Carolina TB I # 3301-0305 Tuesday, August 10, 2004 Engineer's Opinion of Probable Cost Item Quantity Unit Unit Price Ext. Total Mobilization 1 LS $162,000.00 $162,000.00 Clearing and Grubbing 8 AC $5,000.00 $40,000.00 Temporary Silt Fence 12200 LF $3.00 $36,600.00 48" RCP 1950 LF $150.00 $292,500.00 60" RCP 3080 LF $300.00 $924,000.00 72" RCP 950 LF $500.00 $475,000.00 8' DIA MH 8 EA $15,000.00 $120,000.00 10' DIA MH 3 EA $20,000.00 $60,000.00 72" Headwall/Endwall 1 EA $8,000.00 $8,000.00 Seeding 14 AC $1,500.00 $21,000.00 Mulching 14 AC $1,000.00 $14,000.00 Subtotal $2,153,100.00 Design, Permitting, CA, Etc. $645,930.00 Total $2,799,030.00 Example Extended Dry Detention Basin (Distributed) Stormwater Master Plan Wilmington International Airport Wilmington, North Carolina TB I # 3301-0305 Tuesday, August 10, 2004 Engineer's Opinion of Probable Cost Item Quantity Unit Unit Price Ext. Total Mobilization 1 LS $24,000.00 $24,000.00 Unclassified Excavation 17500 CY $5.00 $87,500.00 Borrow Embankment 3800 CY $15.00 $57,000.00 Temporary Silt Fence 2000 LF $3.00 $6,000.00 Rip Rap Inlet Protection 1 EA $600.00 $600.00 12" PVC w/End Cap 5 LF $30.00 $150.00 24" RCP 20 LF $80.00 $1,600.00 36" RCP 35 LF $90.00 $3,150.00 42" RCP 35 LF $100.00 $3,500.00 4' DIA MH 2 EA $6,000.00 $12,000.00 V DIA MH 1 EA $10,000.00 $10,000.00 6' DIA MH w/ Grate Top 1 EA $10,000.00 $10,000.00 36" NCDOT Endwall 1 EA $3,000.00 $3,000.00 24" Flared End Section w/Conc. Collar and Trash Grate 1 EA $3,000.00 $3,000.00 24" RCP Headwall 1 EA $2,500.00 $2,500.00 Low Flow Channel (4' Bottom width) 1100 LF $100.00 $110,000.00 Demo. Drainage Structures 1 LS $5,000.00 $5,000.00 Seeding 5 AC $1,500.00 $7,500.00 Mulching 5 AC $1,000.00 $5,000.00 Subtotal $351,500.00 Design, Permitting, CA, Etc. $105,450.00 Total $456,950.00 Phase I Tenant - Extended Dry Detention Basin (Tenant Cost) Stormwater Master Plan Wilmington International Airport Wilmington, North Carolina TB I # 3301-0305 Tuesday, August 10, 2004 Engineer's Opinion of Probable Cost Item Quantity Unit Unit Price Ext. Total Mobilization 1 LS $26,000.00 $26,000.00 Unclassified Excavation 21000 CY $5.00 $105,000.00 Temporary Silt Fence 2500 LF $3.00 $7,500.00 Rip Rap Inlet Protection 2 EA $600.00 $1,200.00 12" PVC w/End Cap 10 LF $30.00 $300.00 24" RCP 40 LF $80.00 $3,200.00 36" RCP 70 LF $90.00 $6,300.00 42" RCP 70 LF $100.00 $7,000.00 4' DIA MH 4 EA $6,000.00 $24,000.00 V DIA MH 2 EA $10,000.00 $20,000.00 V DIA MH w/ Grate Top 2 EA $10,000.00 $20,000.00 36" NCDOT Endwall 2 EA $3,000.00 $6,000.00 24" Flared End Section w/Conc. Collar and Trash Grate 2 EA $3,000.00 $6,000.00 24" RCP Headwall 2 EA $2,500.00 $5,000.00 Low Flow Channel (4' Bottom Width) 1000 LF $100.00 $100,000.00 Seeding 5 AC $1,500.00 $7,500.00 Mulching 5 AC $1,000.00 $5,000.00 Subtotal $350,000.00 Design, Permitting, CA, Etc. $105,000.00 Total 1 $455,000.00 Phase I Parking - Extended Dry Detention Basin (Airport Cost) Stormwater Master Plan Wilmington International Airport Wilmington, North Carolina TB I # 3301-0305 Tuesday, August 10, 2004 Engineer's Opinion of Probable Cost Item Quantity Unit Unit Price Ext. Total Mobilization 1 LS $13,000.00 $13,000.00 Unclassified Excavation 7200 CY $5.00 $36,000.00 Temporary Silt Fence 1500 LF $3.00 $4,500.00 Rip Rap Inlet Protection 1 EA $600.00 $600.00 12" PVC w/End Cap 5 LF $30.00 $150.00 24" RCP 20 LF $80.00 $1,600.00 36" RCP 35 LF $90.00 $3,150.00 42" RCP 35 LF $100.00 $3,500.00 4' DIA MH 2 EA $6,000.00 $12,000.00 V DIA MH 1 EA $10,000.00 $10,000.00 6' DIA MH w/ Grate Top 1 EA $10,000.00 $10,000.00 36" NCDOT Endwall 1 EA $3,000.00 $3,000.00 24" Flared End Section w/Conc. Collar and Trash Grate 1 EA $3,000.00 $3,000.00 24" RCP Headwall 1 EA $2,500.00 $2,500.00 Low Flow Channel (4' Bottom Width) 600 LF $100.00 $60,000.00 Seeding 2 AC $1,500.00 $3,000.00 Mulching 2 AC $1,000.00 $2,000.00 Subtotal $168,000.00 Design, Permitting, CA, Etc. $50,400.00 Total $218,400.00 Phase I General Aviation - Extended Dry Detention Basin (Airport Cost) Stormwater Master Plan Wilmington International Airport Wilmington, North Carolina TB I # 3301-0305 Tuesday, August 10, 2004 Engineer's Opinion of Probable Cost Item Quantity Unit Unit Price Ext. Total Mobilization 1 LS $12,000.00 $12,000.00 Unclassified Excavation 7800 CY $5.00 $39,000.00 Temporary Silt Fence 1200 LF $3.00 $3,600.00 Rip Rap Inlet Protection 1 EA $600.00 $600.00 12" PVC w/End Cap 5 LF $30.00 $150.00 24" RCP 20 LF $80.00 $1,600.00 36" RCP - 35 LF $90.00 $3,150.00 42" RCP 35 LF $100.00 $3,500.00 4' DIA MH 2 EA $6,000.00 $12,000.00 V DIA MH 1 EA $10,000.00 $10,000.00 6' DIA MH w/ Grate Top 1 EA $10,000.00 $10,000.00 36" NCDOT Endwall 1 EA $3,000.00 $3,000.00 24" Flared End Section w/Conc. Collar and Trash Grate 1 EA $3,000.00 $3,000.00 24" RCP Headwall 1 EA $2,500.00 $2,500.00 Low Flow Channel (4' Bottom Width) 500 LF $100.00 $50,000.00 Seeding 2 AC $1,500.00 $3,000.00 Mulching 2 AC $1,000.00 $2,000.00 Subtotal $159,100.00 Design, Permitting, CA, Etc. $47,730.00 Total $206,830.00 Phase II Tenant - Extended Dry Detention Basin (Tenant Cost) Stormwater Master Plan Wilmington International Airport Wilmington, North Carolina TBI # 3301-0305 Tuesday, August 10, 2004 Engineer's Opinion of Probable Cost Item Quantity Unit Unit Price Ext. Total Mobilization 1 LS $60,000.00 $60,000.00 Unclassified Excavation 54500 CY $5.00 $272,500.00 Temporary Silt Fence 5000 LF $3.00 $15,000.00 Rip Rap Inlet Protection 4 EA $600.00 $2,400.00 12" PVC w/End Cap 20 LF $30.00 $600.00 24" RCP 80 LF $80.00 $6,400.00 36" RCP 140 LF $90.00 $12,600.00 42" RCP 140 LF $100.00 $14,000.00 4' DIA MH 8 EA $6,000.00 $48,000.00 V DIA MH 4 EA $10,000.00 $40,000.00 V DIA MH w/ Grate Top 4 EA $10,000.00 $40,000.00 36" NCDOT Endwall 4 EA $3,000.00 $12,000.00 24" Flared End Section w/Conc. Collar and Trash Grate 4 EA $3,000.00 $12,000.00 24" RCP Headwall 4 EA $2,500.00 $10,000.00 Low Flow Channel (4' Bottom Width) 2300 LF $100.00 $230,000.00 Seeding 10 AC $1,500.00 $15,000.00 Mulching 10 AC $1,000.00 $10,000.00 Subtotal $800,500.00 Design, Permitting, CA, Etc. $240,150.00 Total 1 $1,040,650.00 Phase II Tenant - Conveyance Pipe System A (Airport Cost) Stormwater Master Plan Wilmington International Airport Wilmington, North Carolina TB I # 3301-0305 Tuesday, August 10, 2004 Engineer's Opinion of Probable Cost Item Quantity Unit Unit Price Ext. Total Mobilization 1 LS $41,000.00 $41,000.00 Temporary Silt Fence 4000 LF $3.00 $12,000.00 48" RCP 620 LF $150.00 $93,000.00 60" RCP 1150 LF $300.00 $345,000.00 8' DIA MH 3 EA $15,000.00 $45,000.00 60" Headwall/Endwall 1 EA $6,000.00 $6,000.00 Seeding 4 AC $1,500.00 $61-000.00 Mulching 4 AC $1,000.00 $4,000.00 Subtotal $552,000.00 Design, Permitting, CA, Etc. $165,600.00 Total $717,600.00 Phase 11 Tenant - Conveyance Pipe System B (Airport Cost) Stormwater Master Plan Wilmington International Airport Wilmington, North Carolina TB I # 3301-0305 Tuesday, August 10, 2004 Engineer's Opinion of Probable Cost Item Quantity Unit Unit Price Ext. Total Mobilization 1 LS $8,000.00 $8,000.00 Temporary Silt Fence 1000 LF $3.00 $3,000.00 48" RCP 460 LF $150,00 $69,000.00 8' DIA MH 1 EA $15,000.00 $15,000.00 48" Headwall/Endwall 1 EA $3,000.00 $3,000.00 Seeding 1.5 AC $1,500.00 $2,250.00 Mulching 1.5 AC $1,000.00 $1,500.00 Subtotal $101,750.00 Design, Permitting, CA, Etc. $30,525.00 Total $132,275.00 Phase II Tenant - Conveyance Pipe System C (Airport Cost) Stormwater Master Plan Wilmington International Airport Wilmington, North Carolina TBI # 3301-0305 Tuesday, August 10, 2004 Engineer's Opinion of Probable Cost Item Quantity Unit Unit Price Ext. Total Mobilization 1 LS $63,000.00 $63,000.00 Clearing and Grubbing 2 AC $5,000.00 $10,000.00 Temporary Silt Fence 3200 LF $3.00 $9,600.00 60" RCP 580 LF $300.00 $174,000.00 72" RCP 950 LF $500.00 $475,000.00 8' DIA MH 1 EA $15,000.00 $15,000.00 10' DIA MH 3 EA $20,000.00 $60,000.00 72" Headwall/Endwall 1 EA $8,000.00 $8,000.00 Seeding 3 AC $1,500.00 $4,500.00 Mulching 3 AC $1,000.00 $3,000.00 Subtotal $822,100.00 Design, Permitting, CA, Etc. $246,630.00 Total 1 $1,068, 730.00 Phase III Tenant - Extended Dry Detention Basin (Tenant Cost) Stormwater Master Plan Wilmington International Airport Wilmington, North Carolina T B I # 3301-0305 Tuesday, August 10, 2004 Engineer's Opinion of Probable Cost Item Quantity Unit Unit Price Ext. Total Mobilization 1 LS $28,000.00 $28,000.00 Unclassified Excavation 25000 CY $5.00 $125,000.00 Temporary Silt Fence 2500 LF $3.00 $7,500.00 Rip Rap Inlet Protection 2 EA $600.00 $1,200.00 12" PVC w/End Cap 10 LF $30.00 $300.00 24" RCP 40 LF $80.00 $3,200.00 36" RCP 70 LF $90.00 $6,300.00 42" RCP 70 LF $100.00 $7,000.00 4' DIA MH 4 EA $6,000.00 $24,000.00 V DIA MH 2 EA $10,000.00 $20,000.00 V DIA MH w/ Grate Top 2 EA $10,000.00 $20,000.00 36" NCDOT Endwall 2 EA $3,000.00 $6,000.00 24" Flared End Section w/Conc. Collar and Trash Grate 2 EA $3,000.00 $6,000.00 24" RCP Headwall 2 EA $2,500.00 $5,000.00 Low Flow Channel (4' Bottom Width) 1100 LF $100.00 $110,000.00 weeding 5 AC $1,500.00 $7,500.00 Mulching 5 AC $1,000.00 $5,000.00 Subtotal $382,000.00 Design, Permitting, CA, Etc. $114,600.00 Total 1 $496,600.00 Phase III Tenant - Conveyance Pipe System C (Airport Cost) Stormwater Master Plan Wilmington International Airport Wilmington, North Carolina TB I # 3301-0305 Tuesday, August 10, 2004 Engineer's Opinion of Probable Cost Item Quantity Unit Unit Price Ext. Total Mobilization 1 LS $76,000.00 $76,000.00 Clearing and Grubbing 4 AC $5,000.00 $20,000.00 Temporary Silt Fence 6000 LF $3.00 $18,000.00 48" RCP 450 LF $150.00 $67,500.00 60" RCP 2500 LF $300.00 $750,000.00 8' DIA MH 5 EA $15,000.00 $75,000.00 Seeding 7 AC $1,500.00 $10,500.00 Mulching 7 AC $1,000.00 $7,000.00 Subtotal $1,024,000.00 Design, Permitting, CA, Etc. $307,200.00 Total $1,331,200.00 Phase III Airline Terminal - Extended Dry Detention Basin (Airport Cost) Stormwater Master Plan Wilmington International Airport Wilmington, North Carolina TBI # 3301-0305 Tuesday, August 10, 2004 Engineer's Opinion of Probable Cost Item Quantity Unit Unit Price Ext. Total Mobilization 1 LS $25,000.00 $25,000.00 Unclassified Excavation 32550 CY $5.00 $162,750.00 Temporary Silt Fence 2000 LF $3.00 $6,000.00 Rip Rap Inlet Protection 1 EA $600.00 $600.00 12" PVC w/End Cap 5 LF $30.00 $150.00 24" RCP 20 LF $80.00 $1,600.00 36" RCP 35 LF $90.00 $3,150.00 42" RCP 35 LF $100.00 $3,500.00 4' DIA MH 2 EA $6,000.00 $12,000.00 6' DIA MH 1 EA $10,000.00 $10,000.00 6' DIA MH w/ Grate Top 1 EA $10,000.00 $10,000.00 36" NCDOT Endwall 1 EA $3,000.00 $3,000.00 24" Flared End Section w/Conc. Collar and Trash Grate 1 EA $3,000.00 $3,000.00 24" RCP Headwall 1 EA $2,500.00 $2,500.00 Low Flow Channel (4' Bottom Width) 800 LF $100.00 $80,000.00 Seeding 5 AC $1,500.00 $7,500.00 Mulching 5 AC $1,000.00 $5,000.00 Subtotal $335,750.00 Design, Permitting, CA, Etc. $100 725.00 Total $436,475.00 Phase IV Tenant - Conveyance Pipe System C (Airport Cost) Stormwater Master Plan Wilmington International Airport Wilmington, North Carolina TB I # 3301-0305 Tuesday, August 10, 2004 Engineer's Opinion of Probable Cost Item Quantity Unit Unit Price Ext. Total Mobilization 1 LS $23,000.00 $23,000.00 Clearing and Grubbing 2 AC $5,000.00 $10,000.00 Temporary Silt Fence 3000 LF $3.00 $9,000.00 48" RCP 1500 LF $150.00 $225,000.00 V DIA MH 2 EA $15,000.00 $30,000.00 Seeding 4 AC $1,500.00 $6,000.00 Mulching 4 AC $1,000.00 $4,000.00 Subtotal $307,000.00 Design, Permitting, CA, Etc. $92 100.00 Total $399,100.00 Area A - Extended Dry Detention Basin No. 2 - Airport (Airport Cost) Stormwater Master Plan Wilmington International Airport Wilmington, North Carolina TBI # 3301-0305 Tuesday, August 10, 2004 Engineer's Opinion of Probable Cost Item Quantity Unit Unit Price Ext. Total Mobilization 1 LS $95,000.00 $95,000.00 Unclassified Excavation 75,000 CY $5.00 $375,000.00 Temporary Silt Fence 4,500 LF $3.00 $13,500.00 Rip Rap Inlet Protection 1 EA $600.00 $600.00 24" RCP 125 LF $80.00 $10,000.00 30" RCP 50 LF $95.00 $4,750.00 60" RCP 1,440 LF $300.00 $432,000.00 4' DIA MH 1 EA $6,000.00 $6,000.00 5' DIA MH 1 EA $8,000.00 $8,000.00 24" RCP Headwall 1 EA $2,500.00 $2,500.00 30" RCP Headwall 1 EA $2,500.00 $2,500.00 60" RCP Headwall - Double 2 EA $12,000.00 $24,000.00 Low Flow Channel (4' Bottom Width) 2000 LF $100.00 $200,000.00 Demo. Drainage Structures 1 LS $50,000.00 $50,000.00 Taxiway Restoration 1 LS $15,000.00 $15,000.00 Seeding 10 AC $1,500.00 $15,000.00 Mulching 10 AC $1,000.00 $10,000.00 Subtotal $1,263,850.00 Design, Permitting, CA, Etc. $379,155.00 Total $1,643,005.00 Area B - Extended Dry Detention Basin No. 2 Tenant (Tenant Cost) Stormwater Master Plan Wilmington International Airport Wilmington, North Carolina TB I # 3301-0305 Tuesday, August 10, 2004 Engineer's Opinion of Probable Cost Item Quantity Unit Unit Price Ext. Total Mobilization 1 LS $30,000.00 $30,000.00 Unclassified Excavation 25,000 CY $5.00 $125,000.00 Temporary Silt Fence 2,000 LF $3.00 $6,000.00 Rip Rap Inlet Protection 1 EA $600.00 $600.00 18" DIP w/End Cap 50 LF $60.00 $3,000.00 24" RCP 25 LF $80.00 $2,000.00 60" RCP 440 LF $300.00 $132;000.00 6' DIA MH 2 EA $10,000.00 $20,000.00 18" RCP Headwall 1 EA $2,000.00 $2,000.00 24" Flared End Section w/Conc. Collar and Trash Grate 1 EA $3,000.00 $3,000.00 60" RCP Headwall 1 EA $6,000.00 $6,000.00 Low Flow Channel (4' Bottom Width) 500 LF $100.00 $50,000.00 Demo. Drainage Structures 1 LS $15,000.00 $15,000.00 Roadway Restoration 1 LS $5,000.00 $5,000.00 Seeding 5 AC $1,500.00 $7,500.00 Mulching 5 AC $1,000.00 $5,000.00 Subtotal $412,100.00 Design, Permitting, CA, Etc. $123,630.00 Total $535,730.00 Interconnection Areas A & B - Extended Dry Detention Basin No. 2 (Airport Cost) Stormwater Master Plan Wilmington International Airport Wilmington, North Carolina TB I # 3301-0305 Tuesday, August 10, 2004 Engineer's Opinion of Probable Cost Item Quantity Unit Unit Price Ext. Total Mobilization 1 LS $15,000.00 $15,000.00 60" RCP 530 LF $300.00 $159,000.00 60" RCP Headwall 2 EA $6,000.00 $12,000.00 Taxiway Restoration 1 LS $15,000.00 $15,000.00 Subtotal $201,000.00 Design, Permitting, CA, Etc. $60,300.00 Total $261,300.00 JjL September 1, 2004 ,�=:FIVER '-- S E P - 2 2004 ® D��t Ms. Linda Lewis Environmental Engineer North Carolina Department of Environment and Natural Resources 127 Cardinal Drive Extension Wilmington, NC 28405 RE: Wilmington International Airport Stormwater Master Plan AIP 3-37-0084-30 TBI No. 3301-0305 Dear Linda: In accordance with your letter of August 30, 2004, we are submitting herewith an original and one copy each of the Stormwater Permit Application form and the Low Density Supplement, along with a check covering the $420.00 permit fee. These materials are submitted in support of the Stormwater Master Plan for the Wilmington International Airport delivered to your office last week. Please call me if you have any questions or need additional information. Sincerel Eric M. Stump , P.E. Enclosures c: Ms Julie Wilsey (w/enc.) ENGINEERING & PLANNING CONSULTANTS WWW.TALBERTANDBRIGHTCOM 4810 SHELLEY DRIVE WILMINGTON, NC 28405 910.763.5350 FAX 910.762.6281 WILMINGTON, NORTH CAROLINA • CHARLOTTE, NORTH CAROLINA • RICHMOND, VIRGINIA ;u lL L-IL August 24, 2004 Ms. Linda Lewis Environmental Engineer North Carolina Department of Environment and Natural Resources 127 Cardinal Drive Extension Wilmington, NC 28405 RE: Wilmington International Airport Stormwater Master Plan AIP 3-37-0084-30 TBI No. 3301-0305 Dear Linda: On behalf of the New Hanover County Airport Authority, we are pleased to submit for your review and approval the Stormwater Master Plan for the Wilmington International Airport. The Plan includes a bound report, a separately bound technical appendix and a set of plans. Two copies of each component are enclosed herewith. By copy of this letter, we are forwarding review copies of the Plan to the FAA, NCDOT Division of Aviation and the USDA Wildlife Services. Please call me if you have any questions or need additional information. Sincerely, Eric M. Stumph, P.E. Enclosures c: Ms Julie Wilsey (w/enc.) Mr. Rusty Nealis (w/enc.) Mr. Lamar Sylvester (w/enc.) Mr. Michael Begier (w/enc.) I AUG 2 4 2004 BI.Jif om34 ENGINEERING & PLANNING CONSULTANTS WWW.TALBERTAN DBR[G HT.COM 4810 SHELLEY DRIVE WILMINGTON, NC 28405 910.763.5350 FAX 910.762.6281 WILMINGTON, NORTH CAROLINA • CHARLOTTE, NORTH CAROLINA • RICHMOND, VIRGINIA Wilmington International Airport (ILM) rmwater Master Executive Summary This Stormwater Master Plan has been developed for the Wilmington International Airport, Wilmington, North Carolina. Preparation of the Plan was requested by the Wilmington office of the North Carolina Department of Environment and Natural Resources (NCDENR), pursuant to the North Carolina Stormwater Management Rules (15A NCAC 02H.1000). Development of the Plan has been funded by the Federal Aviation Administration (FAA). The Stormwater Master Plan is a planning tool for providing stormwater management infrastructure in support of anticipated development activities on airport property. Extended dry detention basins and grassed swales are proposed to address the stormwater quality requirements of the NC Rules for areas of "High Density" development at the airport. "High Density" development is expected to be concentrated on the west side of the airport, with an overall density of 60% to 65% built -upon surface in that area. The extended dry detention basins will also serve to address the peak flow attenuation criteria in the New Hanover County Storm Water Management Ordinance. New stormwater conveyance pipelines are proposed to address the capacity and depth limitations of the existing stormwater infrastructure on the west side of the airport. The proposed conveyance pipelines and extended dry detention basins will allow positive drainage of all airport stormwater away from the Wildcat Branch drainage system, which drains the Heritage Park neighborhood located on the west side of Blue Clay Road. Heritage Park suffers frequent nuisance flooding and occasional structural flooding. The tributary area to another marginal drainage system farther south along Blue Clay Road will be reduced. All diverted stormwater from these areas will be conveyed to Smith Creek via existing outfalls located on airport property. A large portion (approximately 1,100 acres) of airport property is designated in this Plan as a "Low Density Stormwater Management Area" in the context of the NC Stormwater Management Rules. The existing built -upon area within the area is approximately 150 acres, or about 14%, well under the applicable 30% upper limit for Low Density projects. The built -upon area within the area is expected to remain well below the 30% threshold level for the foreseeable future. Wildlife hazard issues have been considered in preparation of the Plan. In addition to a careful review of FAA Advisory Circular 150/5200-33A, "Hazardous Wildlife Attractants On or Near Airports," which was revised by FAA during the course of Plan preparation, the USDA Wildlife Services was consulted to interpret the FAA criteria in the context of local conditions. Wildlife Services has advised that the Advisory Circular guidelines are applicable at the Wilmington International Airport and recommends the use of extended dry detention basins and grassed swales rather than wet detention basins at the airport. Design criteria for extended dry detention basins and grassed swales on airport property are proposed, derived from NCDENR design guides and the requirements of the Wildlife Advisory Circular. Wilmington International Airport (ILM) tormwater Two stormwater management concepts have been developed for the west side of the airport. The "centralized" stormwater management concept involves using two large extended dry detention facilities to serve the development areas on the west side of the airport. The "distributed" stormwater management concept involves using multiple smaller extended dry detention basins throughout the area. Cost opinions have been prepared for the two stormwater management concepts. A phasing plan has been developed for the distributed concept, which demonstrates the potential for incremental construction of the proposed improvements, geared to the pace of development. The airport has initiated financial planning efforts with respect to implementation of this Plan. The airport seeks NCDENR approval of both the centralized and distributed stormwater management concepts in order to maintain flexibility as financial possibilities are explored. ■Y µ f.. ! f r • ,.,yam � I; POND TO BE FILLE❑ AN15 �PE❑ ` POND A v OUTLET ` DITCH/5W11ALE TO \ �` BE REGRADED •� ' 1` atl _.� RUNWAY 5-2-4- ITICAL AREA ■:4-f-'1 00 "POND B•�''i �, Ap Y POND BOTTOM AND SLOPES TO BE `�'• `` "•HEGRADED AND STABILIZED STING OUTLET PIPES TO BE ' MOVED AND REPLACED AT LOWER GRADE/INVERT • ER Rai '•'' ::,;: � Ll DITCH TO BE PIPED 00 jr w. 4L i rt 71� 1 1 , ,OITCHES TO BE PIPED � •�. -n �. T'i �.""may`" `��"{f� •� �5�, r4 ' x -„i .:wee--� r'�x. - .:.ab(ad_-��� _" � ''"'�', ...r � ,y;��yr �.h7. p!_y' ��::E,�`rt,-.�� ` N,},r•� ri,,�:� •` "�Y::'�;�+r:r,• t. y r" .. .._ .S - - '4' � ••ti • � v .. %` f �IM `;7� ,�Ar'R��i '�''� j'" !1� �{i�' i'�f� ��'_� .� sgai�• 'r .;t•'Y'. ;ti �_•�y'r`�� g�. �' • a i •�� i� ^w3' _� r.;�'+�d ,ti� ;�}ry .�43��}• ` • YAt 41 a vr,5 t- r'��r`.t 1 �. i'�:a r �':• "may tR �. Ir • r 1_, • y' y CZ. ❑ITCH 1�� BE PIPE❑ f r, � r. TALBERT & BRIGHT ENGINEERING &PLANNING CONSULTANTS 4610 SHELLEY DRIVE WILAIINOTON, NC 28405 FAX 910-762-6261 PHONE! 910-793-8350 NC LICENSE NO. C-0713 EMAIL•TOILMi y`• WILMINGTON INTERNATIONAL AIRPORT WILDLIFE MITIGATION PROJECTTO REMOVE WET DETENTION BASINS AND OTHER STORMWATER IMPROVEMENTS EXHIBIT 2 - POND A TA.LBERT &. BRIGHT ENGINEERING & PLANNING CONSULTANTS 4810 SHELLEY ORNE "LMINOTON. NC 28405 FAX 910-782-8281 PHONE. 910-763-5350 NC LICENSE NO. C-0713 FuAn. meiu L-3 •; J WILMINGTON INTERNATIONAL AIRPORT WILDLIFE MITIGATION PROJECT TO REMOVE WET DETENTION BASINS AND OTHER STORMWATER IMPROVEMENTS EXHIBIT 4 - DITCH Z v TALBERT & BRIGHT ENGINEERING & PLANNING WNSULTANTS 4810 SHELLEY DRIVE WILMINGTON, NC 28405 FAX 910-762-6281 PHONE. 910-763-3390 NC LICENSE NO. C-0713 MAN - TMu u �rra� r Y `Ya3A i WILMINGTON INTERNATIONAL AIRPORT WILDLIFE MITIGATION PROJECTTO REMOVE WET DETENTION BASINS AND OTHER STORMWATER IMPROVEMENTS EXHIBIT 6 - DITCH 3 W 7 WILMINGTON INTERNATIONAL AIRPORT Wilmington, NC ILM Stormwater Master Plan Technical Appendix - Computations PREPARED FOR: New Hanover County Airport Authority Wilmington, North Carolina In Cooperation With: FEDERAL AVIATION ADMINISTRATION AIP 3-37-0084-30 and NORTH CAROLINA DEPARTMENT OF TRANSPORTATION DIVISION OF AVIATION I I I I Wilmington International Airport (ILM) Stormwater Master Plan Table of Contents Technical Appendix The listed items are separated by colored sheets • Computations, Distributed Concept, Example Extended Dry Detention Basin • Computations, Centralized Concept, Extended Dry Detention Basin No. 1 • Computations, Centralized Concept, Extended Dry Detention Basin No. 2 • Computations, Proposed Stormwater Conveyance Pipelines �Ip6191s11111/// CAR 0('�,, *�* 0m,coco,o Imo' 024 j I1wu9g�1�` TOC-1 ( 5,m t& JTVCJ �N \N k I ...... ...... if GA'4it4PGt' 51--X 16u7VE> 0Z P-661'f— Z-xrel'-Deo Nc�v, f3/4-3/^J 7�rIAjAff— 4yt4--,A — 14jeA . Job File: C:\HAESTAD\HAESTAD\ILM SW MASTER PLAN\TERMINAL AREA DRY POND PRE.PPW Rain Dir: C:\HAESTAD\PPKW\RAINFALL\ JOB TITLE JOB TITLE NOT SPECIFIED Press Units & Storm button (main menu screen) to enter title. /L Lg,VTEZ5 a 1,rC weT �x ece- -� -0 � r i ( Iwxr l S/N: C21705506AU7 Talbert & Bright PondPack Ver: 7.0 (325) Compute Time: 12:54:09 Date: 07-24-2004 Table of Contents i Table of Contents ******************** NETWORK SUMMARIES ********************* Watershed....... 1-year Executive Summary (Nodes) .......... 1.01 Watershed....... 100yr Executive Summary (Nodes) .......... 1.02 Watershed....... 10yr Executive Summary (Nodes) 1.03 Watershed....... 25yr Executive Summary (Nodes) .......... 1.04 Watershed....... 2yr Executive Summary (Nodes) .......... 1.05 ****************** DESIGN STORMS SUMMARY ******************* NHC............. Design Storms ...................... 2.01 TC CALCULATIONS ********************* AREA D1......... Tc Calcs ........................... 3.01 AREA D2......... Tc Calcs ........................... 3.03 AREA D3......... Tc Calcs ........................... 3.05 AREA D4......... Tc Calcs ........................... 3.07 AREA D5......... Tc Calcs ........................... 3.09 ********************** CN CALCULATIONS ********************* AREA D1......... Runoff CN-Area 4.01 S/N: C21705506A87 Talbert & Bright PondPack Ver: 7.0 (325) Compute Time: 12:54:09 Date: 07-24-2004 Table of Contents ii Table of Contents (continued) AREA D2......... Runoff CN-Area ..................... 4.02 AREA D3......... Runoff CN-Area ..................... 4.03 AREA D4......... Runoff CN-Area ..................... 4.04 AREA D5......... Runoff CN-Area ..................... 4.05 5/N: C2I705506A87 Talbert & Bright °ondFack Ver: 7.0 (325) Compute Time: 12:54:09 Date: 07-24-2004 Type.... Executive Summary (Nodes) Page 1.01 Name.... Watershed Event: 1 yr File.... C:\HAESTAD\HAESTAD\ILM SW MASTER PLAN\TERMINAL AREA DRY POND PRE.PPW Storm... TypeIII 24hr Tag: 1-year NETWORK SUMMARY -- NODES (Trun.= HYG Truncation: Blank=None; L=Left; R=Rt; LR=Left & Rt) DEFAULT Design Storm File,ID = NHC.RNQ NHC Storm Tag Name = 1-year Data Type, File, ID = Synthetic Storm SCSTYPES.RNF TypeIII 24hr Storm Frequency = 1 yr Total Rainfall Depth= 3.5000 in Duration Multiplier = 1 Resulting Duration = 24.0000 hrs Resulting Start Time= .0000 hrs Step= .1000 hrs End= 24.0000 hrs HYG Vol Qpeak Node ----------------- ID Type ac-ft Trun. hrs AREA D1 ---- AREA ---------- .780 -- --------- 12.8000 AREA D2 AREA .695 12.5000 AREA D3 AREA .119 12.6000 AREA D4 AREA .254 12.6500 AREA D5 AREA .423 12.7500 Outfall OUT 10 JCT 2.272 12.6500 S/.R�: C217C5506A87 Tal�,ert & Bright PondPack Ver: 7.0 (325) Compute Time: 12:54:09 Qpeak Max WSEL cfs ft 3.59 4.76 .63 1.28 1.90 11.24 Date: 07-24-2004 Type.... Executive Summary (Nodes) Page 1.02 Name..... Watershed Event: 100 yr File.... C:\HAESTAD\HAESTAD\ILM SW MASTER PLAN\TERMINAL AREA DRY POND PRE.PPW Storm... TypeIII 24hr Tag: 100yr NETWORK SUMMARY -- NODES (Trun.= HYG Truncation: Blank=None; L=Left; R=Rt; LR=Left & Rt) DEFAULT Design Storm File,ID = NHC.RNQ NHC Storm Tag Name = 100yr Description: New Hanover County Rainfall Curve Data -------------------------------------------------------------------- Data Type, File, ID = Synthetic Storm SCSTYPES.RNF TypeIII 24hr Storm Frequency = 100 yr Total Rainfall Depth= 10.0000 in Duration Multiplier = 1 Resulting Duration = 24.0000 hrs Resulting Start Time= .0000 hrs Step= .1000 hrs End= 24.0000 hrs HYG Vol Qpeak Node ID Type ac-ft Trun. hrs AREA D1 AREA 5.555 12.7000 AREA D2 AREA 3.674 12.4000 AREA D3 AREA .881 12.5000 AREA D4 AREA 2.040 12.5500 AREA D5 AREA 3.552 12.6500 Outfall OUT 10 JCT 15.701 12.5500 S/N: C21705506A87 Talbert & Bright PondPack Ver: 7.0 (325) Compute Time: 12:54:09 Qpeak Max WSEL cfs ft 29.89 25.79 5.55 12.87 20.51 90.82 Date: 07-24-2004 Type.... Executive Summary (Nodes) Page 1.03 Name.... Watershed Event: 10 yr File.... C:\HAESTAD\HAESTAD\ILM SW MASTER PLAN\TERMINAL AREA DRY POND PRE.PPW Storm... TypeIII 24hr Tag: 10yr NETWORK SUMMARY -- NODES (Trun.= HYG Truncation: Blank=None; L=Left; R=Rt; LR=Left & Rt) DEFAULT Design Storm File,ID = NHC.RNQ NHC Storm Tag Name = 10yr Description: New Hanover County Rainfall Curve Data -------------------------------------------------------------------- Data Type,'File, ID = Synthetic Storm SCSTYPES.RNF TypeIII 24hr Storm Frequency = 10 yr Total Rainfall Depth= 7.0000 in Duration Multiplier = 1 Resulting Duration = 24.0000 hrs Resulting Start Time= .0000 hrs Step= .1000 hrs End= 24.0000 hrs HYG Vol Qpeak Node ----------------- ID Type ac-ft Trun. hrs AREA D1 ---- AREA ---------- 3.124 -- --------- 12.7000 AREA D2 AREA 2.216 12.4500 AREA D3 AREA .491 12.6000 AREA D4 AREA 1.117 12.5500 AREA DS AREA 1.926 12.6500 Outfall OUT 10 JCT 8.875 12.5500 S/N: C21705506A87 Talbert & Bright PondPack Ver: 7.0 (325) Compute Time: 12:54:09 Qpeak Max WSEL cfs ft 16.58 15.65 3.06 6.90 10.87 50.66 Date: 07-24-2004 Type.... Executive Summary (Nodes) Page 1.04 Name.... Watershed Event: 25 yr File.... C:\HAESTAD\HAESTAD\ILM SW MASTER PLAN\TERMINAL AREA DRY POND PRE.PPW Storm... TypeIII 24hr Tag: 25yr NETWORK SUMMARY -- NODES (Trun.= HYG Truncation: Blank=None; L=Left; R=Rt; LR=Left & Rt) DEFAULT Design Storm File,ID = NHC.RNQ NHC Storm Tag Name = 25yr Description: New Hanover County Rainfall Curve Data -------------------------------------------------------------------- Data Type, File, ID = Synthetic Storm SCSTYPES.RNF TypeIII 24hr Storm Frequency = 25 yr Total Rainfall Depth= 8.0500 in Duration Multiplier = 1 Resulting Duration = 24.0000 hrs Resulting Start Time= .0000 hrs Step= .1000 hrs End= 24.0000 hrs HYG Vol Qpeak Node ----------------- ID Type ac-ft Trun. hrs AREA D1 ---- AREA ---------- 3.947 -- --------- 12.7000 AREA D2 AREA 2.717 12.4000 AREA D3 AREA .623 12.5500 AREA D4 AREA 1.427 12.5500 AREA D5 AREA 2.472 12.6500 Outfall OUT 10 JCT 11.187 12.5500 S/N: C21705506A87 Talbert & Bright PondPack Ver: 7.0 (325) Compute Time: 12:54:09 Qpeak Max WSEL cfs ft. 21.12 19.17 3.90 8.93 14.14 64.36 Date: 07-24-2004 Type.... Executive Summary (Nodes) Page 1.05 Name.... Watershed Event: 2 yr File.... C:\HAESTAD\HAESTAD\ILM SW MASTER PLAN\TERMINAL AREA DRY POND PRE.PPW Storm... TypeIII 24hr Tag: 2yr NETWORK SUMMARY -- NODES (Trun.= HYG Truncation: Blank=None; L=Left; R=Rt; LR=Left & Rt) DEFAULT Design Storm File,ID = NHC.RNQ NHC Storm Tag Name = 2yr Description: New Hanover County Rainfall Curve Data -------------------------------------------------------------------- Data Type, File, ID = Synthetic Storm SCSTYPES.RNF TypeIII 24hr Storm Frequency = 2 yr Total Rainfall Depth= 4.5000 in Duration Multiplier = 1 Resulting Duration = 24.0000 hrs Resulting Start Time= .0000 hrs Step= .1000 hrs End= 24.0000 hrs HYG Vol Qpeak Node ----------------- ID Type ac-ft Trun. hrs AREA D1 ---- AREA ---------- 1.362 -- --------- 12.8000 AREA D2 AREA 1.095 12.4500 AREA D3 AREA .211 12.6000 AREA D4 AREA .463 12.6500 AREA D5 AREA .784 12.7500 Outfall OUT 10 JCT 3.914 12.6000 S/N: C21705506A€37 Talbert & Bright PondPack Ver: 7.0 (325) Compute Time: 12:54:09 Qpeak Max WSEL cfs ft 6.81 7.67 1.23 2.63 4.03 21.03 Date: 07-24-2004 Type.... Design Storms Page 2.01 Name.... NHC File.... C:\HAESTAD\PPKW\RAINFALL\NHC.RNQ Title... JOB TITLE NOT SPECIFIED Press Units & Storm button (main menu screen) to enter title. DESIGN STORMS SUMMARY Design Storm File,ID = NHC.RNQ NHC Storm Tag Name = 100yr Description: New Hanover County Rainfall Curve Data ---------------------------------------------------------------------- Data Type, File, ID = Synthetic Storm SCSTYPES.RNF TypeIII 24hr Storm Frequency = 100 yr Total Rainfall Depth= 10.0000 in Duration Multiplier = 1 Resulting Duration = 24.0000 hrs Resulting Start Time= .0000 hrs Step= .1000 hrs End= 24.0000 hrs Storm Tag Name = 25yr Description: New Hanover County Rainfall Curve Data --------------------------------------------------------------------- Data Type, File, ID = Synthetic Storm SCSTYPES.RNF TypeIII 24hr Storm Frequency = 25 yr Total Rainfall Depth= 8.0500 in Duration Multiplier = 1 Resulting Duration = 24.0000 hrs Resulting Start Time= .0000 hrs Step= .1000 hrs End= 24.0000 hrs Storm Tag Name = 10yr Description: New Hanover County Rainfall Curve Data ------------------------------------------------------------------ -- Data Type, File, ID = Synthetic Storm SCSTYPES.RNF TypeIII 24hr Storm Frequency = 10 yr Total Rainfall Depth= 7.0000 in Duration Multiplier = 1 Resulting Duration = 24.0000 hrs Resulting Start Time= .0000 hrs Step= .1000 hrs End= 24.0000 hrs Storm Tag Name = 2yr Description: New Hanover County Rainfall Curve Data ---------------------------------------------------------------------- Data Type, File, ID = Synthetic Storm SCSTYPES.RNF TypeIII 24hr Storm Frequency = 2 yr Total Rainfall Depth= 4.5000 in Duration Multiplier = 1 Resulting Duration = 24.0000 hrs Resulting Start Time= .0000 hrs Step= .1000 hrs End= 24.0000 hrs S/N: C21705506A87 Talbert & Bright PondPack Ver: 7.0 (325) Compute Time: 12:54:09 Date: 07-24-2004 Type.... Design Storms Page 2.02 Name.... NHC File.... C:\HAESTAD\PPKW\RAINFALL\NHC.RNQ Title... JOB TITLE NOT SPECIFIED Press Units & Storm button (main menu screen) to enter title. DESIGN STORMS SUMMARY Design Storm File,ID = NHC.RNQ NHC Storm Tag Name = 1-year Data Type, File, ID = Synthetic Storm SCSTYPES.RNF TypeIII 24hr Storm Frequency = 1 yr Total Rainfall Depth= 3.5000 in Duration Multiplier = 1 Resulting Duration = 24.0000 hrs Resulting Start Time= .0000 hrs Step= .1000 hrs End= 24.0000 hrs S/N: C21705506A67 Talbert & Bright PondPack Ver: 7.0 (325) Compute Time: 12:54:09 Date: 07-24-2004 Type.... Tc Calcs Page 3.01 Name.... AREA D1 File.... C:\HAESTAD\HAESTAD\ILM SW MASTER PLAN\TERMINAL AREA DRY POND PRE.PPW TIME OF CONCENTRATION CALCULATOR Segment #1: Tc: Length & Vel. Hydraulic Length 900.00 ft Avg.Velocity 1.00 ft/sec Segment #1 Time: .2500 hrs ------------------------------------------------------------------------ Segment #2: Tc: TR-55 Shallow Hydraulic Length 600.00 ft Slope .005000 ft/ft Unpaved Avg.Velocity 1.14 ft/sec Segment #2 Time: .1461 hrs ------------------------------------------------------------------------ Segment #3: Tc: TR-55 Sheet Mannings n .2400 Hydraulic Length 300.00 ft 2yr, 24hr P 4.5000 in Slope .010000 ft/ft Avg.Velocity .13 ft/sec Segment #3 Time: .6373 hrs ------------------------------------------------------------------------ Total Tc: 1.0334 hrs S/N: C21705506A67 Talbert & Bright PondPack Ver: 7.0 (325) Compute Time: 12:54:09 Date: 07-24-2004 Type.... Tc Calcs Name.... AREA D1 Page 3.02 File.... C:\HAESTAD\HAESTAD\ILM SW MASTER PLAN\TERMINAL AREA DRY POND PRE.PPW ---------------------------------- Tc Equations used... ------------------------------------------------------------------------ ==== SCS TR-55 Sheet Flow ---------------------------------------------- ------------------------------ Tc = (.007 * ((n * Lf)**0.8)) / ((P**.5) * (5f**.4)) Where: Tc = Time of concentration, hrs n = Mannings n Lf = Flow length, ft P = 2yr, 24hr Rain depth, inches Sf = Slope, ft/ft =_== SCS TR-55 Shallow Concentrated Flow Unpaved surface: V = 16.1345 * (Sf**0.5) Paved surface: V = 20.3282 * (Sf**O.5) Tc = (Lf / V) / (3600sec/hr) Where: V = Velocity, ft/sec Sf = Slope, ft/ft Tc = Time of concentration, hrs Lf = Flow length, ft ==== User Defined Length & Velocity Tc = (Lf / V) / (3600sec/hr) Where: Tc = Time of concentration, hrs Lf = Flow length, ft V = Velocity, ft/sec S/N: C21705506A87 Talbert & Bright PondPack Ver: 7.0 (325) Compute Time: 12:54:09 Date: 07-24-2004 Type.... Tc Calcs Name.... AREA D2 Page 3.03 File.... C:\HAESTAD\HAESTAD\ILM SW MASTER PLAN\TERMINAL AREA DRY POND PRE.PPW TIME OF CONCENTRATION CALCULATOR ........................................................................ Segment #1: Tc: Length & Vel. Hydraulic Length 500.00 ft Avg.Velocity 1.00 ft/sec Segment #1 Time: .1389 hrs ------------------------------------------------------------------------ Segment #2: Tc: TR-55 Shallow Hydraulic Length 100.00 ft Slope .005000 ft/ft Unpaved Avg.Velocity 1.14 ft/sec Segment #2 Time: .0243 hrs ------------------------------------------------------------------------ Segment #3: Tc: TR-55 Sheet Mannings n .2400 Hydraulic Length 200.00 ft 2yr, 24hr P 4.5000 in Slope .010000 ft/ft Avg.Velocity .12 ft/sec Segment #3 Time: .4608 hrs ------------------------------------------------------------------------ Total Tc: .6240 hrs S/N: C21705506A87 Talbert & Bright PondPack Ver: 7.0 (325) Compute Time: 12:54:09 Date: 07-24-2004 Type.... Tc Calcs Name.... AREA D2 Page 3.04 File.... C:\HAESTADIHAESTADIILM SW MASTER PLAN\TERMINAL AREA DRY POND PRE.PPW ----------------- Tc Equations used... SCS TR-55 Sheet Flow Tc = (.007 * ((n * Lf)**0.8)) / ((P**.5) * (Sf**.4)) Where: Tc = Time of concentration, hrs n = Mannings n Lf = Flow length, ft P = 2yr, 24hr Rain depth, inches Sf = Slope, ft/ft ==== SCS TR-55 Shallow Concentrated Flow Unpaved surface: V = 16.1345 * (Sf**0.5) Paved surface: V = 20.3282 * (Sf**0.5) Tc = (Lf / V) / (3600sec/hr) Where: V = Velocity, ft/sec Sf = Slope, ft/ft Tc = Time of concentration, hrs Lf = Flow length, ft ---- User Defined Length & Velocity Tc = (Lf / V) / (3600sec/hr) Where: Tc = Time of concentration, hrs Lf = Flow length, ft V = Velocity, ft/sec S/N: C217CS506A87 Talbert & aright PondPack Ver: 7.0 (325) Compute Time: 12:54:09 Date: 07-24-2004 Type.... Tc Calcs Page 3.05 Name.... AREA D3 File.... C:\HAESTAD\HAESTAD\ILM SW MASTER PLAN\TERMINAL AREA DRY POND PRE.PPW TIME OF CONCENTRATION CALCULATOR Segment #1: Tc: Length & Vet. Hydraulic Length 900.00 ft Avg.Velocity 1.00 ft/sec Segment #1 Time: .2500 hrs ------------------------------------------------------------------------ Segment #2: Tc: TR-55 Shallow Hydraulic Length 200.00 ft Slope .005000 ft/ft Unpaved Avg.Velocity 1.14 ft/sec Segment #2 Time: .0487 hrs ------------------------------------------------------------------------ Segment #3: Tc: TR-55 Sheet Mannings n .2400 Hydraulic Length 300.00 ft 2yr, 24hr P 4.5000 in Slope .020000 ft/ft Avg.Velocity .17 ft/sec Segment #3 Time: .4830 hrs _-----------------------__---------------------------------------------- Total Tc: .7817 hrs S/N: C21705506A87 Talbert & Bright PondPack Ver: 7.0 (325) Compute Time: 12:54:09 Date: 07-24-2004 Type.... Tc Calcs Name.... AREA D3 Page 3.06 File.... C:\HAESTAD\HAESTAD\ILM SW MASTER PLAN\TERMINAL AREA DRY POND PRE.PPW ------------------------------------------------------------------------ Tc Equations used... ------------------------------------------------------------------------ ___= SCS TR-55 Sheet Flow ---------------------------------------------- ------------------ ----------------- Tc = (.007 * ((n * Lf)**0.8)) / ((P**.5) * (Sf**.4)) Where: Tc = Time of concentration, hrs n = Mannings n Lf = Flow length, ft P = 2yr, 24hr Rain depth, inches Sf = Slope, ft/ft ==== SCS TR-55 Shallow Concentrated Flow Unpaved su-r.-face: V = 16.1345 * (Sf**0.5) Paved surface: V = 20.3282 * (Sf**0.5) Tc = (Lf / V) / (3600sec/hr) Where: V = Velocity, ft/sec Sf Slope, ft/ft Tc = Time of concentration, hrs Lf = Flow length, ft ==== User Defined Length & Velocity----------------------------- Tc = (Lf / V) / (3600sec/hr) Where: Tc = Time of concentration, hrs Lf = Flow length, ft V = Velocity, ft/sec S/N: C21705506A87 Talbert & Bright PondPack Ver: 7.0 (325) Compute Time: 12:54:09 Date: 07-24-2004 Type.... Tc Calcs Page 3.07 Name.... AREA D4 File.... C:\HAESTAD\HAESTAD\ILM SW MASTER PLAN\TERMINAL AREA DRY POND PRE.PPW TIME OF CONCENTRATION CALCULATOR Segment #1: Tc: Hydraulic Length Slope Unpaved Avg.Velocity TR-55 Shallow 600.00 ft .005000 ft/ft 1.14 ft/sec Segment #1 Time: .1461 hrs ------------------------------------------------------------------------ Segment #2: Tc: TR-55 Sheet Mannings n Hydraulic Length 2yr, 24hr P Slope Avg.Velocity .2400 300.00 ft 4.5000 in .010000 ft/ft ft/sec Segment #2 Time: .6373 hrs Total Tc: .7834 hrs S/N: C21705506A87 Talbert & Bright PondPack Ver: 7.0 (325) Compute Time: 12:54:09 Date: 07-24-2004 Type.... Tc Calcs Name.... AREA D4 Page 3.08 File.... C:\HAESTAD\HAESTAD\ILM SW MASTER PLAN\TERMINAL AREA -DRY POND PRE.PPW -- - ---------------- Tc Equations used... ------------------------------------------------------------------------ ==== SCS TR-55 Sheet Flow Tc = (.007 * ((n * Lf)**0.8)) / ((P**.5) * (Sf**.4)) Where: Tc = Time of concentration, hrs n = Mannings n Lf = Flow length, ft P = 2yr, 24hr Rain depth, inches Sf = Slope, ft/ft ==== SCS TR-55 Shallow Concentrated Flow Unpaved surface, V = 16.1345 * (Sf**O.5) Paved surface: V = 20.3282 * (Sf**0.5) Tc = (Lf / V) / (3600sec/hr) Where: V Velocity, ft/sec Sf Slope, ft/ft Tc = Time of concentration, hrs Lf Flow length, ft S/N: C21705505A87 Talbert & Bright PondPack Ver: 7.0 (325) Compute Time: 12:54:09 Date: 07-24-2004 Type.... Tc Calcs Page 3.09 Name.... AREA D5 File.... C:\HAESTAD\HAESTAD\ILM SW MASTER PLAN\TERMINAL AREA DRY POND PRE.PPW ..................................._......_...........__.................... TIME OF CONCENTRATION CALCULATOR ........................................................................ Segment #1: Tc: Length & Vel. Hydraulic Length 500.00 ft Avg.Velocity 1.00 ft/sec Segment #1 Time: .1389 hrs ------------------------------------------------------------------------ Segment #2: Tc: TR-55 Shallow Hydraulic Length 200700 ft Slope .005000 ft/ft Unpaved Avg.Velocity 1.14 ft/sec Segment #2 Time: .0487 hrs ------------------------------------------------------------------------ Segment #3: Tc: TR-55 Sheet Mannings n .2400 Hydraulic Length 300.00 ft 2yr, 24hr P 3.5000 in Slope .010000 ft/ft Avg.Velocity .12 ft/sec Segment #3 Time: .7227 hrs ------------------------------------------------------------------------ Total Tc: .9102 hrs S/N: C21705506A87 Talbert & Bright PondPack Ver: 7.0 (325) Compute Time: 12:54:09 Date: 07-24-2004 Type.... Tc Calcs Name.... AREA D5 Page 3.10 File.... C:\HAESTAD\HAESTAD\ILM SW MASTER PLAN\TERMINAL AREA DRY POND PRE.PPW ------------------ Tc Equations used... ------------------------------------------------------------------------ ==== SCS TR-55 Sheet Flow Tc = (.007 * ((n * Lf)**0.8)) / ((P**.5) * (Sf**.4)) Where: Tc = Time of concentration, hrs n = Mannings n Lf = Flow length, ft P = 2yr, 24hr Rain depth, inches Sf = Slope, ft/ft ==== SCS TR-55 Shallow Concentrated Flow Unpaved surface: V = 16.1345 * (Sf**0.5) Paved surface: V = 20.3282 * (Sf**0.5) Tc = (Lf / V) / (3600sec/hr) Where: V = Velocity, ft/sec Sf = Slope, ft/ft Tc = Time of concentration, hrs Lf = Flow length, ft ==== User Defined Length & Velocity Tc = (Lf / V) / (3600sec/hr) Where: Tc = Time of concentration, hrs Lf = Flow length, ft V = Velocity, ft/sec S/N: C21705506A87 Talbert & Bright PondPack Ver: 7.0 (325) Compute Time: 12:54:09 Date: 07-24-2004 Type.... Runoff CN-Area Name.... AREA D1 Page 4.01 File.... C:\HAESTAD\HAESTAD\ILM SW MASTER PLAN\TERMINAL AREA DRY POND PRE.PPW RUNOFF CURVE NUMBER DATA Impervious Area Adjustment Adjusted Soil/Surface Description CN acres %C %UC CN - Open Space B 61 10.000 61.00 Impervious 98 1.700 98.00 COMPOSITE AREA & WEIGHTED CN -- > 11.700 66.38 (66) S/N: C21705506A87 Talbert & Bright PondPack Ver: 7.0 (325) Compute Time: 12:54:09 Date: 07-24-2004 Type.... Runoff CN-Area Name.... AREA D2 Page 4.02 File.... C:\HAESTAD\HAESTAD\ILM SW MASTER PLAN\TERMINAL AREA DRY POND PRE.PPW RUNOFF CURVE NUMBER DATA Impervious Area Adjustment Adjusted Soil/Surface Description CN acres X RUC CN -------------------------------- ------------- ----- ----- ------ Open Space B 61 4.000 61.00 Impervious 98 2.410 98.00 COMPOSITE AREA & WEIGHTED CN --> 6.410 74.91 (75) S/N: C21705506A87 Talbert & Bright PondPack Ver: 7.0 (325) Compute Time: 12:54:09 Date: 07-24-2004 Type.... Runoff CN-Area Name.... AREA D3 Page 4.03 File.... C:\HAESTAD\HAESTAD\ILM SW MASTER PLAN\TERMINAL AREA DRY POND PRE.PPW RUNOFF CURVE NUMBER DATA Impervious Area Adjustment Adjusted Soil/Surface Description CN acres %C %UC CN -------------------------------- ------------- ----- ----- ------ open space, B 61 1.700 61.00 Impervious 98 .200 98.00 COMPOSITE AREA & WEIGHTED CN ---> 1.900 64.89 (65) S/N: C21705506AB7 Talbert & Bright PondPack Ver: 7.0 (325) Compute Time: 12:54:09 Date: 07-24-2004 Type.... Runoff CN-Area Name.... AREA D4 Page 4.04 Fite.... C:\HAESTAD\HAESTAD\ILM SW MASTER PLAN\TERMINAL AREA DRY POND PRE.PPW RUNOFF CURVE NUMBER DATA Impervious Area Adjustment Adjusted Soil/Surface Description CN ------------------------------- acres %C %UC CN ---- open space, B 61 --------- 4.400 ----- ----- ------ 61.00 impervious 98 .220 98.00 COMPOSITE AREA & WEIGHTED CN ---> 4.620 62.76 (63) S/N: C21705506A87 Talbert & Bright PondPack Ver: 7.0 (325) Compute Time: 12:54:09 Date: 07-24-2004 Type.... Runoff CN-Area Name.... AREA D5 Page 4.05 File.... C:\HAESTAD\HAESTAD\ILM SW MASTER PLAN\TERMINAL AREA DRY POND PRE.PPW RUNOFF CURVE NUMBER DATA Impervious Area Adjustment Adjusted Soil/Surface Description CN acres %C %UC CN open space, B 61 8.000 61.00 impervious 98 .250 98.00 COMPOSITE AREA & WEIGHTED CN ---> 8.250 62.12 (62) S/N: C21705506A87 Talbert & Bright PondPack Ver: 7.0 (325) Compute Time: 12:54:09 Date: 07-24-2004 Appendix A A-1 Index of Starting Page Numbers for ID Names ----- A AREA D1... 3.01, 4.01 AREA D2... 3.03, 4.02 AREA D3... 3.05, 4.03 AREA D4... 3.07, 4.04 AREA D5... 3.09, 4.05 ----- N ----- NHC... 2.01 ----- W ----- Watershed 1-year... 1.01, 1.02, 1.03, 1.04, 1.05 S/N: C21705506A87 Talbert & bright PondPack Ver: 7.0 (325) Compute Time: 12:54:09 Date: 07-24-2004 Job File: J:\3301 (WILMINGTON)\0305 MASTER DRAINAGE PLAN\TERMINAL AREA DRY POND POSTB.PPW Rain Dir: C:\HAESTAD\PPKW\RAINFALL\ JOB TITLE Wilmington International Airport Terminal Area Extended Dry Detention Basin psN 57Da*A 1 11 6Q. 2 �2 10 Y (L 2:�ya �00Y(2, G2-��• Q - Poz i- w s �2 6.5- 2'2.1& 2�. 13.8 S/ 5p,-7 LfS.2 ✓ 2G•17 L{. 4 9ol -D(ZA-)dk� W,-A := <oo.s ✓ 1u(P.2 �-2-,y3 Zi.'30 A-c-- S/N: C21705506A87 Talbert & Bright PondPack Ver: 7.0 (325) Compute Time: 10:55:34 Date: 08-09-2004 Table of Contents i Table of Contents ******************** NETWORK SUMMARIES ********************* Watershed....... 1" Eq Executive Summary (Nodes) .......... 1.01 Watershed....... 100yr Executive Summary (Nodes) 1.02 Watershed....... 10yr Executive Summary (Nodes) .......... 1.03 Watershed....... 25yr Executive Summary (Nodes) .......... 1.04 Watershed....... 2yr Executive Summary (Nodes) 1.05 ****************** DESIGN STORMS SUMMARY ******************* NHC............. Design Storms ...................... 2.01 ********************** TC CALCULATIONS ********************* AREA D1......... Tc Calcs ........................... 3.01 AREA D2......... Tc Calcs ........................... 3.03 AREA D3......... Tc Calcs ........................... 3.05 AREA D4......... Tc Calcs ........................... 3.07 AREA D5......... Tc Calcs ........................... 3.09 ********************** CN CALCULATIONS ********************* AREA D1......... Runoff CN-Area 4.01 S/N: C21705506A87 Talbert & Bright PondPack Ver: 7.0 (325) Compute Time: 10:55:34 Date: 08-09-2004 Table of Contents ii Table of Contents (continued) AREA D2......... Runoff CN-Area ..................... 4.02 AREA D3......... Runoff CN-Area ..................... 4.03 AREA D4......... Runoff CN-Area ..................... 4.04 AREA D5......... Runoff CN-Area ..................... 4.05 *********************** POND VOLUMES *********************** P 10........... Vol: Elev-Area 5.01 ******************** OUTLET STRUCTURES ********************* PR 20.......... Outlet Input Data 6.01 Individual Outlet Curves ........... 6.05 Composite Rating Curve ............. 6.11 *********************** POND ROUTING *********************** P 10........... Pond E-V-Q Table ................... 7.01 P 10 OUT 1" Eq Pond Routing Summary ............... 7.02 Pond Routed HYG (total out) ........ 7.03 P 10 OUT 100yr Pond Routing Summary ............... 7.08 P 10 OUT 10yr Pond Routing Summary ............... 7.09 P 10 OUT 25yr Pond Routing Summary ............... 7.10 P 10 OUT 2yr Pond Routing Summary ............... 7.11 S/N: C217055U6A87 Talbert & Bright PondPack Ver: 7.0 (325) Compute Time: 10:55:34 Date: 08-09-2004 Type.... Executive Summary (Nodes) Page 1.01 Name.... Watershed Storm: 1" Eq File.... J:\3301 (WILMINGTON)\0305 MASTER DRAINAGE PLAN\TERMINAL AREA DRY POND POSTB.PPW Storm... TypeIII 24hr Tag: 1" Eq NETWORK SUMMARY -- NODES (Trun.= HYG Truncation: Blank=None; L=Left; R=Rt; LR=Left & Rt) DEFAULT Design Storm File,ID = NHC.RNQ NHC Storm Tag Name = 1" Eq Data Type, File, ID = Synthetic Storm SCSTYPES.RNF TypeIII 24hr Total Rainfall Depth= 1.7700 in Duration Multiplier = 1 Resulting Duration = 24.0000 hrs Resulting Start Time= .0000 hrs Step= .1000 hrs End= 24.0000 hrs HYG Vol Qpeak Qpeak Max WSEL Node ----------------- ID Type ac-ft Trun. hrs cfs ft AREA D1 ---- AREA ---------- .712 -- --------- 12.3000 -------- --------- 6.12 AREA D2 AREA .313 12.2000 2.96 AREA D3 AREA .108 12.3000 .91 AREA D4 AREA .243 12.1500 2.54 AREA D5 AREA .373 12.2000 3.59 Outfall OUT 10 JCT 1.748 17.3500 .49 P 10 IN POND 1.748 12.2500 15.53 P 10 OUT POND 1.748 17.3500 .49 22.98 I,`1L F Nc-.rr _ (Zt-sUL:nrJt- Fr - I,?7�� 2`f-F� RACE •�. t%1 Ul ✓ Tb I 5 (LuNGJ'F PL'n. fZJ = .009 (1) + , vS ?S9 0 A-0- 1 1 2� 1 FT' D(LOV10 �Mz ��Dr� e�c re 7. (3 — -7. 1�7 ; (0 . ov H 2 } H RS t'j &.s 0 K- , S/N: C21705506A87 Talbert & Bright PondPack Ver: 7.0 (325) Compute Time: 10:55:34 Date: 08-09-2004 Type.... Executive Summary (Nodes) Page 1.02 Name.... Watershed Event: 100 yr File.... J:\3301 (WILMINGTON)\0305 MASTER DRAINAGE PLAN\TERMINAL AREA DRY POND POSTB.PPW Storm... TypeIII 24hr Tag: 100yr NETWORK SUMMARY -- NODES (Trun.= HYG Truncation: Blank=None; L=Left; R=Rt; LR=Left & Rt) DEFAULT Design Storm F1le,ID = NHC.RNQ NHC Storm Tag Name = 100yr Description: New Hanover County Rainfall Curve Data -------------------------------------------------------------------- Data Type, File, ID = Synthetic Storm SCSTYPES.RNF TypeIII 24hr Storm Frequency = 100 yr Total Rainfall Depth= 10.0000 in Duration Multiplier = 1 Resulting Duration = 24.0000 hrs Resulting Start Time= .0000 hrs Step= .1000 hrs End= 24.0000 hrs HYG Vol Qpeak Qpeak Max WSEL Node ID Type ac-ft Trun. hrs cfs ft AREA D1 AREA 8.196 12.2500 - 68.04 AREA D2 AREA 4.289 12.2000 40.80 AREA D3 AREA 1.312 12.2500 10.80 AREA D4 AREA 3.139 12.1500 32.36 AREA D5 AREA 5.433 12.1500 53.05 Outfall OUT 10 JCT 22.368 12.5000 106.20 P 10 IN POND 22.368 12.2000 199.84 P 10 OUT POND 22.368 12.5000 106.20 27.30 S/N: C21705506A87 Talbert & Bright PondPack Ver: 7.0 (325) Compute Time: 10:55:34 Date: 08-09-2004 Type.... Executive Summary (Nodes) Page 1.03 Name.... Watershed Event: 10 yr File.... J:\3301 (WILMINGTON)\0305 MASTER DRAINAGE PLAN\TERMINAL AREA DRY POND POSTB.PPW Storm... TypeIII 24hr Tag: 10yr NETWORK SUMMARY -- NODES (Trun.= HYG Truncation: Blank=None; L=Left; R=Rt; LR=Left & Rt) DEFAULT Design Storm File,ID = NHC.RNQ NHC Storm Tag Name = 10yr Description: New Hanover County Rainfall Curve Data -------------------------------------------------------------------- Data Type, File, ID = Synthetic Storm SCSTYPES.RNF TypeIII 24hr Storm Frequency = 10 yr Total Rainfall Depth= 7.0000 in Duration Multiplier = 1 Resulting Duration=.24.0000 hrs Resulting Start Time=-.0000 hrs Step= .1000 hrs End= 24.0000 hrs HYG Vol Qpeak Qpeak Max WSEL Node ID ----------------- Type ac-ft Trun. hrs cfs ft AREA D1 ---- AREA ---------- 5.342 -- --------- 12.2500 -------- --------- 45.32 AREA D2 AREA 2.746 12.2000 26.71 AREA D3 AREA .850 12.2500 7.14 AREA D4 AREA 2.022 12.1500 21.34 AREA D5 AREA 3.456 12.1500 34.37 Outfall OUT 10 JCT 14.416 12.6500 45.19 P 10 IN POND 14.416 12.2000 131.54 P 10 OUT POND 14.416 12.6500 45.19 26.17 S/N: C21705506A87 Talbert & Bright PondPack Ver: 7.0 (325) Compute Time: 10:55:34 Date: 08-09-2004 Type.... Executive Summary (Nodes) Page 1.04 Name.... Watershed Event: 25 yr File.... J:\3301 (WILMINGTON)\0305 MASTER DRAINAGE PLAN\TERMINAL AREA DRY POND P05TB.PPW Storm... TypeIII 24hr Tag: 25yr NETWORK SUMMARY -- NODES (Trun.= HYG Truncation: Blank=None; L=Left; R=Rt; LR=Left & Rt) DEFAULT Design Storm File,ID = NHC.RNQ NHC Storm Tag Name = 25yr Description: New Hanover County Rainfall Curve Data -------------------------------------------------------------------- Data Type, File, ID = Synthetic Storm SCSTYPES.RNF TypeIII 24hr Storm Frequency = 25 yr Total Rainfall Depth= 8.0500 in Duration Multiplier = 1 Resulting Duration = 24.0000 hrs Resulting Start Time= .0000 hrs Step= .1000 hrs End= 24.0000 hrs HYG Vol Qpeak Qpeak Max WSEL Node ----------------- ID Type ac-ft Trun. hrs cfs ft - AREA D1 ---- AREA ---------- 6.336 -- --------- 12.2500 -------- --------- 53.31 AREA D2 AREA 3.282 12.2000 31.66 AREA D3 AREA 1.011 12.2500 8.43 AREA D4 AREA 2.410 12.1500 25.21 AREA D5 AREA 4.142 12.1500 40.92 Outfall OUT 10 JCT 17.180 12.6000 60.53 P 10 IN POND 17.180 12.2000 155.53 P 10 OUT POND 17.180 12.6000 60.53 26.67 S/N: C21705506A87 Talbert & Bright PondPack Ver: 7.0 (325) Compute Time: 10:55:34 Date: 08-09-2004 Type.... Executive Summary (Nodes) Page 1.05 Name.... Watershed Event: 2 yr File.... J:\3301 (WILMINGTON)\0305 MASTER DRAINAGE PLAN\TERMINAL AREA DRY POND POSTB.PPW Storm... TypeIII 24hr Tag: 2yr NETWORK SUMMARY -- NODES (Trun.= HYG Truncation: Blank=None; L=Left; R=Rt; LR=Left & Rt) DEFAULT Design Storm File,ID = NHC.RNQ NHC Storm Tag Name = 2yr Description: New Hanover County Rainfall Curve Data -------------------------------------------------------------------- Data Type, File, ID = Synthetic Storm SCSTYPES.RNF TypeIII 24hr Storm Frequency = 2 yr Total Rainfall Depth= 4.5000 in Duration Multiplier = 1 Resulting Duration = 24.0000 hrs Resulting Start Time= .0000 hrs Step= .1000 hrs End= 24.0000 hrs HYG Vol Qpeak Qpeak Max WSEL Node ID ----------------- Type ac-ft Trun. hrs cfs ft AREA D1 ---- AREA ---------- 3.021 -- --------- 12.2500 -------- 26.19 AREA D2 AREA 1.505 12.2000 14.93 AREA D3 AREA .476 12.2500 4.07 AREA D4 AREA 1.120 12.1500 12.09 AREA D5 AREA 1.874 12.2000 19.02 Outfall OUT 10 JCT 7.995 12.9500 13.81 P 10 IN POND 7.995 12.2000 74.31 P 10 OUT POND 7.995 12.9500 13.81 24.81 S/N: C21705506A87 Talbert & Bright PondPack Ver: 7.0 (325) Compute Time: 10:55:34 Date: 08-09-2004 Type.... Design Storms Page 2.01 Name.... NHC File.... C:\HAESTAD\PPKW\RAINFALL\NHC.RNQ Title... Wilmington International Airport Terminal Area Extended Dry Detention Basin DESIGN STORMS SUMMARY Design Storm File,ID = NHC.RNQ NHC Storm Tag Name = 100yr Description: New Hanover County Rainfall Curve Data ---------------------------------------------------------------------- Data Type, File, ID = Synthetic Storm SCSTYPES.RNF TypeIII 24hr Storm Frequency = 100 yr Total Rainfall Depth= 10.0000 in Duration Multiplier = 1 Resulting Duration = 24.0000 hrs Resulting Start Time= .0000 hrs Step= .1000 hrs End= 24.0000 hrs Storm Tag NamL- = 25yr Description: New Hanover County Rainfall Curve Data --------------------------------------------------- --------------- Data Type, File, ID = Synthetic Storm SCSTYPES.RNF TypeIII 24hr Storm Frequency 25 yr Total Rainfall Depth= 8.0500 in Duration Multiplier = 1 Resulting Duration = 24.0000 hrs Resulting Start Time= .0000 hrs Step= .1000 hrs End= 24.0000 hrs Storm Tag Name = 1" Eq Data Type, File, ID = Synthetic Storm SCSTYPES.RNF TypeIII 24hr Total Rainfall Depth= 1.7700 in Duration Multiplier = 1 Resulting Duration = 24.0000 hrs Resulting Start Time= .0000 hrs Step= .1000 hrs End= 24.0000 hrs Storm Tag Name = 10yr Description: New Hanover County Rainfall Curve Data ------------------------------ Data Type, File, ID = Synthetic Storm SCSTYPES.RNF TypeIII 24hr Storm Frequency = 10 yr Total Rainfall Depth= 7.0000 in Duration Multiplier = 1 Resulting Duration = 24.0000 hrs Resulting Start Time= .0000 hrs Step= .1000 hrs. End= 24.0000 hrs 51N: C21705506A87 Talbert & Bright PondPack Ver: 7.0 (325) Compute Time: 10:55:34 Date: 08-09-2004 Type.... Design Storms Page 2.02 Name.... NHC File.... C:\HAESTAD\PPKW\RAINFALL\NHC.RNQ Title... Wilmington International Airport Terminal Area Extended Dry Detention Basin DESIGN STORMS SUMMARY Design Storm File,ID = NHC.RNQ NHC Storm Tag Name = 2yr Description: New Hanover County Rainfall Curve Data ---------------------------------------------------------------------- Data Type, File, ID = Synthetic Storm SCSTYPES.RNF TypeIII 24hr Storm Frequency = 2 yr Total Rainfall Depth= 4.5000 in Duration Multiplier = 1 Resulting Duration = 24.0000 hrs Resulting Start Time= .0000 hrs Step= .1000 hrs End= 24.0000 hrs SiN: C217U5506A87 Talbert & Bright PondPack Ver: 7.0 (325) Compute Time: 10:55:34 Date: 08-09-2004 Type.... Tc Calcs Name.... AREA D1 Page 3.01 File.... J:\3301 (WILMINGTON)\0305 MASTER DRAINAGE PLAN\TERMINAL AREA DRY POND POSTB.PPW TIME OF CONCENTRATION CALCULATOR Segment #1: Tc: Length & Vet. Hydraulic Length 1100.00 ft Avg.Velocity 1.00 ft/sec Segment #1 Time: .3056 hrs ------------------------------------------------------------------------ Segment #2: Tc: TR-55 Shallow Hydraulic Length 200.00 ft Slope .010000 ft/ft Unpaved Avg.Velocity 1.61 ft/sec Segment #2 Time: .0344 hrs ------------------------------------------------------------------------ Segment #3: Tc: TR-55 Sheet Mannings n .0110 Hydraulic Length 200.00 ft 2yr, 24hr P 4.5000 in Slope .010000 ft/ft Avg.Velocity 1.42 ft/sec Segment #3 Time: .0391 hrs ------------------------------------------------------------------------ Total Tc: .3791 hrs S/N: C21705506A87 Talbert & Rriaht PondPack Ver: 7.0 (325) Compute Time: 10:55:34 Date: 08-09-2004 Type.... Tc Calcs Name.... AREA D1 Page 3.02 File.... J:\3301 (WILMINGTON)\0305 MASTER DRAINAGE PLAN\TERMINAL AREA DRY POND POSTB.PPW ------------------------------------------------------------------------ Tc Equations used... ------------------------------------------------------------------------ ==== SCS TR-55 Sheet Flow Tc = (.007 * ((n * Lf)**0.8)) / ((P**.5) * (Sf**.4)) Where: Tc = Time of concentration, hrs n = Mannings n Lf = Flow length, ft P = 2yr, 24hr Rain depth, inches Sf = Slope, ft/ft ==== SCS TR-55 Shallow Concentrated Flow Unpaved surface: V = 16.1345 * (5f**0.5) Paved surface: V = 20.3282 * (Sf**0.5) Tc = (Lf / V) / (3600sec/hr) Where: V = Velocity, ft/sec Sf = Slope, ft/ft Tc = Time of concentration, hrs Lf = Flow length, ft ==== User Defined Length & Velocity Tc = (Lf / V) / (3600sec/hr) Where: Tc = Time of concentration, hrs Lf = Flow length, ft V = Velocity, ft/sec S/N: C21705506A87 Talbert & Bright PondPack Ver: 7.0 (325) Compute Time: 10:55:34 Date: 08-09-2004 Type.... Tc Calcs Name.... AREA D2 Page 3.03 File.... J:\3301 (WILMINGTON)\0305 MASTER DRAINAGE PLAN\TERMINAL AREA DRY POND POSTB.PPW TIME OF CONCENTRATION CALCULATOR ........................................................................ ........................................................................ Segment #1: Tc: Length & Vel. Hydraulic Length 700.00 ft Avg.Velocity 1.00 ft/sec Segment #1 Time: .1944 hrs ------------------------------------------------------------------------ Segment #2: Tc: TR-55 Shallow Hydraulic Length 200.00 ft Slope .010000 ft/ft Unpaved Avg.Velocity 1.61 ft/sec Segment #2 Time: .0344 hrs ------------------------------------------------------------------------ Segment #3: Tc: TR-55 Sheet Mannings n Hydraulic Length 2yr, 24hr P Slope Avg.Velocity .0110 200.00 ft 4.5000 in .010000 ft/ft 1.42 ft/sec Segment #3 Time: .0391 hrs ----------------------------------------------------------------------- Total Tc: .2680 hrs S/N: C21705506A87 Talbert & Bright PondPack Ver: 7.0 (325) Compute Time: 10:55:34 Date: 08-09-2004 Type.... Tc Calcs Page 3.04 Name.... AREA D2 File.... J:\3301 (WILMINGTON)\0305 MASTER DRAINAGE PLAN\TERMINAL AREA DRY POND POSTB.PPW ----------------------------- Tc Eauations used___ ------------------------------------------------------------------------ ==== SCS TR-55 Sheet Flow---------------------------- Tc = (.007 * ((n * Lf)**0.8)) / ((P**.5) * (Sf**.4)) Where: Tc = Time of concentration, hrs n = Mannings n Lf = Flow length, ft P = 2yr, 24hr Rain depth, inches Sf = Slope, ft/ft SCS TR-55 Shallow Concentrated Flow = ------------------------------ Unpaved surface: V = 16.1345 * (Sf**0.5) Paved surface: V = 20.3282 * (Sf**0.5) Tc = (Lf / V) / (3600sec/hr) Where: V = Velocity, ft/sec Sf = Slope, ft/ft Tc = Time of concentration, hrs Lf = Flow length, ft ==== User Defined Length & Velocity Tc = (Lf / V) / (3600sec/hr) Where: Tc = Time of concentration, hrs Lf = Flow length, ft V = Velocity, ft/sec S/N: C21705506A87 Talbert & Bright PondPack Ver: 7.0 (325) Compute Time: 10:55:34 Date: 08-09-2004 Type.... Tc Calcs Name.... AREA D3 Page 3.05 File.... J:\3301 (WILMINGTON)\0305 MASTER DRAINAGE PLAN\TERMINAL AREA DRY POND POSTB.PPW ..........................................................._........._.... TIME OF CONCENTRATION CALCULATOR ........................................................................ ........................................................................ Segment #1: Tc: Length & Vet. Hydraulic Length 1100.00 ft Avg.Velocity 1.00 ft/sec Segment #1 Time: .3056 hrs ------------------------------------------------------------------------ Segment #2: Tc: TR-55 Shallow Hydraulic Length 200.00 ft Slope .010000 ft/ft Unpaved Avg.Velocity 1.61 ft/sec Segment #2 Time: .0344 hrs ------------------------------------------------------------------------ Segment #3: Tc: TR-55 Sheet Mannings n .0110 Hydraulic Length 300.00 ft 2yr, 24hr P 4.5000 in Slope .010000 ft/ft Avg.Velocity 1.54 ft/sec Segment #3 Time: .0541 hrs ------------------------------------------------------------------------ Total Tc: .3941 hrs S/N: C21705506A87 Talbert & Bright PondPack Ver: 7.0 (325) Compute Time: 10:55:34 Date: 08-09-2004 Type.... Tc Calcs Name.... AREA D3 Page 3.06 File.... J:\3301 (WILMINGTON)\0305 MASTER DRAINAGE PLAN\TERMINAL AREA DRY POND POSTB.PPW -------------------- Tc Equations used... SC5 TR-55 Sheet Flow Tc = (.007 * ((n * Lf)**0.8)) / ((P**.5) * (Sf**.4)) Where: Tc = Time of concentration, hrs n = Mannings n Lf = Flow length, ft P = 2yr, 24hr Rain depth. inches Sf = Slope, ft/ft ==== SCS TR-55 Shallow Concentrated Flow Unpaved surface: V = 16.1345 * (Sf**0.5) Paved surface: V = 20.3282 * (Sf**0.5) Tc = (Lf / V) / (3600sec/hr) Where: V = Velocity, ft/sec 5f = Slope, ft/ft Tc = Time of concentration, hrs Lf = Flow length, ft ==== User Defined Length & Velocity -------------- Tc = (Lf / V) / (3600sec/hr) Where: Tc = Time of concentration, hrs Lf = Flow length, ft V = Velocity, ft/sec S/N: C21705506A87 Talbert & Bright PondPack Ver: 7.0 (325) Compute Time: 10:55:34 Date: 08-09-2004 Type.... Tc Calcs Page 3.07 Name.... AREA D4 File.... J:\3301 (WILMINGTON)\0305 MASTER DRAINAGE PLAN\TERMINAL AREA DRY POND POSTB.PPW TIME OF CONCENTRATION CALCULATOR Segment #1: Tc: Length & Vet. Hydraulic Length 400.00 ft Avg.Velocity 1.00 ft/sec Segment #1 Time: .1111 hrs ------------------------------------------------------------------------ Segment #2: Tc: TR-55 Shallow Hydraulic Length 200.00 ft Slope .010000 ft/ft Unpaved Avg.Velocity 1.61 ft/sec Segment #2 Time: .0344 hrs ----------------------------------------------------------------------- Segment #3: Tc: TR-55 Sheet Mannings n Hydraulic Length 2yr, 24hr P Slope Avg.Velocity .0110 300.00 ft 4.5000 in 010000 ft/ft 1.54 ft/sec Segment #3 Time: .0541 hrs ------------------------------------------------------------------------ Total Tc: .1997 hrs S/N: C21705506A87 Talbert & Bright PondPack Ver: 7.0 (325) Compute Time: 10:55:34 Date: 08-09-2004 Type.... Tc Calcs Name.... AREA D4 Page 3.08 File.... J:\3301 (WILMINGTON)\0305 MASTER DRAINAGE PLAN\TERMINAL AREA DRY POND POSTB.PPW ------------------------------------------------------------------------ Tc Equations used... ------------------------------------------------------------------------ ==== SCS TR-55 Sheet Flow Tc = (.007 * ((n * Lf)**0.8)) / ((P**.5) * (Sf**.4)) Where: Tc = Time of concentration, hrs n = Mannings n Lf = Flow length, ft P = 2yr, 24hr Rain depth, inches 5f = Slope, ft/ft ==== SCS TR-55 Shallow Concentrated Flow = ---------------- Unpaved surface: V = 16.1345 * (Sf**0.5) Paved surface: V = 20.3282 * (Sf**0.5) Tc = (Lf / V) / (3600sec/hr) Where: V = Velocity, ft/sec Sf = Slope, ft/ft Tc = Time of concentration, hrs Lf = Flow length, ft ==== User Defined Length & Velocity Tc = (Lf / V) / (3600sec/hr) Where: Tc = Time of concentration, hrs Lf = Flow length, ft V = Velocity, ft/sec S/N: C21705506A87 Talbert & Bright PondPack Ver: 7.0 (325) Compute Time: 10:55:34 Date: 08-09-2004 Type.... Tc Calcs Page 3.09 Name.... AREA D5 File.... J:\3301 (WILMINGTON)\0305 MASTER DRAINAGE PLAN\TERMINAL AREA DRY POND POSTB.PPW TIME OF CONCENTRATION CALCULATOR Segment #1: Tc: Length & Vel. Hydraulic Length 600.00 ft Avg.Velocity 1.00 ft/sec Segment #1 Time: .1667 hrs ------------------------------------------------------------------------ Segment #2: Tc: TR-55 Shallow Hydraulic Length Slope Unpaved Avg.Velocity 200.00 ft .010000 ft/ft 1.61 ft/sec Segment #2 Time: .0344 hrs ------------------------------------------------------------------------ Segment #3: Tc: TR-55 Sheet Mannings n .0110 Hydraulic Length 200.00 ft 2yr, 24hr P 3.5000 in Slope .010000 ft/ft Avg. -Velocity 1.25 ft/sec Segment #3 Time: .0444 hrs ------------------------------------------------------------------------ Total Tc: .2455 hrs S/N: C21705506A87 Talbert & Bright PondPack Ver: 7.0 (325) Compute Time: 10:55:34 Date: 08-09-2004 Type.... Tc Calcs Name.... AREA D5 Page 3.10 File.... J:\3301 (WILMINGTON)\0305 MASTER DRAINAGE PLAN\TERMINAL AREA DRY POND POSTB.PPW ------------------------------------------------------------------------ Tc Equations used... SCS TR-55 Sheet Flow Tc = (.007 * ((n * Lf)**0.8)) / ((P**.5) * (Sf**.4)) Where: Tc = Time of concentration, hrs n = Mannings n Lf = Flow length, ft P = 2yr, 24hr Rain depth, inches Sf = Slope, ft/ft ==== SCS TR-55 Shallow Concentrated Flow Unpaved surface: V = 16.1345 * (Sf**0.5) Paved surface: V = 20.3282 * (Sf**0.5) Tc = (Lf / V) / (3600sec/hr) Where: V = Velocity, ft/sec Sf = Slope, ft/ft Tc = Time of concentration, hrs Lf = Flow length, ft ==== User Defined Length & Velocity =----------------------------------- --------------------- Tc = (Lf / V) / (3600sec/hr) Where: Tc = Time of concentration, hrs Lf = Flow length, ft V = Velocity, ft/sec S/N: C21705506A87 Talbert & Bright PondPack Ver: 7.0 (325) Compute Time: 10:55:34 Date: 08-09-2004 Type.... Runoff CN-Area Name.... AREA D1 Page 4.01 File.... J:\3301 (WILMINGTON)\0305 MASTER DRAINAGE PLAN\TERMINAL AREA DRY POND POSTB.PPW RUNOFF CURVE NUMBER DATA Impervious Area Adjustment Adjusted Soil/Surface Description CN acres %C %UC CN -------------------------------- ------------- ----- ----- ------ Open Space B 61 3.500 61.00 Impervious 98 8.200 98.00 COMPOSITE AREA & WEIGHTED CN ---> 11.700 86.93 (87) S/N: C21705506A87 Talbert & Bright PondPack Ver: 7.0 (325) Compute Time: 10:55:34 Date: 08-09-2004 Type.... Runoff CN-Area Page 4.02 Name.... AREA D2 Fite.... J:\3301 (WILMINGTON)\0305 MASTER DRAINAGE PLAN\TERMINAL AREA DRY POND POSTB.PPW RUNOFF CURVE NUMBER DATA Impervious Area Adjustment Adjusted Soil/Surface Description CN acres %C %UC CN --------- ----- ----- ------ Open Space B 61 2.410 61.00 Impervious 98 4.000 98.00 COMPOSITE AREA & WEIGHTED CN ---> 6.410 84.09 (84) S/N: C21705506A87 Talbert & Bright PondPack Ver: 7.0 (325) Compute Time: 10:55:34 Date: 08-09-2004 Type.... Runoff CN-Area Name.... AREA D3 Page 4.03 File.... J:\3301 (WILMINGTON)\0305 MASTER DRAINAGE PLAN\TERMINAL AREA DRY POND POSTB.PPW RUNOFF CURVE NUMBER DATA Impervious Area Adjustment Adjusted Soil/Surface Description CN acres %C %UC CN open space, B 61 .600 61.00 Impervious 98 1.300 98.00 COMPOSITE AREA & WEIGHTED CN ---> 1.900 86.32 (86) S/N: C21705506A87 Talbert & Bright PondPack Ver: 7.0 (325) Compute Time: 10:55:34 Date: 08-09-2004 Type.... Runoff CN-Area Name.... AREA D4 Page 4.04 File.... J:\3301 (WILMINGTON)\0305 MASTER DRAINAGE PLAN\TERMINAL AREA DRY POND POSTB.PPW RUNOFF CURVE NUMBER DATA Impervious Area Adjustment Adjusted Soil/Surface Description CN acres %C %UC CN open space, B 61 1.620 61.00 impervious 98 3.000 98.00 COMPOSITE AREA & WEIGHTED CN ---> 4.620 85.03 (85) S/N: C21705506A87 Talbert & Bright PondPack Ver: 7.0 (325) Compute Time: 10:55:34 Date: 08-09-2004 Type.... Runoff CN-Area Name.... AREA D5 Page 4.05 Fite.... J:\3301 (WILMINGTON)\0305 MASTER DRAINAGE PLAN\TERMINAL AREA DRY POND POSTB.PPW RUNOFF CURVE NUMBER DATA Impervious Area Adjustment Adjusted Soil/Surface Description CN acres %C %UC CN -------------------------------- ------------- ----- ----- ------ open space, B 61 3.250 61.00 impervious 98 5.000 98.00 COMPOSITE AREA & WEIGHTED CN ---> 8.250 83.42 (83) S/N: C21705506A87 Talbert & Bright PondPack Ver: 7.0 (325) Compute Time: 10:55:34 Date: 08-09-2004 Type.... Vol: Elev-Area Name.... P 10 Page 5.01 File.... J:\3301 (WILMINGTON)\0305 MASTER DRAINAGE PLAN\TERMINAL AREA DRY POND POSTB.PPW Elevation Planimeter Area Al+A2+sgr(A1*A2) Volume Volume Sum (ft) ------------------------------------------------------------------------ (sq.in) (sq.ft) (sq.ft) (ac-ft) (ac-ft) 20.00 ----- 0 0 .000 .000 21.00 ----- 2800 2800 .021 .021 22.00 ----- 6000 12899 .099 .120 22.10 ----- 45278 67760 .052 .172 23.00 ----- 62258 160630 1.106 1.278 24.00 ----- 71922 201096 1.539 2.817 25.00 ----- 78379 225382 1.725 4.542 26.00 ----- 84934 244904 1.874 6.416 27.00 ----- 91430 264486 2.024 8.440 28.00 ----- 97969 284042 2.174 10.613 POND VOLUME EQUATIONS * Incremental volume computed by the Conic Method for Reservoir Volumes. Volume = (1/3) * (EL2-EL1) * (Areal + Area2 + sq.rt.(Area1*Area2)) where: EL1, EL2 = Lower and upper elevations of the increment Areal,Area2 = Areas computed for EL1, EL2, respectively Volume = Incremental volume between EL1 and EL2 V O L ✓vn 1 CN)v GAD iZL J Sej> t ^A.rc` rr . S/N: C21705506A87 Talbert & Bright PondPack Ver: 7.0 (325) Compute Time: 10:55:34 Date: 08-09-2004 Type.... Vol: Elev-Area Page 1.01 Name.... P 10 (5;.o1 A) File.... J:\3301 (WILMINGTON)\0305 MASTER DRAINAGE PLAN\TERMINAL AREA DRY POND POSTB.PPW Elevation Planimeter Area Al+A2+sgr(Al*A2) Volume Volume Sum (ft) (sq.in) (sq.ft) (sq.ft) (ac-ft) (ac-ft) 20.00 ----- 0 0 - -------------------- .000 .000 21.00 ----- 2800 2800 .021 .021 22.00 ---- 45278 59338 .454 .475 23.00 ----- 62258 160630 1.229 1.705 24.00 ----- 71922 201096 1.539 3.244 25.00 ----- 78379 225382 1.725 4.968 26.00 ----- 84934 244904 1.874 6.842 27.00 ----- 91430 264486 2.024 8.866 28.00 ----- 97969 284042 2.174 11.040 POND VOLUME EQUATIONS * Incremental volume computed by the Conic_Method for Reservoir Volumes. Volume = (1/3) * (EL2-EL1) * (Areal + Area2 + sq.rt.(Area1*Area2)) where: EL1, EL2 = Lower and upper elevations of the increment Areal,Area2 = Areas computed for EL1, EL2, respectively Volume = Incremental volume between EL1 and EL2 �fLL V — D,Z x (,7�A-r-. FT- S/N: C21705506A87 Talbert & Bright PondPack Ver: 7.0 (325) Compute Time: 11:19:02 Date: 08-09-2004 Type.... Outlet Input Data Name.... PR 20 Page 6.01 File.... J:\3301 (WILMINGTON)\0305 MASTER DRAINAGE PLAN\TERMINAL AREA DRY POND POSTB.PPW REQUESTED POND WS ELEVATIONS: Min. Elev.= 20.00 ft Increment = .50 ft Max. Elev.= 28.00 ft OUTLET CONNECTIVITY ---> Forward Flow Only (Up5tream to DnStream) <--- Reverse Flow Only (DnStream to UpStream) < ---> Forward and Reverse Both Allowed Structure No. Outfall E1, ft E2, ft Culvert -Circular - -> TW 23.500 28.000 Orifice -Circular ---> TW 20.000 28.000 Weir -Rectangular ---> TW 26.600 28.000 Culvert -Circular -- > TW 23.500 28.000 TW SETUP, D5 Channel S/N: C21705506A87 Talbert & Bright PondPack Ver: 7.0 (325) Compute Time: 10:55:34 Date: 08-09-2004 Type.... Outlet Input Data Name.... PR 20 Page 6.02 File.... J:\3301 (WILMINGTON)\0305 MASTER DRAINAGE PLAN\TERMINAL AREA DRY POND POSTB.PPW OUTLET STRUCTURE INPUT DATA Structure ID Structure Type = Culvert -Circular No. Barrels = 1 Barrel Diameter = 2.0000 ft Upstream Invert = 23.50 ft Dnstream Invert = 23.00 ft Horiz. Length = 30.00 ft Barrel Length = 30.00 ft Barrel Slope = .01667 ft/ft OUTLET CONTROL DATA... Mannings n = .0150 Ke = .5000 Kb = .016523 Kr = .5000 HW Convergence = .001 INLET CONTROL DATA... Equation form = 1 Inlet Control K = .0078 Inlet Control M = 2.0000 Inlet Control c = .02920 Inlet Control Y = .7400 T1 ratio (HW/D) = 1.127 T2 ratio (HW/D) = 1.199 Slope Factor = -.500 (forward entrance loss) (per ft of full flow) (reverse entrance loss) +/- ft Use unsubmerged inlet control Form 1 equ. below T1 elev. Use submerged inlet control Form 1 equ. above T2 elev. In transition zone between unsubmerged and submerged inlet control, interpolate between flows at T1 & T2... At T1 Elev = 25.75 ft ---> Flow = 15.55 cfs At T2 Elev = 25.90 ft ---> Flow = 17.77 cfs S/N: C21705506A87 Talbert & Bright PondPack Ver: 7.0 (325) Compute Time: 10:55:34 Date: 08-09-2004 Type.... Outlet Input Data Page 6.03 Name.... PR 20 File.... J:\3301 (WILMINGTON)\0305 MASTER DRAINAGE PLAN\TERMINAL AREA DRY POND P05TB.PPW OUTLET STRUCTURE INPUT DATA Structure ID Structure Type = Orifice -Circular # of Openings = 1 Invert Elev. = 20.00 ft Diameter = .2708 ft Orifice Coeff. _ .632 Structure ID Structure Type = Weir -Rectangular ------------------------------------ # of Openings = 1 Crest Elev. = 26.60 ft Weir Length = 18.00 ft Weir Table File: WEIR TAB.WCT Weir Table ID: Weir C 10 WEIR COEFFICIENT TABLE Depth, ft Weir C .20 2.6900 .40 2.7200 .60 2.7500 .80 2.8500 1.00 2.9800 1.20 3.0800 1.40 3.2000 1.60 3.2800 1.80 3.3100 3.00 3.3200 Weir TW effects (Use adjustment equation) S/N: C21705506A87 Talbert & Bright PondPack Ver: 7.0 (325) Compute Time: 10:55:34 Date: 08-09-2004 Type.... Outlet Input Data Name.... PR 20 Page 6.04 File.... J:\3301 (WILMINGTON)\0305 MASTER DRAINAGE PLAN\TERMINAL AREA DRY POND POSTB.PPW OUTLET STRUCTURE INPUT DATA Structure ID Structure Type = Culvert -Circular No. Barrels = 1 Barrel Diameter = 3.0000 ft Upstream Invert = 23.50 ft Dnstream Invert = 23.00 ft Horiz. Length = 30.00 ft Barrel Length = 30.00 ft Barrel Slope = .01667 ft/ft OUTLET CONTROL DATA... Mannings n = .0150 Ke = .5000 Kb = .009623 Kr = .5000 HW Convergence = .001 INLET CONTROL DATA... Equation form = 1 Inlet Control K = .0078 Inlet Control M = 2.0000 Inlet Control c = .02920 Inlet Control Y = .7400 T1 ratio (HW/D) = 1.127 T2 ratio (HW/D) = 1.199 Slope Factor = -.500 (forward entrance loss) (per ft of full flow) (reverse entrance loss) +/- ft Use unsubmerged inlet control Form 1 equ. below T1 elev. Use submerged inlet control Form 1 equ. above T2 elev. In transition zone between unsubmerged and submerged inlet control, interpolate between flows at T1 & T2... At T1 Elev = 26.88 ft ---> Flow = 42.85 cfs At T2 Elev = 27.10 ft ---> Flow = 48.97 cfs Structure ID TW Structure Type _ TW SETUP, DS Channel ------------------------------------ FREE OUTFALL CONDITIONS SPECIFIED CONVERGENCE TOLERANCES... Maximum Iterations= 30 Min. TW tolerance = .01 ft Max. TW tolerance = .01 ft Min. HW tolerance = .Oi ft Max. HW tolerance = .01 ft Min. Q tolerance = .10 cfs Max. Q tolerance = .10 cfs S/N: C21705506A87 Talbert & Bright PondPack Ver: 7.0 (325) Compute Time: 10:55:34 Date: 08-09-2004 Type.... Individual Outlet Curves Name.... PR 20 Page 6.05 File.... J:\3301 (WILMINGTON)\0305 MASTER DRAINAGE PLAN\TERMINAL AREA DRY POND POSTB.PPW RATING TABLE FOR ONE OUTLET TYPE Structure ID = (Culvert -Circular) -------------------------------------- Mannings open channel maximum capacity: 27.23 cfs Upstream ID = (Pond Water Surface) DNstream ID = TW (Pond Outfall) W5 Elev,Device Q Tail Water ---------------- Notes WS Elev. --------------- -------------------------- Q TW Elev Converge ft -------- cfs ft +/-ft Computation Messages ------- -------- ----- 20.00 -------------------------- .00 Free Outfall Upstream HW & DNstream TW < Inv.El 20.50 .00 Free Outfall Upstream HW & DNstream TW < Inv.El 21.00 .00 Free Outfall Upstream HW & DNstream TW < Inv.El 21.50 .00 Free Outfall Upstream HW & DNstream TW < Inv.El 22.00 .00 Free Outfall Upstream HW & DNstream TW < Inv.El 22.50 .00 Free Outfall Upstream HW & DNstream TW < Inv.El 23.00 .00 Free Outfall Upstream HW & DNstream TW < Inv.El 23.50 .00 Free Outfall Upstream HW &. DNstream TW < Inv.El 24.00 .92 Free Outfall CRIT.DEPTH CONTROL Vh= .114ft Dcr= .329ft CRIT.DEPTH 24.50 3.42 Free Outfall CRIT.DEPTH CONTROL Vh= .235ft Dcr= .647ft CRIT.DEPTH 25.00 7.14 Free Outfall CRIT.DEPTH CONTROL Vh= .368ft Dcr= .949ft CRIT.DEPTH 25.50 11.62 Free Outfall CRIT.DEPTH CONTROL Vh= .517ft Dcr= 1.224ft CRIT.DEPTH 26.00 16.41 Free Outfall CRIT.DEPTH CONTROL Vh= .692ft Dcr= 1.461ft CRIT.DEPTH 26.50 21.08 Free Outfall CRIT.DEPTH CONTROL Vh= .904ft Dcr= 1.645ft CRIT.DEPTH 26.60 21.96 Free Outfall CRIT.DEPTH CONTROL Vh= .950ft Dcr= 1.674ft CRIT.DEPTH 27.00 25.34 Free Outfall CRIT.DEPTH CONTROL Vh= 1.153ft Dcr= 1.770ft CRIT.DEPTH 27.50 28.79 Free Outfall FULL FLOW...Lfull=8.71ft Vh=1.305ft HL=2.146ft S/N: C2170550GA87 Talbert & Bright PondPack Ver: 7.0 (325) Compute Time: 10:55:34 Date: 08-09-2004 Type.... Individual Outlet Curves Name.... PR 20 Page 6.06 File.... J:\3301 (WILMINGTON)\0305 MASTER DRAINAGE PLAN\TERMINAL AREA DRY POND POSTB.PPW RATING TABLE FOR ONE OUTLET TYPE Structure ID = (Culvert -Circular) -------------------------------------- Mannings open channel maximum capacity: 27.23 cfs Upstream ID = (Pond Water Surface) DNstream ID = TW (Pond Outfall) WS Elev,Device Q Tail Water Notes ---------------- --------------- -------------------------- WS Elev. Q TW Elev Converge ft cfs ft +/-ft Computation Messages -------- ------- -------- ----- -------------------------- 28.00 31.18 Free Outfall FULL FLOW...Lfull=23.54ft Vh=1.531ft HL=2.893ft S/N: C21705506A87 Talbert & Bright PondPack Ver: 7.0 (325) Compute Time: 10:55:34 Date: 08-09-2004 Type.... Individual Outlet Curves Name.... PR 20 Page 6.07 File.... J:\3301 (WILMINGTON)\0305 MASTER DRAINAGE PLAN\TERMINAL AREA DRY POND POSTB.PPW RATING TABLE FOR ONE OUTLET TYPE Structure 1D = (Orifice -Circular) -------------------------------------- Upstream ID = (Pond Water Surface) DNstream ID = TW (Pond Outfall) WS Elev,Device Q WS Elev. Q ft cfs -------- 20.00 ------- .00 20.50 .18 21.00 .27 21.50 .34 22.00 .40 22.50 .45 23.00 .49 23.50 .54 24.00 .57 24.50 .61 25.00 .64 25.50 .68 26.00 .71 26.50 .74 26.60 .74 27.00 .77 27.50 .79 28.00 .82 Tail Water TW Elev Converge ft +/-ft Free Outfall Free Outfall Free Outfall Free Outfall Free Outfall Free Outfall Free Outfall Free Outfall Free Outfall Free Outfall Free Outfall Free Outfall Free Outfall Free Outfall Free Outfall Free Outfall Free Outfall Free Outfall Notes -------------------------- Computation Messages Upstream HW & DNstream TW < Inv.El H =.36 H =.86 H =1.36 H =1.86 H =2.36 H =2.86 H =3.36 H =3.86 H =4.36 H =4.86 H =5.36 H =5.86 H. =6.36 H =6.46 H =6.86 H =7.36 H =7.86 SIN: C21705506A87 Talbert & Bright PondPack Ver: 7.0 (325) Compute Time: 10:55:34 Date: 08-09-2004 Type.... Individual Outlet Curves Page 6.08 Name.... PR 20 File.... J:\3301 (WILMINGTON)\0305 MASTER DRAINAGE PLAN\TERMINAL AREA DRY POND POSTB.PPW RATING TABLE FOR ONE OUTLET TYPE Structure ID = (Weir -Rectangular) -------------------------------------- Upstream ID = (Pond Water Surface) DNstream ID = TW (Pond Outfall) WS Elev,Device Q WS Elev. Q ft cfs -------- 20.00 ------- .00 20.50 .00 21.00 .00 21.50 .00 22.00 .00 22.50 .00 23.00 .00 23.50 .00 24.00 .00 24.50 .00 25.00 .00 25.50 .00 26.00 .00 26.50 .00 26.60 .00 27.00 12.39 27.50 44.80 28.00 95.41 Tail Water Notes TW Elev Converge ft +/-ft Computation Messages Free Outfall HW & TW below Inv.El.=26.600 Free Outfall HW & TW below Inv.E1.=26.600 Free Outfall HW & TW below Inv.E1.=26.600 Free Outfall HW & TW below Inv.El.=26.600 Free Outfall HW & TW below Inv.E1.=26.600 Free Outfall HW & TW below Inv.El.=26.600 Free Outfall HW & TW below Inv.El.=26.600 Free Outfall HW & TW below Inv.E1.=26.600 Free Outfall HW & TW below Inv.E1.=26.600 Free Outfall HW & TW below Inv.E1.=26.600 Free Outfall HW & TW below Inv.E1.=26.600 Free Outfall HW & TW below Inv.E1.=26.600 Free Outfall HW & TW below Inv.E1.=26.600 Free Outfall HW & TW below Inv.El.=26.600 Free Outfall C=2.690; H=.00; Htw=.00; Qfree=.00; Free Outfall C=2.720; H=.40; Htw=.00; Qfree=12.39; Free Outfall C=2.915; H=.90; Htw=.00; Qfree=44.80; Free Outfall C=3.200; H=1.40; Htw=.00; Qfree=95.41; S/N: C21705506A87 Talbert & Bright PondPack Ver: 7.0 (325) Compute Time: 10:55:34 Date: 08-09-2004 Type.... Individual Outlet Curves Page 6.09 Name.... PR 20 File.... J:\3301 (WILMINGTON)\0305 MASTER DRAINAGE PLAN\TERMINAL AREA DRY POND POSTB.PPW RATING TABLE FOR ONE OUTLET TYPE Structure ID = (Culvert -Circular) -------------------------------------- Mannings open channel maximum capacity: 80.27 cfs Upstream ID = (Pond Water Surface) DNstream ID = TW (Pond Outfall) WS Elev,Device Q Tail Water ---------------- Notes WS Elev. --------------- -------------------------- Q TW Elev Converge ft -------- cfs ft +/-ft Computation Messages ------- -------- ----- 20.00 -------------------------- .00 Free Outfall Upstream HW & DNstream TW < Inv.El 20.50 .00 Free Outfall Upstream HW & DNstream TW < Inv.E1 21.00 .00 Free Outfall Upstream HW & DNstream TW < Inv.El 21.50 .00 Free Outfall Upstream HW & DNstream TW < Inv.El 22.00 .00 Free Outfall Upstream HW & DNstream TW < Inv.El 22.50 .00 Free Outfall Upstream HW & DNstream TW < Inv.E1 23.00 .00 Free Outfall Upstream HW & DNstream TW < Inv.El 23.50 .00 Free Outfall Upstream HW & DNstream TW < Inv.El 24.00 1.14 Free Outfall CRIT.DEPTH CONTROL Vh= .113ft Dcr= .330ft CRIT.DEPTH 24.50 4.39 Free Outfall CRIT.DEPTH CONTROL Vh= .230ft Dcr= .655ft CRIT.DEPTH 25.00 9.44 Free Outfall CRIT.DEPTH CONTROL Vh= .353ft Dcr= .971ft CRIT.DEPTH 25.50 15.96 Free Outfall CRIT.DEPTH CONTROL Vh= .483ft Dcr= 1.276ft CRIT.DEPTH 26.00 23.61 Free Outfall CRIT.DEPTH CONTROL Vh= .622ft Dcr= 1.566ft CRIT.DEPTH 26.50 32.03 Free Outfall CRIT.DEPTH CONTROL Vh= .775ft Dcr= 1.836ft CRIT.DEPTH 26.60 33.76 Free Outfall CRIT.DEPTH CONTROL Vh= .808ft Dcr= 1.887ft CRIT.DEPTH 27.00 40.84 Free Outfall CRIT.DEPTH CONTROL Vh= .946ft Dcr= 2.081ft CRIT.DEPTH 27.50 49.61 Free Outfall CRIT.DEPTH CONTROL Vh= 1.138ft Dcr= 2.293ft CRIT.DEPTH S/N: C21705506A87 Talbert & Bright PondPack Ver: 7.0 (325) Compute Time: 10:55:34 Date: 08-09-2004 Type.... Individual Outlet Curves Name.... PR 20 Page 6.10 File.... J:\3301 (WILMINGTON)\0305 MASTER DRAINAGE PLAN\TERMINAL AREA DRY POND POSTB.PPW RATING TABLE FOR ONE OUTLET TYPE Structure ID = (Culvert -Circular) -------------------------------------- Mannings open channel maximum capacity: 80.27 cfs Upstream ID = (Pond Water Surface) DNstream ID = TW (Pond Outfall) WS Elev,Device Q Tail Water WS Elev. Q TW Elev Converge ft cfs ft +/-ft ----------------------- ----- 28.00 58.08 Free Outfall CRIT.DEPTH CONTROL Notes -------------------------- Computation Messages -------------------------- Vh= 1.355ft Dcr= 2.467ft CRIT.DEPTH S/N: C21705506A87 Talbert & Bright PondPack Ver: 7.0 (325) Compute Time: 10:55:34 Date: 08-09-2004 Type.... Composite Rating Curve Name.... PR 20 Page 6.11 File.... J:\3301 (WILMINGTON)\0305 MASTER DRAINAGE PLAN\TERMINAL AREA DRY POND POSTB.PPW ***** COMPOSITE OUTFLOW SUMMARY **** WS Elev, Total Q Elev. Q ft cfs 20.00 .00 20.50 .18 21.00 .27 21.50 .34 22.00 .40 22.50 .45 23.00 .49 23.50 .54 24.00 2.63 24.50 8.42 25.00 17.23 25.50 28.26 26.00 40.73 26.50 53.84 26.60 56.46 27.00 79.34 27.50 123.99 28.00 185.50 Notes -------- Converge ------------------------- TW Elev Error ft +/-ft Contributing Structures --------------- Free Outfall None contributing Free Outfall Free Outfall Free Outfall Free Outfall Free Outfall Free Outfall Free Outfall Free Outfall Free Outfall Free Outfall Free Outfall Free Outfall Free Outfall Free Outfall Free Outfall Free Outfall Free Outfall S/N: C21705506A87 Talbert & Bright PondPack Ver: 7.0 (325) Compute Time: 10:55:34 Date: 08-09-2004 Type.... Pond E-V-Q Table Page 7.01 Name.... P 10 File.... J:\3301 (WILMINGTON)\0305 MASTER DRAINAGE PLAN\TERMINAL AREA DRY POND POSTB.PPW LEVEL POOL ROUTING DATA HYG Dir = J:\3301 (WILMINGTON)\0305 MASTER DRAINAGE PLAN\ Inflow HYG file = NONE STORED - P 10 IN 100yr Outflow HYG file = NONE STORED - P 10 OUT 100yr Pond Node Data = P 10 Pond Volume Data = P 10 Pond Outlet Data = PR 20 No Infiltration INITIAL CONDITIONS ---------------------------------- Starting WS Elev = 20.00 ft Starting Volume = .000 ac-ft Starting Outflow = .00 cfs Starting Infiltr. _ .00 cfs Starting Total Qout-= .00 cfs Time Increment = .0500 hrs Elevation Outflow Storage Area Infilt. Q Total 25/t + 0 ft --------------- cfs ------------------------------------------------------------ ac-ft sq.ft cfs cfs cfs 20.00 .00 .000 0 .00 .00 .00 20.50 .18 .003 700 .00 .18 1.47 21.00 .27 .021 2800 .00 .27 10.64 21.50 .34 .062 4249 .00 .34 30.15 22.00 .40 .120 6000 .00 .40 58.54 22.50 .45 .620 52492 .00 .45 300.76 23.00 .49 1.278 62258 .00 .49 619.17 23.50 .54 2.020 67003 .00 .54 978.18 24.00 2.63 2.817 71922 .00 2.63 1366.10 24.50 8.42 3.661 75116 .00 8.42 1780.30 25.00 17.23 4.542 78379 .00 17.23 2215.45 25.50 28.26 5.460 81624 .00 28.26 2670.90 26.00 40.73 6.416 84934 .00 40.73 3146.00 26.50 53.84 7.409 88152 .00 53.84 3639.88 26.60 56.46 7.612 88803 .00 56.46 3740.81 27.00 79.34 8.440 91430 .00 79.34 4164.19 27.50 123.99 9.508 94671 .00 123.99 4725.76 28.00 185.50 10.613 97969 .00 185.50 5322.35 S/N: C21705506A87 Talbert & Bright PondPack Ver: 7.0 (325) Compute Time: 10:55:34 Date: 08-09-2004 Type.... Pond Routing Summary Page 7.02 Name.... P 10 OUT Tag: 1" Eq Storm: 1" Eq File.... J:\3301 (WILMINGTON)\0305 MASTER DRAINAGE PLAN\TERMINAL AREA DRY POND POSTB.PPW Storm... TypeIII 24hr Tag: 1" Eq LEVEL POOL ROUTING SUMMARY HYG Dir = J:\3301 (WILMINGTON)\0305 MASTER DRAINAGE PLAN\ Inflow HYG file = NONE STORED - P 10 IN 1" Eq Outflow HYG file = NONE STORED - P 10 OUT 1" Eq Pond Node Data = P 10 Pond Volume Data = P 10 Pond Outlet Data = PR 20 No Infiltration INITIAL CONDITIONS Starting WS Elev = 20.00 ft Starting Volume = .000 ac-ft Starting Outflow = .00 cfs Starting Infiltr. = .00 cf-s Starting Total Qout= .00 cfs Time Increment = .0500 hrs INFLOW/OUTFLOW HYDROGRAPH SUMMARY Peak Inflow = 15.53 cfs at 12.2500 hrs Peak ----------------------------------------------------- Outflow = .49 cfs at 17.3500 hrs Peak Elevation = 22.98 ft Peak Storage = 1.250 ac-ft MASS BALANCE (ac-ft) ------------------------ + Initial Vol = .000 + HYG Vol IN = 1.748 - Infiltration = .000 - HYG Vol OUT = 1.748 - Retained Vol = .000 Unrouted Vol = -.000 ac-ft (.002% of Inflow Volume) S/N: C21705506A87 Talbert & Bright PondPack Ver: 7.0 (325) Compute Time: 10:55:34 Date: 08-09-2004 Type.... Pond Routed HYG (total out) Page 7.03 Name.... P 10 OUT Tag: 1" Eq Storm: 1" Eq File.... J:\3301 (WILMINGTON)\0305 MASTER DRAINAGE PLAN\TERMINAL AREA DRY POND POSTB.PPW Storm... TypeIII 24hr Tag: 1" Eq POND ROUTED TOTAL OUTFLOW HYG... HYG file = HYG ID = P 10 OUT HYG Tag = 1" Eq ----------------------------------- Peak Discharge = .49 cfs Time to Peak = 17.3500 hrs HYG Volume = 1.748 ac-ft ----------------------------------- HYDROGRAPH ORDINATES (cfs) Time Output Time increment = .0500 hrs hrs ---------------------------------------_-------------------------------- Time on left represents time for first value in each row. 9.7000 .00 .00 .00 .00 .00 9.9500 .00 .01 .01 .01 .02 10.2000 .02 .03 .03 .04 .04 10.4500 .05 .06 .07 .08 .09 10.7000 .10 .12 .13 .15 .16 10.9500 .18 .18 .18 .18 .19 11.2000 .19 .20 .20 .21 .22 11.4500 .23 .24 .25 .27 .28 11.7000 .28 .29 .31 .33 .35 11.9500 .36 .38 .40 _40 .41 12.2000 .42 .42 .43 .43 .44 12.4500 44 .45 .45 .45 .46 12.7000 .46 .46 .46 .46 .46 12.9500 .46 .46 .46 .47 .47 13.2000 .47 .47 .47 .47 .47 13.4500 ! .47 .47 .47 .47 .47 13.7000 .47 .47 .47 .47 .47 13.9500 .47 .48 .48 .48 .48 14.2000 .48 .48 .48 .48 .48 14.4500 .48 .48 .48 .48 .48 14.7000 .48 .48 .48 .48 .48 14.9500 f .48 .48 .48 .48 .48 15.2000 48 .48 .48 .48 .48 15.4500 .48 .48 .49 .49 .49 15.7000 .49 .49 .49 .49 .49 15.9500 .49 .49 .49 .49 .49 16.2000 .49 .49 .49 .49 .49 16.4500 .49 .49 .49 .49 .49 16.7000 .49 .49 .49 .49 .49 16.9500 .49 .49 .49 .49 .49 17.2000 .49 .49 .49 .49 .49 17.4500 .49 .49 .49 .49 .49 17.7000 .49 .49 .49 .49 .49 5/N: C21705506A87 Talbert & Bright PondPack Ver: 7.0 (325) Compute Time: 10:55:34 Date: 08-09-2004 Type.... Name.... File.... POSTB.PPW Storm... Time hrs 17.9500 18.2000 18.4500 18.7000 18.9500 19.2000 19.4500 19.7000 19.9500 20.2000 20.4500 20.7000 20.9500 21.2000 21.4500 21.7000 21.9500 22.2000 22.4500 22.7000 22.9500 23.2000 23.4500 23.7000 23.9500 24.2000 24.4500 24.7000 24.9500 25.2000 25.4500 25.7000 25.9500 26.2000 26.4500 26.7000 26.9500 27.2000 27.4500 27.7000 27.9500 28.2000 28.4500 28.7000 28.9500 29.2000 29.4500 Pond Routed HYG (total out) Page 7.04 P 10 OUT Tag: 1" Eq Storm: 1" Eq J:\3301 (WILMINGTON)\0305 MASTER DRAINAGE PLAN\TERMINAL AREA DRY POND TypeIII 24hr Tag: 1" Eq HYDROGRAPH ORDINATES (cfs) Output Time increment = .0500 hrs Time on left represents time for first value in each row. -------------------------------------------------------------- .49 .49 .49 .49 .49 .49 .49 .49 .49 .49 .49 .49 .49 .49 .49 .49 .49 .49 .49 .49 .49 .49 .49 .49 .49 .49 .49 .49 .49 .49 .49 .49 .49 .49 .49 .49 .49 .49 .49 .49 .49 .49 .49 .49 .49 .49 .49 .49 .49 .49 .49 .49 .49 .49 .49 .49 .49 .49 .49 .49 .49 .49 .49 .49 .49 .49 .49 .49 .49 .49 .49 .49 .49 .49 .49 .49 .49 .49 .49 .49 .49 .49 .49 .49 .49 .49 .49 .49 .49 .49 .49 .49 .49 .49 .49 .49 .49 .49 .49 .49 .49 .49 .49 .49 .49 .49 .49 .49 .49 .49 .49 .49 .49 .49 .49 .49 .49 .49 .49 .49 .49 .49 .49 .49 .49 .49 _49 .49 .49 .49 .49 .49 .49 .49 .49 .49 .49 .49 .49 .49 .49 .49 .49 .49 .49 .49 .49 .49 .49 .49 .49 .49 .49 .49 .49 .49 .49 .49 .49 .49 .49 .49 .49 .49 .49 .49 .49 .49 .49 .49 .48 .48 .48 .48 .48 .48 .48 .48 .48 .48 .48 .48 .48 .48 .48 .48 .48 .48 .48 .48 .48 .48 .48 .48 .48 .48 .48 .48 .48 .48 .48 .48 .48 .48 .48 .48 .48 .48 .48 .48 .48 .48 .48 .48 .48 .48 .48 .48 .48 .48 .48 .48 .48 .48 .48 .48 .48 .48 .48 .48 .48 .48 .48 .48 .48 S/N: C21705506A87 Talbert & Bright PondPack Ver: 7.0 (325) Compute Time: 10:55:34 Date: 08-09-2004 Type.... Pond Routed HYG (total out) Page 7.05 Name.... P 10 OUT Tag: 1" Eq Storm: 1" Eq File.... J:\3301 (WILMINGTON)\0305 MASTER DRAINAGE PLAN\TERMINAL AREA DRY POND POSTB.PPW Storm... TypeIII 24hr Tag: 1" Eq HYDROGRAPH ORDINATES (cfs) Time j Output Time increment = .0500 hrs hrs j Time on ---------j-------------------------------------------------------------- left represents time for first value in each row. 29.7000 j .48 .48 .48 .48 .48 29.9500 j .48 .48 .48 .47 .47 30.2000 j .47 .47 .47 .47 .47 30.4500 j .47 .47 .47 .47 .47 30.7000 j .47 .47 .47 .47 .47 30.9500 ( .47 .47 .47 .47 .47 31.2000 j .47 .47 .47 .47 .47 31.4500 j .47 .47 .47 .47 .47 31.7000 j .47 .47 .47 .47 .47 31.9500 j .47 .47 .47 .47 .47 32.2000 j .47 .47 .47 .47 .47 32.4500 j .47 .47 .47 .47 .47 32.7000 j .47 .47 .47 .47 .47 32.9500 j .47 .47 .47 .47 .47 33.2000 j .47 .47 .47 .47 .47 33.4500 j .47 .47 .47 .47 .47 33.7000 j .47 .47 .47 .46 .46 33.9500 j .46 .46 .46 .46 .46 34.2000 j .46 .46 .46 .46 .46 34.4500 j .46 .46 .46 .46 .46 34.7000 j .46 .46 .46 .46 .46 34.9500 j 46 .46 .46 .46 .46 35.2000 j 46 .46 .46 .46 .46 35.4500 j 46 .46 .46 .46 .46 35.7000 j .46 .46 .46 .46 .46 35.9500 j .46 .46 .46 .46 .46 36.2000 j .46 .46 .46 .46 .46 36.4500 j .46 .46 .46 .46 .46 36.7000 j .46 .46 .46 .46 .46 36.9500 i .46 .46 .46 .46 .46 37.2000 j .46 .46 .46 .46 .46 37.4500 j .46 .46 .46 .46 .46 37.7000 j .45 .45 .45 .45 .45 37.9500 j .45 .45 .45 .45 .45 38.2000 j .45 .45 .45 .45 .45 38.4500 j .45 .45 .45 .45 .45 38.7000 j .45 .45 .45 .45 .45 38.9500 j .45 .45 .45 .45 .45 39.2000 j .45 .45 .45 .45 .45 39.4500 j .45 .45 .45 .45 .45 39.7000 j .45 .45 .45 .45 .45 39.9500 j .45 .45 .45 .45 .45 40.2000 j .45 .45 .45 .45 .45 40.4500 j .45 .45 .45 .45 .45 40.7000 j .45 .45 .45 .45 .45 40.9500 j .45 .45 .45 .44 .44 41.2000 j .44 .44 .44 .44 .44 S/N: C21705506A87 Talbert & Bright PondPack Ver: 7.0 (325) Compute Time: 10:55:34 Date: 08-09-2004 Type.... Pond Routed HYG (total out) Page 7.06 Name.... P 10 OUT Tag: 1" Eq Storm: 1" Eq File.... J:\3301 (WILMINGTON)\0305 MASTER DRAINAGE PLAN\TERMINAL AREA DRY POND POSTB.PPW Storm... TypeIII 24hr Tag: 1" Eq HYDROGRAPH ORDINATES (cfs) Time j Output Time increment = .0500 hrs hrs j ---------j-------------------------------------------------------------- Time on left represents time for first value in each row. 41.4500 j .44 .44 .44 .44 .44 41.7000 j .44 .44 .44 .44 .44 41.9500 j .44 .44 .44 .44 .44 42.2000 j .44 .44 .44 .44 .44 42.4500 j .44 .44 .44 .44 .44 42.7000 j .44 .44 -44 .44 .44 42.9500 j .44 .44 .44 .44 .44 43.2000 j .44 .44 .44 .44 .44 43.4500 j .44 .44 .44 .44 .44 43.7000 j .44 .44 .44 .43 .43 43.9500 j .43 .43 .43 .43 .43 44.2000 j .43 .43 .43 .43 .43 44.4500 j .43 .43 .43 .43 .43 44.7000 j .43 .43 - .43 .43 .43 44.9500 j .43 .43 .43 .43 .43 45.2000 j .43 .43 .43 .43 .43 45.4500 j .43 .43 .43 .43 .43 45.7000 i .43 .43 .43 .43 .43 45.9500 j .43 .43 .43 .43 .43 46.2000 j .43 .43 .43 .43 .43 46.4500 j .43 .43 _43 .43 .42 46.7000 j .42 .42 .42 .42 .42 46.9500 j .42 .42 .42 .42 .42 47.2000 j 42 .42 .42 .42 .42 47.4500 j .42 .42 .42 .42 .42 47.7000 j .42 .42 .42 .42 .42 47.9500 I .42 .42 .42 .42 .42 48.2000 j .42 .42 .42 .42 .42 48.4500 j .42 .42 .42 .42 .42 48.7000 j .42 .42 .42 .42 .42 48.9500 j .42 .42 .42 .42 .42 49.2000 j .42 .42 .42 .42 .42 49.4500 j .42 .41 .41 .41 .41 49.7000 j .41 .41 .41 .41 .41 49.9500 j .41 .41 .41 .41 .41 50.2000 j .41 .41 .41 .41 .41 50.4500 j .41 .41 .41 .41 .41 50.7000 j .41 .41 .41 .41 .41 50.9500 j .41 .41 .41 .41 .41 51.2000 j .41 .41 .41 .41 .41 51.4500 j .41 .41 .41 .41 .41 51.7000 j 41 .41 .41 .41 .41 51.9500 j .41 .41 .41 .41 .41 52.2000 j .41 .41 .41 .41 .41 52.4500 j .40 .40 .40 .40 .40 52.7000 j .40 .40 .40 .40 .40 52.9500 j .40 .40 .40 .40 .40 S/N: C21705506A87 Talbert & Bright PondPack Ver: 7.0 (325) Compute Time: 10:55:34 Date: 08-09-2004 Type.... Pond Routed HYG (total out) Page 7.07 Name.... P 10 OUT Tag: 1" Eq Storm: 1" Eq File.... J:\3301 (WILMINGTON)\0305 MASTER DRAINAGE PLAN\TERMINAL AREA DRY POND POSTB.PPW Storm... TypeIII 24hr Tag: 1" Eq HYDROGRAPH ORDINATES (cfs) Time j Output Time increment = .0500 hrs hrs j ---------j-------------------------------------------------------------- Time on left represents time for first value in each row. 53.2000 j .40 .40 .40 .40 .40 53.4500 j .40 .40 .40 .40 .40 53.7000 j .40 .40 .40 .40 .40 53.9500 j .40 .40 .40 .40 .40 54.2000 j .40 .40 .40 .40 .40 54.4500 j .39 .39 .39 .39 .39 54.7000 j .39 .38 .38 .38 .38 54.9500 j .38 .38 .37 .37 .37 55.2000 j .37 .37 .37 .37 .36 55.4500 j .36 .36 .36 .36 .36 55.7000 j .36 .35 .35 .35 .35 55.9500 j .35 .35 .35 .34 .34 56.2000 j .34 .34 .34 .33 .33 56.4500 j .33 .33 .32 .32 .3Z 56.7000 i .32 .32 .31 .31 .31 56.9500 j .31 .30 .30 .30 .30 57.2000 j .30 .29 .29 .29 .29 57.4500 j .29 .28 .28 .28 .28 57.7000 j .28 .27 .27 .27 .26 57.9500 j .25 .25 .24 .24 .23 58.2000 j .23 .22 .22 .22 .21 58.4500 j .21 .20 .20 .19 _19 58.7000 j .19 .18 .18 .16 .12 58.9500 j .09 .07 .05 .04 .03 59.2000 j .02 .02 .01 .01 .01 59.4500 j .01 .00 .00 .00 S/N: C21705506A87 Talbert & Bright PondPack Ver: 7.0 (325) Compute Time: 10:55:34 Date: 08-09-2004 Type.... Pond Routing Summary Page 7.08 Name.... P 10 OUT Tag: 100yr Event: 100 yr File.... J:\3301 (WILMINGTON)\0305 MASTER DRAINAGE PLAN\TERMINAL AREA DRY POND POSTB.PPW Storm... TypeIII 24hr Tag: 100yr LEVEL POOL ROUTING SUMMARY HYG Dir = J:\3301 (WILMINGTON)\0305 MASTER DRAINAGE PLAN\ Inflow HYG file = NONE STORED - P 10 IN 100yr Outflow HYG file = NONE STORED - P 10 OUT 100yr Pond Node Data = P 10 Pond Volume Data = P 10 Pond Outlet Data = PR 20 No Infiltration INITIAL CONDITIONS Starting WS Elev = 20.00 ft Starting Volume = .000 ac-ft Starting Outflow = .00 cfs Starting Infiltr. _ .00 cfs Starting Total Qout= .00 cfs Time Increment = .0500 hrs INFLOW/OUTFLOW HYDROGRAPH SUMMARY Peak Inflow = 199.84 cfs at 12.2000 hrs Peak ----------------------------------------------------- Outflow = 106.20 cfs at 12.5000 hrs Peak Elevation = 27.30 ft Peak Storage = 9.078 ac-ft MASS BALANCE (ac-ft) -------------------------- + Initial Vol = .000 + HYG Vol IN = 22.368 - Infiltration = .000 - HYG Vol OUT = 22.368 - Retained Vol = .000 Unrouted Vol = -.000 ac-ft (.000% of Inflow Volume) S/N: C21705506A87 Talbert & Bright PondPack Ver: 7.0 (325) Compute Time: 10:55:34 Date: 08-09-2004 Type.... Pond Routing Summary Page 7.09 Name.... P 10 OUT Tag: 10yr Event: 10 yr File.... J:\3301 (WILMINGTON)\0305 MASTER DRAINAGE PLAN\TERMINAL AREA DRY POND POSTB.PPW Storm... TypeIII 24hr Tag: 10yr LEVEL POOL ROUTING SUMMARY HYG Dir = J:\3301 (WILMINGTON)\0305 MASTER DRAINAGE PLAN\ Inflow HYG file = NONE STORED - P 10 IN 10yr Outflow HYG file = NONE STORED - P 10 OUT 10yr Pond Node Data = P 10 Pond Volume Data = P 10 Pond Outlet Data = PR 20 No Infiltration INITIAL CONDITIONS Starting WS Elev = 20.00 ft Starting Volume = .000 ac-ft Starting Outflow = .00 cfs Starting Infiltr. _ .00-cfs Starting Total Qout= .00 cfs Time Increment = .0500 hrs INFLOW/OUTFLOW HYDROGRAPH SUMMARY Peak Inflow = 131.54 cfs at 12.2000 hrs Peak ----------------------------------------------------- Outflow = 45.19 cfs at 12.6500 hrs Peak Elevation = 26.17 ft Peak Storage = 6.750 ac-ft MASS BALANCE (ac-ft) -------------------------- + Initial Vol = .000 + HYG Vol IN = 14.416 Infiltration = .000 - HYG Vol OUT = 14.416 - Retained Vol = .000 Unrouted Vol = -.000 ac-ft (.000% of Inflow Volume) S/N: C21705506A87 Talbert & Bright PondPack Ver: 7.0 (325) Compute Time: 10:55:34 Date: 08-09-2004 Type.... Pond Routing Summary Page 7.10 Name.... P 10 OUT Tag: 25yr Event: 25 yr File.... J:\3301 (WILMINGTON)\0305 MASTER DRAINAGE PLAN\TERMINAL AREA DRY POND POSTB.PPW Storm... TypeIII 24hr Tag: 25yr LEVEL POOL ROUTING SUMMARY HYG Dir J:\3301 (WILMINGTON)\0305 MASTER DRAINAGE PLAN\ Inflow HYG file = NONE STORED - P 10 IN 25yr Outflow HYG file = NONE STORED - P 10 OUT 25yr Pond Node Data = P 10 Pond Volume Data = P 10 Pond Outlet Data = PR 20 No Infiltration INITIAL CONDITIONS Starting WS Elev = 20.00 ft Starting Volume = .000 ac-ft Starting Outflow = .00 cfs Starting Infiltr. _ .00 cfs Starting Total Qout= .00 cfs Time Increment = .0500 hrs INFLOW/OUTFLOW HYDROGRAPH SUMMARY Peak Inflow = 155.53 cfs at 12.2000 hrs Peak -------------------------------------------------- Outflow = 60.53 cfs at 12.6000 hrs Peak Elevation = 26.67 ft Peak Storage = 7.758 ac-ft MASS BALANCE (ac-ft) -------------------------- + Initial Vol = .000 + HYG Vol IN = 17.180 Infiltration = .000 - HYG Vol OUT = 17.180 Retained Vol = .000 Unrouted Vol = -.000 ac-ft (.000% of Inflow Volume) S/N: C21705506A87 Talbert & Bright PondPack Ver: 7.0 (325) Compute Time: 10:55:34 Date: 08-09-2004 Type.... Pond Routing Summary Page 7.11 Name.... P 10 OUT Tag: 2yr Event: 2 yr File.... J:\3301 (WILMINGTON)\0305 MASTER DRAINAGE PLAN\TERMINAL AREA DRY POND POSTB.PPW Storm... TypeIII 24hr Tag: 2yr LEVEL POOL ROUTING SUMMARY HYG Dir = J:\3301 (WILMINGTON)\0305 MASTER DRAINAGE PLAN\ inflow HYG file = NONE STORED - P 10 IN 2yr Outflow HYG file = NONE STORED - P 10 OUT 2yr Pond Node Data = P 10 Pond Volume Data = P 10 Pond Outlet Data = PR 20 No Infiltration INITIAL CONDITIONS Starting WS Elev = 20.00 ft Starting Volume = .000 ac-ft Starting Outflow = .00 cfs Starting Infiltr. _ .00 cfs Starting Total Qout= .00 cfs Time Increment = .0500 hrs INFLOW/OUTFLOW HYDROGRAPH SUMMARY Peak Inflow = 74.31 cfs at 12.2000 hrs Peak ------------------------------------------- Outflow = 13.81 cfs at 12.9500 hrs Peak Elevation = 24.81 ft Peak Storage = 4.195 ac-ft MASS BALANCE (ac-ft) -------------------------- + Initial Vol .000 + HYG Vol IN = 7.995 - Infiltration = .000 - HYG Vol OUT = 7.995 - Retained Vol = .000 Unrouted Vol = -.000 ac-ft (.001% of Inflow Volume) S/N: C21705506A87 Talbert & Bright PondPack Ver: 7.0 (325) Compute Time: 10:55:34 Date: 08-09-2004 Appendix A A-1 Index of Starting Page Numbers for ID Names ----- A ----- AREA D1... 3.01, 4.01 AREA D2... 3.03, 4.02 AREA D3... 3.05, 4.03 AREA D4... 3.07, 4.04 AREA D5... 3.09, 4.05 ----- N ----- NHC... 2.01 ----- P ----- P 10... 5.01, 7.01, 7.02, 7.03, 7.08, 7.09, 7.10, 7.11 PR 20... 6.01, 6.05, 6.11 ----- W ----- Watershed 1" Eq... 1.01, 1.021 1.03, 1.04, 1.05 S/N: C21705506A87 Talbert & Brighi. PondPack leer: 7.0 (325) Compute Time: 10:55:34 Date: 08-09-2004 I .1 11 I .1 u I Extended Dry Detention Basin No. 1 Analysis Results Summary -- .. p.. �. Job File: C:\HAESTAD\HAESTAD\ILM SW MASTER PLAN\SOUTH WEST SIDE PRE-DEV.PPW Rain D1r: C:\HAESTAD\PPKW\RAINFALL\ JOB TITLE ILM Stormwater Master Plan Existing Conditions Model - Southwest Area Discharge Points -bcv1 LAP IMt'`jr AtiAtys�s %nit S/N: C21705506A87 Talbert & Bright PondPack Ver: 7.0 (325) Compute Time: 18:21:27 Date: 08-05-2004 Table of Contents i Table of Contents ******************** NETWORK SUMMARIES ********************* Watershed....... 100yr Executive Summary (Nodes) .......... 1.01 Watershed._..... 10yr Executive Summary (Nodes) .......... 1.02 Watershed....... 25yr Executive Summary (Nodes) .......... 1.03 Watershed....... 2yr Executive Summary (Nodes) .......... 1.04 Network Calcs Sequence ............. 1.05 SlN: C217055OGA87 Talbert & Bright PondPack Ver: 7.0 (325) Compute Time: 18:21:27 Date: 08-05-2004 Type.... Executive Summary (Nodes) Page 1.01 Name.... Watershed Event: 100 yr File.... C:\HAESTAD\HAESTAD\ILM SW MASTER PLAN\SOUTH WEST SIDE PRE-DEV.PPW Storm... TypeIII 24hr Tag: 100yr NETWORK SUMMARY -- NODES (Trun.= HYG Truncation: Blank=None; L=Left; R=Rt; LR=Left & Rt) DEFAULT Design Storm File,ID = NHC.RNQ NHC Storm Tag Name = 100yr Description: New Hanover County Rainfall Curve Data -------------------------------------------------------------------- Data Type, File, ID = Synthetic Storm SCSTYPES.RNF TypeIII 24hr Storm Frequency = 100 yr Total Rainfall Depth= 10.0000 in Duration Multiplier = 1 Resulting Duration = 24.0000 hrs Resulting Start Time= .0000 hrs Step= .1000 hrs End= 24.0000 hrs HYG Vol Node ID Type ac-ft J 10 JCT 19.492 J 20 JCT 36.664 J 40 JCT 32.810 J 50 JCT 14.570 J 60 JCT 48.893 J 70 JCT 3.185 Outfall OUT 60 JCT 99.459 SUB 11 AREA 5.397 SUB 12 AREA 6.471 SUB 15 AREA 10.269 SUB 16 AREA 8.327 SUB 17 AREA 6.243 SUB 18 AREA 19.659 SUB 19 AREA 14.568 SUB 19A AREA 2.882 SUB 2 AREA -422 SUB 21 AREA 13.448 SUB 22 AREA 1.358 SUB 25 AREA 1.182 SUB 3 AREA 1.242 SUB 39 AREA 2.604 SUB 4 AREA 1.522 SUB 7 AREA .137 SUB26 AREA 3.504 Qpeak Qpeak Max WSEL Trun. hrs cfs ft 13.0000 80.47 12.9500 155.08 12.3000 206.85 12.7000 78.58 R 12.9500 87.75 12.5000 20.94 R 12.4500 348.16 12.7500 26.77 13.1500 25.26 12.7500 51.83 12.7000 44.39 12.7000 34.19 12.3000 163.80 12.9500 66.92 12.5500 18.22 12.4500 2.99 13.0500 55.54 13.1500 5.22 13.1000 4.64 12.5000 7.97 12.7000 14.19 12.5000 10.02 13.4500 .34 12.7000 18.70 S/N: C21705506A87 Talbert & Bright PondPack Ver: 7.0 (325) Compute Time: 18:21:27 Date: 08-05-2004 Type.... Executive Summary (Nodes) Page 1.02 Name.... Watershed Event: 10 yr File.... C:\HAESTAD\HAESTAD\ILM SW MASTER PLAN\SOUTH WEST SIDE PRE-DEV.PPW Storm... TypeIII 24hr Tag: 10yr NETWORK SUMMARY -- NODES (Trun.= HYG Truncation: Blank=None; L=Left; R=Rt; LR=Left & Rt) DEFAULT Design Storm File,ID = MHC.RNQ NHC Storm Tag Name = 10yr Description: New Hanover County Rainfall Curve Data -------------------------------------------------------------------- Data Type, File, ID = Synthetic Storm SCSTYPES.RNF TypeIII 24hr Storm Frequency = 10 yr Total Rainfall Depth= 7.0000 in Duration Multiplier = 1 Resulting Duration = 24.0000 hrs Resulting Start Time= .0000 hrs Step= .1000 hrs End= 24.0000 hrs HYG Vol Qpeak Qpeak Max WSEL Node ----------------- ID Type ac-ft Trun. hrs cfs ft J 10 ---- JCT ---------- 10.633 ----------- 13.0000 ----------------- 42.76 J 20 JCT 20.145 12.9500 85.27 J 40 JCT 19.307 12.3000 124.19 J 50 JCT 7.933 12.7000 41.67 J 60 JCT 26.587 R 12.9500 62.22 J 70 JCT 1.464 12.5500 8.60 Outfall OUT 60 JCT 55.291 R 12.5000 203.43 SUB 11 AREA 2.744 12.8500 12.96 SUB 12 AREA 3.439 13.2000 12.98 SUB 15 AREA 5.568 12.8000 27.36 SUB 16 AREA 4.332 12.7500 22.04 SUB 17 AREA 3.600 12.7000 19.63 SUB 18 AREA 12.191 12.3000 103.31 SUB 19 AREA 7.975 12.9500 35.90 SUB 19A AREA 1.548 12.6000 9.57 SUB 2 AREA .219 12.4500 1.50 SUB 21 AREA 7.221 13.0500 28.84 SUB 22 AREA .707 13.2000 2.60 SUB 25 AREA .621 13.1000 2.33 SUB 3 AREA .543 12.6000 3.00 y SUB 39 AREA 1.537 12.7000 8.39 SUB 4 AREA .702 12.5500 4.15 SUB 7 AREA .029 15.0500 .04 SUB26 AREA 2.084 12.7000 11.15 S;N: C21705506A87 Talbert & Drigiit PondPack Ver: 7.0 (325) Compute Time: 18:21:27 Date: 08-05-2004 a Type.... Executive Summary (Nodes) Page 1.03 Name.... Watershed Event: 25 yr File.... C:\HAESTAD\HAESTAD\ILM SW MASTER PLAN\SOUTH WEST SIDE PRE-DEV.PPW Storm... TypeIII 24hr Tag: 25yr NETWORK SUMMARY -- NODES (Trun.= HYG Truncation: Blank=None; L=Left; R=Rt; LR=Left & Rt) DEFAULT Design Storm File,ID = NHC.RNQ NHC Storm Tag Name = 25yr Description: New Hanover County Rainfall Curve Data -------------------------------------------------------------------- Data Type, File, ID = Synthetic Storm SCSTYPES.RNF TypeIII 24hr Storm Frequency = 25 yr Total Rainfall Depth= 8.0500 in Duration Multiplier = 1 Resulting Duration = 24.0000 hrs Resulting Start Time= .0000 hrs Step= .1000 hrs End= 24.0000 hrs HYG Vol Qpeak Qpeak Max WSEL Node ID Type ac-ft Trun. hrs cfs ft J 10 JCT 13.610 13.0000 55.50 J 20 JCT 25.706 12.9500 110.00 J 40 JCT 23.912 12.3000 152.72 J 50 JCT 10.162 12.7000 54.14 J 60 JCT 34.058 R 12.9500 70.72 J 70 JCT 2.021 12.5000 12.56 Outfall OUT 60 JCT 70.153 R 12.4500 254.14 SUB 11 AREA 3.622 12.8500 17.55 SUB 12 AREA 4.453 13.2000 17.10 SUB 15 AREA 7.147 12.8000 35.60 SUB 16 AREA 5.661 .12.7000 29.51 SUB 17 AREA 4.500 12.7000 24.64 SUB 18 AREA 14.771 12.3000 124.46 SUB 19 AREA 10.194 12.9500 46.42 SUB 19A AREA 1.995 12.5500 12.46 SUB 2 AREA .287 12.4500 2.00 SUB 21 AREA 9.308 13.0500 37.83 SUB 22 AREA .923 13.2000 3.47 SUB 25 AREA .808 13.1000 3.10 SUB 3 AREA .767 12.5500 4.57 SUB 39 AREA 1.902 12.7000 10.40 SUB 4 AREA .967 12.5000 6.03 SUB 7 AREA .059 13.6500 .10 SUB26 AREA 2.570 12.7000 13.76 S/iv: C21705506A87 Talbert & Bright PondPack Ver: 7.0 (325) Compute Time: 18:21:27 Date: 08-05-2004 Type.... Executive Summary (Nodes) Page 1.04 Name.... Watershed Event: 2 yr File.... C:\HAESTAD\HAESTAD\ILM SW MASTER PLAN\SOUTH WEST SIDE PRE-DEV.PPW Storm... TypeIII 24hr Tag: 2yr NETWORK SUMMARY -- NODES (Trun.= HYG Truncation: Blank=None; L=Left; R=Rt; LR=Left & Rt) DEFAULT Design Storm File,ID = NHC.RNQ NHC Storm Tag Name = 2yr Description: New Hanover County Rainfall Curve Data -------------------------------------------------------------------- Data Type, File, ID = Synthetic Storm SCSTYPES.RNF TypeIII 24hr Storm Frequency = 2 yr Total Rainfall Depth= 4.5000 in Duration Multiplier = 1 Resulting Duration = 24.0000 hrs Resulting Start Time= .0000 hrs Step= .1000 hrs End= 24.0000 hrs HYG Vol Qpeak Qpeak Max WSEL Node ID Type ac-ft Trun. hrs cfs ft J 10 JCT 4.392 ----------- 13.0500 ----------------- 15.97 J 20 JCT 8.428 13.0000 32.50 J 40 JCT 9.204 12.3000 59.87 J 50 JCT 3.269 12.8000 15.53 J 60 JCT 10.758 13.2000 39.48 J 70 JCT .422 12.7000 1.63 Outfall OUT 60 JCT 23.654 12.5500 85.83 SUB 11 AREA .984 12.9000 3.83 SUB 12 AREA 1.347 13.4000 4.46 SUB 15 AREA 2.266 12.9000 10.11 SUB 16 AREA 1.627 12.8500 7.15 SUB 17 AREA 1.642 12.7000 8.57 SUB 18 AREA 6.320 12.3000 53.88 SUB 19 AREA 3.305 12.9500 13.54 SUB 19A AREA .618 12.6000 3.45 SUB 2 AREA .082 12.5000 .49 SUB 21 AREA 2.884 13.2000 10.31 SUB 22 AREA .265 13.4000 .84 SUB 25 AREA .238 13.3000 .78 SUB 3 AREA .137 12.7500 .42 SUB 39 AREA .731 12.7000 3.89 SUB 4 AREA .203 12.7000 .79 SUB 7 AREA .000 .0500 .00 SUB26 AREA 1.004 12.7000 5.24 SON: C21705506A87 Talbert & Bright PondPack Ver: 7.0 (325) Compute Time: 18:21:27 Date: 08-05-2004 Type.... Network Calcs Sequence Page 1.05 Name.... Watershed Event: 2 yr Fite.... C:\HAESTAD\HAESTAD\ILM SW MASTER PLAN\SOUTH WEST SIDE PRE-DEV.PPW Storm... TypeIII 24hr Tag: 2yr NETWORK RUNOFF NODE SEQUENCE Runoff Data Apply to Node Receiving Link SCS UH sub 25 Subarea SUB 25 Add Hyd SUB 25 SCS UH sub26 Subarea SUB26 Add Hyd SUB26 SCS UH sub 22 Subarea SUB 22 Add Hyd SUB 22 SCS UH sub 21 Subarea SUB 21 Add Hyd SUB 21 SCS UH sub 12 Subarea SUB 12 Add Hyd SUB 12 SCS UH sub 19 Subarea SUB 19 Add Hyd SUB 19 SCS UH sub 39 Subarea SUB 39 Add Hyd SUB 39 SCS UH sub 11 Subarea SUB 11 Add Hyd SUB 11 SCS UH sub 7 Subarea SUB 7 Add Hyd SUB 7 SCS UH sub 18 Subarea SUB 18 Add Hyd SUB 18 SCS UH sub 15 Subarea SUB 15 Add Hyd SUB 15 SCS UH Sub 17 Subarea SUB 17 Add Hyd SUB 17 SCS UH sub 19A Subarea SUB 19A Add Hyd SUB 19A ---SCS- UH sub 16 Subarea SUB 16 Add Hyd SUB 16 SCS UH sub 4 Subarea SUB 4 Add Hyd SUB 4 SCS UH sub 3 Subarea SUB 3 Add Hyd SUB 3 SCS UH sub 2 Subarea SUB 2 Add Hyd SUB 2 SIN: C21705506A87 Talbert & Bright PondPack Ver: 7.0 (325) Compute Time: 18:21:27 Date: 08-05-2004 Type.... Network Calcs Sequence Page 1.06 Name.... Watershed Event: 2 yr File.... C:\HAESTAD\HAESTAD\ILM SW MASTER PLAN\SOUTH WEST SIDE PRE-DEV.PPW Storm... TypeIII 24hr Tag: 2yr NETWORK ROUTING SEQUENCE Link Operation ---------------------------------------- UPstream Node DNstream Node Add Hyd A 20 Subarea ---------------------------------------- SUB26 Jct J 10 Add Hyd A 10 Subarea SUB 25 Jct J 10 Add Hyd A 40 Subarea SUB 21 Jct J 10 Add Hyd A 30 Subarea SUB 22 Jct J 10 Add Hyd A 60 Subarea SUB 19 Jct J 20 Add Hyd A 80 Subarea SUB 39 Jct J 20 Reach R 10 Jct J 10 Jct J 20 Add Hyd A 230 Subarea SUB 12 Jct J 60 Reach R 50 Jct J 20 Jct J 60 Add Hyd A 260 Subarea SUB 7 Jct J 60 Add Hyd A 250 Subarea SUB 11 Jct J 60 Add Hyd A 410 Subarea SUB 3 Jct J 70 Add Hyd A 400 Subarea SUB 4 Jct J 70 Add Hyd A 420 Subarea SUB 2 Jct J 70 Add Hyd A 360 Subarea SUB 19A Jct J 40 Add Hyd A 150 Subarea SUB 18 Jct J 40 Add Hyd A 160 Subarea SUB 15 Jct J 40 Add Hyd A 350 Subarea SUB 17 Jct J 50 Add Hyd A 210 Subarea SUB 16 Jct J 50 Add Hyd A 460 Jct J 50 Jct OUT 60 Add Hyd A 450 Jct J 40 Jct OUT 60 Add Hyd A 430 Jct J 70 Jct OUT 60 Add Hyd A 440 Jct J 60 Jct OUT 60 S/N: C21705506A87 Talbert & Bright PondPack Ver: 7.0 (325) Compute Time: 18:21:27 Date: 08-05-2004 Appendix A A-1 Index of Starting Page Numbers for ID Names 5;1:: C2170550GA87 Talbert « Bright PondPack Ver: 7.0 (325) Compute Time: 18:21:27 Date: 08-05-2004 Type.... Vol: Elev-Area Name.... P 20 Page 1.01 File.... J:\3301 (WILMINGTON)\0305 MASTER DRAINAGE PLAN\AUGUST 2 SOLUTION SOUTH.PPW Elevation Planimeter Area Al+A2+sgr(A1*A2) Volume Volume Sum (ft) ------------------------------------------------------------------------ (sq.in) (sq.ft) (sq.ft) (ac-ft) (ac-ft) 7.00 ----- 0 0 .000 .000 8.00 ----- 7000 7000 .054 .054 9.00 ----- 16000 33583 .257 .311 10.00 ----- 28000 65166 .499 .809 10.70 ----- 40000 101466 .544 1.353 10.80 ----- 330780 485807 .372 1.724 11.00 ----- 382445 1068901 1.636 3.360 12.00 ----- 591733 1449894 11.095 14.455 13.00 ----- 627496 1828581 13.993 28.448 14.00 ----- 649276 1915065 14.655 43.103 15.00 ----- 671114 1980495 15.155 58.258 16.00 ----- 693012 2046101 15.657 73.915 17.00 ----- 714967 2111883 16.161 90.076 18.00 ----- 736982 2177840 16.665 106.742 19.00 ----- 759054 2243973 17.172 123.913 20.00 - - 781186 2310281 17.679 141.592 POND VOLUME EQUATIONS * Incremental volume computed by the Conic Method for Reservoir Volumes. Volume = (1/3) * (EL2-EL1) * (Areal + Area2 + sq.rt.(Area1*Area2)) where: EL1, EL2 = Lower and upper elevations of the increment Areal,Area2 - Areas computed for EL1, EL2, respectively Volume Incremental volume between EL1 and EL2 ?c�1 �a V U J Oa 12L?1�) J S a l A, S-L? & c- j ,� �p S 6 /0 / s Co 09 (65-) + , 0 5 VOL- x Z o Y, = 3. `f? Ac- - F r- -7,1-7 Ac - Fr V7 t-� d . f o, 7u S/Pv: C21705506A87 Talbert & Bright PondPack Ver: 7.0 (325) Compute Time: 17:09:08 Date: 08-23-2004 Type.... Vol: Elev-Area Name.... P 20 Page 1.01 File.... J:\3301 (WILMINGTON)\0305 MASTER DRAINAGE PLAN\AUGUST 2 SOLUTION 5OUTH.PPW Elevation Planimeter Area Al+A2+sgr(A1*A2) Volume Volume Sum (ft) ------------------------------------------------------------------------ (sq.in) (sq.ft) (sq.ft) (ac-ft) (ac-ft) 7.00 ----- 0 0 .000 .000 8.00 ----- 7000 7000 .054 .054 9.00 ----- 16000 33583 .257 .311 10.00 ----- 116170 175283 1.341 1.652 10.70 ----- 304037 608143 3.258 4.909 10.80 ----- 330780 951944 .728 5.638 11.00 ----- 382445 1068901 1.636 7.274 12.00 ----- 591733 1449894 11.095 18.369 13.00 ----- 627496 1828581 13.993 32.362 14.00 ----- 649276 1915065 14.655 47.016 15.00 ----- 671114 1980495 15.155 62.172 16.00 ----- 693012 2046101 15.657 77.829 17.00 ----- 714967 2111883 16.161 93.990 18.00 ----- 736982 2177840 16.665 110.655 19.00 ----- 759054 2243973 17.172 127.827 20.00 ----- 781186 2310281 17.679 145.505 POND VOLUME EQUATIONS * Incremental volume computed by the Conic Method for Reservoir Volumes. Volume = (1/3) * (EL2-EL1) * (Areal + Area2 + sq.rt.(Area1*Area2)) where: EL1, EL2 = Lower and upper elevations of the increment Areal,Area2 = Areas computed for EL1, EL2, respectively Volume = Incremental volume between EL1 and EL2 �vLc� Vvc_�✓�C 1P(L scn ( ^1 E,j r kl uo, A p+J c,;Z- . S/N: C21705506A87 Talbert & Bright PondPack Ver: 7.0 (325) Compute Time: 17:10:09 Date: 08-23-2004 Job Fite: J:\3301 (WILMINGTON)\0305 MASTER DRAINAGE PLAN\AUGUST 2 SOLUTION SOUTH.PPW Rain Dir: C:\HAESTAD\PPKW\RAINFALL\ JOB TITLE Proposed conditions - west side of airport. E;<Tajbe-,b �Y Na, , SIN: C21705506A8If Talbert & Bright PondPack Ver: 7.0 (325) Compute Time: 14:47:22 Date: 08-20-2004 Table of Contents i Table of Contents ******************** NETWORK SUMMARIES ********************* Watershed....... V Eq Executive Summary (Nodes) 1.01 Watershed....... 100yr Executive Summary (Nodes) .......... 1.02 Watershed....:_.. 10yr Executive Summary (Nodes) 1.03 Watershed....... 25yr Executive Summary (Nodes) .......... 1.04 Watershed....... 2yr Executive Summary (Nodes) .......... 1.05 ****************** DESIGN STORMS SUMMARY ******************* NHC............. Design Storms ............ 2.01 ********************** TC CALCULATIONS ******************** AREA A.......... Tc Calcs ........................... 3.01 AREA B.-:....... Tc Calcs ......... ............. ... 3.03 AREA C.......... Tc Calcs ........................... 3.05 AREA D.......... Tc Calcs ........................... 3.07 AREA E.......... Tc Calcs ........................... 3.09 AREA F.......... Tc Calcs ........................... 3.11 AREA G.......... Tc Calcs ........................... 3.13 /N: C2«7CS506„B7 Talbert aAbera « Bright PondPack Ver: 7,0 (325) Compute Time: 14:47:22 Date: 08-20-2004 Table of Contents Table of Contents (continued) AREA H.......... Tc Calcs ........................... 3.15 AREA I.......... Tc Calcs ........................... 3.17 ********************** CN CALCULATIONS ********************* AREA A.......... Runoff CN-Area ..................... 4.01 AREA B.......... Runoff CN-Area ..................... 4.02 AREA C.......... Runoff CN-Area ..................... 4.03 AREA D.......... Runoff CN-Area ..................... 4.04 AREA E........ .. Runoff CN-Area ..................... 4.05 AREA F.......... Runoff CN-Area ..................... 4.06 AREA G.......... Runoff CN-Area ..................... 4.07 AREA H.......... Runoff CN-Area ..................... 4.08 AREA I.......... Runoff CN-Area ..................... 4.09 *********************** POND VOLUMES *********************** P 10........... Vol: Elev-Area ..................... 5.01 P 20........... Vol: Elev-Area 5.02 ******************** OUTLET STRUCTURES ********************* PR 10.......... Outlet Input Data .................. 6.01 Individual Outlet Curves ........... 6.06 PR 20.......... Outlet Input Data .................. 6.08 S/N: C2170550GA87 Talbert & Bright PondPack Ver: 7.0 (325) Compute Time: 14:47:22 Date: 08-20-2004 Table of Contents iii Table of Contents (continued) Individual Outlet Curves ........... 6.14 Composite Rating Curve ............. 6.22 *********************** POND ROUTING *********************** P 10........... Pond E-V-Q Table ................... 7.01 P 10 OUT 1" Eq Pond Routing Summary ............... 7.02 P 10 OUT 100yr Pond Routing Summary ............... 7.03 P 10 OUT 10yr Pond Routing Summary ............... 7.04 P 10 OUT 25yr Pond Routing Summary ............... 7.05 P 10 OUT 2yr Pond Routing Summary ............... 7.06 P 20........... Pond E-V-Q Table ................... 7.07 P 20 OUT 1" Eq Pond Routing Summary ............... 7.09 Pond Routed HYG (total out) ........ 7.10 P 20 OUT 100yr Pond.Routing Summary ............... 7.15 P 20 OUT 10yr Pond Routing Summary ............... 7.16 P 20 OUT 25yr Pond Routing Summary ............... 7.17 P 20 OUT 2yr Pond Routing Summary ............... 7.18 .3/ 1C C21705506A87 Talbert & Bright PondPack Ver: 7.0 (325) Compute Time: 14:47:22 Date: 08-20-2004 Type.... Executive Summary (Nodes) Page 1.01 Name.... Watershed Storm: 1" Eq File.... J:\3301 (WILMINGTON)\0305 MASTER DRAINAGE PLAN\AUGUST 2 SOLUTION SOUTH.PPW Storm... TypeIII 24hr Tag: 1" Eq NETWORK SUMMARY -- NODES (Trun.= HYG Truncation: Blank=None; L=Left; R=Rt; LR=Left & Rt) DEFAULT Design Storm File,ID = NHC.RNQ NHC Storm Tag Name = 1" Eq Data Type, File, ID = Synthetic Storm SCSTYPES.RNF TypeIII 24hr Total Rainfall Depth= 1.8400 in Duration Multiplier = 1 Resulting Duration = 24.0000 hrs Resulting Start Time= .0000 hrs Step= .1000 hrs End= 24.0000 hrs HYG Vol Qpeak Qpeak Node ID Type ac-ft Trun. hrs cfs AREA A AREA 1.523 12.6000 8.46 AREA B AREA .717 12.4500 5.10 AREA C AREA 1.108 12.5000 7.36 AREA D AREA 1.950 12.6000 11.27 AREA E AREA 2.836 12.5500 17.62 AREA F AREA 2.360 12.6500 13.25 AREA G AREA 1.949 12.5500 12.60 AREA H AREA 2.852 12.6000 16.03 AREA I AREA 2.674 12.6000 16.40 J 10 JCT 2.240 12.4500 5.25 J 20 JCT 1.523 13.7000 2.60 J 30 JCT 3.348 12.6000 12.21 J 40 JCT 5.298 12.8000 22.36 J 50 JCT 5.196 12.6000 30.49 Outfall OUT 10 JCT 17.969 20.7000 4.92 P 10 IN POND 1.523 12.6000 8.46 P 10 OUT POND 1.523 13.7000 2.60 P 20 IN POND 17.969 12.7000 92.70 P 20 OUT POND 17.969 20.7000 4.92 Max WSEL ft 22.64 11.86 S/N: C21705506A87 Talbert & Bright PondPack Ver: 7.0 (325) Compute Time: 14:47:22 Date: 08-20-2004 Type.... Executive Summary (Nodes) Page 1.02 Name.... Watershed Event: 100 yr File.... J:\3301 (WILMINGTON)\0305 MASTER DRAINAGE PLAN\AUGUST 2 SOLUTION SOUTH.PPW Storm... TypeIII 24hr Tag: 100yr NETWORK SUMMARY -- NODES (Trun.= HYG Truncation: Blank=None; L=Left; R=Rt; LR=Left & Rt) DEFAULT Design Storm File,ID = NHC.RNQ NHC Storm Tag Name = 100yr Description: New Hanover County Rainfall Curve Data -------------------------------------------------------------------- Data Type, File, ID = Synthetic Storm SCSTYPES.RNF TypeIII 24hr Storm Frequency = 100 yr Total Rainfall Depth= 10.0000 in Duration Multiplier = 1 Resulting Duration = 24.0000 hrs Resulting Start Time= .0000 hrs Step= .1000 hrs End= 24.0000 hrs HYG Vol Qpeak Qpeak Node ID ----------------- Type ac-ft Trun. hrs cfs AREA A ---- AREA ---------- 27.843 -- --------- 12.5000 -------- 179.88 AREA B AREA 7.706 12.4000 52.40 AREA C AREA 11.909 12.4500 75.88 AREA D AREA 20.946 12.6000 117.81 AREA E AREA 30.466 12.5000 183.12 AREA F AREA 25.359 12.6500 138.04 AREA G AREA 20.943 12.4500 130.93 AREA H AREA 45.867 12.5000 283.54 AREA I AREA 28.723 12.5000 170.12 J 10 JCT 35.549 12.4500 64.47 J 20 JCT 27.843 14.1000 26.81 J 30 JCT 47.457 12.5500 135.94 J 40 JCT 68.403 12.7500 240.45 J 50 JCT 55.825 12.5500 318.60 Outfall OUT 10 JCT 218.059 R 13.6000 337.31 P 10 IN POND 27.843 12.5000 179.88 P 10 OUT POND 27.843 14.1000 26.81 P 20 IN POND 219.761 12.6000 1086.06 P 20 OUT POND 218.059 R 13.6000 337.31 Max WSEL ft 25.49 17.82 SiN: C21705506A87 Talbert & Bright PondPack Ver: 7.0 (325) Compute Time: 14:47:22 Date: 08-20-2004 Type.... Executive Summary (Nodes) Page 1.03 Name.... Watershed Event: 10 yr File.... J:\3301 (WILMINGTON)\0305 MASTER DRAINAGE PLAN\AUGUST 2 SOLUTION SOUTH.PPW Storm... TypeIII 24hr Tag: 10yr NETWORK SUMMARY -- NODES (Trun.= HYG Truncation: Blank=None; L=Left; R=Rt; LR=Left & Rt) DEFAULT Design Storm File,ID = NHC.RNQ NHC Storm Tag Name = 10yr Description: New Hanover County Rainfall Curve Data -------------------------------------------------------------------- Data Type, File, ID = Synthetic Storm SCSTYPES.RNF TypeIII 24hr Storm Frequency = 10 yr Total Rainfall Depth= 7.0000 in Duration Multiplier = 1 Resulting Duration = 24.0000 hrs Resulting Start Time= .0000 hrs Step= .1000 hrs End= 24.0000 hrs HYG Vol Qpeak Qpeak Max WSEL Node ID Type ac-ft Trun. hrs cfs ft AREA A AREA - 17.151 --------- 12.5000 -------- 112.30 --------- AREA B AREA 5.023 12.4000 34.88 AREA C AREA 7.762 12.5000 50.51 AREA D AREA 13.653 12.6000 78.40 AREA E AREA 1.9.858 12.5000 121.79 AREA F AREA 16.529 12.6500 91.90 AREA G AREA 13.651 12.4500 87.04 AREA H AREA 28.G29 12.5500 179.58 AREA I AREA 18.722 12.5000 113.06 J 10 JCT 22.173 12.4500 42.71 J 20 JCT 17.150 13.9000 19.66 J 30 JCT 29.935 12.5500 90.17 J 40 JCT 43.588 12.7500 159.51 J 50 JCT 36.387 12.5500 211.89 Outfall OUT 10 JCT 140.386 R 14.0500 157.58 P 10 IN POND 17.151 12.5000 112.30 P 10 OUT POND 17.150 13.9000 19.66 24.65 P 20 IN POND 140.978 12.6000 712.83 P 20 OUT POND 140.386 R 14.0500 157.58 15.94 S/N: C21705506A87 Talbert & 8right PondPack Ver: 7.0 (325) Compute Time: 14:47:22 Date: 08-20-2004 Type.... Executive Summary (Nodes) Page 1.04 Name.... Watershed Event: 25 yr File.... J:\3301 (WILMINGTON)\0305 MASTER DRAINAGE PLAN\AUGUST 2 SOLUTION SOUTH.PPW Storm... TypeIII 24hr Tag: 25yr NETWORK SUMMARY -- NODES (Trun.= HYG Truncation: Blank=None; L=Left; R=Rt; LR=Left & Rt) DEFAULT Design Storm File,ID = NHC.RNQ NHC Storm Tag Name = 25yr Description: New Hanover County Rainfall Curve Data -------------------------------------------------------------------- Data Type, File, ID = Synthetic Storm SCSTYPES.RNF TypeIII 24hr Storm Frequency = 25 yr Total Rainfall Depth= 8.0500 in Duration Multiplier = 1 Resulting Duration = 24.0000 hrs Resulting Start Time= .0000 hrs Step= .1000 hrs End= 24.0000 hrs HYG Vol Qpeak Qpeak Max WSEL Node ID Type ac-ft Trun. hrs cfs ft AREA A AREA 20.840 - 12.5000 ------- 135.88 --------- AREA B AREA 5.957 12.4000 41.04 AREA C AREA 9.206 12.4500 59.41 AREA D AREA 16.192 12.6000 92.25 AREA E AREA 23.551 12.5000 143.34 AREA F AREA 19.603 12.6500 108.11 AREA G AREA 16.190 12.4500 102.46 AREA H AREA 34.591 12.5000 215.80 AREA I AREA 22.204 12.5000 133.11 J 10 JCT 26.796 12.4500 50.34 J 20 JCT 20.839 13.9500 22.40 J 30 JCT 36.002 12.5500 106.21 J 40 JCT 52.194 12.7500 188.09 J 50 JCT 43.155 12.5500 249.38 Outfall OUT 10. JCT 167.332 R 13.8000 220.21 P 10 IN POND 20.840 12.5000 135.88 P 10 OUT POND 20.839 13.9500 22.40 24.96 P 20 IN POND 168.333 12.6000 843.86 P 20 OUT POND 167.332 R 13.8000 220.21 16.61 SiN: C21705506A87 Talbert & Bright PondPack Ver: 7.0 (325) Compute Time: 14:47:22 Date: 08-20-2004 A Type.... Executive Summary (Nodes) Page 1.05 Name.... Watershed Event: 2 yr File.... J:\3301 (WILMINGTON)\0305 MASTER DRAINAGE PLAN\AUGUST 2 SOLUTION SOUTH.PPW Storm... TypeIII 24hr Tag: 2yr NETWORK SUMMARY -- NODES (Trun.= HYG Truncation: Blank=None; L=Left; R=Rt; LR=Left & Rt) DEFAULT Design Storm File,ID = NHC.RNQ NHC Storm Tag Name = 2yr Description: New Hanover County Rainfall Curve Data -------------------------------------------------------------------- Data Type, File, ID = Synthetic Storm SCSTYPES.RNF TypeIII 24hr Storm Frequency = 2 yr Total Rainfall Depth= 4.5000 in Duration Multiplier = 1 Resulting Duration = 24.0000 hrs Resulting Start Time= .0000 hrs Step= .1000 hrs End= 24.0000 hrs HYG Vol Qpeak Qpeak Max WSEL Node ID Type ac-ft Trun. hrs cfs ft AREA A AREA 8.788 12.5000 -------- 57.53 --------- AREA B AREA 2.841 12.4500 20.19 AREA C AREA 4.390 12.5000 29.26 AREA D AREA 7.721 12.6000 45.27 AREA E AREA 11.231 12.5500 70.25 AREA F AREA 9.348 12.6500 53.10 AREA G AREA 7.720 12.5000 50.24 AREA H AREA 15.012 12.5500 94.84 AREA I AREA 10.589 12.5000 65.11 J 10 JCT 11.628 12.4500 24.03 J 20 JCT 8.787 13.7500 12.27 J 30 JCT 16.018 12.5500 51.32 J 40 JCT 23.739 12.7500 91.27 J 50 JCT 20.579 12.5500 122.20 Outfall OUT 10 JCT 77.640 16.3000 46.11 P 10 IN POND 8.788 12.5000 57.53 P 10 OUT POND 8.787 13.7500 12.27 23.87 P 20 IN POND 77.640 12.6000 401.21 P 20 OUT POND 77.640 16.3000 46.11 14.33 j/n. ..2�705Jvonoi Talbert a"c Bright PondPack Ver: 7.0 (325) Compute Time: 14:47:22 Date: 08-20-2004 Type.... Design Storms Page 2.01 Name.... NHC File.... C:\HAESTAD\PPKW\RAINFALL\NHC.RNQ Title... Proposed conditions - west side of airport. DESIGN STORMS SUMMARY Design Storm File,ID = NHC.RNQ NHC Storm Tag Name = 100yr Description: New Hanover County Rainfall Curve Data ---------------------------------------------------------------------- Data Type, File, ID = Synthetic Storm SCSTYPES.RNF TypeIII 24hr Storm Frequency = 100 yr Total Rainfall Depth= 10.0000 in Duration Multiplier = 1 Resulting Duration = 24.0000 hrs Resulting Start Time= .0000 hrs Step= .1000 hrs End= 24.0000 hrs Storm Tag Name = 25yr Description: New Hanover County Rainfall Curve Data ----- ----------------------- Data Type, File, ID = Synthetic Storm SC5TYPES.RNF TypeIII 24hr Storm Frequency = 25 yr Total Rainfall Depth= 8.0500 in Duration Multiplier = 1 Resulting Duration = 24.0000 hrs Resulting Start Time= .0000 hrs Step= .1000 hrs End= 24.0000 hrs Storm Tag Name = 1" Eq Data Type, File, ID = Synthetic Storm SCSTYPES.RNF TypeIII 24hr Total Rainfall Depth= 1.8400 in Duration Multiplier = 1 Resulting Duration = 24.0000 hrs Resulting Start Time= .0000 hrs Step= .1000 hrs End= 24.0000 hrs Storm Tag Name = 10yr Description: New Hanover County Rainfall Curve Data ---------------------------------------------------------------------- Data Type, File, ID = Synthetic Storm SCSTYPES.RNF TypeIII 24hr Storm Frequency = 10 yr Total Rainfall Depth= 7.0000 in Duration Multiplier = 1 Resulting Duration = 24.0000 hrs Resulting Start Time= .0000 hrs Step= .1000 hrs End= 24.0000 hrs S/N: C21705506A87 Talbert & aright PondPack Ver: 7.0 (325) Compute Time: 14:47:22 Date: 08-20-2004 Type.... Design Storms Page 2.02 Name.... NHC File.... C:\HAE5TAD\PPKW\RAINFALL\NHC.RNQ Title... Proposed conditions - west side of airport. DESIGN STORMS SUMMARY Design Storm File,ID = NHC.RNQ NHC Storm Tag Name = 2yr Description: New Hanover County Rainfall Curve Data ---------------------------------------------------------------------- Data Type, File, ID = Synthetic Storm SCSTYPES.RNF TypeIII 24hr Storm Frequency = 2 yr Total Rainfall Depth=.4.5000 in Duration Multiplier = 1 Resulting Duration = 24.0000 hrs Resulting Start Time= .0000 hrs Step= .1000 hrs End= 24.0000 hrs S/N: C21705506A87 Talbert & Bright PondPack Ver: 7.0 (325) Compute Time: 14:47:22 Date: 08-20-2004 Type.... Tc Calcs Page 3.01 Name.... AREA A File.... J:\3301 (WILMINGTON)\0305 MASTER DRAINAGE PLAN\AUGUST 2 SOLUTION SOUTH.PPW TIME OF CONCENTRATION CALCULATOR Segment #1: Tc: Length & Vet. Hydraulic Length 800.00 ft Avg.Velocity 1.00 ft/sec Segment #1 Time: .2222 hrs ------------------------------------------------------------------------ Segment #2: Tc: TR-55 Shallow Hydraulic Length 200.00 ft Slope .010000 ft/ft Unpaved Avg.Velocity 1.61 ft/sec Segment #2 Time: .0344 hrs ------------------------------------------------------------------------ Segment #3: Tc: TR-55 Sheet Mannings n .2400 Hydraulic Length 200.00 ft 2yr, 24hr P 4.5000 in Slope .010000 ft/ft Avg.Velocity .12 ft/sec Segment #3 Time: .4608 hrs ------------------------------------------------------------------------ Total Tc: .7174 hrs S/N; C21705506A87 Talbert & Bright PondPack Ver: 7.0 (325) Compute Time: 14:47:22 Date: 08-20-2004 Type.... Tc Calcs Name.... AREA A Page 3.02 File.... J:\3301 (WILMINGTON)\0305 MASTER DRAINAGE PLAN\AUGUST 2 SOLUTION SOUTH.PPW ----- ----------------------- Tc Equations used... ------------------------------------------------------------------------ ---- SCS TR-55 Sheet Flow Tc = (.007 * ((n * Lf)**0.8)) / ((P**.5) * (Sf**.4)) Where: Tc = Time of concentration, hrs n = Mannings n Lf = Flow length, ft P = 2yr, 24hr Rain depth, inches Sf = Slope, ft/ft ___= SCS TR-55 Shallow Concentrated Flow Unpaved surface: V = 16.1345 * (Sf**O.5) Paved surface: V = 20.3282 * (Sf**0.5) Tc = (Lf / V) / (3600sec/hr) Where: V = Velocity, ft/sec Sf = Slope, ft/ft Tc = Time of concentration, hrs Lf = Flow length, ft ___= User Defined Length & Velocity Tc = (Lf / V) / (3600sec/hr) Where: Tc = Time of concentration, hrs Lf = Flow length, ft V = Velocity, ft/sec S/N: C21105506A87 Talbert & Bright PondPack Ver: 7.0 (325) Compute Time: 14:47:22 Date: 08-20-2004 Type.... Tc Calcs Page 3.03 Name.... AREA B File.... J:\3301 (WILMINGTON)\0305 MASTER DRAINAGE PLAN\AUGUST 2 SOLUTION SOUTH.PPW TIME OF CONCENTRATION CALCULATOR Segment #1: Tc: Length & Vet. Hydraulic Length 400.00 ft Avg.Velocity 1.00 ft/sec Segment #1 Time: .1111 hrs ------------------------------------------------------------------------ Segment #2: Tc: TR-55 Shallow Hydraulic-tength 200.00 ft Slope .010000 ft/ft Unpaved Avg.Velocity 1.61 ft/sec Segment #2 Time: .0344 hrs ------------------------------------------------------------------------ Segment #3: Tc: TR-55 Sheet Mannings n .2400 Hydraulic Length 200.00 ft 2yr, 24hr P 4.5000 in Slope .010000 ft/ft Avg.Velocity .12 ft/sec Segment #3 Time: .4608 hrs ------------------------------------------------------------------------ Total Tc: .6063 hrs S/N: C21705506A87 Talbert & Bright PondPack Ver: 7.0 (325) Compute Time: 14:47:22 Date: 08-20-2004 Type.... Tc Calcs Name.... AREA B Page 3.04 File.... J:\3301 (WILMINGTON)\0305 MASTER DRAINAGE PLAN\AUGUST 2 SOLUTION SOUTH.PPW ----------------------------------------- ------------------------------ Tc Equations used... ------------------------------------------------------------------------ ==== SCS TR-55 Sheet Flow Tc = (.007 * ((n * Lf)**0.8)) / ((P**.5) * (Sf**.4)) Where: Tc = Time of concentration, hrs n = Mannings n Lf = Flow length, ft P = 2yr, 24hr Rain depth, inches Sf = Slope, ft/ft ==== SCS TR-55 Shallow Concentrated Flow Unpaved surface: V = 16.1345 * (Sf**O.5) Paved surface: V = 20.3282 * (Sf**O.5) Tc = (Lf / V) / (3600sec/hr) Where: V = Velocity, ft/sec Sf = Slope, ft/ft Tc = Time of concentration, hrs Lf = Flow length, ft ==== User Defined Length & Velocity Tc = (Lf / V) / (3600sec/hr) Where: Tc = Time of concentration, hrs Lf = Flow length, ft V = Velocity, ft/sec S/N: C217USSU6A87 -Talbert & Bright PondPack Ver: 7.0 (325) Compute Time: 14:47:22 Date: 08-20-2004 Type.... Tc Calcs Name.... AREA C Page 3.05 File.... J:\3301 (WILMINGTON)\0305 MASTER DRAINAGE PLAN\AUGUST 2 SOLUTION SOUTH.PPW TIME OF CONCENTRATION CALCULATOR Segment #1: Tc: Length & Vel. Hydraulic Length 700.00 ft Avg.Velocity 1.00 ft/sec Segment #1 Time: .1944 hrs ------------------------------------------------------------------------ Segment #2: Tc: TR-55 Shallow Hydraulic Length 200.00 ft Slope .010000 ft/ft Unpaved Avg.Velocity 1.61 ft/sec Segment #2 Time: .0344 hrs ------------------------------------------------------------------------ Segment #3: Tc: TR-55 Sheet Mannings n .2400 Hydraulic Length 200.00 ft 2yr, 24hr P 4.5000 in Slope .010000 ft/ft Avg.Velocity .12 ft/sec Segment #3 Time: .4608 hrs ------------------------------------------------------------------------ Total Tc: .6896 hrs S/N: C21705506A87 Talbert & Bright PondPack Ver: 7.0 (325) Compute Time: 14:47:22 Date: 08-20-2004 Type.... Tc Calcs Page 3.06 Name.... AREA C File.... J:\3301 (WILMINGTON)\0305 MASTER DRAINAGE PLAN\AUGUST 2 SOLUTION SOUTH.PPW ------------------------------------------------------------------------ Tc Equations used... ------------------------------------------------------------------------ ---- SCS TR-55 Sheet Flow Tc = (.007 * ((n * Lf)**0.8)) / ((P**.5) * (Sf**.4)) Where: Tc = Time of concentration, hrs n = Mannings n Lf = Flow length, ft P = 2yr, 24hr Rain depth, inches Sf = Slope, ft/ft 5CS TR-55 Shallow Concentrated Flow ,U•npaved surface V = 16.1345 * (Sf**0.5) Paved surface: V = 20.3282 * (Sf**0.5) Tc = (Lf / V) / (3600sec/hr) Where: V = Velocity, ft/sec Sf = Slope, ft/ft Tc = Time of concentration, hrs Lf = Flow length, ft User Defined Length & Velocity Tc = (Lf / V) / (3600sec/hr) Where: Tc = Time of concentration, hrs Lf = Flow length, ft V = Velocity, ft/sec S/id: C21705506A87 Talbert & Bright PondPack Ver: 7.0 (325) Compute Time: 14:47:22 Date: 08-20-2004 Type.... Tc Calcs Name.... AREA D Page 3.07 File.... J:\3301 (WILMINGTON)\0305 MASTER DRAINAGE PLAN\AUGUST 2 SOLUTION SOUTH.PPW TIME OF CONCENTRATION CALCULATOR Segment #1: Tc: Length & Vet. Hydraulic Length 1400.00 ft Avg.Velocity 1.00 ft/sec Segment #1 Time- .3889 hrs ------------------------------------------------------------------------ Segment #2: Tc: TR-55 Shallow Hydraulic -Length 200-:-00 ft- Slope .010000 ft/ft Unpaved Avg.Velocity 1.61 ft/sec Segment #2 Time: .0344 hrs ------------------------------------------------------------------------ Segment #3: Tc: TR-55 Sheet Mannings n Hydraulic Length 2yr, 24hr P Slope Avg.Velocity .2400 200.00 ft 4.5000 in .010000 ft/ft .12 ft/sec Segment #3 Time: .4608 hrs ----------------------------------------------------------------------- Total Tc: .8841 hrs S/N: C21705506A87 Talbert & Bright PondPack Ver: 7.0 (325) Compute Time: 14:47:22 Date: 08-20-2004 Type.... Tc Calcs Name.... AREA D Page 3.08 File.... J:\3301 (WILMINGTON)\0305 MASTER DRAINAGE PLAN\AUGUST 2 SOLUTION SOUTH.PPW --- ------------------- Tc Equations used... ------------------------------------------------------------------------ ==== SCS TR-55 Sheet Flow Tc = (.007 * ((n * Lf)**0.8)) / ((P**.5) * (Sf**.4)) Where: Tc = Time of concentration, hrs n = Mannings n Lf = Flow length, ft P = 2yr, 24hr Rain depth, inches Sf = Slope, ft/ft ==== SCS TR-SS Shallow Concentrated Flow Unpaved- surf -ace:. -- V = 16.1345 * (Sf**0.5) Paved surface: V = 20.3282 * (Sf**O.5) Tc = (Lf / V) / (3600sec/hr) Where: V = Velocity, ft/sec Sf = Slope, ft/ft Tc = Time of concentration, hrs Lf. = Flow length, ft ==== User Defined Length & Velocity ---------------- Tc = (Lf / V) / (3600sec/hr) Where: Tc = Time of concentration, hrs Lf = Flow length, ft V = Velocity, ft/sec 5/N: C21705506A87 Talbert & Bright PondPack Ver: 7.0 (325) Compute Time: 14:47:22 Date: 08-20-2004 Type.... Tc Calcs Page 3.09 Name.... AREA E File.... J:\3301 (WILMINGTON)\0305 MASTER DRAINAGE PLAN\AUGUST 2 SOLUTION SOUTH.PPW TIME OF CONCENTRATION CALCULATOR Segment #1: Tc: Length & Vet. Hydraulic Length 1000.00 ft Avg.Velocity 1.00 ft/sec Segment #1 Time: .2778 hrs ------------------------------------------------------------------------ Segment #2: Tc: TR-55 Shallow Hydraulic LeTYgtiv-- - .00 ft---- Slope .010000 ft/ft Unpaved Avg.Velocity 1.61 ft/sec Segment #2 Time: .0344 hrs ------------------------------------------------------------------------ Segment #3: Tc: TR-55 Sheet Mannings n .2400 Hydraulic Length 200.00 ft 2yr, 24hr P 4.5000 in Slope .010000 ft/ft Avg.Velocity .12 ft/sec Segment #3 Time: .4608 hrs ------------------------------------------------------------------------ Total Tc: .7730 hrs S/N: C21705506A87 Talbert & Bright PondPack Ver: 7.0 (325) Compute Time: 14:47:22 Date: 08-20-2004 Type.... Tc Calcs Name.... AREA E Page 3.10 File.... J:\3301 (WILMINGTON)\0305 MASTER DRAINAGE PLAN\AUGUST 2 SOLUTION SOUTH.PPW ------------------------------------------------------------------------ Tc Equations used... SCS TR-55 Sheet Flow Tc = (.007 * ((n * Lf)**0.8)) / ((P**.5) * (Sf**.4)) Where: Tc = Time of concentration, hrs n = Mannings n Lf = Flow length, ft P = 2yr, 24hr Rain depth, inches Sf = Slope, ft/ft ==== SCS TR-55 Shallow Concentrated Flow =------------------------------ ------------------------ Unpaved suT-ftee:--- V = 16.1345 * (Sf**0.5) Paved surface: V = 20.3282 * (Sf**0.5) Tc = (Lf / V) / (3600sec/hr) Where: V — Velocity, ft/sec Sf = Slope, ft/ft Tc = Time of concentration, hrs Lf = Flow length, ft ==== User Defined Length & Velocity Tc = (Lf / V) / (3600sec/hr) Where: Tc = Time of concentration, hrs Lf = Flow length, ft V = Velocity, ft/sec S/N: C21705506A87 Talbert & Bright PondPack Ver: 7.0 (325) Compute Time: 14:47:22 Date: 08-20-2004 Type.... Tc Calcs Page 3.11 Name.... AREA F File.... J:\3301 (WILMINGTON)\0305 MASTER DRAINAGE PLAN\AUGUST 2 SOLUTION SOUTH.PPW TIME OF CONCENTRATION CALCULATOR Segment #1: Tc: Length & Vet. Hydraulic Length 1600.00 ft Avg.Velocity 1.00 ft/sec Segment #1 Time: .4444 hrs ------------------------------------------------------------------------ Segment #2: Tc: TR-55 Shallow Hydraulic Length -- 00 f- -- Slope .010000 ft/ft Unpaved Avg.Velocity 1.61 ft/sec Segment #2 Time: .0344 hrs ------------------------------------------------------------------------ Segment #3: Tc: TR-55 Sheet Mannings n .2400 Hydraulic Length 200.00 ft 2yr, 24hr P 4.5000 in Slope .010000 ft/ft Avg.Velocity .12 ft/sec Segment #3 Time: .4608 hrs ------------------------------------------------------------------------ Total Tc: .9396 hrs S/N: C21705506A87 Talbert & Bright PondPack Ver: 7.0 (325) Compute Time: 14:47:22 Date: 08-20-2004 Type.... Tc Calcs Name.... AREA F Page 3.12 File.... J:\3301 (WILMINGTON)\0305 MASTER DRAINAGE PLAN\AUGUST 2 SOLUTION SOUTH.PPW ------------------------- Tc Equations used... ------------------------------------------------------------------------ ___= SCS TR-55 Sheet Flow Tc = (.007 * ((n * Lf)**0.8)) / ((P**.5) * (Sf**.4)) Where: Tc = Time of concentration, hrs n = Mannings n Lf = Flow length, ft P = 2yr, 24hr Rain depth, inches Sf = Slope, ft/ft ___= SCS TR-55 Shallow Concentrated Flow Unpaved surface: �-_ _•- V = 16.1345 * (Sf**0.5) Paved surface: V = 20.3282 * (Sf**0.5) Tc = (Lf / V) / (3600sec/hr) Where: V = Velocity, ft/sec Sf = Slope, ft/ft Tc = Time of concentration, hrs Lf = Flow length, ft ___= User Defined Length & Velocity------------------------------------ Tc = (Lf / V) / (3600sec/hr) Where: Tc = Time of concentration, hrs Lf = Flow length, ft V = Velocity, ft/sec S/N: C21705506A87 Talbert & Bright PondPack Ver: 7.0 (325) Compute Time: 14:47:22 Date: 08-20-2004 Type.... Tc Calcs Page 3.13 Name... AREA G File.... J:\3301 (WILMINGTON)\0305 MASTER DRAINAGE PLAN\AUGUST 2 SOLUTION SOUTH.PPW TIME OF CONCENTRATION CALCULATOR Segment #1: Tc: Length & Vet. Hydraulic Length 800.00 ft Avg.Velocity 1.00 ft/sec Segment #1 Time: .2222 hrs ------------------------------------------------------------------------ Segment #2: Tc: TR-55 Shallow Hydraulic Length 200.00-- Slope .010000 ft/ft Unpaved Avg.Velocity 1.61 ft/sec Segment #2 Time: .0344 hrs ------------------------------------------------------------------------ Segment #3: Tc: TR-55 Sheet Mannings n .2400 Hydraulic Length 200.00 ft 2yr, 24hr P 4.5000 in Slope .010000 ft/ft Avg.Velocity .12 ft/sec Segment #3 Time: .4608 hrs ------------------------------------------------------------------------ Total Tc: .7174 hrs S/N: C21705506A87 Talbert & Bright PondPack Ver: 7.0 (325) Compute Time: 14:47:22 Date: 08-20-2004 Type.... Tc Calcs Name.... AREA G Page 3.14 File.... J:\3301 (WILMINGTON)\0305 MASTER DRAINAGE PLAN\AUGUST 2 SOLUTION SOUTH.PPW --- ------------------------------- Tc Equations used... ------------------------------------------------------------------------ ==== SCS TR-55 Sheet Flow ---------------------------------------------- ------------------------------------------ Tc = (.007 * ((n * Lf)**0.8)) / ((P**.5) * (Sf**.4)) Where: Tc = Time of concentration, hrs n = Mannings n Lf = Flow length, ft P = 2yr, 24hr Rain depth, inches Sf = Slope, ft/ft ==== SCS TR-55 Shallow Concentrated Flow Unpaved surface: V = 16.1345 * (Sf**O.5) Paved surface: V = 20.3282 * (Sf**0.5) Tc = (Lf / V) / (3600sec/hr) Where: V = Velocity, ft/sec Sf = Slope, ft/ft Tc = Time of concentration, hrs Lf = Flow length, ft ==== User Defined Length & Velocity ------------------------------------ ------------------------------------ Tc = (Lf / V) / (3600sec/hr) Where: Tc = Time of concentration, hrs Lf = Flow length, ft V = Velocity, ft/sec S/N: C21705506A87 Talbert & Bright PondPack Ver: 7.0 (325) Compute Time: 14:47:22 Date: 08-20-2004 Type.... Tc Calcs Page 3.15 Name.... AREA H File.... J:\3301 (WILMINGTON)\0305 MASTER DRAINAGE PLAN\AUGUST 2 SOLUTION SOUTH.PPW ........................................................................ TIME OF CONCENTRATION CALCULATOR ........................................................................ ........................................................................ Segment #1: Tc: Length & Vet. Hydraulic Length 1000.00 ft Avg.Velocity 1.00 ft/sec Segment #1 Time: .2778 hrs ------------------------------------------------------------------------ Segment #2: Tc: TR-55 Shallow Hydraulic Length -200.00 ft Slope .010000 ft/ft Unpaved Avg.Velocity 1.61 ft/sec Segment #2 Time: .0344 hrs ---------------------------------------------------------------------- Segment #3: Tc: TR-55 Sheet Mannings.n .2400 Hydraulic Length 200.00 ft 2yr, 24hr P 4.5000 in Slope 1010000 ft/ft Avg.Velocity .12 ft/sec Segment #3 Time: .4608 hrs Total Tc: .7730 hrs S/N.- C21705506A87 Talbert & Bright PondPack Ver: 7.0 (325) Compute Time: 14:47:22 Date: 08-20-2004 Type.... Tc Calcs Name.... AREA H Page 3.16 File.... J:\3301 (WILMINGTON)\0305 MASTER DRAINAGE PLAN\AUGUST 2 SOLUTION SOUTH.PPW ------------------------------------------------------------------------ Tc Equations used... ------------------------------------------------------------------------ ___= SCS TR-55 Sheet Flow Tc = (.007 * ((n * Lf)**0.8)) / ((P**.5) * (Sf**.4)) Where: Tc = Time of concentration, hrs n = Mannings n Lf = Flow length, ft P = 2yr, 24hr Rain depth, inches Sf = Slope, ft/ft ___= SCS TR-55 Shallow Concentrated Flow Unpaved surface: V = 16.1345 * (5f**0.5) Paved surface: V = 20.3282 * (Sf**0.5) Tc = (Lf / V) / (3600sec/hr) Where: V = Velocity, ft/sec Sf = Slope, ft/ft Tc = Time of concentration, hrs Lf = Flow length, ft ___= User Defined Length & Velocity Tc = (Lf / V) / (3600sec/hr) Where: Tc = Time of concentration, hrs Lf = Flow length, ft V = Velocity, ft/sec S/iv: C21705506A87 Talbert & Bright PondPack Ver: 7.0 (325) Compute Time: 14:47:22 Date: 08-20-2004 Type.... Tc Calcs Page 3.17 Name.... AREA I File.... J:\3301 (WILMINGTON)\0305 MASTER DRAINAGE PLAN\AUGUST 2 SOLUTION SOUTH.PPW TIME OF CONCENTRATION CALCULATOR . .. ... .... .. .......... . . .. ....... .... .. ..... Segment #1: Tc: Length & Vet. Hydraulic Length 1100.00 ft Avg.Velocity 1.00 ft/sec Segment #1 Time: .3056 hrs ------------------------------------------------------------------------ Segment #2: Tc: TR-55 Shallow Hydraulic Length 200.00 ft Slope .010000 ft/ft Unpaved Avg.Velocity 1.61 ft/sec Segment #2 Time: .0344 hrs ------------------------------------------------------------------------ Segment #3: Tc: TR-55 Sheet Mannings n .2400 Hydraulic Length 200.00 ft 2yr, 24hr P 4.5000 in Slope .010000 ft/ft Avg.Velocity .12 ft/sec Segment #3 Time: .4608 hrs ------------------------------------------------------------------------ Total Tc: .8008 hrs S/ir': C21705506A87 Talbert & Bright PondPack Ver: 7.0 (325) Compute Time: 14:47:22 Date: 08-20-2004 i Type.... Tc Calcs Page 3.18 Name.... AREA I File.... J:\3301 (WILMINGTON)\0305 MASTER DRAINAGE PLAN\AUGUST 2 SOLUTION SOUTH.PPW Tc Equations used. SCS TR-55 Sheet Flow Tc = (.007 * ((n * Lf)**0.8)) / ((P**.5) * (Sf**.4)) Where: Tc = Time of concentration, hrs n = Mannings n Lf = Flow length, ft t P = 2yr, 24hr Rain depth, inches k Sf = Slope, ft/ft SCS TR-55 Shallow Concentrated Flow Unpaved surface: - V = 16.1345 * (Sf**O.5) Paved surface: V = 20.3282 * (Sf**O.5) r Tc = (Lf / V) / (3600sec/hr) Where: V = Velocity, ft/sec Sf = Slope, ft/ft Tc = Time of concentration, hrs Lf = Flow length, ft User Defined Length & Velocity Tc = (Lf / V) / (3600sec/hr) Where: Tc = Time of concentration, hrs Lf = Flow length, ft V = Velocity, ft/sec S/N: C21705506A87 Talbert & Bright PondPack Ver: 7.0 (325) Compute Time: 14:47:22 Date: 08-20-2004 Type.... Runoff CN-Area Name.... AREA A Page 4.01 File.... J:\3301 (WILMINGTON)\0305 MASTER DRAINAGE PLAN\AUGUST 2 SOLUTION-SOUTH.PPW RUNOFF CURVE NUMBER DATA Impervious Area Adjustment Adjusted Soil/Surface Description -------------------------------- CN acres %C %UC CN woods ---- 58 --------- 12.000 ----- ----- ------ 58.00 open space 61 12.000 61.00 impervious 98 22.000 98.00 COMPOSITE AREA & WEIGHTED CN ---> 46.000 77.91 (78) SiN: C21705506A87 Talbert & Bright PondPack Ver: 7.0 (325) Compute Time: 14:47:22 Date: 08-20-2004 Type.... Runoff CN-Area Name.... AREA B Page 4.02 File.... J:\3301 (WILMINGTON)\0305 MASTER DRAINAGE PLAN\AUGUST 2 SOLUTION 50UTH.PPW RUNOFF CURVE NUMBER DATA Impervious Area Adjustment Adjusted Soil/Surface Description CN acres %C %UC CN -------------------------------- ------------- ----- ----- ------ open space 61 3.400 61.00 impervious 98 7.600 98.00 COMPOSITE AREA & WEIGHTED CN ---> 11.000 86.56 (87) S/N: C2i705506A87 Talbert & Bright PondPack Ver: 7.0 (325) Compute Time: 14:47:22 Date: 08-20-2004 Type.... Runoff CN-Area Name.... AREA C Page 4.03 File.... J:\3301 (WILMINGTON)\0305 MASTER DRAINAGE PLAN\AUGUST 2 SOLUTION SOUTH.PPW RUNOFF CURVE NUMBER DATA .......................................................................... Impervious Area Adjustment Adjusted Soil/Surface Description CN acres %C %UC CN open space 61 5.000 61.00 impervious 98 12.000 98.00 COMPOSITE AREA & WEIGHTED CN ---> 17.000 87.12 (87) 5/N: C21705506A87 Talbert & Bright PondPack Ver: 7.0 (325) Compute Time: 14:47:22 Date: 08-20-2004 Type.... Runoff CN-Area Name.... AREA D Page 4.04 File.... J:\3301 (WILMINGTON)\0305 MASTER DRAINAGE PLAN\AUGUST 2 SOLUTION SOUTH.PPW RUNOFF CURVE NUMBER DATA Impervious Area Adjustment Adjusted Soil/Surface Description CN acres %C %UC CN open space 61 9.000 61.00 impervious 98 20.900 98.00 COMPOSITE AREA & WEIGHTED CN ---> 29.900 86.86 (87) S/N: C21705506A87 Talbert & Bright PondPack Ver: 7.0 (325) Compute Time: 14:47:22 Date: 08-20-2004 Type.... Runoff CN-Area Name.... AREA E Page 4.05 File.... J:\3301 (WILMINGTON)\0305 MASTER DRAINAGE PLAN\AUGUST 2 SOLUTION SOUTH.PPW RUNOFF CURVE NUMBER DATA Impervious Area Adjustment Adjusted Soil/Surface Description CN acres %C %UC CN open space 61 13.000 61.00 impervious 98 30.500 98.00 COMPOSITE AREA & WEIGHTED CN ---> 43.500 86.94 (87) S/N: C21705506A87 Talbert & Bright PondPack Ver: 7.0 (325) Compute Time: 14:47:22 Date: 08-20-2004 Type.... Runoff CN-Area Name.... AREA F Page 4.06 Fite.... J:\3301 (WILMINGTON)\0305 MASTER DRAINAGE PLAN\AUGUST 2 SOLUTION SOUTH.PPW RUNOFF CURVE NUMBER DATA Impervious Area Adjustment Adjusted Soil/Surface Description CN acres %C %UC CN open space 61 11.000 61.00 impervious 98 25.200 98.00 COMPOSITE AREA & WEIGHTED CN ---> 36.200 86.76 (87) 5/N: C21705506A87 Talbert & Bright PondPack Ver: 7.0 (325) Compute Time: 14:47:22 Date: 08-20-2004 Type.... Runoff CN-Area Name.... AREA G Page 4.07 File.... J:\3301 (WILMINGTON)\0305 MASTER DRAINAGE PLAN\AUGUST 2 SOLUTION SOUTH.PPW RUNOFF CURVE NUMBER DATA Impervious Area Adjustment Adjusted Soil/Surface Description CN acres %C %UC CN impervious 98 20.900 98.00 open space 61 9.000 61.00 COMPOSITE AREA & WEIGHTED CN ---> 29.900 86.86 (87) S/N: C21705506A87 Talbert & Bright PondPack Ver: 7.0 (325) Compute Time: 14:47:22 Date: 08-20-2004 Type.... Runoff CN-Area Name.... AREA H Page 4.08 Fite.... J:\3301 (WILMINGTON)\0305 MASTER DRAINAGE PLAN\AUGUST 2 SOLUTION SOUTH.PPW RUNOFF CURVE NUMBER DATA Impervious Area Adjustment Adjusted Soil/Surface Description CN acres %C %UC CN open space 61 35.200 61.00 impervious 98 38.000 98.00 COMPOSITE AREA & WEIGHTED CN ---> 73.200 80.21 (80) S/N: C21705506A87 Talbert & Bright PondPack Ver: 7.0 (325) Compute Time: 14:47:22 Date: 08-20-2004 Type.... Runoff CN-Area Name.... AREA I Page 4.09 File.... J:\3301 (WILMINGTON)\0305 MASTER DRAINAGE PLAN\AUGUST 2 SOLUTION SOUTH.PPW RUNOFF CURVE NUMBER DATA Impervious Area Adjustment Adjusted Soil/Surface Description CN acres %C %UC CN open space 61 12.000 61.00 impervious 98 29.000 98.00 COMPOSITE AREA & WEIGHTED CN ---> 41.000 87.17 (87) S/N: C21705506A87 Talbert & Bright PondPack Ver: 7.0 (325) Compute Time: 14:47:22 Date: 08-20-2004 Type.... Vol: Elev-Area Name.... P 10 Page 5.01 File.... J:\3301 (WILMINGTON)\0305 MASTER DRAINAGE PLAN\AUGUST 2 SOLUTION SOUTH.PPW Elevation Planimeter Area Al+A2+sgr(A1*A2) Volume Volume Sum (ft) (sq.in) (sq.ft) (sq.ft) (ac-ft) (ac-ft) --------------- -------------------------------------------------- ----- 21.80 0 0 .000 .000 22.00 ----- 11047 11047 .017 .017 24.00 ----- 237085 299309 4.581 4.598 26.00 ----- 398989 943636 14.442 19.040 27.00 --- 521330 1376395 10.533 29.572 y, POND VOLUME EQUATIONS * Incremental volume computed by the Conic Method for Reservoir Volumes. lV Volume = (1/3) * (EL2-EL1) * (Areal.+ Area2 + sq.rt.(Area1*Area2)) where: EL1, EL2 = Lower and upper elevations of the increment Areal,Area2 = Areas computed for EL1, EL2, respectively Volume = Incremental volume between EL1 and EL2 S/N: C2i705506A87 Talbert & Bright PondPack Ver: 7.0 (325) Compute Time: 14:47:22 Date: 08-20-2004 Type.... Vol: Elev-Area Name.... P 20 Page 5.02 File.... J:\3301 (WILMINGTON)\0305 MASTER DRAINAGE PLAN\AUGUST 2 SOLUTION SOUTH.PPW Elevation Planimeter Area Al+A2+sgr(A1*A2) Volume Volume Sum (ft) ------------------------------------------------------------------------ (sq.in) (sq.ft) (sq.ft) (ac-ft) (ac-ft) 7.00 ----- 0 0 .000 .000 8.00 ----- 7000 7000 .054 .054 9.00 ----- 16000 33583 .257 .311 10.00 ----- 28000 65166 .499 .809 10.70 ----- 40000 101466 .544 1.353 10.80 ----- 330780 485807 .372 1.724 11.00 ----- 382445 1068901 1.636 3.360 12.00 ----- 591733 1449894 11.095 14.455 13.00 ----- 627496 1828581 13.993 28.448 14.00 ----- 649276 1915065 14.655 43.103 15.00 ----- 671114 1980495 15.155 58.258 16.00 ----- 693012 2046101 15.657 73.915 17.00 ----- 714967 2111883 16.161 90.076 18.00 ----- 736982 2177840 16.665 106.742 19.00 759054 2243973 17.172 123.913 20.00 ----- 781186 2310281 17.679 141.592 POND VOLUME EQUATIONS * Incremental volume computed by the Conic Method for Reservoir Volumes. Volume = (1/3) * (EL2-:EL1) * (Areal + Area2 i sq.rt.(Areal*Areal)) where: EL1, EL2 = Lower and upper elevations of the increment Areal,Area2 = Areas computed for EL1, EL2, respectively Volume = Incremental volume between EL1 and EL2 S/N: C21705506A87 Talbert & Bright PondPack Ver: 7.0 (325) Compute Time: 14:47:22 Date: 08-20-2004 Type.... Outlet Input Data Page 6.01 Name.... PR 10 File.... J:\3301 (WILMINGTON)\0305 MASTER DRAINAGE PLAN\AUGUST 2 SOLUTION SOUTH.PPW REQUESTED POND WS ELEVATIONS: Min. Elev.= 21.80 ft Increment = .50 ft Max. Elev.= 27.00 ft OUTLET CONNECTIVITY ---> Forward Flow Only (Upstream to DnStream) <--- Reverse Flow Only (DnStream to Upstream) < ---> Forward and Reverse Both Allowed Structure No. Outfall E1, ft E2, ft ----------------- ----------------------------- Weir-Rectangular. ---> TW 26.000 27.000 Culvert -Circular ---> TW 21.800 27.000 TW SETUP, DS Channel SiN: C21705506A87 Talbert & Bright PondPack Ver: 7.0 (325) Compute Time: 14:47:22 Date: 08-20-2004 Type.... Outlet Input Data Name.... PR 10 Page 6.02 File.... J:\3301 (WILMINGTON)\0305 MASTER DRAINAGE PLAN\AUGUST 2 SOLUTION SOUTH.PPW OUTLET STRUCTURE INPUT DATA Structure ID Structure Type = Weir -Rectangular # of Openings = 1 Crest Elev. = 26.00 ft Weir Length = 16.00 ft Weir Coeff. = 2.980000 Weir TW effects (Use adjustment equation) S/N: C21705506A87 Talbert & Bright PondPack Ver: 7.0 (325) Compute Time: 14:47:22 Date: 08-20-2004 Type.... Outlet Input Data Name.... PR 10 Page 6.03 File.... J:\3301 (WILMINGTON)\0305 MASTER DRAINAGE PLAN\AUGUST 2 SOLUTION SOUTH.PPW OUTLET STRUCTURE INPUT DATA Structure ID = Structure Type = Culvert -Circular ------------------------------------ No. Barrels = 1 Barrel Diameter = 2.0000 ft Upstream Invert = 21.80 ft Dnstream Invert = 20.50 ft Horiz. Length = 30.00 ft Barrel Length = 30.03 ft Barrel Slope = .04333 ft/ft OUTLET CONTROL DATA... Mannings n = .0150 Ke = .5000 Kb = .016523 Kr = .5000 HW Convergence = .001 INLET CONTROL DATA... Equation form = 1 Inlet Control K = .0078 Inlet Control M = 2.0000 Inlet Control c = .02920 Inlet Control Y = .7400 T1 ratio (HW/D) = 1.114 T2 ratio (HW/D) = 1.186 Slope Factor = -.500 (forward entrance loss) (per ft of full flow) (reverse entrance loss) +/- ft Use unsubmerged inlet control Form 1 equ. below T1 elev. Use submerged inlet control Form 1 equ. above T2 elev. In transition zone between unsubmerged and submerged inlet control, interpolate between flows at T1 & T2... At T1 Elev = 24.03 ft ---> Flow = 15.55 cfs At T2 Elev = 24.17 ft ---> Flow = 17.77 cfs S/N: C21705506A87 Talbert & Bright PondPack Ver: 7.0 (325) Compute Time: 14:47:22 Date: 08-20-2004 Type.... Outlet Input Data Name.... PR 10 Page 6.04 File.... J:\3301 (WILMINGTON)\0305 MASTER DRAINAGE PLAN\AUGUST 2 SOLUTION SOUTH.PPW OUTLET STRUCTURE INPUT DATA Structure ID = TW Structure Type = TW SETUP, DS Channel ------------------------------------ USE DOWNSTREAM CHANNEL NORMAL DEPTH FOR TW... Channel Type: Chn-Circular Channel ID: PR 10 CONVERGENCE TOLERANCES... Maximum Iterations= 30 Min. TW tolerance = .01 ft Max. TW tolerance = .01 ft Min. HW tolerance = .01 ft Max. HW tolerance = .01 ft Min.• Q tolerance = .10 cfs Max. Q tolerance = .10 cfs S/N: C21705506A87 Talbert & Bright PondPack Ver: 7.0 (325) Compute Time: 14:47:22 Date: 08-20-2004 Type.... Outlet Input Data Name.... PR 10 Page 6.05 File.... J:\3301 (WILMINGTON)\0305 MASTER DRAINAGE PLAN\AUGUST 2 SOLUTION SOUTH.PPW USE DOWNSTREAM CHANNEL NORMAL DEPTH FOR TW... Channel Type: Chn-Circular Channel ID: PR 10 Solution to Mannings Open Channel Flow Equation (Computed values are based on normal depth.) CIRCULAR CROSS SECTION Slope = .001200 ft/ft Mannings n = 0.01500 Invert Elev. = 20.00 ft Top of Channel = 25.00 ft Diameter = 5.0000 ft S/N: C21705506A87 Talbert & Bright PondPack Ver: 7.0 (325) Compute Time: 14:47:22 Date: 08-20-2004 Type.... Individual Outlet Curves Name.... PR 10 Page 6.06 File.... J:\3301 (WILMINGTON)\0305 MASTER DRAINAGE PLAN\AUGUST 2 SOLUTION SOUTH.PPW RATING TABLE FOR ONE OUTLET TYPE Structure ID = (Weir -Rectangular) -------------------------------------- Upstream ID = (Pond Water Surface) DNstream ID = TW (Pond Outfall) WS Elev,Device Q WS Elev. Q ft cfs -------- 21.80 ------- .00 22.30 .00 22.80 .00 23.30 .00 23.80 .00 24.30 .00 24.80 .00 25.30 .00 25.80 .00 26.00 .00 26.30 7.83 26.80 34.12 27.00 47.G8 Tail Water TW Elev Converge ft +/-ft 20.00 .000 20.37 .000 20.71 .000 21.03 .000 2'1,-: -30 .000 21.56 .000 21.78 .000 21.96 .000 22.12 .000 22.17 .000 22.54 .000 23.54 .000 24.09 .009 Notes -------------------------- Computation Messages HW & TW below Inv.El.=26.000 HW & TW below Inv.E1.=26.000 HW & TW below Inv.El.=26.000 HW & TW below Inv.El.=26.000 HW & TW below Inv.El.=26.000 HW & TW below Inv.El.=26.000 HW & TW below Inv.E1.=26.000 HW & TW below Inv.E1.=26.000 HW & TW below Inv.El.=26.000 H=.00; Htw=.00; Qfree=.00; H=.30; Htw=.00; Qfree=7.83; H=.80; Htw=.00; Qfree=34.12; H=1.00; Htw=.00; Qfree=47.68; S/N: C21705506A87 Talbert & Bright PondPack Ver: 7.0 (325) Compute Time: 14:47:22 Date: 08-20-2004 Type.... Individual Outlet Curves Name.... PR 10 Page 6.07 File.... J:\3301 (WILMINGTON)\0305 MASTER DRAINAGE PLAN\AUGUST 2 SOLUTION SOUTH.PPW RATING TABLE FOR ONE OUTLET TYPE Structure ID = (Culvert -Circular) -------------------------------------- Mannings open channel maximum capacity: 43.90 cfs Upstream ID = (Pond Water Surface) DNstream ID = TW (Pond Outfall) WS Elev,Device Q Tail Water Notes ---------------- WS Elev. --------------- Q TW Elev Converge -------------------------- ft -------- cfs ft ------- -------- +/-ft ----- Computation -------------------------- Messages 21.80 .00 20.00 .000 Upstream HW & DNstream TW < Inv.El 22.30 .92 20.37 .000 CRIT.DEPTHCONTROL Vh- .114ft Dcr= .329ft 22.80 3.42 20.71 .000 CRIT.DEPTH CONTROL Vh= .235ft Dcr= .647ft 23.30 7.14 21.03 .000 CRIT.DEPTH CONTROL Vh= .368ft Dcr= .949ft 23.80 11.63 21.30 .000 CRIT.DEPTH CONTROL Vh= .517ft Dcr= 1.225ft 24.30 16.42 21.56 .000 CRIT.DEPTH CONTROL Vh= .G93ft Dcr= 1.461ft 24.80 21.08 21.78 .000 CRIT.DEPTH CONTROL Vh= .904ft Dcr= 1.644ft 25.30 25.33 21.96 .000 CRIT.DEPTH CONTROL Vh= 1.153ft Dcr= 1.770ft 25.80 29.13 22.12 .000 CRIT.DEPTH CONTROL Vh= 1.434ft Dcr= 1.849ft 26.00 30.54 22.17 .000 CRIT.DEPTH CONTROL Vh= 1.553ft Dcr= 1.871ft 26.30 32.17 22.54 .000 INLET CONTROL... Submerged: HW =4.50 26.80 32.22 23.54 .000 CRIT.DEPTH CRIT.DEPTH CRIT.DEPTH CRIT.DEPTH CRIT.DEPTH CRIT.DEPTH CRIT.DEPTH CRIT.DEPTH CRIT.DEPTH FULL FLOW...Lfull=30.03ft Vh=1.635ft HL=3.263ft 27.00 30.44 24.09 .009 FULL FLOW ... Lfull=30.03ft Vh=1.459ft HL=2.913ft S/N: C2170506A87 Talbert & Bright PondPack Ver: 7.0 (325) Compute Time: 14:47:22 Date: 08-20-2004 Type.... Outlet Input Data Name.... PR 20 Page 6.08 File.... J:\3301 (WILMINGTON)\0305 MASTER DRAINAGE PLAN\AUGUST 2 SOLUTION SOUTH.PPW REQUESTED POND WS ELEVATIONS: Min. Elev.= 7.00 ft Increment = .50 ft Max. Elev.= 20.00 ft OUTLET CONNECTIVITY ********************************************** ---> Forward Flow Only (UpStream to DnStream) <--- Reverse Flow Only (DnStream to UpStream) < ---> Forward and Reverse Both Allowed Structure Culvert -Circular Weir -Rectangular Culvert -Circular Orifice -Circular Culvert -Circular TW SETUP, DS Channel No. Outfall El, ft ---------- TW 13.500 -> TW 18.500 ---> TW 12.500 ---> TW 7.000 ---> TW 15.000 E2, ft 20.000 20.000 20.000 20.000 20.000 S/N: C21705506A87 Talbert & Bright PondPack Ver: 7.0 (325) Compute Time: 14:47:22 Date: 08-20-2004 Type.... Outlet Input Data Name.... PR 20 Page 6.09 File.... J:\3301 (WILMINGTON)\0305 MASTER DRAINAGE PLAN\AUGUST 2 SOLUTION SOUTH.PPW OUTLET STRUCTURE INPUT DATA Structure ID = Structure Type = Culvert -Circular ------------------------------------ No. Barrels = 2 L o GA-f},yp �a Barrel Diameter = 3.0000 ft EXIS/1Y6— Upstream Invert = 13.50 ft Dnstream Invert. = 13.00 ft Hor i z. Length = 30.00 ft Barrel Length = 30.00 ft Barrel Slope = .01667 ft/ft OUTLET CONTROL DATA... Mannings n = 0150 Ke =5000 Kb = .009623 Kr = .5000 HW Convergence = .001 INLET CONTROL DATA... Equation form = 1 Inlet Control K = .0078 Inlet Control M = 2.0000 Inlet Control c = .02920 Inlet Control Y = .7400 T1 ratio (HW/D) = 1.127 T2 ratio (HW/D) = 1.199 Slope Factor = -.500 (forward entrance loss) (per ft of full flow) (reverse entrance loss) +/- ft Use unsubmerged inlet control Form 1 equ. below T1 elev. Use submerged inlet control Form 1 equ. above T2 elev. In transition zone between unsubmerged and submerged inlet control, interpolate between flows at T1 & T2... At T1 Elev = 16.88 ft ---> Flow = 42.85 cfs At T2 Elev = 17.10 ft ---> Flow = 48.97 cfs S/N: C21705506A87 Talbert & Bright PondPack Ver: 7.0 (325) Compute Time: 14:47:22 Date: 08-20-2004 Type.... Outlet Input Data Name.... PR 20 Page 6.10 E File.... J:\3301 (WILMINGTON)\0305 MASTER DRAINAGE PLAN\AUGUST 2 SOLUTION SOUTH.PPW OUTLET STRUCTURE INPUT DATA Structure ID Structure Type = Weir -Rectangular i------------------------------------ # of Openings = 1 1 Crest Elev. 18.50 ft Weir Length 25.00 ft Weir Coeff. = 2.640000 Weir TW effects (Use adjustment equation) CA I 6"n L0 C4MS) hCOF gJQ S j1/JCr -DiS S/N: C21705506A87 Talbert & Bright PondPack Ver: 7.0 (325) Compute Time: 14:47:22 Date: 08-20-2004 I Type.... Outlet Input Data Name.... PR 20 Page 6.11 File.... J:\3301 (WILMINGTON)\0305 MASTER DRAINAGE PLAN\AUGUST 2 SOLUTION SOUTH.PPW OUTLET STRUCTURE INPUT DATA Structure ID Structure Type -------------------- = Culvert -Circular -- No. Barrels = 2 IYr' Barrel Diameter = 4.0000 ft Upstream Invert Dnstream Invert = 12.50 = 11.50 ft ft �ISG�I Horiz. Length = 30.00 ft �T Barrel Length = 30.02 ft (�Jt Barrel Slope = .03333 ft/ft OUTLET CONTROL DATA... Mannings n = .0150 Ke = .5000 (forward entrance loss) Kb = 006557 (per ft--of full flow) Kr = .5000 (reverse entrance loss) HW Convergence .001 +/- ft INLET CONTROL DATA... Equation form = 1 Inlet Control K = .0078 Inlet Control M = 2.0000 Inlet Control c = .02920 Inlet Control Y = .7400 T1 ratio (HW/D) = 1.119 T2 ratio (HW/D) = 1.191 Slope Factor = -.500 Use unsubmerged inlet control Form 1 equ. below T1 elev. Use submerged inlet control Form 1 equ. above T2 elev. In transition zone between unsubmerged and submerged inlet control, interpolate between flows at T1 & T2... At T1 Elev = 16.98 ft ---> Flow = 87.96 cfs At T2 Elev = 17.26 ft ---> Flow = 100.53 cfs S/N: C21705506A87 Talbert & Bright PondPack Ver: 7.0 (325) Compute Time: 14:47:22 Date: 08-20-2004 Type.... Outlet Input Data Name.... PR 20 Page 6.12 File.... J:\3301 (WILMINGTON)\0305 MASTER DRAINAGE PLAN\AUGUST 2 SOLUTION SOUTH.PPW OUTLET STRUCTURE INPUT DATA Structure ID Structure Type = Orifice -Circular # of Openings = 3 Invert Elev. = 7.00 ft Diameter = .4375 ft Orifice Coeff. _ .632 Structure ID Structure Type = Culvert -Circular No. Barrels = 1 Barrel Diameter = 2. 0900- f t- Upstream Invert = 15.00 ft Dnstream Invert = 14.70 ft Horiz. Length = 100.00 ft Barrel Length = 100.00 ft Barrel Slope = .00300 ft/ft OUTLET CONTROL DATA. Mannings n = .0150 Ke = .5000 (forward entrance loss) Kb = .016523 (per ft of full flow) Kr = .5000 (reverse entrance loss) HW Convergence = .001 +/- ft INLET CONTROL DATA_ Equation form = 1 E Inlet Control K = .0078 Inlet Control M = 2.0000 Inlet Control c = .02920 Inlet Control Y = .7400 T1 ratio (HW/D) = 1.134 C T2 ratio (HW/D) = 1.206 Slope Factor = -.500 Use unsubmerged inlet control Form 1 equ. below T1 elev. i Use submerged inlet control Form 1 equ. above T2 elev. In transition zone between unsubmerged and submerged inlet control, interpolate between flows at T1 & T2... At T1 Elev = 17.27 ft - -> Flow = 15.55 cfs At T2 Elev = 17.41 ft ---> Flow = 17.77 cfs 5/N: C21705506A87 Talbert & Bright PondPack Ver: 7.0 (325) Compute Time: 14:47:22 Date: 08-20-2004 { J Type.... Outlet Input Data Page 6.13 Name.... PR 20 File.... J:\3301 (WILMINGTON)\0305 MASTER DRAINAGE PLAN\AUGUST 2 SOLUTION SOUTH.PPW i OUTLET STRUCTURE INPUT DATA Structure ID = TW Structure Type = TW SETUP, DS Channel ------------------------------------ FREE OUTFALL CONDITIONS SPECIFIED CONVERGENCE TOLERANCES... Maximum Iterations= 30 Min. TW tolerance = .01 ft Max. TW tolerance = .01 ft Min. HW tolerance = .01 ft Max. HW tolerance = .01 ft Min. Q tolerance = .10 cfs Max. Q tolerance = .10 cfs i/F777nCJ06A87 Talbert « Bright <fvJ/f PondPack Ver: 7.0 (325) Compute Time: 14:47:22 Date: 08-20-2004 Type.... Individual Outlet Curves Name.... PR 20 Page 6.14 File.... J:\3301 (WILMINGTON)\0305 MASTER DRAINAGE PLAN\AUGUST 2 SOLUTION SOUTH.PPW RATING TABLE FOR ONE OUTLET TYPE Structure ID = (Culvert -Circular) -------------------------------------- i Mannings open channel maximum capacity: 80.27 cfs G Upstream ID = (Pond Water Surface) DNstream ID = TW (Pond Outfall) NUMBER OF BARRELS = 2 EACH FLOW = SUM OF BARRELS x FLOW FOR ONE BARREL WS Elev,Device Q Tail Water ---------------- Notes WS Elev. --------------- -------------------------- Q TW Elev Converge ft -------- cfs ft +/-ft Computation Messages ------- -------- ----- 7.00 -------------------------- .00 Free Outfall ay Upstream HW & DNstream TW < Inv.El 7.50 .00 Free Outfall Upstream HW & DNstream TW < Inv.E1 8.00 .00 Free Outfall X! ST1 Upstream HW & DNstream TW < Inv.El �j IsC.N Jilt-6'C� 8.50 .00 Free Outfall Upstream HW & DNstream TW < Inv.El 9.00 .00 Free Outfall Upstream HW & DNstream TW < Inv.E1 9.50 .00 Free Outfall Upstream HW & DNstream TW < Inv.El 10.00 .00 Free Outfall Upstream HW & DNstream TW < Inv.El 10.50 .00 Free Outfall Upstream HW & DNstream TW < Inv.El 11.00 .00 Free Outfall Upstream HW & DNstream TW < Inv.El 11.50 .00 Free Outfall Upstream HW & DNstream TW < Inv.El 12.00 .00 Free Outfall Upstream HW & DNstream TW < Inv.El 12.50 .00 Free Outfall Upstream HW & DNstream TW < Inv.El 13.00 .00 Free Outfall Upstream HW & DNstream TW < Inv.El 13.50 .00 Free Outfall Upstream HW & DNstream TW < Inv.El 14.00 2.28 Free Outfall CRIT.DEPTH CONTROL Vh= .113ft Dcr= .330ft CRIT.DEPTH S/N: C21705506A87 Talbert & Bright PondPack Ver: 7.0 (325) Compute Time: 14:47:22 Date: 08-20-2004 Type.... Individual Outlet Curves Name.... PR 20 Page 6.15 File.... J:\3301 (WILMINGTON)\0305 MASTER DRAINAGE PLAN\AUGUST 2 SOLUTION SOUTH.PPW RATING TABLE FOR ONE OUTLET TYPE Structure ID = (Culvert -Circular) -------------------------------------- Mannings open channel maximum capacity: 80.27 cfs Upstream ID = (Pond Water Surface) DNstream ID = TW (Pond Outfall) NUMBER OF BARRELS = 2 EACH FLOW = SUM OF BARRELS x FLOW FOR ONE BARREL WS Elev,Device Q Tail Water Notes ---------------- WS Elev. --------------- Q TW Elev Converge -------------------------- ft -------- cfs ft +/-ft ------- -------- ----- Computation Messages 14.50 8.77 Free Outfall -------------------------- -- CRIT.DEPTH CONTROL Vh= .230ft Dcr= .655ft 15.00 18.89 Free Outfall CRIT.DEPTH CONTROL Vh= .353ft Dcr= .971ft 15.50 31.92 Free Outfall CRIT.DEPTH CONTROL Vh= .483ft Dcr= 1.276ft 16.00 47.22 Free Outfall CRIT.DEPTH CONTROL Vh= .622ft Dcr= 1.566ft 16-50 64.05 Free Outfall CRIT.DEPTH CONTROL Vh= .775ft Dcr= 1.836ft 17.00 81.69 Free Outfall CRIT.DEPTH CONTROL Vh= .946ft Dcr= 2.081ft 17.50 99.21 Free Outfall CRIT.DEPTH CONTROL Vh= 1.138ft Dcr= 2.293ft 18.00 116.15 Free Outfall CRIT.DEPTH CONTROL Vh= 1.355ft Dcr= 2.467ft 18.50 132.07 Free Outfall CRIT.DEPTH CONTROL Vh= 1.598ft Dcr= 2.601ft 19.00 146.87 Free Outfall CRIT.DEPTH CONTROL Vh= 1.865ft Dcr= 2.701ft 19.50 161.16 Free Outfall BACKWATER CONTROL.. Vh= 2.112ft hwDi= 2.832ft 20.00 171.66 Free Outfall INLET CONTROL... Submerged: HW =6.50 CRIT.DEPTH CRIT.DEPTH CRIT.DEPTH CRIT.DEPTH CRIT.DEPTH CRIT.DEPTH CRIT.DEPTH CRIT.DEPTH CRIT.DEPTH CRIT.DEPTH Lbw= 30.Oft 5/kk%': C21705506A87 Tial'u'er t & Bright PondPack Ver: 7.0 (325) Compute Time: 14:47:22 Date: 08-20-2004 Type.... Individual Outlet Curves Name.... PR 20 Page 6.16 File.... J:\3301 (WILMINGTON)\0305 MASTER DRAINAGE PLAN\AUGUST 2 SOLUTION SOUTH.PPW RATING TABLE FOR ONE OUTLET TYPE Structure ID = (Weir -Rectangular) -------------------------------------- Upstream ID = (Pond Water Surface) DNstream ID = TW (Pond Outfall) WS Elev,Device Q Tait Water Notes WS Elev. Q TW Elev Converge --- ft -------- cfs ------- ft +/-ft -------- ----- Computation Messages 7.00 .00 Free Outfall -------------------------- HW & TW below Inv.E1.=18.500 7.50 .00 Free Outfall HW & TW below Inv.El.=18.500 8.00 .00 Free Outfall HW & TW below Inv.E1.=18.500 8.50 .00 Free Outfall HW & TW below Inv.El..=18.500 9.00 .00 Free Outfall HW & TW below Inv.El.=18.500 9.50 .00 Free Outfall HW & TW below Inv.El.=18.500 10.00 .00 Free Outfall HW & TW below Inv.El.=18.500 10.50 .00 Free Outfall HW & TW below Inv.E1.=18.500 11.00 .00 Free Outfall HW & TW below Inv.E1.=18.500 11.50 .00 Free Outfall HW & TW below Inv.El.=18.500 12.00 .00 Free Outfall HW & TW below Inv.Et.=18.500 12.50 .00 Free Outfall HW & TW below Inv.El.=18.500 13.00 .00 Free Outfall HW & TW below Inv.El.=18.500 13.50 .00 Free Outfall HW & TW below Inv.El.=18.500 14.00 .00 Free Outfall HW & TW below Inv.E1.=18.500 14.50 .00 Free Outfall HW & TW below Inv.E1.=18.500 15.00 .00 Free Outfall HW & TW below Inv.E1.=18.500 15.50 .00 Free Outfall HW & TW below Inv.El.=18.500 16.00 .00 Free Outfall HW & TW below Inv.Et.=18.500 16.50 .00 Free Outfall HW & TW below Inv.El.=18.500 17.00 .00 Free Outfall HW & TW below Inv.E1.=18.500 17.50 .00 Free Outfall HW & TW below Inv.E1.=18.500 18.00 .00 Free Outfall HW & TW below Inv.E1.=18.500 18.50 .00 Free Outfall H=.00; Htw=.00; Qfree=.00; 19.00 23.33 Free Outfall H=.50; Htw=.00; Qfree=23.33; 19.50 66.00 Free Outfall H=1.00; Htw=.00; Qfree=66.00; 20.00 121.25 Free Outfall H=1.50; Htw=.00; Qfree=121.25; 64eyZkt l 5?(LA.W11 S/N: C21705506A87 Talbert & Bright PondPack Ver: 7.0 (325) Compute Time: 14:47:22 Date: 08-20-2004 Type.... Individual Outlet Curves Name.... PR 20 Page 6.17 File.... J:\3301 (WILMINGTON)\0305 MASTER DRAINAGE PLAN\AUGUST 2 SOLUTION SOUTH.PPW RATING TABLE FOR ONE OUTLET TYPE Structure ID = (Culvert -Circular) -------------------------------------- Mannings open channel maximum capacity: 244.48 cfs Upstream ID = (Pond Water Surface) DNstream ID = TW (Pond Outfall) NUMBER OF BARRELS = 2 EACH FLOW = SUM OF BARRELS x FLOW FOR ONE BARREL WS Elev,Device Q Tail Water Notes ---------------- --------------- -------------------------- WS Elev. Q TW Elev Converge ft cfs ft +/-ft Computation Messages 7.00 .00 Free Outfall Upstream HW & DNstream TW < Inv.El 7.50 .00 Free Outfall Upstream HW & DNstream TW < Inv.El 8.00 .00 Free Outfall Upstream HW & DNstream TW < Inv.El 8.50 .00 Free Outfall Upstream HW & DNstream TW < Inv.El 9.00 .00 Free Outfall Upstream HW & DNstream TW < Inv.El 9.50 .00 Free Outfall Upstream HW & DNstream TW < Inv.El 10.00 .00 Free Outfall Upstream HW & DNstream TW < Inv.El 10.50 .00 Free Outfall Upstream HW & DNstream TW < Inv.El 11.00 .00 Free Outfall Upstream HW & DNstream TW < Inv.El 11.50 .00 Free Outfall Upstream HW & DNstream TW < Inv.El 12.00 .00 Free Outfall Upstream HW & DNstream TW < Inv.El 12.50 .00 Free Outfall Upstream HW & DNstream TW < Inv.El 13.00 2.66 Free Outfall CRIT.DEPTH CONTROL Vh= .112ft Dcr= .331ft CRIT.DEPTH 13.50 10.34 Free Outfall CRIT.DEPTH CONTROL Vh= .228ft Dcr= .658ft CRIT.DEPTH 14.00 22.53 Free Outfall CRIT.DEPTH CONTROL Vh= .347ft Dcr= .979ft CRIT.DEPTH S/N: C2i705506A0^7 Talbert & Bright PondPack Ver: 7.0 (325) Compute Time: 14:47:22 Date: 08-20-2004 Type.... Individual Outlet Curves Name.... PR 20 Page 6.18 File.... J:\3301 (WILMINGTON)\0305 MASTER DRAINAGE PLAN\AUGUST 2 SOLUTION SOUTH.PPW RATING TABLE FOR ONE OUTLET TYPE Structure ID = (Culvert -Circular) -------------------------------------- Mannings open channel maximum capacity: 244.48 cfs Upstream ID = (Pond Water Surface) DNstream ID = TW (Pond Outfall) NUMBER OF BARRELS = 2 EACH FLOW = SUM OF BARRELS x FLOW FOR ONE BARREL WS Elev,Device Q Tail Water ---------------- Notes WS Elev. --------------- Q TW Elev Converge -------------------------- ft -------- cfs ft +/-ft ------- -------- ----- Computation Messages 14.50 38.75 Free Outfall ----------=--------------- CRIT.DEPTH CONTROL Vh= .470ft Dcr= 1.295ft CRIT.DEPTH 15.00 58.38 Free Outfall CRIT.DEPTH CONTROL Vh= .599ft Dcr= 1.601ft CRIT.DEPTH 15.50 80.79 Free Outfall CRIT.DEPTH CONTROL Vh= .735ft Dcr= 1.897ft CRIT.DEPTH 16.00 105.37 Free Outfall CRIT.DEPTH CONTROL Vh= .879ft Dcr= 2.181ft CRIT.DEPTH 16.50 131.59 Free Outfall CRIT.DEPTH CONTROL Vh= 1.034ft Dcr= 2.449ft CRIT.DEPTH 17.00 158.54 Free Outfall CRIT.DEPTH CONTROL Vh= 1.202ft Dcr= 2.697ft CRIT.DEPTH 17.50 185.71 Free Outfall CR.T.T.DEPTH CONTROL Vh= 1.385ft Dcr= 2.922ft CRIT.DEPTH 18.00 212.54 Free Outfall CRIT.DEPTH CONTROL Vh= 1.587ft Dcr= 3.120ft CRIT.DEPTH 18.50 238.45 Free Outfall CRIT.DEPTH CONTROL Vh= 1.807ft Dcr= 3.289ft CRIT.DEPTH 19.00 263.24 Free Outfall CRIT.DEPTH CONTROL Vh= 2.048ft Dcr= 3.429ft CRIT.DEPTH 19.50 286.67 Free Outfall CRIT.DEPTH CONTROL Vh= 2.307ft Dcr= 3.541ft CRIT.DEPTH 20.00 308.81 Free Outfall CRIT.DEPTH CONTROL Vh= 2.581ft Dcr= 3.629ft CRIT.DEPTH S/N: C21705506Ao^7 Talbert & Bright PondPack Ver: 7.0 (325) Compute Time: 14:47:22 Date: 08-20-2004 Type.... Individual Outlet Curves Name.... PR 20 Page 6.19 File.... J:\3301 (WILMINGTON)\0305 MASTER DRAINAGE PLAN\AUGUST 2 SOLUTION SOUTH.PPW RATING TABLE FOR ONE OUTLET TYPE Structure ID = (Orifice -Circular) -------------------------------------- Upstream ID = (Pond Water Surface) DNstream ID = TW (Pond Outfall) NUMBER OF OPENINGS = 3 EACH FLOW = SUM OF OPENINGS x FLOW FOR ONE OPENING WS Elev,Device Q WS Elev. Q ft cfs 7.00 .00 7.50 1.21 8.00 2.02 8.50 2.59 9.00 3.05 9.50 3.45 10.00 3.81 10.,_50 4.14 11.00 4.45 11.50 4.73 12.00 5.00 12.50 5.25 13.00 5.50 13.50 5.73 14.00 5.95 14.50 6.17 15.00 6.38 15.50 6.58 16.00 6.78 16.50 6.97 17.00 7.15 17.50 7.33 18.00 7.51 18.50 7.68 19.00 7.85 19.50 8.01 20.00 8.17 Tail Water TW Elev Converge ft +/-ft Free Outfall Free Outfall Free Outfall Free Outfall Free Outfall Free Outfall Free Outfall Free Outfall Free Outfall Free Outfall Free Outfall Free Outfall Free Outfall Free Outfall Free Outfall Free Outfall Free Outfall Free Outfall Free Outfall Free Outfall Free Outfall Free Outfall Free Outfall Free Outfall Free Outfall Free Outfall Free Outfall Notes -------------------------- Computation Messages Upstream HW & DNstream TW < Inv.El H =.28 H =.78 H =1.28 H =1.78 H =2.28 H =2.78 bj ck-fl PT- H =3.28 Excsn H =3.78 H =4. 28 ! SC." ke&15, H =4.78 H =5.28 PV,,.-rr H =5.78 H =6.28 H =6.78 H =7.28 H =7.78 H =8.28 H =8.78 H =9.28 H =9.78 H =10.28 H =10.78 H =11.28 H =11.78 H =12.28 H =12.78 S %-I /U 506r%87 Talbert & oright PondPack Ver: 7.0 (325) Compute Time: 14:47:22 Date: 08-20-2004 Type.... Individual Outlet Curves Name.... PR 20 Page 6.20 File.... J:\3301 (WILMINGTON)\0305 MASTER DRAINAGE PLAN\AUGUST 2 SOLUTION SOUTH.PPW RATING TABLE FOR ONE OUTLET TYPE Structure ID = (Culvert -Circular) -------------------------------------- Mannings open channel maximum capacity: 11.55 cfs Upstream ID = (Pond Water Surface) DNstream ID = TW (Pond Outfall) WS Elev,Device Q Tail Water Notes ---------------- --------------- -------------------------- WS Elev. Q TW Elev Converge ft cfs ft +/-ft Computation Messages -------- ------- -------- ------------------------------- 7.00 .00 Free Outfall Upstream HW & DNstream TW < Inv.E1 7.50 .00 Free Outfall Upstream HW & DNstream TW < Inv.E1 8.00 .00 Free Outfall Upstream HW & DNstream TW < Inv.El 8.50 .00 Free Outfall Upstream HW & DNstream TW < Inv.E1 9.00 .00 Free Outfall Upstream HW & DNstream TW < Inv.El 9.50 .00 Free Outfall Upstream HW & DNstream TW < Inv.El 10.00 .00 Free Outfall Upstream HW & DNstream TW < Inv.E1 10.50 00 Free Outfall Upstream HW & DNstream TW < Inv.El 11.00 ..00 Free Outfall Upstream HW & DNstream TW < Inv.El 11.50 .00 Free Outfall Upstream HW & DNstream TW < Inv.El 12.00 .00 Free Outfall Upstream HW & DNstream TW < Inv.El 12.50 .00 Free Outfall Upstream HW & DNstream TW < Inv.E1 13.00 .00 Free Outfall Upstream HW & DNstream TW < Inv.El 13.50 .00 Free Outfall Upstream HW & DNstream TW < Inv.E1 14.00 .00 Free Outfall Upstream HW & DNstream TW < Inv.E1 14.50 .00 Free Outfall Upstream HW & DNstream TW < Inv.El 15.00 .00 Free Outfall Upstream HW & DNstream TW < Inv.El S/N: C21705506A87 Talbert & BrighL PondPack Ver: 7.0 (325) Compute Time: 14:47:22 EK f S"Fttj (f S GH pot /4T- 1�f� Date: 08-20-2004 Type.... Individual Outlet Curves Name.... PR 20 Page 6.21 File.... J:\3301 (WILMINGTUN)\0305 MASTER DRAINAGE PLAN\AUGUST 2 SOLUTION SOUTH.PPW RATING TABLE FOR ONE OUTLET TYPE Structure ID = (Culvert -Circular) -------------------------------------- i Mannings open channel maximum capacity: 11.55 cfs Upstream ID = (Pond Water Surface) DNstream ID = TW (Pond Outfall) WS Elev,Device Q Tail Water Notes ---------------- WS Elev. --------------- -------------------------- Q TW Elev Converge ft -------- cfs ft +/-ft Computation Messages ------- -------- ----= 15.50 -------------------------- .93 Free Outfall BACKWATER CONTROL.. Vh= .068ft hwDi= .398ft Lbw= 100.Oft 16.00 3.49 Free Outfall BACKWATER CONTROL.. Vh= .146ft hwDi= .782ft Lbw= 10a.Oft 16.50 7.18 Free Outfall BACKWATER CONTROL.. Vh= .219ft hwDi= 1.171ft Lbw= 100.Oft 17.00 11.38 Free Outfall BACKWATER CONTROL.. Vh= .290ft hwDi= 1.564ft Lbw= 100.Oft 17.50 15.22 Free Outfall BACKWATER CONTROL.. Vh= .371ft hwDi= 1.944ft Lbw= 100.Oft 18.00 17.76 Free Outfall FULL FLOW...Lfull=49.25ft Vh=.496ft HL=1.149ft 18.50 20.06 Free Outfall FULL FLOW...Lfull=73.70ft Vh=.633ft HL=1.721ft 19.00 22.20 Free Outfall FULL FLOW...Lfull=85.15ft Vh=.776ft HL=2.255ft 19.50 24.24 Free Outfall FULL FLOW...Lfull=90.55ft Vh=.925ft HL=2.771ft 20.00 26.14 Free Outfall FULL FLOW ... Lfull=93.90ft Vh=1.076ft HL=3.282ft S/ : C2170550GA87 Talbert & Bright PondPack Ver: 7.0 (325) Compute Time: 14:47:22 Date: 08-20-2004 Type.... Composite Rating Curve Name.... PR 20 Page 6.22 File.... K \3301 (WILMINGTON)\0305 MASTER DRAINAGE PLAN\AUGUST 2 SOLUTION SOUTH.PPW ***** COMPOSITE OUTFLOW SUMMARY **** DVS Elev, Total Q Notes ---------------- -------- Converge ------------------------- Elev. Q TW Elev Error ft -------- cfs ------- ft +/-ft Contributing Structures 7.00 .00 -------- Free ----- -------------------------- Outfall None contributing 7.50 1.21 Free Outfall 8.00 2.02 Free Outfall 8.50 2.59 Free Outfall 9.00 3.05 Free Outfall 9.50 3.45 Free Outfall 10.00 3.81 Free Outfall 10.50 4.14 Free Outfall 11.00 4.45 Free Outfall 11.50 4.73 Free Outfall 12.00 5.00 Free Outfall 12.50 5.25 Free Outfall 13.00 8.16 Free Outfall 13.50 16.07 Free Outfall 14.00 30.76 Free Outfall 14.50 53.69 Free Outfall 15.00 83.65 Free Outfall 15.50 120.23 Free Outfall 16.00 162.86 Free Outfall 16.50 209.79 Free Outfall 17.00 258.76 Free Outfall 17.50 307.47 Free Outfall 18.00 353.95. Free Outfall 18.50 398.26 Free Outfall 19.00 463.49 Free Outfall 19.50 546.09 Free Outfall 20.00 636.03 Free Outfall S/N: C21705506A87 Talbert & Bright PondPack Ver: 7.0 (325) Compute Time: 14:47:22 Date: 08-20-2004 Type.... Pond E-V-Q Table Page 7.01 Name.... P 10 File.... J:\3301 (WILMINGTON)\0305 MASTER DRAINAGE PLAN\AUGUST 2 SOLUTION SOUTH.PPW LEVEL POOL ROUTING DATA HYG Dir = J:\3301 (WILMINGTON)\0305 MASTER DRAINAGE PLAN\ Inflow HYG file = NONE STORED - P 10 IN 100yr Outflow HYG file = NONE STORED - P 10 OUT 100yr Pond Node Data = P 10 Pond Volume Data = P 10 Pond Outlet Data = PR 10 No Infiltration INITIAL CONDITIONS ---------------------------------- Starting WS Elev = 21.80 ft Starting Volume = .000 ac-ft Starting Outflow = .00 cfs Starting Infiltr. _ .00 cfs Starting Total Qout= .00 cfs Time.Inc:rement = .0500 hrs Elevation Outflow Storage Area Infilt. Q Total 2S/t + 0 ft cfs ac-ft sq.ft cfs cfs cfs 21.80 .00 .000 0 .00 ------------------------ .00 .00 22.30 .92 .142 26366 .00 .92 69.63 22.80 3.42 .657 66475 .00 3.42 321.60 23.30 7.14 1.738 124807 .00 7.14 848.22 23.80 11.63 3.592 201361 .00 11.63 1750.30 24.30 16.42 6.304 258699 .00 16.42 3067.75 24.80 21.08 9.490 296819 .00 21.08 4614.30 25.30 25.33 13.128 337556 .00 25.33 6379.50 25-80 29.13 17.249 380913 .00 29.13 8377.83 26.00 30.54 19.040 398989 .00 30.54 9245.72 26.30 40.01 21.907 433976 .00 40.01 10643.05 26.80 66.34 27.238 495555 .00 66.34 13249.52 27.00 78.12 29.572 521330 .00 78.12 14391.06 S/N: C21705506A87 Talbert & Bright PondPack \per: 7.0 (325) Compute Time: 14:47:22 Date: 08-20-2004 Type.... Pond Routing Summary Page 7.02 Name.... P 10 OUT Tag: 1" Eq Storm: 1" Eq File.... J:\3301 (WILMINGTON)\0305 MASTER DRAINAGE PLAN\AUGUST 2 SOLUTION SOUTH.PPW Storm... TypeIII 24hr Tag: 1" Eq LEVEL POOL ROUTING SUMMARY HYG Dir = J:\3301 (WILMINGTON)\0305 MASTER DRAINAGE PLAN\ Inflow HYG file = NONE STORED - P 10 IN 1" Eq Outflow HYG file = NONE STORED - P 10 OUT 1" Eq Pond Node Data = P 10 Pond Volume Data = P 10 Pond Outlet Data = PR 10 No Infiltration INITIAL CONDITIONS Starting WS Elev = 21.80 ft Starting Volume = .000 ac-ft Starting Outflow = .00 cfs Starting Infiltr. _ .00 cfs 5tar-tirrg Total Qo-ut= .00 cfs Time Increment = .0500 hrs INFLOW/OUTFLOW HYDROGRAPH SUMMARY Peak Inflow = 8.46 cfs at 12.6000 hrs Peak ----------------------------------------------------- Outflow = 2.60 cfs at 13.7000 hrs Peak Elevation = 22.64 ft Peak Storage = .435 ac-ft MASS BALANCE (ac-ft) -------------------------- + Initial Vol = .000 + HYG Vol IN = 1.523 - Infiltration = .000 - HYG Vol OUT = 1.523 Retained Vol = .000 Unrouted Vol = -.000 ac-ft (.030% of Inflow Volume) 5/114: C21705506A87 Talbert & Bright PondPack Ver: 7.0 (325) Compute Time: 14:47:22 Date: 08-20-2004 Type.... Pond Routing Summary Page 7.03 Name.... P 10 OUT Tag: 100yr Event: 100 yr File.... J:\3301 (WILMINGTON)\0305 MASTER DRAINAGE PLAN\AUGUST 2 SOLUTION SOUTH.PPW Storm... TypeIII 24hr Tag: 100yr LEVEL POOL ROUTING SUMMARY HYG Dir = J:\3301 (WILMINGTON)\0305 MASTER DRAINAGE PLAN\ Inflow HYG file = NONE STORED - P 10 IN 100yr Outflow HYG file = NONE STORED - P 10 OUT 100yr Pond Node Data = P 10 Pond Volume Data = P 10 Pond Outlet Data = PR 10 No Infiltration INITIAL CONDITIONS Starting WS Elev = 21.80 ft Starting Volume = .000 ac-ft Starting Outflow = .00 cfs Starting I:nfiltr. = .00 cfs Starting Total Qout= .00 cfs Time Increment = .0500 hrs INFLOW/OUTFLOW HYDROGRAPH SUMMARY Peak Inflow = 179.88 cfs at 12.5000 hrs Peak Outflow = 26.81 cfs at 14.1000 hrs ----------------------------------------------------- Peak Elevation = 25.49 ft Peak Storage = 14.672 ac-ft MASS BALANCE (ac-ft) -------------------------- + Initial Vol = .000 + HYG Vol IN = 27.843 - Infiltration = .000 - HYG Vol OUT = 27.843 Retained Vol = .000 Unrouted Vol = -.000 ac-ft (.002% of Inflow Volume) S/N: C2170550GA87 Talbert & Bright PondPack Ver: 7.0 (325) Compute Time: 14:47:22 Date: 08-20-2004 Type.... Pond Routing Summary Page 7.04 Name.... P 10 OUT Tag: 10yr Event: 10 yr File.... JK3301 (WILMINGTON)\0305 MASTER DRAINAGE PLAN\AUGUST 2 SOLUTION SOUTH.PPW Storm... TypeIII 24hr Tag: 10yr LEVEL POOL ROUTING SUMMARY HYG Dir = K \3301 (WILMINGTON)\0305 MASTER DRAINAGE PLAN\ Inflow HYG file = NONE STORED - P 10 IN 10yr Outflow HYG file = NONE STORED - P 10 OUT 10yr Pond Node Data = P 10 Pond Volume Data = P 10 Pond Outlet Data = PR 10 No Infiltration INITIAL CONDITIONS Starting WS Elev = 21.80 ft Starting Volume = .000 ac-ft Starting Outflow = .00 cfs Starting Infiltr. _ .00 cfs Starttag Total Q.aut= .00 cfs Time Increment = .0500 hrs INFLOW/OUTFLOW HYDROGRAPH SUMMARY Peak Inflow = 112.30 cfs at 12.5000 hrs Peak Outflow = 19.66 cfs at 13.9000 hrs ----------------------------------------------------- Peak Elevation = 24.65 It Peak Storage = 8.475 ac-ft MASS BALANCE (ac-ft) -------------------------- + Initial Vol = .000 + HYG Vol IN = 17.151 - Infiltration = .000 - HYG Vol OUT = 17.150 - Retained Vol = .000 Unrouted Vol = -.000 ac-ft (.003% of Inflow Volume) 5/N: C21705506A87 Talbert & Bright PondPack Ver: 7.0 (325) Compute Time: 14:47:22 Date: 08-20-2004 Type.... Pond Routing Summary Page 7.05 Name.... P 10 OUT Tag: 25yr Event: 25 yr File.... J:\3301 (WILMINGTON)\0305 MASTER DRAINAGE PLAN\AUGUST 2 SOLUTION 50UTH.PPW Storm... TypeIII 24hr Tag: 25yr LEVEL POOL ROUTING SUMMARY HYG Dir = J:\3301 (WILMINGTON)\0305 MASTER DRAINAGE PLAN\ Inflow HYG file = NONE STORED - P 10 IN 25yr Outflow HYG file = NONE STORED - P 10 OUT 25yr Pond Node Data = P 10 Pond Volume Data = P 10 Pond Outlet Data = PR 10 No Infiltration INITIAL CONDITIONS ---------------------------------- Starting WS Elev = 21.80 ft Starting Volume = .000 ac-ft Starting Outflow = .00 cfs Starting Infiltr. _ .00 cfs Starting Total Qat<t---- --.00 cfs Time Increment = .0500 hrs INFLOW/OUTFLOW HYDROGRAPH SUMMARY Peak Inflow = 135.88 cfs at 12.5000 hrs Peak Outflow = 22.40 cfs at 13.9500 hrs ----------------------------------------------------- Peak Elevation = 24.96 ft Peak Storage = 10.570 ac-ft MA55 BALANCE (ac-ft) -------------------------- + Initial Vol = .000 + HYG Vol IN = 20.840 - Infiltration = .000 - HYG Vol OUT = 20.839 - Retained Vol = .000 Unrouted Vol = -.000 ac-ft (.002% of Inflow Volume) S/N: C21705506A87 Talbert & Bright PondPack Ver: 7.0 (325) Compute Time: 14:47:22 Date: 08-20-2004 'er...W-. Type.... Pond Routing Summary Page 7.06 Name.... P 10 OUT Tag: 2yr Event: 2 yr File.... J:\3301 (WILMINGTON)\0305 MASTER DRAINAGE PLAN\AUGUST 2 SOLUTION SOUTH.PPW Storm... TypeIII 24hr Tag: 2yr LEVEL POOL ROUTING SUMMARY HYG Dir = J:\3301 (WILMINGTON)\0305 MASTER DRAINAGE PLAN\ Inflow HYG file = NONE STORED - P 10 IN 2yr Outflow HYG file = NONE STORED - P 10 OUT 2yr j Pond Node Data = P 10 Pond Volume Data = P 10 fr Pond Outlet Data = PR 10 ` No Infiltration INITIAL CONDITIONS ---------------------------------- Starting WS Elev = 21.80 ft Starting Volume = .000 ac-ft Starting Outflow = .00 cfs Starting Infiltr. _ .00 cfs Starting Totil-Qout�wz� .00-cfs Time Increment = .0500 hrs INFLOW/OUTFLOW HYDROGRAPH SUMMARY Peak Inflow = 57.53 cfs at 12.5000 hrs Peak Outflow = 12.27 cfs at 13.7500 hrs ------------------------------------------------------ Peak Elevation = 23.87 ft Peak Storage = 3.908 ac-ft MASS BALANCE (ac-ft) -------------------------- + Initial Vol = .000 + HYG Vol IN = 8.788 - Infiltration = .000 - HYG Vol OUT = 8.787 - Retained Vol = .000 Unrouted Vol = -.000 ac-ft (.005% of Inflow Volume) S/Nv C21705506A87 Talbert & Bright PondPack Ver: 7.0 (325) Compute Time: 14:47:22 Date: 08-20-2004 r Type.... Pond E-V-Q Table Page 7.07 Name.... P 20 File.... J:\3301 (WILMINGTON)\0305 MASTER DRAINAGE PLAN\AUGUST 2 SOLUTION SOUTH.PPW LEVEL POOL ROUTING DATA I HYG Dir = J:\3301 (WILMINGTON)\0305 MASTER DRAINAGE PLAN\ Inflow HYG file = NONE STORED - P 20 IN 100yr Outflow HYG file = NONE STORED - P 20 OUT 100yr Pond Node Data = P 20 Pond Volume Data = P 20 Pond Outlet Data = PR 20 No Infiltration INITIAL CONDITIONS ---------------------------------- Starting WS Elev = 7.00 ft Starting Volume = .000 ac-ft Starting Outflow = .00 cfs Starting Infiltr. _ .00 cfs Starting Total Qout= .00 cfs Time Increment: -. _ .0500 Lhrs " Elevation Outflow Storage Area Infilt. Q Total 2S/t + 0 ft ------------------------------------------------------------------------------ cfs ac-ft sq.ft cfs cfs cfs 7.00 .00 .000 0 .00 .00 .00 7.50 1.21 .007 1750 .00 1.21 4.45 8.00 2.02 .054 7000 .00 2.02 27.95 8.50 2.59 .156 11042 .00 2.59 78.20 9.00 3.05 .311 16000 .00 3.05 153.36 9.50 3.45 .525 21583 .00 3.45 257.77 10.00 3.81 .809 28000 .00 3.81 395.48 10.50 4.14 1.178 36354 .00 4.14 574.06 11.00 4.45 3.360 382445 .00 4.45 1630.88 11.50 4.73 8.307 481402 .00 4.73 4025.47 12.00 5.00 14.455 591733 .00 5.00 7001.41 12.50 5.25 21.349 609483 .00 5.25 10338.25 13.00 8.16 28.448 627496 .00 8.16 13777.09 13.50 16.07 35.713 638340 .00 16.07 17301.16 14.00 30.76 43.103 G49276 .00 30.76 20892.53 14.50 53.69 50.618 660150 .00 53.69 24552.71 15.00 83.65 58.258 671114 .00 83.65 28280.58 15.50 120.23 66.024 682019 .00 120.23 32075.82 16.00 162.86 73.915 693012 .00 162.86 35937.94 16.50 209.79 81.933 703947 .00 209.79 39865.27 17.00 258.76 90.076 714967 .00 258.76 43855.63 17.50 307.47 98.346 725933 .00 307.47 47906.80 18.00 353.95 106.742 736982 .00 353.95 52016.90 S/N: C21705506A87 Talbert & Bright PondPack Ver: 7.0 (325) Compute Time: 14:47:22 Date: 08-20-2004 Type.... Pond E-V-Q Table Page 7.08 Name.... P 20 File.... J:\3301 (WILMINGTON)\0305 MASTER DRAINAGE PLAN\AUGUST 2 SOLUTION SOUTH.PPW LEVEL POOL ROUTING DATA HYG Dir = J:\3301 (WILMINGTON)\0305 MASTER DRAINAGE PLAN\ Inflow HYG file = NONE STORED - P 20 IN 100yr Outflow HYG file = NONE STORED - P 20 OUT 100yr Pond Node Data = P 20 Pond Volume Data = P 20 Pond Outlet Data = PR 20 No Infiltration INITIAL CONDITIONS c---------------------------------- Starting WS Elev = 7.00 ft Starting Volume = .000 ac-ft Starting Outflow = .00 cfs Starting Infiltr. _ .00 cfs Starting Total Qout.= .00 cfs Time 'Increment ° 05-Oa• .hrs, -- Elevation Outflow Storage Area Infilt. Q Total 2S/t + 0 ft _----------------------------------------------------------------------------- cfs ac-ft sq.ft cfs cfs cfs 18.50 398.26 115.264 747977 .00 398.26 56186.05 19.00 463.49 123.913 759054 .00 463.49 60437.44 19.50 546.09 132.689 770080 .00 546.09 64767.60 20.00 636.03 141.592 781186 .00 636.03 69166.58 SJIN: C2170550GA007 Talbert & BrighL PondPack Ver: 7.0 (325) Compute Time: 14:47:22 Date: 08-20-2004 Type.... Pond Routing Summary Page 7.09 Name.... P 20 OUT Tag: 1" Eq Storm: 1" Eq File.... J:\3301 (WILMINGTON)\0305 MASTER DRAINAGE PLAN\AUGUST 2 SOLUTION SOUTH.PPW Storm... TypeIII 24hr Tag: 1" Eq LEVEL POOL ROUTING SUMMARY HYG Dir = J:\3301 (WILMINGTON)\0305 MASTER DRAINAGE PLAN\ Inflow HYG file = NONE STORED - P 20 IN 1" Eq Outflow HYG file = NONE STORED - P 20 OUT 1" Eq Pond Node Data = P 20 Pond Volume Data = P 20 Pond Outlet Data = PR 20 No Infiltration INITIAL CONDITIONS ---------------------------------- Starting WS Elev = 7.00 ft Starting Volume = .000 ac-ft I Starting Outflow = .00 cfs Starting Infiltr. _ .00 cfs Starting Total Qout—& = .00- is Time Increment = .0500 hrs INFLOW/OUTFLOW HYDROGRAPH SUMMARY Peak Inflow = 92.70 cfs at 12.7000 hrs Peak Outflow = 4.92 cfs at 20.7000 hrs ----------------------------------------------------- Peak Elevation 11.86 ft Peak Storage = 12.551 ac-ft ! MASS BALANCE (ac-ft) -------------------------- + Initial Vol = .000 + HYG Vol IN = 17.969 - Infiltration = .000 - HYG Vol OUT = 17.969 - Retained Vol = .000 i---------- Unrouted Vol = -.000 ac-ft (.000% of Inflow Volume) i i Si iv: C21705506A87 Talbert & Bright PondPack Ver: 7.0 (325) Compute Time: 14:47:22 Date: 08-20-2004 Type.... Pond Routed HYG (total out) Page 7.10 Name.... P 20 OUT Tag: 1" Eq Storm: 1" Eq File.... J:\3301 (WILMINGTON)\0305 MASTER DRAINAGE PLAN\AUGUST 2 SOLUTION SOUTH.PPW Storm... TypeIII 24hr Tag: 1" Eq POND ROUTED TOTAL OUTFLOW HYG... HYG file = HYG ID = P 20 OUT HYG Tag = 1" Eq ----------------------------------- Peak Discharge = 4.92 cfs Time to Peak = 20.7000 hrs HYG Volume = 17.969 ac-ft ----------------------------------- HYDROGRAPH ORDINATES (cfs) Time Output Time increment = .0500 hrs hrs --------- -------------------------------------------------------------- Time on left represents time for first value in each row. 9.5000 .00 .00 .00 .00 .01 9.7500 .01 .02 .03 .04 .06 10.0000 .09 .12 .16 .20 .25 10.2500 .30 .43 .51 .59 10.5000 .68 .77 .87 .98 1.10 10.7500 1.21 1.23 1.25 1.29 1.33 <i CZME--) 1.44 1.50 1.58 1.66 11.2500 135 1.85 1.96 2.04 2.08 11.5000 2.13 2.19 2.25 2.33 2.41 11.7500 2.51 2.61 2.69 2.78 2.90 12.0000 3.05 3.17 3.33 3.50 3.67 12.2500 3.85 4.03 4.16 4.19 4.23 12.5000 4.28 4.32 4.37 4.42 4.46 12.7500 4.48 4.50 4.52 4.54 4.56 13.0000 4.57 4.59 4.60 4.62 4.63 13.2500 4.64 4.66 4.67 4.68 4.69 13.5000 4.69 4.70 4.71 4.72 4.72 13.7500 4.73 4.74 4.74 4.74 4.75 14.0000 4.75 4.76 4.76 4.76 4.77 14.2500 4.77 4.77 4.78 4.78 4.78 14.5000 4.79 4.79 4.79 4.80 4.80 14.7500 4.80 4.80 4.81 4.81 4.81 15.0000 4.81 4.82 4.82 4.82 4.82 15.2500 4.83 4.83 4.83 4.83 4.83 15.5000 4.84 4.84 4.84 4.84 4.84 15.7500 j 4.85 4.85 4.85 4.85 4.85 16.0000 4.86 4.86 4.86 4.86 4.86 16.2500 4.86 4.86 4.87 4.87 4.87 16.5000 4.87 4.87 4.87 4.87 4.88 16.7500 4.88 4.88 4.88 4.88 4.88 17.0000 4.88 4.88 4.88 4.89 4.89 17.2500 4.89 4.89 4.89 4.89 4.89 17.5000 4.89 4.89 4.89 4.89 4.90 SIN: C21705506AS7 Talbert Sc Bright PondPack Ver: 7.0 (325) Compute Time: 14:47:22 Date: 08-20-2004 Type.... Pond Routed HYG (total out) Page 7.11 Name.... P 20 OUT Tag: 1" Eq Storm: 1" Eq File.... J:\3301 (WILMINGTON)\0305 MASTER DRAINAGE PLAN\AUGUST 2 SOLUTION SOUTH.PPW Storm... TypeIII 24hr Tag: 1" Eq HYDROGRAPH ORDINATES (cfs) Time Output Time increment = .0500 hrs hrs --------- -------------------------------------------------------------- Time on left represents time for first value in each row_ 17.7500 1 4.90 4.90 4.90 4.90 4.90 18.0000 4.90 4.90 4.90 4.90 4.90 18.2500 4.90 4.90 4.90 4.90 4.91 18.5000 4.91 4.91 4.91 4.91 4.91 18.7500 4.91 4.91 4.91 4.91 4.91 19.0000 4.91 4.91 4.91 4.91 4.91 19.2500 4.91 4.91 4.91 4.91 4.91 19.5000 4.91 4.91 4.91 4.91 4.92 19.7500 4.92 4.92 4.92 4.92 4.92 20.0000 4.92 4.92 4.92 4.92 4.92 20.2500 4.92 4.92 4.92 4.92 4.92 20.5000 4.92 4.92 4.92 4.92 4.92 20.7500 4.92 4.92 4.92 4.92 4.92 21.0000 4.92 4.92 4.92 4.92 4.92 21.2500 4'.92 4.92 4:-92 4.92 4.92 21.5000 4.92 4.92 4.92 4.92 4.92 21.7500 4.92 4.92 4.92 4.92 4.92 22.0000 4.92 4.92 4.92 4.92 4.92 22.2500 4.92 4.92 4.92 4.92 4.92 22.5000 4.92 4.92 4.92 4.92 4.92 22.7500 1 4.92 4.92 4.92 4.92 4.92 23.0000 4.92 4.92 4.92 4.92 4.92 23-2500 4.92 4.92 4.92 4.92 4.92 23.5000 4.92 4.92 4.92 4.92 4.92 23.7500 4.92 4.92 4.92 4.92 4.92 24.0000 4.92 4.92 4.92 4.92 4.92 24.2500 4.92 4.92 4.92 4.92 4.92 24.5000 1 4.92 4.92 4.92 4.92 4.92 24.7500 4.91 4.91 4.91 4.91 4.91 25.0000 4.91 4.91 4.91 4.91 4.91 25.2500 4.91 4.91 4.91 4.91 4.90 25.5000 4.90 4.90 4.90 4.90 .4.90 25.7500 4.90 4.90 4.90 4.90 4.90 26.0000 4.90 4.90 4.89 4.89 4.89 26.2500 4.89 4.89 4.89 4.89 4.89 26.5000 4.89 4.89 4.89 4.89 4.88 26.7500 4.88 4.88 4.88 4.88 4.88 27.0000 4.88 4.88 4.88 4.88 4.88 27.2500 4.88 4.87 4.87 4.87 4.87 27.5000 4.87 4.87 4.87 4.87 4.87 27.7500 4.87 4.87 4.87 4.86 4.86 28.0000 4.86 4.86 4.86 4.86 4.86 28.2500 4.86 4.86 4.86 4.86 4.86 28.5000 4.85 4.85 4.85 4.85 4.85 28.7500 4.85 4.85 4.85 4.85 4.85 29.0000 4.85 4.84 4.84 4.84 4.84 29.2500 1 4.84 4.84 4.84. 4.84 4.84 S/PS: C21705 0GA87 Talbert & Bright PondPack Ver: 7.0 (325) Compute Time: 14:47:22 Date: 08-20-2004 Type.... Pond Routed HYG (total out) Page 7.12 Name.... P 20 OUT Tag: 1" Eq Storm: 1" Eq File.... J:\3301 (WILMINGTON)\0305 MASTER DRAINAGE PLAN\AUGUST 2 SOLUTION SOUTH.PPW Storm... TypeIII 24hr Tag: 1" Eq HYDROGRAPH ORDINATES (cfs) Time [ Output Time increment = .0500 hrs hrs [ Time on left represents time for first value in each row. 29.5000 [ 4.84 4.84 4.84 4.83 4.83 29.7500 [ 4.83 4.83 4.83 4.83 4.83 30.0000 [ 4.83 4.83 4.83 4.83 4.82 30.2500 [ 4.82 4.82 4.82 4.82 4.82 30.5000 [ 4.82 4.82 4.82 4.82 4.82 30.7500 ( 4.82 4.81 4.81 4.81 4.81 31.0000 [ 4.81 4.81 4.81 4.81 4.81 31.2500 [ 4.81 4.81 4.80 4.80 4.80 31.5000 [ 4.80 4.80 4.80 4.80 4.80 31.7500 [ 4.80 4.80 4.80 4.80 4.79 32.0000 [ 4.79 4.79 4.79 4.79 4.79 32.2500 [ 4.79 4.79 4.79 4.79 4.79 32.5000 [ 4.79 4.78 4.78 4.78 4.78 32.7500 [ 4.78 4:78- 4:78 4.78 4.78 33.0000 [ 4.78 4.78 4.77 4.77 4.77 33.2500 [ 4.77 4.77 4.77 4.77 4.77 33.5000 [ 4.77 4.77 4.77 4.77 4.76 33.7500 [ 4.76 4.76 4.76 4.76 4.76 34.0000 [ 4.76 4.76 4.76 4.76 4.76 34.2500 [ 4.76 4.75 4.75 4.75 4.75 34.5000 [ 4.75 4.75 4.75 4.75 4.75 34.7500 [ 4.75 4.75 4.74 4.74 4.74 35.0000 [ 4.74 4.74 4.74 4..74 4.74 35.2500 [ 4.74 4.74 4.74 4.74 4.73 35.5000 [ 4.73 4.73 4.73 4.73 4.73 35.7500 [ 4.73 4.73 4.73 4.73 4.72 36.0000 [ 4.72 4.72 4.72 4.72 4.72 36.2500 [ 4.72 4.72 4.72 4.71 4.71 36.5000 [ 4.71 4.71 4.71 4.71 4.71 36.7500 [ 4.71 4.71 4.70 4.70 4.70 37.0000 [ 4.70 4.70 4.70 4.70 4.70 37.2500 [ 4.70 4.69 4.69 4.69 4.69 37.5000 [ 4.69 4.69 4.69 4.69 4.69 37.7500 [ 4.68 4.68 4.68 4.68 4.68 38.0000 [ 4.68 4.68 4.68 4.68 4.67 38.2500 [ 4.67 4.67 4.67 4.67 4.67 38.5000 [ 4.67 4.67 4.67 4.66 4.66 38.7500 [ 4.66 4.66 4.66 4.66 4.66 39.0000 [ 4.66 4.66 4.65 4.65 4.65 39.2500 [ 4.65 4.65 4.65 4.65 4.65 39.5000 [ 4.65 4.64 4.64 4.64 4.64 39.7500 [ 4.64 4.64 4.64 4.64 4.64 40.0000 [ 4.63 4.63 4.63 4.63 4.63 40.2500 [ 4.63 4.63 4.63 4.63 4.62 40.5000 [ 4.62 4.62 4.62 4.62 4.62 40.7500 [ 4.62 4.62 4.62 4.61 4.61 41.0000 [ 4.61 4.61 4.61 4.61 4.61 S/N: C21705506A87 Talbert & Bright PondPack Ver: 7.0 (325) Compute Time: 14:47:22 Date: 08-20-2004 Type.... Pond Routed HYG (total out) Page 7.13 Name.... P 20 OUT Tag: 1" Eq Storm: 1" Eq File.... J:\3301 (WILMINGTON)\0305 MASTER DRAINAGE PLAN\AUGUST 2 SOLUTION SOUTH.PPW Storm... TypeIII 24hr Tag: 1" Eq HYDROGRAPH ORDINATES (cfs) Time Output Time increment = .0500 hrs hrs Time --------- -------------------------------------------------------------- on left represents time for first value in each row. 41.2500 4.61 4.61 4.60 4.60 4.60 41.5000 4.60 4.60 4.60 4.60 4.60 41.7500 4.60 4.59 4.59 4.59 4.59 42.0000 4.59 4.59 4.59 4.59 4.59 42.2500 4.58 4.58 4.58 4.58 4.58 42.5000 4.58 4.58 4.58 4.58 4.58 42.7500 4.57 4.57 4.57 4.57 4.57 43.0000 4.57 4.57 4.57 4.57 4.56 43.2500 4.56 4.56 4.56 4.56 4.56 43.5000 4.56 4.56 4.56 4.55 4.55 43.7500 4.55 4.55 4.55 4.55 4.55 44.0000 4.55 4.55 4.54 4.54 4.54 44.2500 4.54 4.54 4.54 4.54 4.54 44.5000 4.54 4.53 4.53 4.53 4.53 44.7500 4.53 4.53! 4.53%. 4.53• 4.53 45.0000 4.53 4.52 4.52 4.52 4.52 45.2500 4.52 4.52 4.52 4.52 4.52 45.5000 4.51 4.51 4.51 4.51 4.51 45.7500 4.51 4.51 4.51 4.51 4.50 46.0000 4.50 4.50 4.50 4.50 4.50 46.2500 4.50 4.50 4.50 4.50 4.49 46.5000 4.49 4.49 4.49 4.49 4.49 46.7500 4.49 4.49 4.49 4.48 4.48 47.0000 4.48 4.48 4.48 4.48 4.48 47.2500 4.48 4.48 4.47 4.47 4.47 47.5000 4.47 4.47 4.47 4.47 4.47 47.7500 4.47 4.47 4.46 4.46 4.46 48.0000 4.46 4.46 4.46 4.46 4.46 48.2500 4.46 4.45 4.45 4.45 4.45 48.5000 4.45 4.45 4.45 4.45 4.45 48.7500 4.44 4.44 4.44 4.44 4.43 49.0000 4.43 4.43 4.43 4.42 4.42 49.2500 4.42 4.42 4.41 4.41 4.41 49.5000 4.41 4.40 4.40 4.40 4.40 49.7500 4.39 4.39 4.39 4.39 4.38 50.0000 4.38 4.38 4.38 4.37 4.37 50.2500 4.37 4.37 4.36 4.36 4.36 50.5000 4.36 4.35 4.35 4.35 4.35 50.7500 4.34 4.34 4.34 4.34 4.33 51.0000 4.33 4.33 4.33 4.32 4.32 51.2500 4.32 4.32 4.31 4.31 4.31 51.5000 4.31 4.30 4.30 4.30 4.30 51.7500 4.29 4.29 4.29 4.29 4.28 52.0000 .� 4.28 4.28 4.28 4.27 4.27 52.2500 4.27 4.27 4.26 4.26 4.26 52.5000 4.26 4.25 4.25 4.25 4.25 52.7500 4-24 4.24 4.24 4.24 4.23 S/N: C21705506A87 Talbert & Bright PondPack Ver: 7.0 (325) Compute Time: 14:47:22 Date: 08-20-2004 Type.... Pond Routed HYG (total out) Page 7.14 Name.... P 20 OUT Tag: 1" Eq Storm: 1" Eq File.... J:\3301 (WILMINGTON)\0305 MASTER DRAINAGE PLAN\AUGUST 2 SOLUTION SOUTH.PPW Storm... TypeIII 24hr Tag: 1" Eq HYDROGRAPH ORDINATES (cfs) Time Output Time increment = .0500 hrs hrs ---------I-------------------------------------------------------------- Time on left represents time for first value in each row. 53.0000 j 4.23 4.23 4.23 4.22 4.22 53.2500 4.22 4.22 4.21 4.21 4.21 53.5000 4.21 4.21 4.20 4.20 4.20 53.7500 4.20 4.19 4.19 4.19 4.19 54.0000 4.18 4.18 4.18 4.18 4.17 54.2500 4.17 4.17 4.17 4.16 4.16 54.5000 4.16 4.16 4.15 4.15 4.15 54.7500 4.15 4.14 4.14 4.13 4.12 55.0000 4.10 4.09 4.07 4.06 4.04 55.2500 4.03 4.01 4.00 3.98 3.97 55.5000 3.95 3.94 3.92 3.91 3.90 55.7500 3.88 3.87 3.85 3.84 3.82 56.0000 3.81 3.79 3.77 3.75 3.73 56.2500 3.71 3.69 3.67 3.65 3.63 56.5000 3.61 3.60 3.58, 3.56- 3.54 56.7500 3.52 3.50 3.48 3.47 3.45 57.0000 3.42 3.39 3.37 3.34 3.31 57.2500 3.29 3.26 3.24 3.21 3.19 57.5000 3.16 3.14 3.12 3.09 3.07 57.7500 3.04 3.00 2.97 2.93 2.89 58.0000 2.86 2.82 2.79 2.75 2.72 58.2500 2.69 2.65 2.62 2.59 2.53 58.5000 2.47 2.42 2.36 2.31 2.2G 58.7500 2.21 2.16 2.11 2.06 2.00 1.73 1.61 1.50 1.40 59.2500 1.30 1.21 .55 .25 .11 59.5000 .05 .02 .01 .00 .00 5lo '� DRAT %1M,5' S{N: C21705506A87 Talbert & Bright PondPack Ver: 7.0 (325) Compute Time: 14:47:22 Date: 08-20-2004 Type.... Pond Routing Summary Page 7.15 Name.... P 20 OUT Tag: 100yr Event: 100 yr File.... J:\3301 (WILMINGTON)\0305 MASTER DRAINAGE PLAN\AUGUST 2 SOLUTION SOUTH.PPW Storm... TypeIII 24hr Tag: 100yr LEVEL POOL ROUTING SUMMARY HYG Dir = J:\3301 (WILMINGTON)\0305 MASTER DRAINAGE PLAN\ Inflow HYG file = NONE STORED - P 20 IN 100yr Outflow HYG file = NONE STORED - P 20 OUT 100yr Pond Node Data = P 20 Pond Volume Data = P 20 Pond Outlet Data = PR 20 No Infiltration INITIAL CONDITIONS Starting WS Elev = 7.00 ft Starting Volume = .000 ac-ft Starting Outflow = .00 cfs Starting Infiltr. _ .00 cfs Starting Total' Qout= .00 cfs - Time Increment = .0500 hrs INFLOW/OUTFLOW HYDROGRAPH SUMMARY Peak Inflow = 1086.06 cfs at 12.6000-hrs Peak ----------------------------------------------------- Outflow = 337.31 cfs at 13.6000 hrs Peak Elevation = 17.82 ft Peak Storage = 103.721 ac-ft MASS BALANCE (ac-ft) -------------------------- + Initial Vol = .000 + HYG Vol IN = 219.761 Infiltration = .000 HYG Vol OUT = 218.059 Retained Vol = 1.281 Unrouted Vol = -.422 ac-ft (.192% of Inflow Volume) WARNING: Outflow hydrograph truncated on right side. SiN: C21705506A87 Talbert & Bright PondPack Ver: 7.0 (325) Compute Time: 14:47:22 Date: 08-20-2004 Type.... Pond Routing Summary Page 7.16 Name.... P 20 OUT Tag: 10yr Event: 10 yr File.... J:\3301 (WILMINGTON)\0305 MASTER DRAINAGE PLAN\AUGUST 2 SOLUTION SOUTH.PPW Storm... TypeIII 24hr Tag: 10yr I LEVEL POOL ROUTING SUMMARY HYG Dir = J:\3301 (WILMINGTON)\0305 MASTER DRAINAGE PLAN\ Inflow HYG file = NONE STORED - P 20 IN 10yr Outflow HYG file = NONE STORED - P 20 OUT 10yr ! Pond Node Data = P 20 Pond Volume Data = P 20 ,1 Pond Outlet Data = PR 20 ` No Infiltration INITIAL CONDITIONS ---------------------------------- Starting WS Elev = 7.00 ft Starting Volume = .000 ac-ft Starting Outflow = .00 cfs Starting Infiltr. _ .00 cfs Starting Total Qout= .00 cfs Time Increment = .0500 hrs INFLOW/OUTFLOW HYDROGRAPH SUMMARY Peak Inflow = 712.83 cfs at 12.6000 hrs Peak Outflow = 157.58 cfs at 14.0500 hrs Peak Elevation = 15.94 ft Peak Storage = 72.931 ac-ft MASS BALANCE (ac-ft) -------------------------- + Initial Vol = .000 + HYG Vol IN = 140.978 - Infiltration = .000 - HYG Vol OUT = 140.386 - Retained Vol = .585 Unrouted Vol = -.007 ac-ft (.005% of Inflow Volume) WARNING: Outflow hydrograph truncated on right side. SiN: C H705506A87 Talbert & Bright PondPack Ver: 7.0 (325) Compute Time: 14:47:22 Date: 08-20-2004 Type.... Pond Routing Summary Page 7.17 Name.... P 20 OUT Tag: 25yr Event: 25 yr File.... J:\3301 (WILMINGTON)\0305 MASTER DRAINAGE PLAN\AUGUST 2 SOLUTION SOUTH.PPW Storm... TypeIII 24hr Tag: 25yr LEVEL POOL ROUTING SUMMARY HYG Dir = J:\3301 (WILMINGTON)\0305 MASTER DRAINAGE PLAN\ Inflow HYG file = NONE STORED - P 20 IN 25yr Outflow HYG file = NONE STORED - P 20 OUT 25yr Pond Node Data = P 20 Pond Volume Data = P 20 Pond Outlet Data = PR 20 No Infiltration INITIAL i CONDITIONS ---------------------------------- ' Starting WS Elev = 7.00 ft Starting Volume = .000 ac-ft Starting Outflow = .00 cfs Starting Infiltr. _ .00 cfs Starting Total Qout= .00 cfs Time Increment = .0500 hrs INFLOW/OUTFLOW HYDROGRAPH SUMMARY Peak Inflow = 843.86 cfs at 12.6000 hrs Peak Outflow = 220.21 cfs at 13.8000 hrs Peak Elevation — 16.61 fit Peak Storage = 83.656 ac-ft MASS BALANCE (ac-ft) -------------------------- + Initial Vol = .000 + HYG Vol IN = 168.333 Infiltration = .000 HYG Vol OUT = 167.332 Retained Vol = .989 Unrouted Vol = -.012 ac-ft (.007% of Inflow Volume) WARNING: Outflow hydrograph truncated on right side. S/N: C21705506A87 Talbert & Bright PondPack Ver: 7.0 (325) Compute Time: 14:47:22 Date: 08-20-2004 Type.... Pond Routing Summary Page 7.18 Name.... P 20 OUT Tag: 2yr Event: 2 yr File.... J:\3301 (WILMINGTON)\0305 MASTER DRAINAGE PLAN\AUGUST 2 SOLUTION SOUTH.PPW Storm... TypeIII 24hr Tag: 2yr LEVEL POOL ROUTING SUMMARY HYG Dir = J:\3301 (WILMINGTON)\0305 MASTER DRAINAGE PLAN\ Inflow HYG file = NONE STORED - P 20 IN 2yr Outflow HYG file = NONE STORED - P 20 OUT 2yr Pond Node Data = P 20 Pond Volume Data = P 20 Pond Outlet Data = PR 20 No Infiltration INITIAL CONDITIONS Starting WS Elev = 7.00 ft Starting Volume = .000 ac-ft Starting Outflow = .00 cfs Starting Infiltr. _ .00 cfs Starting Total Qout= .00 cfs Time Increment = OSOO hrs INFLOW/OUTFLOW HYDROGRAPH SUMMARY Peak Inflow = 401.21 cfs at 12.6000 hrs Peak Outflow = 46.11 cfs at 16.3000 hrs Peak Elevation = 14.33 ft Peak Storage = 48.121 ac-ft MASS BALANCE (ac-ft) + Initial Vol = .000 + HYG Vol IN = 77.640 - Infiltration = .000 - HYG Vol OUT = 77.640 - Retained Vol = .000 Unrouted Vol = .000 ac-ft (.000% of Outflow Volume) S/N: C21705506A81 Talbert & Bright PondPack Ver: 7.0 (325) Compute Time: 14:47:22 Date: 08-20-2004 Appendix A A-1 Index of Starting Page Numbers for ID Names ----- A ----- AREA A... 3.01, 4.01 AREA B... 3.03, 4.02 AREA C... 3.05, 4.03 AREA D... 3.07, 4.04 AREA E... 3.09, 4.05 AREA F... 3.11, 4.06 AREA G... 3.13, 4.07 AREA H... 3.15, 4.08 AREA I... 3.17, 4.09 ----- N ----- NHC... 2.01 ----- P ----- P 10... 5.01, 7.01, 7.02, 7.03, 7.04, 7.05, 7.06 P 20... 5.02, 7.07, 7.09, 7.10, 7.15, 7.16, 7.17, 7.18, 6.01, 6.06 PR 20... 6.08, 6.14, 6.22 --- W --- Watershed 1" Eq... 1.01, 1.02, 1.03, 1.04, 1.05 S/N: C20055U6A87 Talbert & Bright PondPack Ver: 7.0 (325) Compute Time: 14:47:22 Date: 08-20-2004 .1 I . I .1 i 11 j &7ec-jbib Dll L ice / 77 oAJ 13r-S JN 1O/ , z. P/ — Z- 341 23 , / 9 27 f ,�` 2 , 5o 9�5,7-3 v, zs- '' sTd a -Al Daf4?,� ��c- Via' SeDe.4ey�lr S� A f S Ae,. Fr r % OF 1 y qo,✓®r� �' i Job File: J:\3301 (WILMINGTON)\0305 MASTER DRAINAGE PLAN\WEST SIDE 1735 PRE.PPW Rain Dir: C:\HAESTAD\PPKW\RAINFALL\ JOB TITLE ILM Stormwater Master Plan Existing Conditions North Area SlN: C21705506A87 Talbert & Bright PondPacK Ver: 7.0 (325) Compute Time: 14:00:01 Date: 08-23-2004 Table of Contents i i Table of Contents ******************** NETWORK SUMMARIES ********************* Watershed....... 100yr Executive Summary (Nodes) .......... 1.01 Watershed....... 10yr Executive Summary (Nodes) .......... 1.02 Watershed....... 25yr Executive Summary (Nodes) .......... 1.03 Watershed....... 2yr Executive Summary (Nodes) .......... 1.04 ****************** DESIGN STORMS SUMMARY ******************* NHC............. Design Storms ........ 2.01 ********************** TC CALCULATIONS ********************* SUB 27.......... Tc Calcs ........................... 3.01 SUB 29 30....... Tc Calcs ........................... 3.03 SUB 33 34....... Tc Calcs ........................... 3.05 SUB 35.......... Tc Calcs 3.07 SUB 36.......... Tc Calcs ........................... 3.09 SUB 37.......... Tc Calcs ........................... 3.11 SUB 56.......... Tc Calcs ........................... 3.13 ******************** RUNOFF HYDROGRAPHS ******************** SUB 27.......... 100yr SCS Unit Hyd. Summary .............. 4.01 SIN: C21705506A87 Talbert & Bright PondPack Ver: 7.0 (325) Compute Time: 14:00:01 Date: 08-23-2004 Table of Contents ii Table of Contents (continued) SUB 27.......... 10yr SCS Unit Hyd. Summary .......... ... 4.02 SUB 27.......... 25yr SCS Unit Hyd. Summary .............. 4.03 SUB 27.......... 2yr t SCS Unit Hyd. Summary .............. 4.04 SUB 29 30....... 100yr SCS Unit Hyd. Summary .............. 4.05 SUB 29 30....... 10yr SCS Unit Hyd. Summary .............. 4.06 SUB 29 30....... 25yr SCS Unit Hyd. Summary .............. 4.07 SUB 29 30....... 2yr SCS Unit Hyd. Summary .............. 4.08 SUB 33 34....... 100yr SCS Unit Hyd. Summary .............. 4.09 SUB 33 34....... 10yr SCS Unit Hyd. Summary .............. 4.10 SUB 33 34....... 25yr SCS Unit Hyd. Summary .............. 4.11 SUB 33 34....... 2yr SCS Unit Hyd. Summary .............. 4.12 SUB 35.......... 100yr SCS Unit Hyd. Summary .............. 4.13 SUB 35.......... 10yr SCS Unit Hyd. Summary .............. 4.14 SUB 35.......... 25yr SCS Unit Hyd. Summary .............. 4.15 SUB 35.......... 2yr SCS Unit Hyd. Summary .............. 4.16 SUB 36.......... 100yr SCS Unit Hyd. Summary .............. 4.17 SM C21705506A87 Talbert & Bright PondPack Ver: 7.0 (325) Compute Time: 14:00:01 Cate: 08-23-2004 Table of Contents i i i Table of Contents (continued) SUB 36.......... 10yr SCS Unit Hyd. Summary .............. 4.18 SUB 36.......... 25yr SCS Unit Hyd. Summary .............. 4.19 SUB 36.......... 2yr SCS Unit Hyd. Summary .............. 4.20 SUB 37.......... 100yr SCS Unit Hyd. Summary .............. 4.21 SUB 37.......... 10yr SCS Unit Hyd. Summary .............. 4.22 SUB 37.......... 25yr SCS Unit Hyd. Summary .............. 4.23 SUB 37.......... 2yr SCS Unit Hyd. Summary .............. 4.24 SUB 56.......... 100yr SCS Unit Hyd. Summary .............. 4.25 SUB 56.......... 10yr SCS Unit Hyd. Summary ..,........... 4.26 SUB 56.......... 25yr SCS Unit Hyd. Summary .............. 4.27 SUB 56.......... 2yr SCS Unit Hyd. Summary .............. 4.28 SIN: C27705506A87 Talbert & Bright PondPack Ver: 7.0 (325) Compute Time: 14:00:01 Date: 08-23-2004 Type.... Executive Summary (Nodes) Page 1.01 Name.... Watershed Event: 100 yr File.... 0 \3301 (WILMINGTON)\0305 MASTER DRAINAGE PLAN\WEST SIDE 1735 PRE.PPW Storm... TypeIII 24hr Tag: 100yr NETWORK SUMMARY -- NODES (Trun.= HYG Truncation: Blank=None; L=Left; R=Rt; LR=Left & Rt) DEFAULT Design Storm File,ID = NHC.RNQ NHC Storm Tag Name = 100yr Description: New Hanover -------------------------------------------------------------------- County Rainfall Curve Data Data Type, File, ID = Synthetic Storm SCSTYPES.RNF TypeIII 24hr Storm Frequency = 100 yr Total Rainfall Depth= 10.0000 in Duration Multiplier = 1 Resulting Duration = 24.0000 hrs Resulting Start Time= .0000 hrs Step= .1000 hrs End= 24.0000 hrs HYG Vol Qpeak Qpeak Max W5EL Node ID ----------------- Type ---- ac-ft Trun. hrs cfs ft J 10 ---------- JCT -- 57.728 --------- 12.6000 ----------------- 315.38 Outfall OUT 10 JCT 69.492 12.6000 389.03 SUB 27 AREA 3.413 12.8000 17.44 SUB 29 30 AREA 2.024 12.7000 11.17 SUB 33 34 AREA 4.216 12.7000 22.80 SUB 35 AREA 12.253 12.7500 64.45 SUB 36 AREA 8.480 12.6500 48.83 SUB 37 AREA 27.343 12.5500 157.39 SUB 56 AREA 11.764 12.5000 74.76 S/N: C21705506A87 Talbert & Bright PondPack Ver: 7.0 (325) Compute Time: 14:00:01 Date: 08-23-2004 Type.... Executive Summary (Nodes) Page 1.02 Name.... Watershed Event: 10 yr File.... J:\3301 (WILMINGTON)\0305 MASTER DRAINAGE PLAN\WEST SIDE 1735 PRE.PPW Storm... TypeIII 24hr Tag: 10yr NETWORK SUMMARY -- NODES (Trun.= HYG Truncation: Blank=None; L=Left; R=Rt; LR=Left & Rt) DEFAULT Design Storm File,ID = NHC.RNQ NHC Storm Tag Name = 10yr Description: New Hanover County Rainfall Curve Data -------------------------------------------------------------------- Data Type, File, ID = Synthetic Storm SCSTYPES.RNF TypeIII 24hr Storm Frequency — 10 yr Total Rainfall Depth= 7.0000 in Duration Multiplier = 1 Resulting Duration = 24.0000 hrs Resulting Start Time= .0000 hrs Step= .1000 hrs End= 24.0000 hrs HYG Vol Qpeak Node ID Type ac-ft Trun. hrs J 10 JCT 34.183 12.6000 Outfall OUT 10 JCT 41.021 12.6000 SUB 27 AREA 1.886 12.8000 SUB 29 30 AREA .934 12.7000 SUB 33 34 AREA 2.118 12.8000 SUB 35 AREA 6.707 12.7500 SUB 36 AREA 4.507 12.6500 SUB 37 AREA 18.031 12.5500 SUB 56 AREA 6.838 12.5500 S1N: C21705506A87 Talbert & Bright PondPack Ver: 7.0 (325) Compute Time: 14:00:01 Qpeak Max WSEL cfs ft 185.56 228.61 9.48 4.62 10.80 34.54 25.16 106.00 43.27 Date: 08-23-2004 Type.... Executive Summary (Nodes) Page 1.03 Name.... Watershed Event: 25 yr File.... J:\3301 (WILMINGTON)\0305 MASTER DRAINAGE PLAN\WEST SIDE 1735 PRE.PPW Storm... TypeIII 24hr Tag: 25yr NETWORK SUMMARY -- NODES (Trun.= HYG Truncation: Blank=None; L=Left; R=Rt; LR=Left & Rt) i DEFAULT Design Storm File,ID = NHC.RNQ NHC Storm Tag Name = 25yr Description: New Hanover County Rainfall Curve Data -------------------------------------------------------------------- Data Type, File, ID = Synthetic Storm SCSTYPES.RNF TypeIII 24hr Storm Frequency = 25 yr Total Rainfall Depth= 8.0500 in Duration Multiplier = 1 Resulting Duration = 24.0000 hrs Resulting Start Time= .0000 hrs Step= .1000 hrs End= 24.0000 hrs HYG Vol Qpeak Qpeak Max WSEL Node ID Type ac-ft Trun. hrs cfs ft J 10 JCT 42.185 - 12.6000 --------- 229 89 Outfall OUT 10 JCT 50.703 12.6000 283.49 SUB 27 AREA 2.401 12.8000 12.18 SUB 29 30 AREA 1.287 12.7000 6.75 SUB 33 34 AREA 2.810 12.7000 14.76 SUB 35 AREA 8.574 12.7500 44.68 SUB 36 AREA 5.836 12.6500 33.13 SUB 37 AREA 21.278 12.5500 124.06 SUB 56 AREA 8.518 12.5000 54.10 S/N: C21705506A87 Talbert & Bright PondPack Ver: 7.0 (325) Compute Time: 14:00:01 Date: 08-23-2004 Type.... Executive Summary (Nodes) Page 1.04 Name.... Watershed Event: 2 yr File.... J:\3301 (WILMINGTON)\0305 MASTER DRAINAGE PLAN\WEST SIDE 1735 PRE.PPW Storm... TypeIII 24hr Tag: 2yr NETWORK SUMMARY -- NODES (Trun.= HYG Truncation: Blank=None; L=Left; R=Rt; LR=Left & Rt) DEFAULT Design Storm File,ID = NHC.RNQ NHC Storm Tag Name = 2yr Description: New Hanover County Rainfall Curve Data -------------------------------------------------------------------- Data Type, File, ID = Synthetic Storm SCSTYPES.RNF TypeIII 24hr Storm Frequency = 2 yr Total Rainfall Depth= 4.5000 in Duration Multiplier = 1 Resulting Duration = 24.0000 hrs Resulting Start Time= .0000 hrs Step= .1000 hrs End= 24.0000 hrs HYG Vol Qpeak Qpeak Max WSEL Node ID Type ac-ft Trun. hrs cfs ft J 10 JCT 16.759 12.6000 ------ ---------- 88.59 Outfall OUT 10 JCT 19.922 12.6000 108.05 SUB 27 AREA .795 12.8000 3.67 SUB 29 30 AREA .270 12.8500 .88 SUB 33 34 AREA .740 12.8000 3.06 SUB 35 AREA 2.780 12.8500 13.04 SUB 36 AREA 1.765 12.7500 8.77 SUB 37 AREA 10.409 12.5500 62.65 SUB 56 AREA 3.163 12.6000 19.46 S/N: C21705506A87 Talbert & Bright PondPack Ver: 7.0 (325) Compute Time: 14:00:01 Date: 08-23-2004 Type.... Design Storms Page 2.01 Name.... NHC File.... C:\HAESTAD\PPKW\RAINFALL\NHC.RNQ Title... ILM Stormwater Master Plan Existing Conditions North Area DESIGN STORMS SUMMARY Design Storm File,ID = NHC.RNQ NHC Storm Tag Name = 100yr Description: New Hanover County Rainfall Curve Data ---------------------------------------------------------------------- Data Type, File, ID = Synthetic Storm SCSTYPES.RNF TypeIII 24hr Storm Frequency = 100 yr Total Rainfall Depth= 10.0000 in Duration Multiplier = 1 Resulting Duration = 24.0000 hrs Resulting Start Time= .0000 hrs Step= .1000 hrs End= 24.0000 hrs Storm Tag Name -----= 25yr Description: New Hanover County Rainfall Curve Data ----------------------------------------------------------------- Data Type, File, ID = Synthetic Storm SCSTYPES.RNF TypeIII 24hr Storm Frequency = 25 yr Total Rainfall Depth= 8.0500 in Duration Multiplier = 1 Resulting Duration = 24.0000 hrs Resulting Start Time= .0000 hrs Step= .1000 hrs End= 24.0000 hrs Storm Tag Name = 10yr Description: New Hanover County Rainfall Curve Data ------------------------------------------- - ---------- -- ----------- Data Type, File, ID = Synthetic Storm SCSTYPES.RNF TypeIII 24hr Storm Frequency = 10 yr Total Rainfall Depth= 7.0000 in Duration Multiplier = 1 Resulting Duration = 24.0000 hrs Resulting Start Time= .0000 hrs Step= .1000 hrs End= 24.0000 hrs Storm Tag Name = 2yr Description: New Hanover County Rainfall Curve Data ---------------------------------------------------------------------- Data Type, File, ID = Synthetic Storm SCSTYPES.RNF TypeIII 24hr Storm Frequency = 2 yr Total Rainfall Depth= 4.5000 in Duration Multiplier = 1 Resulting Duration = 24.0000 hrs Resulting Start Time= .0000 hrs Step= .1000 hrs End= 24.0000 hrs S/N: C21705506A87 Talbert & Bright PondPack leer: 7.0 (325) Compute Time: 14:00:01 Date: 08-23-2004 Type.... Tc Calcs Name.... SUB 27 Page 3.01 File.... J:\3301 (WILMINGTON)\0305 MASTER DRAINAGE PLAN\WEST SIDE 1735 PRE.PPW TIME OF CONCENTRATION CALCULATOR Segment #1: Tc: Length & Vet. Hydraulic Length 1700.00 ft Avg.Velocity 1.00 ft/sec Segment #1 Time: .4722 hrs ------------------------------------------------------------------------ Segment #2: Tc: TR-55 Shallow Hydraulic Length 2-0O-.,60 ft Slope .005000 ft/ft Unpaved Avg.Velocity 1.14 ft/sec Segment #2 Time: .0487 hrs ------------------------------------------------------------------------ Segment #3: Tc: TR-55 Sheet Mannings n Hydraulic Length 2yr, 24hr P Slope Avg.Velocity .2400 200.00 ft 4.5000 in .005000 ft/ft 09 ft/sec Segment #3 Time: .6080 hrs ------------------------------------------------------------------------- Total Tc: 1.1289 hrs S/N: C2170550GA87 Talbert & Bright PondPack Ver: 7.0 (325) Compute Time: 14:00:01 Date: 08-23-2004 Type.... Tc Calcs Name.... SUB 27 Page 3.02 File.... J:\3301 (WILMINGTON)\0305 MASTER DRAINAGE PLAN\WEST SIDE 1735 PRE.PPW ------ -------------------------------- Tc Equations used... ------------------------------------------------------------------------ ==== SCS TR-55 Sheet Flow Tc = (.007 * ((n * Lf)**0.8)) / ((P**.5) * (Sf**.4)) Where: Tc = Time of concentration, hrs n = Mannings n Lf = Flow length, ft P = 2yr, 24hr Rain depth, inches Sf = Slope, ft/ft ==== SCS TR-55 Shallow Concentrated Flow Unpaved surface: ---- - V = 16.1345 * (Sf**O.5) Paved surface: V = 20.3282 * (Sf**0.5) Tc = (Lf / V) / (3600sec/hr) Where: V = Velocity, ft/sec Sf = Slope, ft/ft Tc = Time of concentration, hrs Lf = Flow length, ft ==== User Defined Length & Velocity Tc = = (Lf / V) / (3600sec/hr) Where: Tc = Time of concentration, hrs Lf = Flow length, ft V = Velocity, ft/sec S!N: C21705506A87 Talbert & Bright PondPack Ver: 7.0 (325) Compute Time: 14:00:01 Date: 08-23-2004 Type.... Tc Calcs Name.... SUB 29 30 Page 3.03 File.... J:\3301 (WILMINGTON)\0305 MASTER DRAINAGE PLAN\WEST SIDE 1735 PRE.PPW TIME OF CONCENTRATION CALCULATOR Segment #1: Tc: Length & Vet. Hydraulic Length 900.00 ft Avg.Velocity 1.00 ft/sec Segment #1 Time: .2500 hrs ------------------------------------------------------------------------ Segment #2: Tc: TR-55 Shallow Hydraulic Length 200.00 ft--- Slope .005000 ft/ft Unpaved Avg.Velocity 1.14 ft/sec Segment #2 Time: .0487 hrs ------------------------------------------------------------------------ Segment #3: Tc: TR-55 Sheet Mannings n Hydraulic Length 2yr, 24hr P Slope Avg.Velocity .2400 200.00 ft 4.5000 in 005000 ft/ft .09 ft/sec Segment #3 Time: .6080 hrs ------------------------------------------------------------------------ Total Tc: .9067 hrs S/N: r21705506A87 Talbert & Bright PondPack Ver: 7.0 (325) Compute Time: 14:00:01 Date: 08-23-2004 Type.... Tc Calcs Name.... SUB 29 30 Page 3.04 File.... J:\3301 (WILMINGTON)\0305 MASTER DRAINAGE PLAN\WEST SIDE 1735 PRE.PPW ---------------------------- Tc Equations used... ------------------------------------------------------------------------ ==== SCS TR-55 Sheet Flow Tc = (.007 * ((n * Lf)**0.8)) / ((P**.5) * (Sf**.4)) t Where: Tc = Time of concentration, hrs n = Mannings n Lf = Flow length, ft P = 2yr, 24hr Rain depth, inches Sf = Slope, ft/ft ==== SCS TR-55 Shallow Concentrated Flow = ------------------------------ Unpaved surface: V = 16.1345 * (5f**0.5) Paved surface: V = 20.3282 * (Sf**0.5) Tc = (Lf / V) / (3600sec/hr) Where: V = Velocity, ft/sec Sf = Slope, ft/ft Tc = Time of concentration, hrs Lf = Flow length, ft ==== User Defined Length & Velocity Tc = (Lf / V) / (3600sec/hr) Where: Tc = 'Time of concentration, hrs Lf = Flow length, ft V = Velocity, ft/sec 5/N: C21705506A87 Talbert & Bright PondPack Ver: 7.0 (325) Compute Time: 14:00:01 Date: 08-23-2004 Type.... Tc Calcs Page 3.05 Name.... SUB 33 34 File.... J:\3301 (WILMINGTON)\0305 MASTER DRAINAGE PLAN\WEST SIDE 1735 PRE.PPW TIME OF CONCENTRATION CALCULATOR Segment #1: Tc: Length & Vet. Hydraulic Length 1200.00 ft Avg.Velocity 1.00 ft/sec Segment #1 Time: .3333 hrs ------------------------------------------------------------------------ Segment #2: Tc: TR-55 Shallow Hydraulic Length 200.00 ft Slope .005000 ft/ft Unpaved Avg.Velocity 1.14 ft/sec Segment #2 Time: .0487 hrs ------------------------------------------------------------------------ Segment #3: Tc: TR-55 Sheet Mannings n Hydraulic Length 2yr, 24hr P Slope Avg.Velocity .2400 200.00 ft 4.5000 in .005000 'ft/ft .09 ft/sec Segment #3 Time: .6080 hrs ------------------------------------------------------------------------- Total Tc: .9900 hrs 5/N: C21705506A.87 Talbert & Bright PondPack Ver: 7.0 (325) Compute Time: 14:00:01 Date: 08-23-2004 Type.... Tc Calcs Page 3.06 Name.... SUB 33 34 File.... J:\3301 (WILMINGTON)\0305 MASTER DRAINAGE PLAN\WEST SIDE 1735 PRE.PPW -------------------------------- Tc Equations used... ------------------------------------------------------------------------ ==== SCS TR-55 Sheet Flow Tc = (.007 * ((n * Lf)**0.8)) / ((P**.5) * (Sf**.4)) Where: Tc = Time of concentration, hrs n = Mannings n Lf = Flow length, ft P = 2yr, 24hr Rain depth, inches Sf = Slope, ft/ft ==== SCS TR-55 Shallow Concentrated Flow Unpaved surface: surface: V = 16.1345 * (Sf**0.5) Paved surface: V = 20.3282 * (Sf**0.5) Tc = (Lf / V) / (3600sec/hr) Where: V = Velocity, ft/sec Sf = Slope, ft/ft Tc = Time of concentration, hrs Lf = Flow length, ft User Defined Length & Velocity Tc = (Lf / V) / (3600sec/hr) Where: Tc = Time of concentration, hrs Lf = Flow length, ft V = Velocity, ft/sec S/N: C2170550GA87 Talbert & Bright PondPack Ver: 7.0 (325) Compute Time: 14:00:01 Date: 08-23-2004 Type.... Tc Calcs Page 3.07 Name.... SUB 35 File.... J:\3301 (WILMINGTON)\0305 MASTER DRAINAGE PLAN\WEST SIDE 1735 PRE.PPW TIME OF CONCENTRATION CALCULATOR Segment #1: Tc: Length & Vet. Hydraulic Length 1500.00 ft Avg.Velocity 1.00 ft/sec Segment #1 Time: .4167 hrs ------------------------------------------------------------------------ Segment #2: Tc: TR-55 Shallow Hydraulic Length 200.00 ft Slope .005000 ft/ft l Unpaved Avg.Velocity 1.14 ft/sec Segment #2 Time: .0487 hrs ------------------------------------------------------------------------ Segment #3: Tc: TR-55 Sheet Mannings n .2400 Hydraulic Length 200.00 ft 2yr, 24hr P 4.5000 in Slope .005000 ft/ft Avg.Velocity .09 ft/sec Segment #3 Time: .6080 hrs ------------------------------------------------------------------------ Total Tc: 1.0734 hrs S/N: C2170550GA87 Talbert & Bright PondPack Ver: 7.0 (325) Compute Time: 14:00:01 Date: 08-23-2004 Type.... Tc Calcs Name.... SUB 35 Page 3.08 File.... J:\3301 (WILMINGTON)\0305 MASTER DRAINAGE PLAN\WEST SIDE 1735 PRE.PPW -- --------------------------- Tc Equations used... ------------------------------------------------------------------------ ___= SCS TR-55 Sheet Flow ------- ------------------ - ---------------------------------------------- Tc = (.007 * ((n * Lf)**0.8)) / ((P**.5) * (Sf**.4)) Where: Tc = Time of concentration, hrs n = Mannings n Lf = Flow length, ft P = 2yr, 24hr Rain depth, inches Sf = Slope, ft/ft i ==== SCS TR-55 Shallow Concentrated Flow Unpaved surface: V = 16.1345 * (Sf**0.5) r Paved surface: V 20.3282 * (Sf**0.5) Tc (Lf / V) / (3600sec/hr) Where: V = Velocity, ft/sec Sf = Slope, ft/ft Tc = Time of concentration, hrs ' Lf = Flow length, ft User Defined Length & Velocity =----------------------------------- ------ -------------------------- Tc = (Lf / V) / (3600sec/hr) Where: Tc = Time of concentration, hrs Lf = Flow length, ft V = Velocity, ft/sec S/N: C21705506A87 Talbert & Bright PondPack Ver: 7.0 (325) Compute Time: 14:00:01 Date: 08-23-2004 Type.... Tc Calcs Page 3.09 Name.... SUB 36 File.... J:\3301 (WILMINGTON)\0305 MASTER DRAINAGE PLAN\WEST SIDE 1735 PRE.PPW TIME OF CONCENTRATION CALCULATOR Segment #1: Tc: Length & Vet. Hydraulic Length 1000.00 ft Avg.Velocity 1.00 ft/sec Segment #1 Time: .2778 hrs ------------------------------------------------------------------------ Segment #2: Tc: TR-55 Shallow Hydraulic Length 100.00 ft Slope .005000 ft/ft Unpaved Avg.Velocity 1.14 ft/sec Segment #2 Time: .0243 hrs ------------------------------------------------------------------------ Segment #3: Tc: TR-55 Sheet Mannings n .2400 Hydraulic Length 200.00 ft 2yr, 24hr P 4.5000 in Slope .005000 ft/ft Avg.Velocity .09 ft/sec I Segment #3 Time: .6080 hrs Total Tc: .9101 hrs S/N: C21705506A87 Talbert & Bright PondPack Ver: 7.0 (325) Compute Time: 14:00:01 Date: 08-23-2004 Type.... Tc Calcs Page 3.10 Name.... SUB 36 File.... J:\3301 (WILMINGTON)\0305 MASTER DRAINAGE PLAN\WEST SIDE 1735 PRE.PPW --- ----------------------- Tc Equations used... ------------------------------------------------------------------------ ___= SCS TR-55 Sheet Flow I Tc = (.007 * ((n * Lf)**0.8)) / ((P**.5) * (Sf**.4)) Where: Tc = Time of concentration, hrs n = Mannings n Lf = Flow length, ft P = 2yr, 24hr Rain depth, inches Sf = Slope, ft/ft SCS TR-55 Shallow Concentrated Flow Unpaved surface: V = 16.1345 * (Sf**0.5) I Paved surface: V = 20.3282 * (Sf**O.5) s Tc = (Lf / V) / (3600sec/hr) 1 Where: V = Velocity, ft/sec Sf = Slope, ft/ft Tc = Time of concentration, hrs Lf = Flow length, ft User Defined Length & Velocity Tc = (Lf / V) / (3600sec/hr) Where: Tc = Time of concentration, hrs Lf = Flow length, ft V = Velocity, ft/sec S/N: C21705506A87 Talbert & Bright PondPack Ver: 7.0 (325) Compute Time: 14:00:01 Date: 08-23-2004 Type.... Tc Calcs Name.... SUB 37 Page 3.11 File.... J:\3301 (WILMINGTON)\0305 MASTER DRAINAGE PLAN\WEST SIDE 1735 PRE.PPW TIME OF CONCENTRATION CALCULATOR Segment #1: Tc: Length & Vel. Hydraulic Length 2700.00 ft Avg.Velocity 1.00 ft/sec Segment #1 Time: .7500 hrs ------------------------------------------------------------------------ Segment #2: Tc: TR-55 Shallow Hydraulic Length 200.00 ft Slope .008000 ft/ft Paved Avg.Velocity 1.82 ft/sec Segment #2 Time: .0306 hrs ------------------------------------------------------------------------ Segment #3: Tc: TR-55 Sheet Mannings n .0110 Hydraulic Length 200.00 ft 2yr, 24hr P 4.5000 in Slope .008000 ft/ft Avg.Velocity 1.30 ft/sec I Segment #3 Time: .0428 hrs ------------------------------------------------------------------------ Total Tc: .8233 hrs SIN: C2170550GA87 Talbert & Bright PondPack Ver: 7.0 (325) Compute Time: 14:00:01 Date: 08-23-2004 ! Type.... Tc Calcs Page 3.12 Name.... SUB 37 File.... J:\3301 (WILMINGTON)\0305 MASTER DRAINAGE PLAN\WEST SIDE 1735 PRE.PPW -------------- Tc Equations used... ------------------------------------------------------------------------ SCS TR-55 Sheet Flow Tc = (.007 * ((n * Lf)**0.8)) / ((P**.5) * (Sf**.4)) Where: Tc = Time of concentration, hrs n = Mannings n Lf = Flow length, ft P = 2yr, 24hr Rain depth, inches Sf = Slope, ft/ft SCS TR-55 Shallow Concentrated Flow Unpaved surface: V = 16.1345 * (Sf**O.5) Paved surface: V = 20.3282 * (Sf**0.5) Tc = (Lf / V) / (3600sec/hr) Where: V = Velocity, ft/sec Sf = Slope, ft/ft Tc = Time of concentration, hrs Lf = Flow length, ft User Defined Length & Velocity ------------- Tc = (Lf / V) / (3600sec/hr) Where: Tc = Time of concentration, hrs Lf = Flow length, ft V = Velocity, ft/sec S/N: C21705506A87 Talbert & Bright PondPack Ver: 7.0 (325) Compute Time: 14:00:01 Date: 08-23-2004 Type.... Tc Calcs Page 3.13 Name.... SUB 56 File.... J:\3301 (WILMINGTON)\0305 MASTER DRAINAGE PLAN\WEST SIDE 1735 PRE.PPW 1 TIME OF CONCENTRATION CALCULATOR' Segment #1: Tc: Length & Vel. Hydraulic Length 400.00 ft Avg.Velocity 1.00 ft/sec Segment #1 Time: .1111 hrs ------------------------------------------------------------------------ Segment #2: Tc: TR-55 Shallow Hydraulic Length 200.00 ft Slope .005000 ft/ft Unpaved Avg.Velocity 1.14 ft/sec Segment #2 Time: .0487 hrs ------------------------------------------------------------------------ Segment #3: Tc: TR-55 Sheet Mannings n .2400 Hydraulic Length 200.00 ft 2yr, 24hr P- 4.5000 in Slope .005000 ft/ft Avg.Velocity .09 ft/sec Segment #3 Time: .6080 hrs ------------------------------------------------------------------------ Total Tc: .7678 hrs S/N: C21705506A87 Talbert & Bright PondPack Ver: 7.0 (325) Compute Time: 14:00:01 Date: 08-23-2004 Type.... Tc Calcs Page 3.14 Name.... SUB 56 File.... J:\3301 (WILMINGTON)\0305 MASTER DRAINAGE PLAN\WEST SIDE 1735 PRE.PPW I ---- ------------------------- Tc Equations used... ------------------------------------------------------------------------ I=__= SCS TR-55 Sheet Flow Tc = (.007 * ((n * Lf)**0.8)) / ((P**.5) * (Sf**.4)) Where: Tc = Time of concentration, hrs n = Mannings n Lf = Flow length, ft f P = 2yr, 24hr Rain depth, inches f Sf = Slope, ft/ft r SCS TR-55 Shallow Concentrated Flow Unpaved surface: V = 16.1345 * (Sf**0.5) Paved surface: V = 20.3282 * (Sf**0.5) Tc = (Lf / V) / (3600sec/hr) Where: V = Velocity, ft/sec Sf = Slope, ft/ft Tc = Time of concentration, hrs Lf = Flow length, ft User Defined Length & Velocity 4 Tc = (Lf / V) / (3600sec/hr) Where: Tc = Time of concentration, hrs Lf = Flow length, ft V = Velocity, ft/sec S/N: C21705506A87 Talbert & Bright PondPack Ver: 7.0 (325) Compute Time: 14:00:01 Date: 08-23-2004 Type.... SCS Unit Hyd. Summary Page 4.01 Name.... SUB 27 Tag: 100yr Event: 100 yr File.... J:\3301 (WILMINGTON)\0305 MASTER DRAINAGE PLAN\WEST SIDE 1735 PRE.PPW Storm... TypeIII 24hr Tag: 100yr SCS UNIT HYDROGRAPH METHOD STORM EVENT: 100 year storm Duration = 24.0000 hrs Rain Depth = 10.0000 in Rain Dir = C:\HAESTAD\PPKW\RAINFALL\ Rain File -ID = SCSTYPES.RNF - TypeIII 24hr Unit Hyd Type = Default Curvilinear HYG Dir = J:\3301 (WILMINGTON)\0305 MASTER DRAINAGE PLAN\ HYG File - ID = - SUB 27 100yr Tc = 1.1289 hrs Drainage Area = 7.539 acres Runoff CN= 64 Computational Time Increment = .15052 hrs Computed Peak Time = 12.7943 hrs Computed Peak Flow = 17.47 cfs Time Increment for HYG File = .0500 hrs Peak Time, Interpolated Output = 12.8000 hrs Peak Flow, Interpolated Output = 17.44 cfs DRAINAGE AREA ------------------- 1D:None Selected CN - 64 Area = 7.539 acres S =-5.6250 in 0.25 = 1.1250 in Cumulative Runoff ------------------- 5.4321 in 3.413 ac-ft HYG Volume... 3.413 ac-ft (area under HYG curve) ***** UNIT HYDROGRAPH PARAMETERS ***** Time Concentration, Tc = 1.12891 hrs (ID: SUB 27) Computational Incr, Tm = .15052 hrs = 0.20000 Tp Unit Hyd. Shape Factor = 483.432 (37.46% under rising limb) K = 483.43/645.333, K = .7491 (also, K = 2/(1+(Tr/Tp)) Receding/Rising, Tr/Tp = 1.6698 (solved from K = .7491) Unit peak, qp = 7.57 cfs Unit peak time Tp = .75261 hrs Unit receding limb, Tr = 3.01042 hrs Total unit time, Tb = 3.76303 hrs S/N: C21705506A87 Talbert & Bright PondPack Ver: 7.0 (325) rompute Time: 1,:00:01 Date: 08-23-2004 Type.... SCS Unit Hyd. Summary Page 4.02 Name.... SUB 27 Tag: 10yr Event: 10 yr File.... J:\3301 (WILMINGTON)\0305 MASTER DRAINAGE PLAN\WEST SIDE 1735 PRE.PPW Storm... TypeIII 24hr Tag: 10yr SCS UNIT HYDROGRAPH METHOD STORM EVENT: 10 year storm Duration = 24.0000 hrs Rain Depth = 7.0000 in Rain Dir = C:\HAESTAD\PPKW\RAINFALL\ Rain File -ID = SCSTYPES.RNF - TypeIII 24hr Unit Hyd Type = Default Curvilinear HYG Dir = J:\3301 (WILMINGTON)\0305 MASTER DRAINAGE PLAN\ HYG File - ID = - SUB 27 10yr Tc = 1.1289 hrs Drainage Area = 7.539 acres Runoff CN= 64 i Computational Time Increment = .15052 hrs Computed Peak Time = 12.7943 hrs Computed Peak Flow = 9.49 cfs Time Increment for HYG File = .0500 hrs Peak Time, Interpolated Output = 12.8000 hrs Peak Flow, Interpolated Output = 9.48 cfs DRAINAGE AREA ID:None Selected CN = 64 Area = 7.539 acres S = 5.6250 in 0.2S = 1.1250 in Cumulative Runoff ------------------- j 3.0014 in 1.886 ac-ft HYG Volume... 1.886 ac-ft (area under HYG curve) ***** UNIT HYDROGRAPH PARAMETERS ***** Time Concentration, Tc = 1.12891 hrs (ID: SUB 27) Computational Incr, Tm = .15052 hrs = 0.20000 Tp Unit Hyd. Shape Factor = 483.432 (37.46% under rising limb) K = .483.43/645.333, K = .7491 (also, K = 2/(1+(Tr/Tp)) Receding/Rising, Tr/Tp = 1.6698 (solved from K = .7491) Unit peak, qp = 7.57 cfs Unit peak time Tp = .75261 hrs Unit receding limb, Tr = 3.01042 hrs Total unit time, Tb = 3.76303 hrs S/N: C21705506A87 Talbert & Bright PondPack Ver: 7.0 (325) Compute Time: 14:00:01 Date. 08-23-L004 n U Type.... SCS Unit Hyd. Summary Page 4.03 Name.... SUB 27 Tag: 25yr Event: 25 yr File.... J:\3301 (WILMINGTON)\0305 MASTER DRAINAGE PLAN\WEST SIDE 1735 PRE.PPW Storm... TypeIII 24hr Tag: 25yr i SCS UNIT HYDROGRAPH METHOD STORM EVENT: 25 year storm Duration = 24.0000 hrs Rain Depth = 8.0500 in Rain Dir = C:\HAESTAD\PPKW\RAINFALL\ Rain File -ID = SCSTYPES.RNF - TypeIII 24hr Unit Hyd Type = Default Curvilinear HYG Dir = J:\3301 (WILMINGTON)\0305 MASTER DRAINAGE PLAN\ HYG File - ID = - SUB 27 25yr Tc = 1.1289 hrs Drainage Area = 7.539 acres Runoff CN= 64 Computational Time Increment = 15052 hrs Computed Peak Time = 12.7943 hrs Computed Peak Flow = 12.20 cfs Time Increment for HYG File = .0500 hrs Peak Time, Interpolated Output = 12.8000 hrs Peak Flow, Interpolated Output = 12.18 cfs DRAINAGE AREA ID:None Selected CN = 64 Area = 7.539 acres S = .5.6250 in 0.2S = 1.1250 in Cumulative Runoff ------------------- 3.8212 in 2.401 ac-ft HYG Volume... 2.401 ac-ft (area under HYG curve) ***** UNIT HYDROGRAPH PARAMETERS ***** Time Concentration, Tc = 1.12891 hrs (ID: SUB 27) Computational Incr, Tm = .15052 hrs = 0.20000 Tp Unit Hyd. Shape Factor = 483.432 (37.46% under rising limb) K = 483.43/645.333, K = .7491 (also, K = 2/(1+(Tr/Tp)) Receding/Rising, Tr/Tp = 1.6698 (solved from K = .7491) Unit peak, qp = 7.57 cfs Unit peak time Tp = .75261 hrs Unit receding limb, Tr = 3.01042 hrs Total unit time, Tb = 3.76303 hrs S/N: C21705506A87 Talbert & Bright PondPack Ver. 7.0 (325) Compute Time: 14:00:01 Oate: 08-23-2004 Type.... SCS Unit Hyd. Summary Page 4.04 Name.... SUB 27 Tag: 2yr Event: 2 yr File.... J:\3301 (WILMINGTON)\0305 MASTER DRAINAGE PLAN\WEST SIDE 1735 PRE.PPW Storm... TypeIII 24hr Tag: 2yr SCS UNIT HYDROGRAPH METHOD STORM EVENT: 2 year storm Duration = 24.0000 hrs Rain Depth = 4.5000 in Rain Dir = C:\HAESTAD\PPKW\RAINFALL\ Rain File -ID = SCSTYPES.RNF - TypeIII 24hr Unit Hyd Type = Default Curvilinear HYG Dir = J:\3301 (WILMINGTON)\0305 MASTER DRAINAGE PLAN\ HYG File - ID = - SUB 27 2yr Tc = 1.1289 hrs Drainage Area = 7.539 acres Runoff CN= 64 Computational Time Increment = 15052 hrs Computed Peak Time = 12.7943 hrs Computed Peak Flow = 3.67 cfs Time Increment for HYG File = OSOO hrs Peak Time, Interpolated Output = 12.8000 hrs Peak Flow, Interpolated Output = 3.67 cfs DRAINAGE AREA ID:None Selected CN = 64 Area = 7.539 acres S = 5.6250 in 0.2S = 1.1250 in Cumulative Runoff 1.2656 in 795 ac ft HYG Volume... .795 ac-ft (area under HYG curve) ***** UNIT HYDROGRAPH PARAMETERS ***** Time Concentration, Tc = 1.12891 hrs (ID: SUB 27) Computational Incr, Tm = .15052 hrs = 0.20000 Tp Unit Hyd. Shape Factor = 483.432 (37.46% under rising limb) K = 483.43/645.333, K = .7491 (also, K = 2/(1+(Tr/Tp)) Receding/Rising, Tr/Tp = 1.6698 (solved from K = .7491) Unit peak, qp = 7.57 cfs Unit peak time Tp = .75261 hrs Unit receding limb, Tr = 3.01042 hrs Total unit time, Tb = 3.76303 hrs S/N: C21705506A87 Talbert & Bright PondPack Ver: 7.0 (325) Compute Time: 14:00:01 Date: 08-23-2004 Type.... SCS Unit Hyd. Summary Page 4.05 Name.... SUB 29 30 Tag: 100yr Event: 100 yr File.... J:\3301 (WILMINGTON)\0305 MASTER DRAINAGE PLAN\WEST SIDE 1735 PRE.PPW Storm... TypeIII 24hr Tag: 100yr SCS UNIT HYDROGRAPH METHOD i STORM EVENT: 100 year storm Duration = 24.0000 hrs Rain Depth = 10.0000 in Rain Dir = C: ;HAESTAD\PPK'W\RAINFALL\ f Rain File -ID = SCSTYPES.RNF - TypeIII 24hr I Unit Hyd Type = Default Curvilinear HYG Dir = J:\3301 (WILMINGTON)\0305 MASTER DRAINAGE PLAN\ HYG File - ID = - SUB 29 30 100yr Tc = .9067 hrs Drainage Area = 7.098 acres Runoff CN= 49 Computational Time Increment _ 12089 hrs Computed Peak Time 12.6936 hrs Computed Peak Flow = 11.20 cfs Time Increment for HYG File = .0500 hrs Peak Time, Interpolated Output = 12.7000 hrs Peak Flow, Interpolated Output = 11.17 cfs DRAINAGE AREA ID:None Selected CN = 49 Area = 7.098 acres 5 = 10.4082 in 0.2S = 2.081G in Cumulative Runoff ------------------- 3.4213 in 2.024 ac-ft HYG Volume... 2.024 ac-ft (area under HYG curve) ***** UNIT HYDROGRAPH PARAMETERS ***** Time Concentration, Tc = .90669 hrs (ID: SUB 29 30) Computational Incr, Tm = .12089 hrs = 0.20000 Tp Unit Hyd. Shape Factor = 483.432 (37.46% under rising limb) K = 483.43/645.333, K = .7.491 (also, K = 2/(1+(Tr/Tp)) Receding/Rising, Tr/Tp = 1.6698 (solved from K = .7491) Unit peak, qp = 8.87 cfs Unit peak time Tp = .60446 hrs Unit receding limb, Tr = 2.41783 hrs Total unit time, Tb = 3.02229 hrs S/N: C21705506A87 Talbert & Bright PondPack Ver: 7.0 (325) Compute Time: 14:00:01 Date: 08-23-2004 Type.... SCS Unit Hyd. Summary Page 4.06 Name.... SUB 29 30 Tag: 10yr Event: 10 yr File.... J:\3301 (WILMINGTON)\0305 MASTER DRAINAGE PLAN\WEST SIDE 173S PRE.PPW j Storm... TypeIII 24hr Tag: 10yr SCS UNIT HYDROGRAPH METHOD STORM EVENT: 10 year storm Duration = 24.0000 hrs Rain Depth = 7.0000 in Rain Dir = C:\HAESTAD\PPKW\RAINFALL\ Rain File -ID = SCSTYPES.RNF - TypeIII 24hr Unit Hyd Type = Default Curvilinear HYG Dir = J:\3301 (WILMINGTON)\0305 MASTER DRAINAGE PLAN\ HYG File - ID = - SUB 29 30 10yr Tc = .9067 hrs Drainage Area = 7.098 acres Runoff CN= 49 Computational Time Increment = 12089 hrs Computed Peak Time = 12.6936 hrs Computed Peak Flow = 4.62 cfs Time Increment for HYG File = .0500 hrs Peak Time, Interpolated Output = 12.7000 hrs Peak Flow, Interpolated Output = 4.62 cfs i DRAINAGE AREA ------------------- ID:None Selected E CN = 49 Area = 7.098 acres S = 10.4082 in 0.2S = 2.0816 in Cumulative Runoff ------------------- 1.5783 in 934 ac-ft HYG Volume... .934 ac-ft (area under HYG curve) ***** UNIT HYDROGRAPH PARAMETERS ***** Time Concentration, Tc = .90669 hrs (ID: SUB 29 30) Computational Incr, Tm = .12089 hrs = 0.20000 Tp Unit Hyd. Shape Factor = 483.432 (37.46% under rising limb) ( K = 483.43/645.333, K = .7491 (also, K = 2/(1+(Tr/Tp)) Receding/Rising, Tr/Tp = 1.6698 (solved from K = .7491) Unit peak, qp = 8.87 cfs l l Unit peak time Tp = .60446 hrs Unit receding limb, Tr = 2.41783 hrs Total unit time, Tb = 3.02229 hrs �- S/N: C21705506A87 Talbert & Bright PondPack Ver: 7.0 (325) Compute f Time: 14:00:01 Date: 08-23-2004 Type.... SCS Unit Hyd. Summary Page 4.07 Name.... SUB 29 30 Tag: 25yr Event: 25 yr File.... J:\3301 (WILMINGTON)\0305 MASTER DRAINAGE PLAN\WEST SIDE 1735 PRE.PPW Storm... TypeIII 24hr Tag: 25yr SCS UNIT HYDROGRAPH METHOD STORM EVENT: 25 year storm Duration = 24.0000 hrs Rain Depth = 8.0500 in Rain Dir = C:\HAESTAD\PPKW\RAINFALL\ Rain File -ID = SCSTYPES.RNF - TypeIII 24hr Unit Hyd Type = Default Curvilinear HYG Dir = J:\3301 (WILMINGTON)\0305 MASTER DRAINAGE PLAN\ HYG File - ID = - SUB 29 30 25yr Tc = .9067 hrs Drainage Area = 7.098 acres Runoff CN= 49 Computational Time Increment = .12089 hrs Computed Peak Time = 12.6936 hrs Computed Peak Flow = 6.76 cfs Time Increment for HYG File = .0500 hrs Peak Time, -Interpolated Output = 12.7000 hrs Peak Flow, Interpolated Output = 6.75 cfs DRAINAGE AREA ID:None Selected CN = 49 Area 7.098 acres S 10.4082 in 0.2S 2.0816 in Cumulative Runoff 2.1752 in 1.287 ac-ft HYG Volume... 1.287 ac-ft (area under HYG curve) ***** UNIT HYDROGRAPH PARAMETERS ***** Time Concentration, Tc = .90669 hrs (ID: SUB 29 30) Computational incr, Tm = .12089 hrs = 0.20000 Tp Unit Hyd. Shape Factor = 483.432 (37.46% under rising limb) K = 483.43/645.333, K = .7491 (also, K = 2/(1+(Tr/Tp)) Receding/Rising, Tr/Tp = 1.6698 (solved from K = .7491) Unit peak, qp = 8.87 cfs Unit peak time Tp = .60446 hrs Unit receding limb, Tr = 2.41783 hrs Total unit time, Tb = 3.02229 hrs S/N: C21705506A87 Talbert & Bright PondPack Ver: 7.0 (325) Compute Time: 14:00:01 Date: 08-23-2004 Type.... SCS Unit Hyd. Summary Page 4.08 Name.... SUB 29 30 Tag: 2yr Event: 2 yr File.... J:\3301 (WILMINGTON)\0305 MASTER DRAINAGE PLAN\WEST SIDE 1735 PRE.PPW Storm... TypeIII 24hr Tag: 2yr SCS UNIT HYDROGRAPH METHOD STORM EVENT: 2 year storm Duration = 24.0000 hrs Rain Depth = 4.5000 in Rain Dir = C:\HAESTAD\PPKW\RAINFALL\ Rain File -ID = SCSTYPES.RNF - TypeIII 24hr Unit Hyd Type = Default Curvilinear HYG Dir = J:\3301 (WILMINGTON)\0305 MASTER DRAINAGE PLAN\ HYG File - ID = - SUB 29 30 2yr Tc = .9067 hrs Drainage Area = 7.098 acres Runoff CN= 49 I Computational Time Increment = 12089 hrs I Computed Peak Time 12.9354 hrs Computed Peak Flow = .89 cfs I i Time Increment for HYG File = 0500 hrs Peak Time, Interpolated Output = 12.9000 hrs Peak Flow, Interpolated Output = .89 cfs a DRAINAGE AREA ID:None Selected CN — 49 Area = 7.098 acres S = 10.4082 in 0.2S = 2.0816 in Cumulative Runoff ------------------- .4560 in .270 ac-ft HYG Volume... .270 ac-ft (area under HYG curve) ***** UNIT HYDROGRAPH PARAMETERS ***** Time Concentration, Tc = .90669 hrs (ID: SUB 29 30) Computational Incr, Tm = .12089 hrs = 0.20000 Tp Unit Hyd. Shape Factor = 483.432 (37.46% under rising limb) K = 483.43/645.333, K = .7491 (also, K = 2/(1+(Tr/Tp)) Receding/Rising, Tr/Tp = 1.6698 (solved from K = .7491) Unit peak, qp = 8.87 cfs Unit peak time Tp = .60446 hrs Unit receding limb, Tr = 2.41783 hrs Total unit time, Tb = 3.02229 hrs S/N: C21705506A87 Talbert & Bright PondPack Ver: 7.0 (325) Compute Time: 14:00:01 Date: 08-23-2004 Type.... SCS Unit Hyd. Summary Page 4.09 Name.... SUB 33 34 Tag: 100yr Event: 100 yr File.... J:\3301 (WILMINGTON)\0305 MASTER DRAINAGE PLAN\WEST SIDE 1735 PRE.PPW Storm... TypeIII 24hr Tag: 100yr SCS UNIT HYDROGRAPH METHOD STORM EVENT: 100 year storm Duration = 24.0000 hrs Rain Depth = 10.0000 in Rain Dir = C:\HAESTAD\PPKW\RAINFALL\ Rain File -ID = SCSTYPES.RNF - TypeIII 24hr Unit Hyd Type = Default Curvilinear HYG Dir = J:\3301 (WILMINGTON)\0305 MASTER DRAINAGE PLAN\ HYG File - ID = - SUB 33 34 100yr Tc = .9900 hrs Drainage Area = 11.966 acres Runoff CN= 55 Computational Time Increment = 13200 hrs Computed Peak Time = 12.6722 hrs Computed Peak Flow = 22.90 cfs Time Increment for HYG File = .0500 hrs Peak Time, Interpolated Output = 12.7000 hrs Peak Flow, Interpolated Output = 22.80 cfs DRAINAGE AREA ID:None Selected CN = 55 Area = 11.966 acres S = 8.1818 in 0.25 = 1.6364 in Cumulative Runoff ------------------- 4.2278 in 4.216 ac-ft HYG Volume... 4.216 ac-ft (area under HYG curve) ***** UNIT HYDROGRAPH PARAMETERS ***** Time Concentration, Tc = .99002 hrs (ID: SUB 33 34) Computational Incr, Tm = .13200 hrs = 0.20000 Tp Unit Hyd. Shape Factor = 483.432 (37.46% under rising limb) K = 483.43/645.333, K = .7491 (also, K = 2/(1+(Tr/Tp)) Receding/Rising, Tr/Tp = 1.6698 (solved from K = .7491) Unit peak, qp = 13.69 cfs Unit peak time Tp = .66001 hrs Unit receding limb, Tr = 2.64005 hrs Total unit time, Tb = 3.30006 hrs S/N: C21705506A87 Talbert & Bright PondPack Ver: 7.0 (325) Compute Time: 14:00:01 Date: 08-23-2004 Type.... SCS Unit Hyd. Summary Page 4.10 Name.... SUB 33 34 Tag: 10yr Event: 10 yr File.... J:\3301 (WILMINGTON)\0305 MASTER DRAINAGE PLAN\WEST SIDE 1735 PRE.PPW Storm... TypeIII 24hr Tag: 10yr SCS UNIT HYDROGRAPH METHOD STORM EVENT: 10 year storm Duration = 24.0000 hrs Rain Depth = 7.0000 in Rain Dir = C:\HAESTAD\PPKW\RAINFALL\ Rain File -ID = SCSTYPES.RNF - TypeIII 24hr Unit Hyd Type = Default Curvilinear HYG Dir = J:\3301 (WILMINGTON)\0305 MASTER DRAINAGE PLAN\ HYG File - ID = - SUB 33 34 10yr Tc = .9900 hrs Drainage Area = 11.966 acres Runoff CN= 55 Computational Time Increment = 13200 hrs Computed Peak Time = 12.8043 hrs Computed Peak Flow = 10.80 cfs Time Increment for HYG file = .0500 hrs Peak Time, Interpolated Output = 12.8000 hrs Peak Flow, Interpolated Output = 10.80 cfs DRAINAGE AREA ID:None Selected CN 55 Area 11.966 acres S 8.1818 in 0.'25 1.6364 in Cumulative Runoff --------------- 2.1239 in 2.118 ac-ft HYG Volume... 2.118 ac-ft (area under HYG curve) ***** UNIT HYDROGRAPH PARAMETERS ***** Time Concentration, Tc = .99002 hrs (ID: SUB 33 34) Computational Incr, Tm = .13200 hrs = 0.20000 Tp Unit Hyd. Shape Factor = 483.432 (37.46% under rising limb) K = 483.43/645.333, K = .7491 (also, K = 2/(1+(Tr/Tp)) Receding/Rising, Tr/Tp = 1.6698 (solved from K = .7491) Unit peak, qp = 13.69 cf.s Unit peak time Tp = .66001 hrs Unit receding limb, Tr = 2.64005 hrs Total unit time, Tb = 3.30006 hrs 5/N: C21705506A87 Talbert & Bright PondPack Ver: 7.0 (325) Compute Time: 14:00:01 Date: 08-23-2004 Type.... SCS Unit Hyd. Summary Page 4.11 Name.... SUB 33 34 Tag: 25yr Event: 25 yr File.... J:\3301 (WILMINGTON)\0305 MASTER DRAINAGE PLAN\WEST SIDE 1735 PRE.PPW Storm... TypeIII 24hr Tag: 25yr SCS UNIT HYDROGRAPH METHOD STORM EVENT: 25 year storm Duration = 24.0000 hrs Rain Depth = 8.0500 in Rain Dir = C:\IiAESiAD\PPKW\RAINFALL\ Rain File -ID = SCSTYPES.RNF - TypeIII 24hr Unit Hyd Type = Default Curvilinear HYG Dir = J:\3301 (WILMINGTON)\0305 MASTER DRAINAGE PLAN\ HYG File - ID = - SUB 33 34 25yr Tc = .9900 hrs Drainage Area = 11.966 acres Runoff CN= 55 -------------------- Computational Time Increment = .13200 hrs Computed Peak Time = 12.6722 hrs Computed Peak Flow = 14.78 cfs Time Increment for HYG File = .0500 hrs Peak Tithe, Tnterpolated-Output = 12.7000 hrs Peak Flow, Interpolated Output = 14.76 cfs DRAINAGE AREA ID:None Selected CN — 55 Area = 11.966 acres S = 8.1818 in 0.2S = 1.6364 in Cumulative Runoff ------------------- 2.8183 in 2.810 ac-ft HYG Volume... 2.810 ac-ft (area under HYG curve) ***** UNIT HYDROGRAPH PARAMETERS ***** Time Concentration, Tc = .99002 hrs (ID: SUB 33 34) Computational Incr, Tm = .13200 hrs = 0.20000 Tp Unit Hyd. Shape Factor = 483.432 (37.46% under rising limb) K = 483.43/645.333, K = .7491 (also, K = 2/(1+(Tr/Tp)) Receding/Rising, Tr/Tp = 1.6698 (solved from K = .7491) . Unit peak, qp = 13.69 cfs Unit peak time Tp = .66001 hrs Unit receding limb, Tr = 2.64005 hrs Total unit time, Tb = 3.30006 hrs S/N: C21705506A87 Talbert & Bright PondPack Ver: 7.0 (325) Compute Time: 14:00:01 Date: 08-23-2004 Type.... SCS Unit Hyd. Summary Page 4.12 Name.... SUB 33 34 Tag: 2yr Event: 2 yr File.... J:\3301 (WILMINGTON)\0305 MASTER DRAINAGE PLAN\WEST SIDE 1735 PRE.PPW Storm... TypeIII 24hr Tag: 2yr SCS UNIT HYDROGRAPH METHOD STORM EVENT: 2 year storm Duration = 24.0000 hrs Rain Depth = 4.5000 in Rain Dir = C:\HAESTAD\PPKW\RAINFALL\ Rain File -ID = SCSTYPES.RNF - TypeIII 24hr Unit Hyd Type = Default Curvilinear HYG Dir = J:\3301 (WILMINGTON)\0305 MASTER DRAINAGE PLAN\ HYG File - ID = - SUB 33 34 2yr Tc = .9900 hrs Drainage Area = 11.966 acres Runoff CN= 55 ------------------ Computational Time Increment = .13200 hrs Computed Peak Time = 12.8043 hrs Computed Peak Flow = 3.07 cfs Time Increment for HYG File = .0500 hrs Peak Time,---1-n-terpolated Output = 12.8000 hrs Peak Flow, Interpolated Output = 3.06 cfs DRAINAGE AREA ------------------- ID:None Selected CN = 55 Area = 11.966 acres S = 8.1818 in 0.2S = 1.6364 in Cumulative Runoff ------------------- .7424 in .740 ac-ft HYG Volume... .740 ac-ft (area under HYG curve) ***** UNIT HYDROGRAPH PARAMETERS ***** Time Concentration, Tc = .99002 hrs (ID: SUB 33 34) Computational Incr, Tm = .13200 hrs = 0.20000 Tp Unit Hyd. Shape Factor = 483.432 (37.46% under rising limb) K = 483.43/645.333, K = .7491 (also, K = 2/(1+(Tr/Tp)) Receding/Rising, Tr/Tp = 1.6698 (solved from K = .7491) Unit peak, qp = 13.69 cfs Unit peak time Tp = .66001 hrs Unit receding limb, Tr = 2.64005 hrs Total unit time, Tb = 3.30006 hrs S/N: C21705506A87 Talbert & Bright PondPack Ver: 7.0 (325) Compute Time: 14:00:01 Date: 08-23•-2004 Type.... SCS Unit Hyd. Summary Page 4.13 Name.... SUB 35 Tag: 100yr Event: 100 yr File.... J:\3301 (WILMINGTON)\0305 MASTER DRAINAGE PLAN\WEST SIDE 1735 PRE.PPW Storm... TypeIII 24hr Tag: 100yr SCS UNIT HYDROGRAPH METHOD STORM EVENT: 100 year storm Duration = 24.0000 hrs Rain Depth = 10.0000 in Rain Dir = C:\HAESTAD\PPKW\RAINFALL\ Rain File -ID = SCSTYPES.RNF - TypeIII 24hr Unit Hyd Type = Default Curvilinear HYG Dir = J:\3301 (WILMINGTON)\0305 MASTER DRAINAGE PLAN\ HYG File - ID = - SUB 35 100yr Tc = 1.0734 hrs Drainage Area = 27.745 acres Runoff CN= 63 Computational Time Increment = 14311 hrs Computed Peak Time = 12.7371 hrs Computed Peak Flow = 64.68 cfs Time Increment for HYG File = .0500 hrs Peak Time, Inter-Wated Output = 12.7500 hrs Peak Flow, Interpolated Output = 64.45 cfs DRAINAGE AREA ------------------- ID:None Selected CN — 63 Area = 27.745 acres S = 5.8730 in 0.25 = 1.1746 in Cumulative Runoff ------------------- 5.2991 in 12.252 ac-ft HYG Volume... 12.253 ac-ft (area under HYG curve) ***** UNIT HYDROGRAPH PARAMETERS ***** Time Concentration, Tc = 1.07335 hrs (ID: SUB 35) Computational Incr, Tm = .14311 hrs = 0.20000 Tp Unit Hyd. Shape Factor = 483.432 (37.46% under rising limb) K = 483.43/645.333, K = .7491 (also, K = 2/(1+(Tr/Tp)) Receding/Rising, Tr/Tp = 1.6698 (solved from K = .7491) Unit peak, qp = 29.29 cfs Unit peak time Tp = .71557 hrs Unit receding limb, Tr = 2.86227 hrs Total unit time, Tb = 3.57784 hrs S/N: C21705506A87 Talbert & Bright PondPack Ver: 7.0 (325) Compute Time: 14:00:01 Date: 08-23-200+ Type.... SCS Unit Hyd. Summary Page 4.14 Name.... SUB 35 Tag: 10yr Event: 10 yr File.... J:\3301 (WILMINGTON)\0305 MASTER DRAINAGE PLAN\WEST SIDE 1735 PRE.PPW Storm... TypeIII 24hr Tag: 10yr SCS UNIT HYDROGRAPH METHOD STORM EVENT: 10 year storm Duration = 24.0000 hrs Rain Depth = 7.0000 in Rain Dir = C:\HAESTAD\PPKW\,RAINFALL\ Rain File -ID = SCSTYPES.RNF - TypeIII 24hr Unit Hyd Type = Default Curvilinear HYG Dir = J:\3301 (WILMINGTON)\0305 MASTER DRAINAGE PLAN\ HYG File - ID = - SUB 35 10yr Tc = 1.0734 hrs Drainage Area = 27.745 acres Runoff CN= 63 Computational Time Increment = 14311 hrs Computed Peak Time = 12.7371 hrs Computed Peak Flow = 34.62 cfs Time Increment for HYG File = .0500 hrs Peak Time, Interpoed Output = -12.7500 hrs Peak Flow, Interpolated Output = 34.54 cfs DRAINAGE AREA ID:None Selected CN = 63 Area = 27.745 acres 5 = 5.8730 in 0.2S = 1.1746 in Cumulative Runoff ------------------- 2.9008 in 6.707 ac-ft HYG Volume... 6.707 ac-ft (area under HYG curve) ***** UNIT HYDROGRAPH PARAMETERS ***** Time Concentration, Tc = 1.07335 hrs (ID: SUB 35) Computational Incr, Tm = .14311 hrs = 0.20000 Tp Unit Hyd. Shape Factor = 483.432 (37.46% under rising limb) K = 483.43/645.333, K = .7491 (also, K = 2/(1+(Tr/Tp)) Receding/Rising, Tr/Tp = 1.6698 (solved from K = .7491) Unit peak, qp = 29.29 cfs Unit peak time Tp = .71557 hrs Unit receding limb, Tr = 2.86227 hrs Total unit time, Tb = 3.57784 hrs S/N: C21705506A87 Talbert & Bright PondPack Ver: 7.0 (325) Compute Time: 14-00:01 Date: 08-73-2004 Type.... SCS Unit Hyd. Summary Page 4.15 Name.... SUB 35 Tag: 25yr Event: 25 yr File.... J:\3301 (WILMINGTON)\0305 MASTER DRAINAGE PLAN\WEST SIDE 1735 PRE.PPW Storm... TypeIII 24hr Tag: 25yr 5CS UNIT HYDROGRAPH METHOD STORM EVENT: 25 year storm Duration = 24.0000 hrs Rain Depth = 8.0500 in Rain Dir = C:\HrESTAD\PPKW\RAINFALL\ Rain File -ID = SCSTYPES.RNF - TypeIII 24hr Unit Hyd Type = Default Curvilinear HYG Dir = J:\3301 (WILMINGTON)\0305 MASTER DRAINAGE PLAN\ HYG File - ID = - SUB 35 25yr Tc = 1.0734 hrs Drainage Area = 27.745 acres Runoff CN= 63 --------------- Computational Time Increment = .14311 hrs Computed Peak Time = 12.7371 hrs Computed Peak Flow = 44.81 cfs Time Increment for HYG File = .0500 hrs Peak Time, Interpolates-6utput = 12-3500 hrs Peak Flow, Interpolated Output = 44.68 cfs DRAINAGE AREA ------------------- ID:None Selected CN = 63 Area = 27.745 acres S = 5.8730 in 0.2S = 1.174G in Cumulative Runoff ------------------- 3.7080 in 8.573 ac-ft HYG Volume... 8.574 ac-ft (area under HYG curve) ***** UNIT HYDROGRAPH PARAMETERS ***** Time Concentration, Tc = 1.07335 hrs (ID: SUB 35) Computational Incr, Tm = .14311 hrs = 0.20000 Tp Unit Hyd. Shape Factor = 483.432 (37.46% under rising limb) K = 483.43/645.333, K = .7491 (also, K = 2/(1+(Tr/Tp)) Receding/Rising, Tr/Tp = 1.6698 (solved from K = .7491) Unit peak, qp = 29.29 cfs Unit peak time Tp = .71557 hrs Unit receding limb, Tr = 2.86227 hrs Total unit time, Tb = 3.57784 hrs S/N: C21705506A87 Talbert & Bright PondPack Ver: 7.0 (325) Compute Time: 14:00:01 Date: 08-23-2004 Type.... SC5 Unit Hyd. Summary Page 4.16 Name.... SUB 35 Tag: 2yr Event: 2 yr File.... J:\3301 (WILMINGTON)\0305 MASTER DRAINAGE PLAN\WEST SIDE 1735 PRE.PPW Storm... TypeIII 24hr Tag: 2yr SCS UNIT HYDROGRAPH METHOD STORM EVENT: 2 year storm Duration = 24.0000 hrs Rain Depth = 4.5000 in Rain Di,- = C:\HAE5TAD\PPKW\RAINFALL\ Rain File -ID = SCSTYPE5.RNF - TypeIII 24hr Unit Hyd Type = Default Curvilinear HYG Dir = J:\3301 (WILMINGTON)\0305 MASTER DRAINAGE PLAN\ HYG File - ID = - SUB 35 2yr Tc = 1.0734 hrs Drainage Area = 27.745 acres Runoff CN= 63 Computational Time Increment = 14311 hrs Computed Peak Time = 12.8802 hrs Computed Peak Flow = 13.06 cfs Time Increment for HYG File = .0500 hrs Peak Time,-Interpolated� i�,ut = 12.85,00 hrs Peak Flow, Interpolated Output = 13.04 cfs DRAINAGE AREA ------------------- ID:None Selected CN = 63 Area = 27.745 acres S 5.8730 in 0.2S 1.1746 in Cumulative Runoff ------------------- 1.2022 in 2.780 ac-ft HYG Volume... 2.780 ac-ft (area under HYG curve) ***** UNIT HYDROGRAPH PARAMETERS ***** Time Concentration, Tc = 1.07335 hrs (ID: SUB 35) Computational Incr, Tm = .14311 hrs = 0.20000 Tp Unit Hyd. Shape Factor = 483.432 (37.46% under rising limb) K = 483.43/645.333, K = .7491 (also, K = 2/(1+(Tr/Tp)) Receding/Rising, Tr/Tp = 1.6698 (solved from K = .7491) Unit peak, qp = 29.29 cfs Unit peak time Tp = .71SS7 hrs Unit receding limb, Tr = 2.86227 hrs Total unit time, Tb = 3.57784 hrs S/N: C21705506A87 Talbert & Bright PondPack Ver: 7.0 (325) Compute Time: 14:00:01 Dare: 08-23-2004 Type.... SCS Unit Hyd. Summary Page 4.17 Name.... SUB 36 Tag: 100yr Event: 100 yr File..... J:\3301 (WILMINGTON)\0305 MASTER DRAINAGE PLAN\WEST SIDE 1735 PRE.PPW Storm... TypeIII 24hr Tag: 100yr SCS UNIT HYDROGRAPH METHOD STORM EVENT: 100 year storm Duration = 24.0000 hrs Rain Depth = 10.0000 in Rain Dir = C:\HAESTAD\PPKW\RAINFALL\ Rain File -ID = SCSTYPES.RNF - TypeIII 24hr Unit Hyd Type = Default Curvilinear HYG Dir = J:\3301 (WILMINGTON)\0305 MASTER DRAINAGE PLAN\ HYG File - ID = - SUB 36 100yr Tc = .9101 hrs Drainage Area = 20.774 acres Runoff CN= 60 Computational Time Increment = 12135 hrs Computed Peak Time = 12.6203 hrs Computed Peak Flow = 49.15 cfs Time Incr-emen°t for HYG Films--= .0500 hrs Peak Time, Interpolated Output = 12.6500 hrs Peak Flow, Interpolated Output = 48.83 cfs DRAINAGE AREA ID:None Selected CN = 60 Area = 20.774 acres S = 6.6667 in 0.2S = 1.3333 in Cumulative Runoff ------------------- 4.8986 in 8.480 ac-ft HYG Volume... 8.480 ac-ft (area under HYG curve) ***** UNIT HYDROGRAPH PARAMETERS ***** Time Concentration, Tc = .91012 hrs (ID: SUB 36) Computational Incr, Tm = .12135 hrs = 0.20000 Tp Unit Hyd. Shape Factor = 483.432 (37.46% under rising limb) K = 483.43/645.333, K = .7491 (also, K = 2/(1+(Tr/Tp)) Receding/Rising, Tr/Tp = 1.6698 (solved from K = .7491) Unit peak, qp = 25.86 cfs Unit peak time Tp = .60674 hrs Unit receding limb, Tr = 2.42698 hrs Total unit time, Tb = 3.03372 hrs S/N: C21705506A87 Talbert & Bright PondPack Ver: 7.0 (325) Compute Time: 14:00:01 Date: 08-23-2004 Type.... SCS Unit Hyd. Summary Page 4.18 Name.... SUB 36 Tag: 10yr Event: 10 yr File.... J:\3301 (WILMINGTON)\0305 MASTER DRAINAGE PLAN\WEST SIDE 1735 PRE.PPW Storm... TypeIII 24hr Tag: 10yr SCS UNIT HYDROGRAPH METHOD STORM FVFNT- 10 year storm Duration = 24.0000 hrs Rain Depth = 7.0000 in Rain Dir = C:\HAESTAD\PPKW\RAINFALL\ Rain File -ID = SCSTYPES.RNF - TypeIII 24hr Unit Hyd Type = Default Curvilinear HYG Dir = J:\3301 (WILMINGTON)\0305 MASTER DRAINAGE PLAN\ HYG File - ID = - SUB 36 10yr Tc = .9101 hrs Drainage Area = 20.774 acres Runoff CN= 60 ---------------- Comoutational Time Increment = .12135 hrs Computed Peak Time = 12.6203 hrs Computed Peak Flow = 25.22 cfs Time Increment for HYG File = .0500 hrs Peak- Time, Irrte•rp-olated Output--- .—12.6500 -hrs-° Peak Flow, Interpolated Output = 25.16 cfs DRAINAGE AREA ID:None Selected CN = 60 Area = 20.774 acres 5 = 6.6667 in 0.2S = 1.3333 in Cumulative Runoff ------------------- 2.6036 in 4.507 ac-ft HYG Volume... 4.507 ac-ft (area under HYG curve) ***** UNIT HYDROGRAPH PARAMETERS ***** Time Concentration, Tc = .91012 hrs (ID: SUB .36) Computational Incr, Tm = .12135 hrs = 0.20000 Tp Unit Hyd. Shape Factor = 483.432 (37.46% under rising limb) K = 483.43/645.333, K = .7491 (also, K = 2/(1+(Tr/Tp)) Receding/Rising, Tr/Tp = 1.6698 (solved from K = .7491) Unit peak, qp = 25.86 cfs Unit peak time Tp = .60674 hrs Unit receding limb, Tr = 2.42698 hrs Total unit time, Tb = 3.03372 hrs S/N: C21705506A87 Talbert & Bright PondPack Ver: 7.0 (325) Compute Time: 14:00:01 Date: 08-23-2004 Type.... SCS Unit Hyd. Summary Page 4.19 Name.... SUB 36 Tag: 25yr Event: 25 yr File.... J:\3301 (WILMINGTON)\0305 MASTER DRAINAGE PLAN\WEST SIDE 1735 PRE.PPW Storm... TypeIII 24hr Tag: 25yr SCS UNIT HYDROGRAPH METHOD STORM EVFNT- 75 year storm Duration = 24.0000 hrs Rain Depth = 8.0500 in Rain Dir = C:\HAESTAD\PPKW\RAINFALL\ Rain File -ID = SCSTYPES.RNF - TypeIII 24hr Unit Hyd Type = Default Curvilinear HYG Dir = J:\3301 (WILMINGTON)\0305 MASTER DRAINAGE PLAN\ HYG File - ID = - SUB 36 25yr Tc = .9101 hrs Drainage Area = 20.774 acres Runoff CN= 60 --------------- Computational Time Increment = .12135 hrs Computed Peak Time = 12.6203 hrs Computed Peak Flow = 33.27 cfs Time Increment for HYG File = .0500 hrs Peak Time, Interafied Output = —1-2:-6500 hrs Peak Flow, Interpolated Output = 33.13 cfs DRAINAGE AREA ID:None Selected CN = 60 Area = 20.774 acres S = 6.6667 in 0.2S = 1.3333 in Cumulative Runoff 3.3709 in 5.836 ac-ft HYG Volume... 5.836 ac-ft (area under HYG curve) ***** UNIT HYDROGRAPH PARAMETERS ***** Time Concentration, Tc = .91012 hrs (ID: SUB 36) Computational Incr, Tm = .12135 hrs = 0.20000 Tp Unit Hyd. Shape Factor = 483.432 (37.46% under rising limb) K = 483.43/645.333, K = .7491 (also, K = 2/(1+(Tr/Tp)) Receding/Rising, Tr/TD = 1.6698 (solved from K = .7491) Unit peak, qp = 25.86 cfs Unit peak time Tp = .60674 hrs Unit receding limb, Tr = 2.42698 hrs Total unit time, Tb = 3.03372 hrs S/N: C21705506A87 Talbert & Bright "rond'rack Ver: 7.0 (325) Compute Time: 14:00:01 Date: 08-23-2004 Type.... SCS Unit Hyd. Summary Page 4.20 Name.... SUB 36 Tag: 2yr Event: 2 yr File..'.. J:\3301 (WILMINGTON)\0305 MASTER DRAINAGE PLAN\WEST SIDE 1735 PRE.PPW Storm... TypeIII 24hr Tag: 2yr SCS UNIT HYDROGRAPH METHOD STORM EVENT: 2 vear storm Duration = 24.0000 hrs Rain Depth = 4.5000 in Rain Dir = C:\HAESTAD\PPKW\RAINFALL\ Rain File -ID = SCSTYPES.RNF - TypeIII 24hr Unit Hyd Type = Default Curvilinear HYG Dir = J:\3301 (WILMINGTON)\0305 MASTER DRAINAGE PLAN\ HYG File - ID = - SUB 36 2yr Tc = .9101 hrs Drainage Area = 20.774 acres Runoff CN= 60 Computational Time Time Increment = .12135 hrs Computed Peak Time = 12.7416 hrs Computed Peak Flow = 8.80 cfs Time Increment for HYG File = .0500 hrs Peak Time, Interpolst-,& -=Output = 123-500 hrs Peak Flow, Interpolated Output = 8.77 cfs DRAINAGE AREA ID:None Selected CN = 60 Area = 20.774 acres S = 6.6667 in 0.2S = 1.3333 in Cumulative Runoff 1.0198 in 1.765 ac-ft HYG Volume... 1.765 ac-ft (area under HYG curve) ***** UNIT HYDROGRAPH PARAMETERS ***** Time Concentration, Tc = .91012 hrs (ID: SUB 36) Computational Incr, Tm = .12135 hrs = 0.20000 Tp Unit Hyd. Shape Factor = 483.432 (37.46% under rising limb) K = 483.43/645.333, K = .7491 (also, K = 2/(1+(Tr/Tp)) Receding/Rising, Tr/Tp = 1.6698 (solved from K = .7491) Unit peak, qp = 25.86 cfs Unit peak time Tp = .60674 hrs Unit receding limb, Tr = 2.42698 hrs Total unit time, Tb = 3.03372 hrs S/N: C21705506A87 Talbert & Bright PondPack Ver: 7.0 (325) Compute Time: 14:00:01 Date: 08-23-2004 Type.... SCS Unit Hyd. Summary Page 4.21 Name.... SUB 37 Tag: 100yr Event: 100 yr File.... J:\3301 (WILMINGTON)\0305 MASTER DRAINAGE PLAN\WEST SIDE 1735 PRE.PPW Storm... TypeIII 24hr Tag: 100yr SCS UNIT HYDROGRAPH METHOD STORM EVENT: 100 year storm Duration = 24.0000 hrs Rain Depth = 10.0000 in Rain Dir = C:\HAESTAD\PPKW\RAINFALL\ Rain File -ID = SCSTYPES.RNF - TypeIII 24hr Unit Hyd Type = Default Curvilinear HYG Dir = J:\3301 (WILMINGTON)\0305 MASTER DRAINAGE PLAN\ HYG File - ID = - SUB 37 100yr Tc = .8233 hrs Drainage Area = 37.906 acres Runoff CN= 89 Computational Time Increment = _1097R hrs Computed Peak Time = 12.5146 hrs Computed Peak Flow = 158.56 cfs Time Increment for HYG File = .0500 hrs Peak Time, Interpolatedy#tput = 12. 5-M• drr=s Peak Flow, Interpolated Output = 157.39 cfs DRAINAGE AREA ID:None Selected CN = 89 Area = 37.906 acres S = 1.2360 in 0.2S = .2472 in Cumulative Runoff ------------------- 8.6559 in 27.342 ac-ft HYG Volume... 27..343 ac-ft (area under HYG curve) ***** UNIT HYDROGRAPH PARAMETERS ***** Time Concentration, Tc = .82333 hrs (ID: SUB 37) Computational Incr, Tm = .10978 hrs = 0.20000 Tp Unit Hyd. Shape Factor = 483.432 (37.46% under rising limb) K = 483.43/645.333, K = .7491 (also, K = 2/(1+(Tr/Tp)) Receding/Rising, Tr/Tp = 1.6698 (solved from K = .7491) Unit peak, qp = 52.17 cfs Unit peak time Tp = .54889 hrs Unit receding limb, Tr = 2.19555 hrs Total unit time, Tb = 2.74444 hrs S/N: C21705506A87 Talbert & Bright PondPack Ver: 7.0 (325) Compute Time: 14:00:01 Date: 08-23-2004 Type.... SCS Unit Hyd. Summary Page 4.22 Name.... SUB 37 Tag: 10yr Event: 10 yr File.... J:\3301 (WILMINGTON)\0305 MASTER DRAINAGE PLAN\WEST SIDE 1735 PRE.PPW Storm... TypeIII 24hr Tag: 10yr SCS UNIT HYDROGRAPH METHOD STORM EVENT: 10 year storm Duration = 24.0000 hrs Rain Depth = 7.0000 in Rain Dir = C:\HAESTAD\PPKW\RAINFALL\ Rain File -ID = SCSTYPES.RNF - TypeIII 24hr Unit Hyd Type = Default Curvilinear HYG Dir = J:\3301 (WILMINGTON)\0305 MASTER DRAINAGE PLAN\ HYG File - ID = - SUB 37 10yr Tc = .8233 hrs Drainage Area = 37.906 acres Runoff CN= 89 Computational Time Increment = .10978 hrs Computed Peak Time = 12.5146 hrs Computed Peak Flow = 106.69 cfs Time Increment for HYG File = .0500 hrs Peak Time, Interpolated Outer = 12.5500 .hg— Peak Flow, Interpolated Output = 106.00 cfs DRAINAGE AREA ID:None Selected CN = 89 Area = 37.906 acres 5 = 1.2360 in 0.2S = .2472 in Cumulative Runoff ------------------- 5.7081 in 18.031 ac-ft HYG Volume... 18.031 ac-ft (area under HYG curve) ***** UNIT HYDROGRAPH PARAMETERS ***** Time Concentration, Tc = .82333 hrs (ID: SUB 37) Computational Incr, Tm = .10978 hrs = 0.20000 Tp Unit Hyd. Shape Factor = 483.432 (37.46% under rising limb) K = 483.43/645.333, K = .7491 (also, K = 2/(1+(Tr/Tp)) Receding/Rising, Tr/Tp = 1.6698 (solved from K = .7491) Unit peak, qp = 52.17 cfs Unit peak time Tp = .54889 hrs Unit receding limb, Tr = 2.19555 hrs Total unit time, Tb = 2.74444 hrs S/N: C21705506A87 Talbert & Bright PondPack Ver: 7.0 (325) Compute Time: 14:00:01 Date: 08-23-2004 Type.... SCS Unit Hyd. Summary Page 4.23 Name.... SUB 37 Tag: 25yr Event: 25 yr File.... J:\3301 (WILMINGTON)\0305 MASTER DRAINAGE PLAN\WEST SIDE 1735 PRE.PPW Storm... TypeIII 24hr Tag: 25yr SCS UNIT HYDROGRAPH METHOD STORM EVENT: 25 year storm Duration = 24.0000 hrs Rain Depth = 8.0500 in Rain Dir = C:\HAESTAD\PPKW\RAINFALL\ Rain Fite -ID = SCSTYPES.RNF - TypeIII 24hr Unit Hyd Type = Default Curvilinear HYG Dir = J:\3301 (WILMINGTON)\0305 MASTER DRAINAGE PLAN\ HYG File - ID = - SUB 37 25yr Tc = .8233 hrs Drainage Area = 37.906 acres Runoff CN= 89 Computational Time Increment = .10978 hrs Computed Peak Time = 12.5146 hrs Computed Peak Flow = 124.92 cfs Time Increment for HYG File = .0500 hrs Peak Time, Interpolated Output:.'°*— 12.5500 hrs Peak Flow, Interpolated Output = 124.06 cfs DRAINAGE AREA ID:None Selected CN = 89 Area = 37.906 acres S = 1.2360 in 0.25 = .2472 in Cumulative Runoff ------------------- 6.7359 in 21.277 ac-ft HYG Volume... 21.278 ac-ft (area under HYG curve) ***** UNIT HYDROGRAPH PARAMETERS ***** Time Concentration, Tc = .82333 hrs (ID: SUB 37) Computational Incr, Tm = .10978 hrs = 0.20000 Tp Unit Hyd. Shape Factor = 483.432 (37.46% under rising limb) K = 483.43/645.333, K = .7491 (also, K = 2/(1+(Tr/Tp)) Receding/Rising, Tr/Tp = 1.6698 (solved from K = .7491) Unit peak, qp = 52.17 cfs Unit peak time Tp = .54889 hrs Unit receding limb, Tr = 2.19555 hrs Total unit time, Tb = 2.74444 hrs S/N: C21705506A87 Talbert & Bright PondPack Ver: 7.0 (325) Compute Time: 14:00:01 Date: 08-23-2004 Type.... SCS Unit Hyd. Summary Page 4.24 Name.... SUB 37 Tag: 2yr Event: 2 yr File.... J:\3301 (WILMINGTON)\0305 MASTER DRAINAGE PLAN\WEST SIDE 1735 PRE.PPW Storm... TypeIII 24hr Tag: 2yr SCS UNIT HYDROGRAPH METHOD I STORM EVENT: 2 year storm Duration = 24.0000 hrs Rain Depth = 4.5000 in Rain Dir = C:\HAESTAD\PPKW\RAINFALL\ I Rain File -ID = SCSTYPES.RNF - TypeIII 24hr Unit Hyd Type = Default Curvilinear HYG Dir = J:\3301 (WILMINGTON)\0305 MASTER DRAINAGE PLAN\ HYG File - ID = - SUB 37 2yr I Tc = .8233 hrs Drainage Area = 37.906 acres Runoff CN= 89 Computational Time Increment = 10978 hrs Computed Peak Time — 12.5146 hrs Computed Peak Flow = 62.94 cfs I = Time Increment for HYG File .0500 hrs Peak Time, Interpolated Output _ 12:5500 hrs Peak Flow, Interpolated Output — 62.65 cfs DRAINAGE AREA ----------------- - 4 ID:None Selected CN = 89 Area = 37.906 acres S = 1.2360 in 0.2S = .2472 in Cumulative Runoff ---------------- 3.2952 in 10.409 ac-ft HYG Volume... 10.409 ac-ft (area under HYG curve) ***** UNIT HYDROGRAPH PARAMETERS ***** Time Concentration, Tc = .82333 hrs (ID: SUB 37) Computational Incr, Tm = .10978 hrs = 0.20000 Tp i Unit Hyd. Shape Factor = 483.432 (37.46% under rising limb) i K= 483.43/645.333, K= .7491 (also, K= 2/(1+(Tr/Tp)) Receding/Rising, Tr/Tp = 1.6698 (solved from K = .7491) Unit peak, qp = 52.17 cfs Unit peak time Tp = .54889 hrs Unit receding limb, Tr = 2.19555 hrs Total unit time, Tb = 2.74444 hrs S/N: C21705506A87 Talbert & Bright PondPack Ver: 7.0 (325) Compute rime: 14:00:01 Date: 08-23-2004 I n Type.... SCS Unit Hyd. Summary Page 4.25 Name.... SUB 56 Tag: 100yr Event: 100 yr File.... J:\3301 (WILMINGTON)\0305 MASTER DRAINAGE PLAN\WEST SIDE 1735 PRE.PPW Storm... TypeIII 24hr Tag: 100yr SCS UNIT HYDROGRAPH METHOD STORM EVENT: 100 year storm Duration = 24.0000 hrs Rain Deoth = 10.0000 in Rain Dir = C:\HAESTAD\PPKW\RAINFALL\ Rain File -ID = SCSTYPES.RNF - TypeIII 24hr Unit Hyd Type = Default Curvilinear HYG Dir = J:\3301 (WILMINGTON)\0305 MASTER DRAINAGE PLAN\ HYG File - ID = - SUB 56 100yr Tc = .7678 hrs Drainage Area = 22.676 acres Runoff CN= 70 Computational Time Time Increment = .10237 hrs Computed Peak Time = 12.4895 hrs Computed Peak Flow = 74.84 cfs Time Increment for HYG File = .0500 hrs Peak Time, Interpolated Output = 122 0 hrs Peak Flow, Interpolated Output = 74.76 cfs DRAINAGE AREA ID:None Selected CN = 70 Area = 22.676 acres S = 4.2857 in 0.2S = .8571 in Cumulative Runoff ------------------- 6.2249 in 11.763 ac-ft HYG Volume... 11.764 ac-ft (area under HYG curve) ***** UNIT HYDROGRAPH PARAMETERS ***** Time Concentration, Tc = .76780 hrs (ID: SUB 56) Computational Incr, Tm = .10237 hrs = 0.20000 Tp Unit Hyd. Shape Factor = 483.432 (37.46% under rising limb) K = 483.43/645.333, K = .7491 (also, K = 2/(1+(Tr/Tp)) Receding/Rising, Tr/Tp = 1.6698 (solved from K = .7491) Unit peak, qp = 33.46 cfs Unit peak time Tp = .51186 hrs Unit receding limb, Tr = 2.04746 hrs Total unit time, Tb = 2.55932 hrs S/N: C21705506A87 Talbert & Bright PondPack Ver: 7.0 (325) Compute Time: 14:00:01 Date: 08-23-2004 Type.... SCS Unit Hyd. Summary Page 4.26 Name.... SUB 56 Tag: 10yr Event: 10 yr File.... J:\3301 (WILMINGTON)\0305 MASTER DRAINAGE PLAN\WEST SIDE 1735 PRE.PPW Storm... TypeIII 24hr Tag: 10yr SCS UNIT HYDROGRAPH METHOD STORM EVENT: 10 year storm Duration = 24.0000 hrs Rain Depth = 7.0000 in Rain Dir = C:\HAESTAD\PPKW\RAINFALL\ Rain File -ID = SCSTYPES.RNF - TypeIII 24hr Unit Hyd Type = Default Curvilinear HYG Dir = J:\3301 (WILMINGTON)\0305 MASTER DRAINAGE PLAN\ HYG File - ID = - SUB 56 10yr Tc = .7678 hrs Drainage Area = 22.676 acres Runoff CN= 70 Computational Time Increment = 10237 hrs Computed Peak Time = 12.5919 hrs Computed Peak Flow = 43.29 cfs Time Increment for HYG File = .0500 hrs Peak Time, Interpolated Output = 12.55'0O-h-rs Peak Flow, Interpolated Output = 43.27 cfs DRAINAGE AREA ID:None Selected CN = 70 Area = 22.67G acres S = 4.2857 in 0.25 = .8571 in Cumulative Runoff ------------------- 3.6184 in 6.838 ac-ft HYG Volume... 6.838 ac-ft (area under HYG curve) ***** UNIT HYDROGRAPH PARAMETERS ***** Time Concentration, Tc = .76780 hrs (ID: SUB 56) Computational Incr, Tm = .10237 hrs = 0.20000 Tp Unit Hyd. Shape Factor = 483.432 (37.46% under rising limb) K = 483.43/645.333, K = .7491 (also, K = 2/(1+(Tr/Tp)) Receding/Rising, Tr/Tp = 1.6698 (solved from K = .7491) Unit peak, qp = 33.46 cfs Unit peak time Tp = .51186 hrs Unit receding limb, Tr = 2.04746 hrs Total unit time, Tb = 2.55932 hrs S/N: C21705506A87 Talbert & Bright FondPack Ver. 7.0 (325) Compute Time: 14:00:01 Date: 08-23-2004 Type.... SCS Unit Hyd. Summary Page 4.27 Name.... SUB 56 Tag: 25yr Event: 25 yr File.... J:\3301 (WILMINGTON)\0305 MASTER DRAINAGE PLAN\WEST SIDE 1735 PRE.PPW Storm... TypeIII 24hr Tag: 25yr SCS UNIT HYDROGRAPH METHOD STORM FVFNT- 75 year storm Duration = 24.0000 hrs Rain Depth = 8.0500 in Rain Dir = C:\HAESTAD\PPKW\RAINFALL\ Rain File -ID = SCSTYPES.RNF - TypeIII 24hr Unit Hyd Type = Default Curvilinear HYG Dir = J:\3301 (WILMINGTON)\0305 MASTER DRAINAGE PLAN\ HYG File - ID = - SUB 56 25yr Tc = .7678 hrs Drainage Area = 22.676 acres Runoff CN= 70 Computational Time Increment = .10237 hrs Computed Peak Time = 12.4895 hrs Computed Peak Flow = 54.12 cfs Time Increment for HYG File = .0500 hrs Peak Time, Interpolated Output = 12.5000 Kr-s Peak Flow, Interpolated Output = 54.10 cfs DRAINAGE AREA ID:None Selected CN = 70 Area = 22.676 acres S = 4.2857 in 0.2S = .8571 in Cumulative Runoff 4.5073 in 8.517 ac-ft HYG Volume... 8.518 ac-ft (area under HYG curve) ***** UNIT HYDROGRAPH PARAMETERS ***** Time Concentration, Tc = .76780 hrs (ID: SUB 56) Computational Incr, Tm = .10237 hrs = 0.20000 Tp Unit Hyd. Shape Factor = 483.432 (37.46% under rising limb) K = 483.43/645.333, K = .7491 (also, K = 2/(1+(Tr/Tp)) Receding/Rising, Tr/Tp = 1.6698 (solved from K = .7491) Unit peak, qp = 33.46 cfs Unit peak time Tp = .51186 hrs Unit receding limb, Tr = 2.04746 hrs Total unit time, Tb = 2.55932 hrs S/N: C21705506A87 Talbert & Bright PondPack Ver: 7.0 (325) Compute Time: 14:00:01 Date: 08-23-2004 Type.... SCS Unit Hyd. Summary Page 4.28 Name.... SUB 56 Tag: 2yr Event: 2 yr File.... J:\3301 (WILMINGTON)\0305 MASTER DRAINAGE PLAN\WEST SIDE 1735 PRE.PPW ` Storm... TypeIII 24hr Tag: 2yr SCS UNIT HYDROGRAPH METHOD STORM EVENT: 2 year storm Duration = 24.0000 hrs Rain Depth = 4.5000 in Rain Dir = C:\HAESTAD\PPKW\RAINFALL\ f Rain File -ID = SCSTYPES.RNF - TypeIII 24hr Unit Hyd Type = Default Curvilinear HYG Dir = J:\3301 (WILMINGTON)\0305 MASTER DRAINAGE PLAN\ HYG File - ID = - SUB 56 2yr Tc = .7678 hrs Drainage Area = 22.676 acres Runoff CN= 70 IComputational Time Increment = 10237 hrs Computed Peak Time = 12.5919 hrs Computed Peak Flow = 19.54 cfs Time Increment for HYG File .0500 hrs Peak Time, Interpolated Output = 12.6000 hrs f Peak Flow, Interpolated Output _----19_46—cfs tl DRAINAGE AREA ID:None Selected CN = 70 Area = 22.676 acres S — 4.2857 in 0.25 = .8571 in Cumulative Runoff 1.6737 in 3.163 ac-ft HYG Volume... 3.163 ac-ft (area under HYG curve) ***** UNIT HYDROGRAPH PARAMETERS ***** Time Concentration, Tc = .76780 hrs (ID: SUB 56) Computational Incr, Tm = .10237 hrs = 0.20000 Tp Unit Hyd. Shape Factor = 483.432 (37.46% under rising limb) K = 483.43/645.333, K = .7491 (also, K = 2/(1+(Tr/Tp)) Receding/Rising, Tr/Tp = 1.6698 (solved from K = .7491) Unit peak, qp = 33.46 cfs Unit peak time Tp = .51186 hrs Unit receding limb, Tr = 2.04746 hrs Total unit time, Tb = 2.55932 hrs 5/N: C21705506A87 Talbert & Bright FondPack Ver: 7.0 (325) Compute Time: 14:00:01 Date: 08-23-2004 Appendix A A-1 Index of Starting Page Numbers for ID Names ----- N ----- NHC... 2.01 SUB 27... 3.01, 4.01, 4.02, 4.03, 4.04 SUB 29 30... 3.03, 4.05, 4.06, 4.07, I 4.08 SUB 33 34... 3.05, 4.09, 4.10, 4.11, ` 4.12 I SUB 35... 3.07, 4.13, 4.14, 4.15, 4.16 SUB 36... 3.09, 4.17, 4.18, 4.19, t 4.20 SUB 37... 3.11, 4.21, 4.22, 4.23, 4.24 SUB 56... 3.13, 4.25, 4.26, 4.27, 4.28 f ----- W ----- Watershed 100yr... 1.01, 1.02, 1.03, I 1.04 S/N: C21705506A87 Talbert & Bright PondPack Ver: 7.0 (325) Compute Time: 14:00:01 Date: 08-23-2004 f4iooseD Cd ND f -r7jv,.f A&I" / e OA-S i P IV, LF1 o ct" lk 0 A 30 A w P 30 PR 30 A Out 20 r on,)rl N 0 ATX 11 J3 EXMN,b� Pal Type.... Vol: Elev-Area Name.... P 30 Page 1.01 i File.... J:\3301 (WILMINGTON)\0305 MASTER DRAINAGE PLAN\AUGUST 20 SOLUTION NORTH.PPW I Elevation Planimeter Area Al+A2+sgr(A1*A2) Volume Volume Sum (ft) ------------------------------------------------------------------------ (sq.in) (sq.ft) (sq.ft) (ac-ft) (ac-ft) 20.50 ---- 0 0 .000 .000 21.50 10000 10000 .077 .077 I I 22.00 77900 115811 .443 .520 22.20 ----- 134795 315167 .482 1.002 E 22.30 _--163242 446375 .342 1.344 22.40 191690 531827 .407 1.751 [I 22.50 ----- 220137 617249 .472 2.223 23.00 ----- 372566 879087 3.364 5.586-- 24.00 _____ 478131 1272758 9.740 15.326 25.00 501649 1469529 11.245 26.571 26.00 ----- 525371 1540393 11.788 38.359 27.00 i ----- 549292 1611861 12.334 50.693 POND VOLUME EQUATIONS * Incrementat volume computed by the Conic Method for Reservoir Volumes. Volume = (1/3) * (EL2-EL1) * (Areal + Area2 + sq.rt.(Areal*Areal)) t where: EL1, EL2 = Lower and upper elevations of the increment Areal,Area2 = Areas computed for EL1, EL2, respectively r Volume = Incremental volume between EL1 and EL2 1 S/N: C21705506A87 Talbert & Bright PondPack Ver: 7.0 (325) Compute Time: 09:54:46 Date: 08-20-2004 Type.... Vol: Elev-Area Name.... P 30 Page 1.01 File.... J:\3301 (WILMINGTON)\0305 MASTER DRAINAGE PLAN\AUGUST 20 SOLUTION NORTH.PPW Elevation Planimeter Area Al+A2+sgr(Al*A2) Volume Volume Sum (ft) ------------------------------------------------------------------------ (sq.in) (sq.ft) (sq.ft) (ac-ft) (ac-ft) 20.50 ----- 0 0 .000 .000 21.50 ----- 10000 10000 .077 .077 22.00 ----- 14000 35832 .137 .214 22.20 ----- 16000 44967 .069 .282 22.30 ----- 17000 49492 .038 .320 22.40 ----- 18000 '52493 .040 .360 '22.50 ----- 220137 301085 .230 .591 23.00 ----- 372566 879087 3.364 3.954 0'" 24.00 ----- 478131 1272758 9.740 13.694 25.00 ----- 501649 1469529 11.245 24.939 26.00 ----- 525371 1540393 11.788 36.727 27.00 ----- 549292 1611861 12.334 49.061 POND VOLUME EQUATIONS * Incremental volume computed by the Conic Method for Reservoir Volumes. Volume = (1/3) * (EL2-EL1) * (Areal + Area2 + sq.rt.(Areal*Areal)) where: IEL1, EL2 = Lowe-r and upper elevations of the increment Areal,Area2 = Areas computed for EL1, EL2, respectively Volume = Incremental volume between EL1 and EL2 C k T D k'4 pej -D6T Tl w rsl jj Na, , &^toi Patvr 04S t S, SSG 3 9S `f At, FT. 4 S1.MEq 1 . GeM.r Zi�►� P,q �00C9 (100).+ • 1b S Vol. N 2V6/0 AC �r 5/N: C21705506A87 Talbert & Bright PondPack Ver: 7.0 (325) Compute Time: 09:58:40 Date: 08-20-2004 ' Job Fite: J:\3301 (WILMINGTON)\0305 MASTER DRAINAGE PLAN\AUGUST 20 SOLUTION NORTH.PPW Rain Dir: C:\HAESTAD\PPKW\RAINFALL\ JOB TITLE i Proposed conditions - west side of airport. F S/N: C21705506A87 Talbert & Bright i PondPack Ver: 7.0 (325) Compute Time: 16:32:51 Date: 08-23-2004 i Table of Contents i Table of Contents ******************** NETWORK SUMMARIES ********************* Watershed....... 1" Eq Executive Summary (Nodes) .......... 1.01 Watershed....... 100yr Executive Summary (Nodes) .......... 1.02 Watershed....... 10yr Executive Summary (Nodes) .......... 1.03 Watershed....... 25yr Executive Summary (Nodes) .......... 1.04 Watershed....... 2yr Executive Summary (Nodes) .......... 1.05 ****************** DESIGN STORMS SUMMARY ******************* NHC............. Design Storms ...................... 2.01 ********************** TC CALCULATIONS ********************* J1.............. Tc Calcs ........................... 3.01 J2.............. Tc Calcs ........................... 3.03 J3.............. Tc Calcs ........................... 3.05 f******************** RUNOFF HYDROGRAPHS ******************** I J1.............. 1" Eq SCS Unit Hyd. Summary .............. 4.01 c S/N: C2170550GA87 Talbert & Bright PondPack Ver: 7.0 (325) Compute Time: 16:32:51 Date: 08-23-2004 Table of Contents I Table of Contents (continued) 1 J1.............. 100yr SCS Unit Hyd. Summary .............. 4.02 J1.............. 10yr i SCS Unit Hyd. Summary 4.03 J1.............. 25yr l SCS Unit Hyd. Summary .............. 4.04 J1.............. 2yr SCS Unit Hyd. Summary .............. 4.05 J2.............. 1" Eq SCS Unit Hyd. Summary .............. 4.06 J2.............. 100yr SCS Unit Hyd. Summary ............. 4.07 J2.............. 10yr SCS Unit Hyd. Summary .............. 4.08 J2.............. 25yr SCS Unit Hyd. Summary .............. 4.09 f J2.............. 2yr SCS Unit Hyd. Summary .............. 4.10 l J3.............. 1" Eq SCS Unit Hyd. Summary .............. 4.11 A .............. 100yr SCS Unit Hyd. Summary .............. 4.12 I J3.............. 10yr SCS Unit Hyd. Summary .............. 4.13 J3.............. 25yr SCS Unit Hyd. Summary .............. 4.14 J3.............. 2yr SCS Unit Hyd. Summary .............. 4.15 *********************** POND VOLUMES *********************** P 30........... Vol: Elev-Area 5.01 1 S/N: C21705506A87 Talbert & Bright PondPack Ver: 7.0 (325) Compute Time: 16:32:51 Date: 08-23-2004 Table of Contents i i i Table of Contents (continued) ******************** OUTLET STRUCTURES ********************* PR 30.......... Outlet Input Data .................. 6.01 Individual Outlet Curves ........... 6.06 Composite Rating Curve ............. 6.10 *********************** POND ROUTING *********************** P 30........... Pond E-V-Q Table ................... 7.01 P 30 OUT 1" Eq Pond Routing Summary ............... 7.02 Pond Routed HYG (total out) ........ 7.03 P 30 OUT 100yr Pond Routing Summary ............... 7.08 P 30 OUT 10yr Pond Routing Summary 7.09 P 30 OUT 25yr Pond Routing Summary 7.10 P 30 OUT 2yr Pond Routing Summary ............... 7.11 S/N: C21705506A87 Talbert & Bright PondPack Ver: 7.0 (325) Compute Time: 16:32:51 Date: 08-23-2004 Type.... Executive Summary (Nodes) Page 1.01 Name.... Watershed Storm: 1" Eq File.... J:\3301 (WILMINGTON)\0305 MASTER DRAINAGE PLAN\AUGUST 20 SOLUTION NORTH.PPW Storm... TypeIII 24hr Tag: 1" Eq NETWORK SUMMARY -- NODES (Trun.= HYG Truncation: Blank=None; L=Left; R=Rt; LR=Left & Rt) DEFAULT Design Storm File,TD = NHC.RNQ NHC Storm Tag Name = 1" Eq Data Type, File, ID = Synthetic Storm SCSTYPES.RNF TypeIII 24hr Total Rainfall Depth= 2.0200 in Duration Multiplier = 1 Resulting Duration = 24.0000 hrs Resulting Start Time= .0000 hrs Step= .1000 hrs End= 24.0000 hrs HYG Vol Qpeak Qpeak Max WSEL Node ID ----------------- Type ac-ft Trun. hrs cfs ft J1 ---- AREA ---------- 2.746 ----------- 12.7000 ----------------- 13.42 J2 AREA 4.826 12.2000 48.83 J3 AREA .510 12.3500 3.04 Outfall OUT 20 JCT 8..082 20.2500 2.28 P 30 IN POND 8.082 12.2000 54.81 P 30 OUT POND 8.082 20.2500 2.28 23.19 S/N: C21705506A87 Talbert & Bright PondPack Ver: 7.0 (325) Compute Time: 16:32:51 Date: 08-23-2004 f i Type.... Executive Summary (Nodes) Page 1.02 Name.... Watershed Event: 100 yr File.... J:\3301 (WILMINGTON)\0305 MASTER DRAINAGE PLAN\AUGUST 20 SOLUTION NORTH.PPW Storm... TypeIII 24hr Tag: 100yr NETWORK SUMMARY -- NODES (Trun.= HYG Truncation: Blank=None; L=Left; R=Rt; LR=Left & Rt) DEFAULT Design Storm File,ID = NHC.RNQ NHC Storm Tag Name = 100yr Description: New Hanover County Rainfall Curve Data -------------------------------------------------------------------- Data Type, File, ID = Synthetic Storm SCSTYPES.RNF TypeIII 24hr Storm Frequency = 100 yr Total Rainfall Depth= 10.0000 in Duration Multiplier = 1 Resulting Duration = 24.0000 hrs Resulting Start Time= .0000 hrs Step= .1000 hrs End= 24.0000 hrs HYG Vol Qpeak Qpeak Max WSEL Node ID Type ac-ft Trun. hrs cfs ft J1 AREA 48.330 12.5500 290.27 J2 AREA 39.991 12.2000 373.97 J3 AREA 12.787 12.2000 122.59 Outfall OUT 20 JCT 101.108 13.4000 158.82 P 30 IN POND 101.109 12.2000 670.06 P 30 OUT POND 101.108 13.4000 158.82 27.21 S/N: C21705506A87 Talbert & Bright PondPack Ver: 7.0 (325) Compute Time: 16:32:51 Date: 08-23-2004 IType.... Executive Summary (Nodes) Page 1.03 Name.... Watershed Event: 10 yr i File.... J:\3301 (WILMINGTON)\0305 MASTER DRAINAGE PLAN\AUGUST 20 SOLUTION NORTH.PPW Storm... TypeIII 24hr Tag: 10yr NETWORK SUMMARY -- NODES f (Trun.= HYG Truncation: Blank=None; L=Left; R=Rt; LR=Left & Rt) DEFAULT Design Storm File,ID = NHC.RNQ NHC Storm Tag Name = 10yr Description: New Hanover County Rainfall Curve Data -------------------------------------------------------------------- Data Type, File, ID = Synthetic Storm SCSTYPES.RNF TypeIII 24hr Storm Frequency = 10 yr Total Rainfall Depth= 7.0000 in Duration Multiplier = 1 Resulting Duration = 24.0000 hrs Resulting Start Time= .0000 hrs Step= .1000 hrs End= 24.0000 hrs i HYG Vol Qpeak Qpeak Max WSEL i Node ID Type ac-ft Trun. hrs cfs ft J1 AREA 29.161 12.6000 176.29 J2 AREA 26.372 12.2000 252.66 J3 AREA 7.433 12.2000 71.11 Outfall OUT 20 JCT 62.965 13.6000 82.57 P 30 IN POND 62.965 12.2000 424.67 i P 30 OUT POND 62.965 13.6000 82.57 25.73 S/N: C21705506A87 Talbert & Bright PondPack Ver: 7.0 (325) Compute Time: 16:32:51 Date: 08-23-2004 Type.... Executive Summary (Nodes) Page 1.04 Name.... Watershed Event: 25 yr File.... J:\3301 (WILMINGTON)\0305 MASTER DRAINAGE PLAN\AUGUST 20 SOLUTION NORTH.PPW Storm... TypeIII 24hr Tag: 25yr NETWORK SUMMARY -- NODES (Trun.= HYG Truncation: Blank=None; L=Left; R=Rt; LR=Left & Rt) DEFAULT Design Storm File,ID = NHC.RNQ NHC Storm Tag Name = 25yr Description: New Hanover County Rainfall Curve Data t-------------------------------------------------------------------- Data Type, File, ID = Synthetic Storm SCSTYPES.RNF TypeIII 24hr Storm Frequency = 25 yr Total Rainfall Depth= 8.0500 in Duration Multiplier = 1 Resulting Duration = 24.0000 hrs Resulting Start Time= .0000 hrs Step= .1000 hrs End= 24.0000 hrs HYG Vol Qpeak Qpeak Max WSEL Node ID Type ac-ft Trun. hrs cfs ft J1 AREA 35.748 12.5500 215.76 J2 AREA 31.121 12.2000 295.30 J3 AREA 9.259 12.2000 88.85 Outfall OUT 20 JCT 76.127 13.5000 109.70 P 30 IN POND 76.127 12.2000 510.05 P 30 OUT POND 76.127 13.5000 109.70 26.25 S/N: C21705506A87 Talbert & Bright PondPack Ver: 7.0 (325) Compute Time: 16:32:51 Date: 08-23-2004 Type.... Executive Summary (Nodes) Page 1.05 Name.... Watershed Event: 2 yr File.... J:\3301 (WILMINGTON)\0305 MASTER DRAINAGE PLAN\AUGUST 20 SOLUTION NORTH.PPW Storm... TypeIII 24hr Tag: 2yr NETWORK SUMMARY -- NODES (Trun.= HYG Truncation: Blank=None; L=Left; R=Rt; LR=Left & Rt) DEFAULT Design Storm File,ID = NHC.RNQ NHC Storm Tag Name = 2yr Description: New Hanover County Rainfall Curve Data -------------------------------------------------------------------- Data Type, File, ID = Synthetic Storm SCSTYPES.RNF TypeIII 24hr Storm Frequency = 2 yr Total Rainfall Depth= 4.5000 in Duration Multiplier = 1 Resulting Duration = 24.0000 hrs Resulting Start Time= .0000 hrs Step= .1000 hrs End= 24.0000 hrs HYG Vol Qpeak Qpeak Max WSEL Node ID Type ac-ft Trun. hrs cfs ft Ji AREA 14.409 12.6000 86.26 J2 AREA 15.224 12.2000 150.16 J3 AREA 3.438 12.2500 31.87 Outfall OUT 20 JCT 33.072 14.7000 27.00 P 30 IN POND 33.072 12.2000 226.91 P 30 OUT POND 33.072 14.7000 27.00 24.50 S/N: C21705506A87 Talbert & Bright PondPack Ver: 7.0 (325) Compute Time: 16:32:51 Date: 08-23-2004 Type.... Design Storms Name.... NHC Page 2.01 File.... C:\HAESTAD\PPKW\RAINFALL\NHC.RNQ Title... Proposed conditions - west side of airport. DESIGN STORMS SUMMARY Design Storm File,ID = NHC.RNQ NHC Storm Tag Name = 100yr Description: New Hanover County Rainfall Curve Data ---------------------------------------------------------------------- Data Type, File, ID = Synthetic Storm SCSTYPES.RNF TypeIII 24hr Storm Frequency = 100 yr Total Rainfall Depth= 10.0000 in Duration Multiplier = 1 Resulting Duration = 24.0000 hrs Resulting Start Time= .0000 hrs Step= .1000 hrs End= 24.0000 hrs f Storm Tag Name = 25yr --.-Description: New Hanover County Rainfall Curve Data ----------------------------------------------------------------------- Data Type, File, ID = Synthetic Storm SCSTYPES.RNF TypeIII 24hr Storm Frequency = 25 yr Total Rainfall Depth= 8.0500 in Duration Multiplier = 1 Resulting Duration = 24.0000 hrs Resulting Start Time= .0000 hrs Step= .1000 hrs End= 24.0000 hrs Storm Tag Name = 1" Eq ---------------------------------- --- ------------------ Data Type, File, ID = Synthetic Storm SCSTYPES.RNF TypeIII 24hr Total Rainfall Depth= 2.0200 in Duration Multiplier = 1 Resulting Duration = 24.0000 hrs Resulting Start Time= .0000 hrs Step= .1000 hrs End= 24.0000 hrs Storm Tag Name = 10yr Description: New Hanover County Rainfall Curve Data ---------------------------------------------------------------------- Data Type, File, ID = Synthetic Storm SCSTYPES.RNF TypeIII 24hr Storm Frequency = 10 yr Total Rainfall Depth= 7.0000 in Duration Multiplier = 1 Resulting Duration = 24.0000 hrs Resulting Start Time= .0000 hrs Step= .1000 hrs End= 24.0000 hrs S/N: C21705506A87 Talbert & Bright PondPack Ver: 7.0 (325) Compute Time: 16:32:51 Date: 08-23-2004 Type.... Design Storms Page 2.02 Name.... NHC File.... C:\HAESTAD\PPKW\RAINFALL\NHC.RNQ Title... Proposed conditions - west side of airport. DESIGN STORMS SUMMARY Design Storm File.ID = NHC.RNQ NHC Storm Tag Name = 2yr Description: New Hanover County Rainfall Curve Data ---------------------------------------------------------------------- Data Type, File, ID = Synthetic Storm SCSTYPES.RNF TypeIII 24hr ' Storm Frequency = 2 yr Total Rainfall Depth= 4.5000 in Duration Multiplier = 1 Resulting Duration = 24.0000 hrs Resulting Start Time= .0000 hrs Step= .1000 hrs End= 24.0000 hrs S/N: C21705506A87 Talbert & Bright PondPack Ver: 7.0 (325) Compute Time: 16:32:51 Date: 08-23-2004 Type.... Tc Calcs Page 3.01 Name.... J1 File.... J:\3301 (WILMINGTON)\0305 MASTER DRAINAGE PLAN\AUGUST 20 SOLUTION NORTH.PPW TIME OF CONCENTRATION CALCULATOR ........................................................................ ........................................................................ Segment #1: Tc: Length & Vet. Hydraulic Length 1000.00 ft Avg.Velocity 1.50 ft/sec Segment #1 Time: .1852 hrs ------------------------------------------------------------------------ Segment #2: Tc: TR-55 Shallow Hydraulic Length 200.00 ft Slope .005000 ft/ft Unpaved Avg.Velocity 1.14 ft/sec Segment #2 Time: .0487 hrs ------------------------------------------------------------------------ Segment #3: Tc: TR-55 Sheet Mannings n .2400 Hydraulic Length 200.00 ft 2yr, 24hr P 4.5000 in Slope .005000 ft/ft Avg.Velocity .09 ft/sec Segment #3 Time: .6080 hrs ------------------------------------------------------------------------ Total Tc: .8419 hrs S/N: C21705506A87 Talbert & Bright PondPack Ver: 7.0 (325) Compute Time: 16:32:51 Date: 08-23-2004 Type.... Tc Calcs Page 3.02 Name.... J1 File.... J:\3301 (WILMINGTON)\0305 MASTER DRAINAGE PLAN\AUGUST 20 SOLUTION NORTH.PPW ----- --- - Tc Equations used... ------------------------------------------------------------------------ j =__= SCS TR-55 Sheet Flow f Tc = (.007 * ((n * Lf)**0.8)) / ((P**.5) * (Sf**.4)) I Where: Tc = Time of concentration, hrs ` n = Mannings n Lf = Flow length, ft ( P = 2yr, 24hr Rain depth, inches I Sf = Slope, ft/ft SCS TR-55 Shallow Concentrated Flow Unpaved surface: V = 16.1345 * (Sf**O.5) Paved surface: V = 20.3282 * (Sf**O.5) Tc = (Lf / V) / (3600sec/hr) Where: V = Velocity, ft/sec Sf = Slope, ft/ft Tc = Time of concentration, hrs Lf = Flow length, ft ---- User Defined Length & Velocity ------------------------------------ ---- ------------------------------------ Tc = (Lf / V) / (3600sec/hr) Where: Tc = Time of concentration, hrs Lf = Flow length, ft V = Velocity, ft/sec S/N: C21705506A87 Talbert & Bright PondPack Ver: 7.0 (325) Compute Time: 16:32:51 Date: 08-23-2004 Type.... Tc Calcs Page 3.03 Name.... J2 File.... J:\3301 (WILMINGTON)\0305 MASTER DRAINAGE PLAN\AUGUST 20 SOLUTION NORTH.PPW ........................................................................ ........................................................................ TIME OF CONCENTRATION CALCULATOR ........................................................................ ........................................................................ i------------------------------------------------------------------------ { Segment #1: Tc: Length & Vel. II Hydraulic Length 1000.00 ft Avg.Velocity 1.50 ft/sec Segment #1 Time: .1852 hrs ------------------------------------------------------------------------ Segment.#2: Tc: TR-55 Shallow Hydraulic -1=ength 200:00 ft Slope .008000 ft/ft Paved t Avg.Velocity 1.82 ft/sec Segment #2 Time: .0306 hrs ------------------------------------------------------------------------ Segment #3: Tc: TR-55 Sheet Mannings n .0110 Hydraulic Length 200.00 ft 2yr, 24hr P 4.5000 in Slope .008000 ft/ft Avg.Velocity 1.30 ft/sec Segment #3 Time: .0428 hrs ------------------------------------------------------------------------ Total Tc: .2585 hrs S/N: C21705506A87 Talbert & Bright PondPack Ver: 7.0 (325) Compute Time: 16:32:51 Date: 08-23-2004 Type.... Tc Calcs Name.... J2 Page 3.04 F File.... J:\3301 (WILMINGTON)\0305 MASTER DRAINAGE PLAN\AUGUST 20 SOLUTION NORTH.PPW ------------------------------------------------------------------------ Tc Equations used... ------------------------------------------------------------------------- SCS TR-55 Sheet Flow ----------------- Tc = (.007 * ((n * Lf)**0.8)) / ((P**.5) * (Sf**.4)) Where: Tc = Time of concentration, hrs n = Mannings n Lf = Flow length, ft P = 2yr, 24hr Rain depth, inches k Sf = Slope, ft/ft ___= SCS TR-55 Shallow Concentrated Flow Unpaved- -9vr#ace : V = 16.1345 * (Sf**0.5) Paved surface: V = 20.3282 * (Sf**0.5) Tc = (Lf / V) / (3600sec/hr) Where: V = Velocity, ft/sec Sf = Slope, ft/ft Tc = Time of concentration, hrs Lf = Flow length, ft User Defined Length & Velocity Tc = (Lf / V) / (3600sec/hr) Where: Tc = Time of concentration, hrs Lf = Flow length, ft V = Velocity, ft/sec S/N: C21705506A87 Talbert & Bright PondPack Ver: 7.0 (325) Compute Time: 16:32:51 Date: 08-23-2004 i i Type.... Tc Calcs Page 3.05 Name.... J3 { File.... J:\3301 (WILMINGTON)\0305 MASTER DRAINAGE PLAN\AUGUST 20 SOLUTION NORTH.PPW f TIME OF CONCENTRATION CALCULATOR ... ....... ... ....... ..... ....... .. .... . .. .. ..... . Segment #1: Tc: TR-55 Shallow Hydraulic Length 200.00 ft Slope .010000 ft/ft Unpaved Avg.Velocity 1.61 ft/sec ! Segment #1 Time: .0344 hrs ------------------------------------------------------------------------ Segment #2: Tc: TR-55 Sheet Mannings n .2400 Hydraulic Length 100.00 ft 2yr, 24hr P 4.5000 in Slope .010000 ft/ft Avg.Velocity .10 ft/sec Segment #2 Time: .2646 hrs ---------------------------------------------------------------- ------ Total Tc: .2991 hrs S/N: C21705506A87 Talbert & Bright PondPack Ver: 7.0 (325) Compute Time: 16:32:51 Date: 08-23-2004 Type.... Tc Calcs Name.... J3 Page 3.06 File.... J:\3301 (WILMINGTON)\0305 MASTER DRAINAGE PLAN\AUGUST 20 SOLUTION NORTH.PPW ------------------------------------------------------------------------ Tc Equations used... ----------------------------------------------------------------- ___= SCS TR-55 Sheet Flow Tc = (.007 * ((n * Lf)**0.8)) / ((P**.5) * (Sf**.4)) Where: Tc = Time of concentration, hrs n = Mannings n Lf = Flow length, ft P = 2yr, 24hr Rain depth, inches Sf = Slope, ft/ft SCS TR-55 Shallow Concentrated Flow Unpaved surface:— V = 16.1345 * (Sf**0.5) ' Paved surface: V = 20.3282 * (Sf**0.5) r Tc = (Lf / V) / (3600sec/hr) Where: V = Velocity, ft/sec Sf = Slope, ft/ft Tc = Time of concentration, hrs Lf = Flow length, ft S/N: C21705506A87 Talbert & Bright PondPack Ver: 7.0 (325) Compute Time: 16:32:51 Date: 08-23-2004 Type.... SCS Unit Hyd. Summary Page 4.01 Name.... J1 Tag: 1" Eq Storm: 1" Eq File.... J:\3301 (WILMINGTON)\0305 MASTER DRAINAGE PLAN\AUGUST 20 SOLUTION NORTH.PPW Storm... TypeIII 24hr Tag: 1" Eq SCS UNIT HYDROGRAPH METHOD STORM EVENT: year storm Duration = 24.0000 hrs Rain Depth = 2.0200 in Rain Dir = C:\HAESTAD\PPKW\RAINFALL\ Rain File -ID = SCSTYPES.RNF - TypeIII 24hr Unit Hyd Type = Default Curvilinear HYG Dir = J:\3301 (WILMINGTON)\0305 MASTER DRAINAGE PLAN\ HYG File - ID = - J1 1" Eq Tc = .8419 hrs Drainage Area = 84.330 acres Runoff CN= 75 -------------------------------------------- -------------------------------------------- Computational Time Increment = .11225 hrs Computed Peak Time = 12.6842 hrs Computed Peak Flow = 13.47 cfs Time Increment for HYG File = .0500 hrs Peak Time;-1-nterpolated Output = 12.7000 hrs Peak Flow, Interpolated Output = 13.42 cfs -------------------------------------------- -------------------------------------------- DRAINAGE AREA ID:None Selected CN = 75 Area = 84.330 acres S = 3.3333 in 0.25 = .6667 in Cumulative Runoff ------------------- .3908 in 2.746 ac-ft HYG Volume... 2.746 ac-ft (area under HYG curve) ***** UNIT HYDROGRAPH PARAMETERS ***** Time Concentration, Tc = .84187 hrs (ID: J1) Computational Incr, Tm = .11225 hrs = 0.20000 Tp Unit Hyd. Shape Factor = 483.432 (37.46% under rising limb) K = 483.43/645.333, K = .7491 (also, K = 2/(1+(Tr/Tp)) Receding/Rising, Tr/Tp = 1.6698 (solved from K = .7491) Unit peak, qp = 113.50 cfs Unit peak time Tp = .56125 hrs Unit receding limb, Tr = 2.24499 hrs Total unit time, Tb = 2.80624 hrs S/N: C2170550GA87 Talbert & Bright PondPack Ver: 7.0 (325) Compute Time: 16:32:51 Date: 08-23-2004 Type.... SCS Unit Hyd. Summary Page 4.02 Name.... J1 Tag: 100yr Event: 100 yr File.... J:\3301 (WILMINGTON)\0305 MASTER DRAINAGE PLAN\AUGUST 20 SOLUTION NORTH.PPW Storm... TypeIII 24hr Tag: 100yr SCS UNIT HYDROGRAPH METHOD STORM EVENT: 100 vear stnrm Duration = 24.0000 hrs Rain Depth = 10.0000 in Rain Dir = C:\HAESTAD\PPKW\RAINFALL\ Rain File -ID = SCSTYPES.RNF - TypeIII 24hr Unit Hyd Type = Default Curvilinear HYG Dir = J:\3301 (WILMINGTON)\0305 MASTER DRAINAGE PLAN\ HYG File - ID = - J1 100yr Tc = .8419 hrs Drainage Area = 84.330 acres Runoff CN= 75 Computational Time Increment = _1122S hrs Computed Peak Time = 12.5719 hrs Computed Peak Flow = 292.38 cfs Time Increment for HYG File = .0500 hrs Peak Time,-erpolated Output = 12.5500 hrs Peak Flow, Interpolated Output = 290.27 cfs DRAINAGE AREA ID:None Selected CN = 75 Area = 84.330 acres S = 3.3333 in 0.2S = .6667 in Cumulative Runoff ------------------ 6.8772 in 48.329 ac-ft HYG Volume... 48.330 ac-ft (area under HYG curve) ***** UNIT HYDROGRAPH PARAMETERS ***** Time Concentration, Tc = .84187 hrs (ID: J1) Computational Incr, Tm = .11225 hrs = 0.20000 Tp Unit Hyd. Shape Factor = 483.432 (37.46% under rising limb) K = 483.43/645.333, K = .7491 (also, K = 2/(1+(Tr/Tp)) Receding/Rising, Tr/Tp = 1.6698 (solved from K = .7491) Unit peak, qp = 113.50 cfs Unit peak time Tp = .56125 hrs Unit receding limb, Tr = 2.24499 hrs Total unit time, Tb = 2.80624 hrs S/N: C21705506A87 Talbert & Bright 'rondPack Ver: 7.0 (325) Compute Time: 16:32:51 Date: 08-23-2004 Type.... SCS Unit Hyd. Summary Page 4.03 Name.... J1 Tag: 10yr Event: 10 yr File.... J:\3301 (WILMINGTON)\0305 MASTER DRAINAGE PLAN\AUGUST 20 SOLUTION NORTH.PPW Storm... TypeIII 24hr Tag: 10yr SCS UNIT HYDROGRAPH METHOD STORM EVENT: 10 year storm Duration = 24.0000 hrs Rain Depth = 7.0000 in Rain Dir = C:\HAESTAD\PPKW\RAINFALL\ Rain File -ID = SCSTYPES.RNF - TypeIII 24hr Unit Hyd Type = Default Curvilinear HYG Dir = J:\3301 (WILMINGTON)\0305 MASTER DRAINAGE PLAN\ HYG File - ID = - J1 10yr Tc = .8419 hrs Drainage Area = 84.330 acres Runoff CN= 75 Computational Time Increment = .11225 hrs Computed Peak Time = 12.5719 hrs Computed Peak Flow = 177.74 cfs Time Increment for HYG File = .0500 hrs Peak Time, Inteated Output = 12.6000 hrs Peak Flow, Interpolated Output = 176.29 cfs DRAINAGE AREA ID:None Selected CN = 75 Area = 84.330 acres S = 3.3333 in 0.25 = .6667 in Cumulative Runoff 4.1494 in 29.160 ac-ft HYG Volume... 29.161 ac-ft (area under HYG curve) ***** UNIT HYDROGRAPH PARAMETERS ***** Time Concentration, Tc = .84187 hrs (ID: J1) Computational Incr, Tm = .11225 hrs = 0.20000 Tp Unit Hyd. Shape Factor = 483.432 (37.46% under rising limb) K = 483.43/645.333, K = .7491 (also, K = 2/(1+(Tr/Tp)) Receding/Rising, Tr/Tp = 1.6698 (solved from K = .7491) Unit peak, qp = 113.50 cfs Unit peak time Tp = .56125 hrs Unit receding limb, Tr = 2.24499 hrs Total unit time, Tb = 2.80624 hrs S/N: C21705506A87 Talbert & Bright rondPack Ver: 7.0 (325) Compute Time: 16:32:51 Date: 08-23-2004 a Type.... SCS Unit Hyd. Summary Page 4.04 Name.... J1 Tag: 25yr Event: 25 yr File.... J:\3301 (WILMINGTON)\0305 MASTER DRAINAGE PLAN\AUGUST 20 SOLUTION NORTH.PPW Storm... TypeIII 24hr Tag: 25yr SCS UNIT HYDROGRAPH METHOD STORM EVENT: 25 year storm Duration = 24.0000 hrs Rain Depth = 8.0500 in Rain Dir = C:\HAESTAD\PPKW\RAINFALL\ Rain File -ID = SCSTYPES.RNF - TypeIII 24hr Unit Hyd Type = Default Curvilinear HYG Dir = J:\3301 (WILMINGTON)\0305 MASTER DRAINAGE PLAN\ HYG File - ID = - J1 25yr Tc = .8419 hrs Drainage Area = 84.330 acres Runoff CN= 75 Computational Time Increment = .11225 hrs Computed Peak Time = 12.5719 hrs Computed Peak Flow = 217.56 cfs Time Increment for HYG File = .0500 Mrs Peak Time, Interpvbrted Output =- 1:2.5500 hrs Peak Flow, Interpolated Output = 215.76 cfs DRAINAGE AREA ID:None Selected CN = 75 Area = 84.330 acres S = 3.3333 in 0.2S = .6667 in Cumulative Runoff ------------------- 5.0868 in 35.748 ac-ft HYG Volume... 35.748 ac-ft (area under HYG curve) ***** UNIT HYDROGRAPH PARAMETERS ***** Time Concentration, Tc = .84187 hrs (ID: J1) Computational Incr, Tm = .11225 hrs = 0.20000 Tp Unit Hyd. Shape Factor = 483.432 (37.46% under rising limb) K = 483.43/645.333, K = .7491 (also, K = 2/(1+(Tr/Tp)) Receding/Rising, Tr/Tp = 1.6698 (solved from K = .7491) Unit peak, qp = 113.50 cfs Unit peak time Tp = .56125 hrs Unit receding limb, Tr = 2.24499 hrs Total unit time, Tb = 2.80624 hrs 5/N: C21705506A87 Talbert & Bright PondPack Ver: 7.0 (325) Compute Time: 16:32:51 Date: 08-23-2004 Type.... SCS Unit Hyd. Summary Page 4.05 Name.... J1 Tag: 2yr Event: 2 yr File.... J:\3301 (WILMINGTON)\0305 MASTER DRAINAGE PLAN\AUGUST 20 SOLUTION NORTH.PPW Storm... TypeIII 24hr Tag: 2yr SCS UNIT HYDROGRAPH METHOD STORM EVENT: 2 year storm Duration = 24.0000 hrs Rain Depth = 4.5000 in Rain Dir = C:\HAESTAD\PPKW\RAINFALL\ Rain File -ID = SCSTYPES.RNF - TypeIII 24hr Unit Hyd Type = Default Curvilinear HYG Dir = J:\3301 (WILMINGTON)\0305 MASTER DRAINAGE PLAN\ HYG File - ID = - J1 2yr Tc = .8419 hrs Drainage Area = 84.330 acres Runoff CN= 75 Computational Time Increment = .11225 hrs Computed Peak Time = 12.5719 hrs Computed Peak Flow = 86.65 cfs Time Increment for HYG File = .0500 hrs Peak Time, Interpol tput = 12.6000 hrs Peak Flow, Interpolated Output = 86.26 cfs -------------------------------------------- -------------------------------------------- DRAINAGE AREA ID:None Selected CN = 75 Area = 84.330 acres S = 3.3333 in 0.2S = .6667 in Cumulative Runoff ------------------- 2.0504 in 14.409 ac-ft HYG Volume... 14.409 ac-ft (area under HYG curve) ***** UNIT HYDROGRAPH PARAMETERS ***** Time Concentration, Tc = .84187 hrs (ID: J1) Computational Incr, Tm = .11225 hrs = 0.20000 Tp Unit Hyd. Shape Factor = 483.432 (37.46% under rising limb) K = 483.43/645.333, K = .7491 (also, K = 2/(1+(Tr/Tp)) Receding/Rising, Tr/Tp = 1.6698 (solved from K = .7491) Unit peak, qp = 113.50 cfs Unit peak time Tp = .56125 hrs Unit receding limb, Tr = 2.24499 hrs Total unit time, Tb = 2.80624 hrs S/N: C21705506A87 Talbert & Bright FondPack Ver: 7.0 (325) Compute Time: 16:32:51 Date: 08-23-2004 j Type.... SCS Unit Hyd. Summary Page 4.06 Name.... J2 Tag: 1" Eq Storm: 1" Eq File.... J:\3301 (WILMINGTON)\0305 MASTER DRAINAGE PLAN\AUGUST 20 SOLUTION NORTH.PPW Storm... TypeIII 24hr Tag: 1" Eq t SCS UNIT HYDROGRAPH METHOD STORM EVENT: year storm Duration = 24.0000 hrs Rain Depth = 2.0200 in Rain Dir = C:\HAESTAD\PPKW\RAINFALL\ Rain File -ID = SCSTYPES.RNF - TypeIII 24hr Unit Hyd Type = Default Curvilinear HYG Dir = J:\3301 (WILMINGTON)\0305 MASTER DRAINAGE PLAN\ HYG File - ID = - J2 1" Eq Tc = .2585 hrs Drainage Area = 55.440 acres Runoff CN= 89 Computational Time Increment = 03447 hrs Computed Peak Time = 12.2019 hrs Computed Peak Flow = 48.85 cfs Time Increment for HYG File = OSOO hrs Peak` Time, Interpolatedt = 12.2000—hrs E Peak —Flow, —Interpolated Output = 48.83 cfs i DRAINAGE AREA ID:None Selected CN = 89 Area = 55.440 acres 5 = 1.2360 in 0.2S = .2472 in Cumulative Runoff ------------------- 1.0446 in 4.826 ac ft HYG Volume... 4.826 ac-ft (area under HYG curve) ***** UNIT HYDROGRAPH PARAMETERS ***** Time Concentration, Tc = .25852 hrs (ID: J2) Computational Incr, Tm = .03447 hrs = 0.20000 Tp Unit Hyd. Shape Factor = 483.432 (37.46% under rising limb) K = 483.43/645.333, K = .7491 (also, K = 2/(1+(Tr/Tp)) Receding/Rising, Tr/Tp = 1.6698 (solved from K = .7491) Unit peak, qp = 242.99 cfs Unit peak time Tp = .17234 hrs Unit receding limb, Tr = .68938 hrs Total unit time, Tb = .86172 hrs S/N: C21705506A87 Talbert & Bright PondPack Ver: 7.0 (325) Compute Time: 16:32:51 Date: 08-23-2004 Type.... SCS Unit Hyd. Summary Page 4.07 Name.... J2 Tag: 100yr Event: 100 yr File.... J:\3301 (WILMINGTON)\0305 MASTER DRAINAGE PLAN\AUGUST 20 SOLUTION NORTH.PPW Title... sw area Storm... TypeIII 24hr Tag: 100yr SCS UNIT HYDROGRAPH METHOD STORM EVENT: 100 year storm Duration = 24.0000 hrs Rain Depth = 10.0000 in Rain Dir = C:\HAESTAD\PPKW\RAINFALL\ Rain File -ID = SCSTYPES.RNF - TypeIII 24hr Unit Hyd Type = Default Curvilinear HYG Dir = J:\3301 (WILMINGTON)\0305 MASTER DRAINAGE PLAN\ HYG File - ID = - J2 100yr Tc = .2585 hrs Drainage Area = 55.440 acres Runoff CN= 89 Computational Time Increment = .03447 hrs Computed Peak Time = 12.1675 hrs Computed Peak Flow = 377.98 cfs Time Increment -for HYG File- .0500 h•r-s- Peak Time, Interpolated Output = 12.2000 hrs Peak _Flow, _Interpolated _Output _=373_97_cfs DRAINAGE AREA ID:None Selected CN = 89 Area = 55.440 acres 5 = 1.2360 in 0.25 = .2472 in Cumulative Runoff ------------------- 8.6559 in 39.990 ac-ft HYG Volume... 39.991 ac-ft (area under HYG curve) ***** UNIT HYDROGRAPH PARAMETERS ***** Time Concentration, Tc = .25852 hrs (ID: J2) Computational Incr, Tm = .03447 hrs = 0.20000 Tp Unit Hyd. Shape Factor = 483.432 (37.46% under rising limb) K = 483.43/645.333, K = .7491 (also, K = 2/(1+(Tr/Tp)) Receding/Rising, Tr/Tp = 1.6698 (solved from K = .7491) Unit peak, qp = 242.99 cfs Unit peak time Tp = .17234 hrs Unit receding limb, Tr = .68938 hrs Total unit time, Tb = .86172 hrs S/N: C.217055.06A87 Talbert & Bright i PondPack Ver: 7.0 (325) Compute Time: 16:32:51 Date: 08-23-2004 r Type.... SCS Unit Hyd. Summary Page 4.08 Name.... J2 Tag: 10yr Event: 10 yr File.... J:\3301 (WILMINGTON)\0305 MASTER DRAINAGE PLAN\AUGUST 20 SOLUTION NORTH.PPW Storm... TypeIII 24hr Tag: 10yr SCS UNIT HYDROGRAPH METHOD STORM EVENT: 10 year storm Duration = 24.0000 hrs Rain Depth = 7.0000 in Rain Dir = C:\HAESTAD\PPKW\RAINFALL\ I Rain File -ID = SCSTYPES.RNF - TypeIII 24hr I Unit Hyd Type = Default Curvilinear HYG Dir = J:\3301 (WILMINGTON)\0305 MASTER DRAINAGE PLAN\ ` HYG File - ID = - J2 10yr I Tc = .2585 hrs Drainage Area = 55.440 acres Runoff CN= 89 IComputational Time Increment = 03A47 hrs Computed Peak Time = 12.1675 hrs Computed Peak Flow = 254.90 cfs Time Increment for HYG File = .0500 hrs Peak Time, Interpolated Output---l-2.2000 hrs Peak Flow, Interpolated Output = 252.66 cfs DRAINAGE AREA ID:None Selected CN = 89 Area = 55.440 acres 5 = 1.2360 in 0.2S = .2472 in Cumulative Runoff ------------------- 5.7081 in 26.371 ac-ft HYG Volume... 26.372 ac-ft (area under HYG curve) ***** UNIT HYDROGRAPH PARAMETERS ***** Time Concentration, Tc = .25852 hrs (ID: J2) Computational Incr, Tm = .03447 hrs = 0.20000 Tp Unit Hyd. Shape Factor = 483.432 (37.46% under rising limb) K = 483.43/645.333, K = .7491 (also, K = 2/(1+(Tr/Tp)) Receding/Rising, Tr/Tp = 1.6698 (solved from K = .7491) Unit peak, qp = 242.99 cfs Unit peak time Tp = .17234 hrs Unit receding limb, Tr = .68938 hrs Total unit time, Tb = .86172 hrs S/N: C21705506A87 Talbert & Bright rondPack Ver: 7.0 (325) Compute Time: 16:32:.51 Date: 08-23-2004 Type.... SCS Unit Hyd. Summary Page 4.09 Name.... J2 Tag: 25yr Event: 25 yr File.... J:\3301 (WILMINGTON)\0305 MASTER DRAINAGE PLAN\AUGUST 20 SOLUTION NORTH.PPW Storm... TypeIII 24hr Tag: 25yr SCS UNIT HYDROGRAPH METHOD STORM EVENT: 25 year storm Duration = 24.0000 hrs Rain Death = 8.0500 in Rain Dir = C:\HAESTAD\PPKW\RAINFALL\ Rain File -ID = SCSTYPES.RNF - TypeIII 24hr Unit Hyd Type = Default Curvilinear HYG Dir = J:\3301 (WILMINGTON)\0305 MASTER DRAINAGE PLAN\ HYG File - ID = - J2 25yr Tc = .2585 hrs Drainage Area = 55.440 acres Runoff CN= 89 Computational Time Increment = .03447 hrs Computed Peak Time = 12.1675 hrs Computed Peak Flow = 298.17 cfs Time Increment for HYG File = .0500 hrs Peak Time, Interpolat-ed Ou'tput = 2fl00 hrs Peak Flow, Interpolated Output = 295.30 cfs DRAINAGE AREA ID:None Selected CN = 89 Area = 55.440 acres S = 1.2360 in 0.25 = .2472 in Cumulative Runoff ------------------- 6.7359 in 31.120 ac-ft HYG Volume... 31.121 ac-ft (area under HYG curve) ***** UNIT HYDROGRAPH PARAMETERS ***** Time Concentration, Tc = .25852 hrs (ID: J2) Computational Incr, Tm = .03447 hrs = 0.20000 Tp Unit Hyd. Shape Factor = 483.432 (37.46%under rising limb) K = 483.43/645.333, K = .7491 (also, K = 2/(1+(Tr/Tp)) Receding/Rising, Tr/Tp = 1.6698 (solved from K = .7491) Unit peak, qp = 242.99 cfs Unit peak time Tp = .17234 hrs Unit receding limb, Tr = .68938 hrs Total unit time, Tb = .86172 hrs S/N: C21705506A87 Talbert & Bright PondPack Ver: 7.0 (325) Compute Time: 16:32:51 Date: 08-23-2004 Type.... SCS Unit Hyd. Summary Page 4.10 Name.... J2 Tag: 2yr Event: 2 yr File.... J:\3301 (WILMINGTON)\0305 MASTER DRAINAGE PLAN\AUGUST 20 SOLUTION NORTH.PPW Storm... TypeIII 24hr Tag: 2yr SCS UNIT HYDROGRAPH METHOD STORM EVENT: 2 year storm Duration = 24.0000 hrs Rain Depth = 4.5000 in Rain Dir = C:\HAESTAD\PPKW\RAINFALL\ Rain File -ID = SCSTYPES.RNF - TypeIII 24hr Unit Hyd Type = Default Curvilinear HYG Dir = J:\3301.(WILMINGTON)\0305 MASTER DRAINAGE PLAN\ HYG File - ID = - J2 2yr Tc = .2585 hrs Drainage Area = 55.440 acres Runoff CN= 89 Computational Time .Increment = .03447 hrs Computed Peak Time = 12.1675 hrs Computed Peak Flow = 150.93 cfs Time Increment for HYG File = .0500 hrs Peak Time, Interpolated Output = 12-2W-hrs Peak Flow, Interpolated Output = 150.16 cfs DRAINAGE AREA ID:None Selected CN = 89 Area 55.440 acres S = 1.2360 in 0.25 .2472 in Cumulative Runoff ------------------- 3.2952 in 15.224 ac-ft HYG Volume... 15.224 ac-ft (area under HYG curve) ***** UNIT HYDROGRAPH PARAMETERS ***** Time Concentration, Tc = .25852 hrs (ID: J2) Computational Incr, Tm = .03447 hrs = 0.20000 Tp Unit Hyd. Shape Factor = 483.432 (37.46% under rising limb) K = 483.43/645.333, K = .7491 (also, K = 2/(1+(Tr/Tp)) Receding/Rising, Tr/Tp = 1.6698 (solved from K = .7491) Unit peak, qp = 242.99 cfs Unit peak time Tp = .17234 hrs Unit receding limb, Tr = .68938 hrs Total unit time, Tb = .86172 hrs S/N: C21705506A87 Talbert & Bright Pond Pack Ver: 7.0 (325) Compute Time: 16:32:51 Date: 08-23-2004 Type.... SCS Unit Hyd. Summary Page 4.11 Name.... J3 Tag: 1" Eq Storm: 1" Eq File.... J:\3301 (WILMINGTON)\0305 MASTER DRAINAGE PLAN\AUGUST 20 SOLUTION NORTH.PPW Storm... TypeIII 24hr Tag: 1" Eq SCS UNIT HYDROGRAPH METHOD STORM EVENT: year storm Duration = 24.0000 hrs Rain Depth = 2.0200 in Rain Dir = C:\HAESTAD\PPKW\RAINFALL\ Rain File -ID = SCSTYPES.RNF - TypeIII 24hr Unit Hyd Type = Default Curvilinear HYG Dir = J:\3301 (WILMINGTON)\0305 MASTER DRAINAGE PLAN\ HYG File - ID = - J3 1" Eq Tc = .2991 hrs Drainage Area = 24.650 acres Runoff CN= 70 Computational Time Increment = .03988 hrs Computed Peak Time = 12.3618 hrs Computed Peak Flow = 3.04 cfs Time Increment for HYG File = .0500 hrs Peak Time, Interpolated Output = 12.3500st- Peak Flow, Interpolated Output = 3.04 cfs DRAINAGE AREA ID:None Selected CN = 70 Area = 24.650 acres S = 4.2857 in 0.2S = .8571 in Cumulative Runoff .2482 in .510 ac-ft HYG Volume... .510 ac-ft (area under HYG curve) ***** UNIT HYDROGRAPH PARAMETERS ***** Time Concentration, Tc = .29908 hrs (ID: J3) Computational Incr, Tm = .03988 hrs = 0.20000 Tp Unit Hyd. Shape Factor = 483.432 (37.46% under rising limb) K = 483.43/645.333, K = .7491 (also, K = 2/(1+(Tr/Tp)) Receding/Rising, Tr/Tp = 1.6698 (solved from K = .7491) Unit peak, qp = 93.39 cfs Unit peak time Tp = .19938 hrs Unit receding limb, Tr = .79754 hrs Total unit time, Tb = .99692 hrs S/N: C21705506A87 Talbert & Bright PondPack Ver: 7.0 (325) Compute Time: 16:32:51 Date: 08-23-2004 u Type.... SCS Unit Hyd. Summary Page 4.12 Name.... J3 Tag: 100yr Event: 100 yr File.... J:\3301 (WILMINGTON)\0305 MASTER DRAINAGE PLAN\AUGUST 20 SOLUTION NORTH.PPW Title... SE area Storm... TypeIII 24hr Tag: 100yr SCS UNIT HYDROGRAPH METHOD STORM EVENT: 100 year storm Duration = 24.0000 hrs Rain Depth = 10.0000 in Rain Dir = C:\HAESTAD\PPKW\RAINFALL\ Rain File -ID = SCSTYPES.RNF - TypeIII 24hr Unit Hyd Type = Default Curvilinear HYG Dir = J:\3301 (WILMINGTON)\0305 MASTER DRAINAGE PLAN\ HYG File - ID = - J3 100yr Tc = .2991 hrs Drainage Area = 24.650 acres Runoff CN= 70 Computational Time Increment = .03988 hrs Computed Peak Time = 12.2023 hrs Computed Peak Flow = 122.87 cfs Time -Increment for--HYG File — .0500 -hrs Peak Time, Interpolated Output = 12.2000 hrs Peak Flow, Interpolated Output = 122.59 cfs DRAINAGE AREA ID:None Selected CN = 70 Area = 24.650 acres S = 4.2857 in 0.2S = .8571 in Cumulative Runoff ---------------- 6.2249 in 12.787 ac-ft HYG Volume... 12.787 ac-ft (area under HYG curve) ***** UNIT HYDROGRAPH PARAMETERS ***** Time Concentration, Tc = .29908 hrs (ID: J3) Computational Incr, Tm = .03988 hrs = 0.20000 Tp Unit Hyd. Shape Factor = 483.432 (37.46% under rising limb) K = 483.43/645.333, K = .7491 (also, K = 2/(1+(Tr/Tp)) Receding/Rising, Tr/Tp = 1.6698 (solved from K = .7491) Unit peak, qp = 93.39 cfs Unit peak time Tp = .19938 hrs Unit receding limb, Tr = .79754 hrs Total unit time, Tb = .99692 hrs S/N: C21705506A87 Talbert & Bright PondPack Ver: 7.0 (325) Compute Time: 16:32:51 Date: 08-23-2004 a Type.... SCS Unit Hyd. Summary Page 4.13 Name.... J3 Tag: 10yr Event: 10 yr File.... J:\3301 (WILMINGTON)\0305 MASTER DRAINAGE PLAN\AUGUST 20 SOLUTION NORTH.PPW Storm... TypeIII 24hr Tag: 10yr SCS UNIT HYDROGRAPH METHOD STORM EVENT: 10 year storm Duration = 24.0000 hrs Rain Depth = 7.0000 in Rain Dir = C:\HAESTAD\PPKW\RAINFALL\ Rain File -ID = SCSTYPES.RNF - TypeIII 24hr Unit Hyd Type = Default Curvilinear HYG Dir = J:\3301 (WILMINGTON)\0305 MASTER DRAINAGE PLAN\ HYG File - ID = - J3 10yr Tc = .2991 hrs Drainage Area = 24.650 acres Runoff CN= 70 Computational Time Increment = .03988 hrs Computed Peak Time = 12.2023 hrs Computed Peak Flow = 71.31 cfs Time Increment for HYG File = .0500 hrs Peak TiAe, Interpolated Output = 12.2000-hrs Peak Flow, Interpolated Output = 71.11 cfs DRAINAGE AREA ID:None Selected CN = 70 Area = 24.650 acres S = 4.2857 in 0.2S = .8571 in Cumulative Runoff ------------------ 3.6184 in 7.433 ac-ft HYG Volume... 7.433 ac-ft (area under HYG curve) ***** UNIT HYDROGRAPH PARAMETERS ***** Time Concentration, Tc = .29908 hrs (ID: J3) Computational Incr, Tm = .03988 hrs = 0.20000 Tp Unit Hyd. Shape Factor = 483.432 (37.46% under rising limb) K = 483.43/645.333, K = .7491 (also, K = 2/(1+(Tr/Tp)) Receding/Rising, Tr/Tp = 1.6698 (solved from K = .7491) Unit peak, qp = 93.39 cfs Unit peak time Tp = .19938 hrs Unit receding limb, Tr = .79754 hrs Total unit time, Tb = .99692- hrs S/N: C21705506A87 Talbert & Bright PondPack Ver: 7.0 (325) Compute Time: 16:32:51 Date: 08-23-2004 Type.... SCS Unit Hyd. Summary Page 4.14 Name.... J3 Tag: 25yr Event: 25 yr File.... J:\3301 (WILMINGTON)\0305 MASTER DRAINAGE PLAN\AUGUST 20 SOLUTION NORTH.PPW Storm... TypeIII 24hr Tag: 25yr SCS UNIT HYDROGRAPH METHOD STORM EVENT: 25 year storm Duration = 24.0000 hrs Rain Depth = 8.0500 in Rain Dir = C:\HAESTAD\PPKW\RAINFALL\ Rain File -ID = SCSTYPES.RNF - TypeIII 24hr Unit Hyd Type = Default Curvilinear HYG Dir = J:\3301 (WILMINGTON)\0305 MASTER DRAINAGE PLAN\ HYG File - ID = - J3 25yr Tc = .2991 hrs Drainage Area = 24.650 acres Runoff CN= 70 Computational Time Increment = .03988 hrs Computed Peak Time = 12.2023 hrs Computed Peak Flow = 89.07 cfs Time Increment for HYG -File = .0500- hrs Peak Time, Interpolated Output 12.2000 hrs Peak Flow, Interpolated Output 88.85 cfs ID:None Selected CN = 70 Area = 24.650 acres S = 4.2857 in 0.2S = .8571 in Cumulative Runoff ------------ 4.5073 in 9.259 ac-ft HYG Volume... 9.259 ac-ft (area under HYG curve) ***** UNIT HYDROGRAPH PARAMETERS ***** Time Concentration, Tc = .29908 hrs (ID: J3) Computational Incr, Tm = .03988 hrs = 0.20000 Tp Unit Hyd. Shape Factor = 483.432 (37.46% under rising limb) K = 483.43/645.333, K = .7491 (also, K = 2/(1+(Tr/Tp)) Receding/Rising, Tr/Tp = 1.6698 (solved from K = .7491) Unit peak, qp = 93.39 cfs Unit peak time Tp = .19938 hrs Unit receding limb, Tr = .79754 hrs Total unit time, Tb = .99692 hrs S/N: C21705506A87 Talbert & Bright PondPack Ver: 7.0 (325) Compute Time: 16:32:51 Date: 08-23-2004 Type.... SCS Unit Hyd. Summary Page 4.15 Name.... J3 Tag: 2yr Event: 2 yr File.... J:\3301 (WILMINGTON)\0305 MASTER DRAINAGE PLAN\AUGUST 20 SOLUTION NORTH.PPW Storm... TypeIII 24hr Tag: 2yr SCS UNIT HYDROGRAPH METHOD STORM FVFNT- 2 vear storm Duration = 24.0000 hrs Rain Depth = 4.5000 in Rain Dir = C:\HAESTAD\PPKW\RAINFALL\ Rain File -ID = SCSTYPES.RNF - TypeIII 24hr Unit Hyd Type = Default Curvilinear HYG Dir = J:\3301 (WILMINGTON)\0305 MASTER DRAINAGE PLAN\ HYG File - ID = - J3 2yr Tc = .2991 hrs Drainage Area = 24.650 acres Runoff CN= 70 Computational Time Increment = .03988 hrs Computed Peak Time = 12.2422 hrs Computed Peak Flow = 32.06 cfs Time Increment for HYG File = .0500 hrs Peak Time,- Frr•polated Output = 12.2500 hrs, Peak Flow, Interpolated Output = 31.87 cfs DRAINAGE AREA ID:None Selected CN 70 Area 24.650 acres S 4.2857 in 0.2S .8571 in Cumulative Runoff ------------------- 1.6737 in 3.438 ac-ft HYG Volume_ 3.438 ac-ft (area under HYG curve) ***** UNIT HYDROGRAPH PARAMETERS ***** Time Concentration, Tc = .29908 hrs (ID: J3) Computational Incr, Tm = .03988 hrs = 0.20000 Tp Unit Hyd. Shape Factor = 483.432 (37.46% under rising limb) K = 483.43/645.333, K = .7491 (also, K = 2/(1+(Tr/Tp)) Receding/Rising, Tr/Tp = 1.6698 (solved from K = .7491) Unit peak, qp = 93.39 cfs Unit peak time Tp = .19938 hrs Unit receding limb, Tr = .79754 hrs Total unit time, Tb = .99692 hrs S/N: C21705506A87 Talbert & Bright PondPack Ver: 7.0 (325) Compute Time: 16:32:51 Date: 08-23-2004 Type.... Vol: Elev-Area Name.... P 30 Page 5.01 File.... J:\3301 (WILMINGTON)\0305 MASTER DRAINAGE PLAN\AUGUST 20 SOLUTION NORTH.PPW I Elevation Planimeter Area Al+A2+sgr(A1*A2) Volume Volume Sum (ft) ------------------------------------------------------------------------ (sq.in) (sq.ft) (sq.ft) (ac-ft) (ac-ft) t 20.50 ----- 0 0 .000 .000 21.50 ----- 10000 10000 .077 .077 I 22.00 ----- 14000 35832 .137 .214 22.20 ----- 16000 44967 .069 .282 22.30 17000 49492 .038 .320 22.40 _____ 18000 52493 .040 .360 22.50 ----- 220137 301085 .230 .591 23.00 ----- 372566 879087 3.364 3.954 f 24.00 ----- 478131 1272758 9.740 13.694 j 25.00 ----- 501649 1469529 11.245 24.939 26.00 ----- 525371 1540393 11.788 36.727 27.00 ----- 549292 1611861 12.334 49.061 27.50 ----- 561329 1665899 6.374 55.435 POND VOLUME EQUATIONS * Incremental volume computed by the Conic Method for Reservoir Volumes. Volume = (1/3) * (EL2-EL1) * (Areal + Area2 + sq.rt.(Area1*Area2)) where: EL1, EL2 = Lower and upper elevations of the increment Areal,Area2 = Areas computed for ELI, EL2, respectively Volume = Incremental volume between EL1 and EL2 S/N: C21705506A87 Talbert & Bright PondPack Ver: 7.0 (325) Compute Time: 16:32:51 Date: 08-23-2004 d Type.... Outlet Input Data Name.... PR 30 Page 6.01 File.... J:\3301 (WILMINGTON)\0305 MASTER DRAINAGE PLAN\AUGUST 20 SOLUTION NORTH.PPW REQUESTED POND WS ELEVATIONS: Min. Elev.= 20.50 ft Increment = .50 ft Max. Elev.= 27.50 ft OUTLET CONNECTIVITY ---> Forward Flow Only (Upstream to DnStream) <--- Reverse Flow Only (DnStream to Upstream) < ---> Forward and Reverse Both Allowed Structure No. ----------------- Outfall El, ft E2, ft ---- Culvert-Circular ------- --- TW --------- 23:200 --------- 27.500 Culvert -Circular ---> TW 23.200 27.500 Orifice -Circular ---: TW 20.500 27.500 Culvert -Circular ---• TW 23.200 27.500 TW SETUP, DS Channel 5/N: C21705506A87 Talbert & Bright PondPack Ver: 7.0 (325) Compute Time: 16:32:51 Date: 08-23-2004 Type.... Outlet Input Data Name.... PR 30 Page 6.02 File.... J:\3301 (WILMINGTON)\0305 MASTER DRAINAGE PLAN\AUGUST 20 SOLUTION NORTH.PPW OUTLET STRUCTURE INPUT DATA Structure ID Structure Type = Culvert -Circular No. Barrels = 1 Barrel Diameter = 2.0000 ft Upstream Invert = 23.20 ft Dnstream Invert = 22.50 ft Horiz. Length = 30.00 ft Barrel Length = 30.01 ft Barrel Slope = .02333 ft/ft OUTLET CONTROL DATA.. Mannings n = .0150 Ke = :2000 (forward entrance loss) Kb = .016523 (per ft of full flow) Kr = .5000 (reverse entrance loss) HW Convergence = .001 +/ ft INLET CONTROL DATA... Equation form = 1 Inlet Control K = .0078 Inlet Control M 2.0000 Inlet Control c = .02920 Inlet Control Y = .7400 T1 ratio (HW/D) = 1.124 T2 ratio (HW/D) = 1.196 Slope Factor = .500 Use unsubmerged inlet control Form 1 equ. below T1 elev. Use submerged inlet control Form 1 equ. above T2 elev. In transition zone between unsubmerged and submerged inlet control, interpolate between flows at T1 & T2... At T1 Elev = 25.45 ft ---> Flow = 15.55 cfs At T2 Elev = 25.59 ft ---> Flow = 17.77 cfs S/N: C21705506A87 Talbert & Bright PondPack Ver: 7.0 (325) Compute Time: 16:32:51 Date: 08-23-2004 Type.... Outlet Input Data Name.... PR 30 Page 6.03 File.... J:\3301 (WILMINGTON)\0305 MASTER DRAINAGE PLAN\AUGUST 20 SOLUTION NORTH.PPW OUTLET STRUCTURE INPUT DATA Structure ID Structure Type ------------------=-Culvert-Circular No. Barrels --------------- = 1 Barrel Diameter = 4.5000 ft I Upstream Invert = 23.20 ft Dnstream Invert = 22.50 ft Horiz. Length = 30.00 ft Barrel Length = 30.01 ft Barrel Slope = .02333 ft/ft 0 OUTLET CONTROL DATA... Mannings n = .0150 Ke = .2000 Kb = .005604- Kr = .5000 HW Convergence = .001 INLET CONTROL DATA... Equation form = 1 Inlet Control K = .0078 Inlet Control M = 2.0000 Inlet Control c = .02920 Inlet Control Y = .7400 T1 ratio (HW/D) = 1.124 T2 ratio (HW/D) = 1.196 Slope Factor = -.500 (forward entrance loss) (per ft of full flow) (reverse entrance loss) +/- ft Use unsubmerged inlet control Form 1 equ. below T1 elev. Use submerged inlet control Form 1 equ. above T2 elev. In transition zone between unsubmerged and submerged inlet control, interpolate between flows at T1 & T2... At T1 Elev = 28.26 ft ---> Flow = 118.08 cfs At T2 Elev = 28.58 ft ---> Flow = 134.95 cfs S/N: C21705506A87 Talbert & Bright PondPack Ver: 7.0 (325) Compute Time: 16:32:51 Date: 08-23-2004 Type.... Outlet Input Data Name.... PR 30 Page 6.04 File.... J:\3301 (WILMINGTON)\0305 MASTER DRAINAGE PLAN\AUGUST 20 SOLUTION NORTH.PPW OUTLET STRUCTURE INPUT DATA Structure ID Structure Type = Orifice -Circular # of Openings = 2 Invert Elev. = 20.50 ft Diameter = .4271 ft Orifice Coeff. _ .632 Structure ID Structure Type = Culvert -Circular No. Barrels = 1 Barrel Diameter = 2.5000 t. Upstream Invert = 23.20 ft Dnstream Invert = 22.50 ft Horiz. Length = 30.00 ft Barrel Length = 30.01 ft Barrel Slope = .02333 ft/ft OUTLET CONTROL DATA... Mannings n = .0150 Ke = .2000 (forward entrance loss) Kb = .012271 (per ft of full flow) Kr = .5000 (reverse entrance loss) HW Convergence = .001 +/- ft INLET CONTROL DATA. Equation form = 1 Inlet Control K = .0078 Inlet Control M = 2.0000 Inlet Control c = .02920 Inlet Control Y = .7400 T1 ratio (HW/D) = 1.124 T2 ratio (HW/D) = 1.196 Slope Factor = -.500 Use unsubmerged inlet control Form 1 equ. below T1 elev. Use submerged inlet control Form 1 equ. above T2 elev. In transition zone between unsubmerged and submerged inlet control, interpolate between flows at T1 & T2... At T1 Elev = 26.01 ft ---> Flow = 27.16 cfs At T2 Elev = 26.19 ft ---> Flow = 31.05 cfs S/N: C2i7OS506A87 Talbert & Bright PondPack Ver: 7.0 (325) Compute Time: 16:32:51 Date: 08-23-2004 Type.... Outlet Input Data Name.... PR 30 Page 6.05 r 1 File.... J:\3301 (WILMINGTON)\0305 MASTER DRAINAGE PLAN\AUGUST 20 SOLUTION NORTH.PPW OUTLET STRUCTURE INPUT DATA Structure ID = TW Structure Type = TW SETUP, DS Channel ------------------------------------ FREE OUTFALL CONDITIONS SPECIFIED CONVERGENCE TOLERANCES... Maximum Iterations= 30 Min. TW tolerance = .01 ft Max. TW tolerance = .01 ft Min. HW tolerance = .01 ft Max. HW tolerance = .01 ft Min. Q tolerance = .10 cfs Max. Q tolerance = .10 cfs SiN: C2i705506A87 Talbert & Bright PondPack Ver: 7.0 (325) Compute Time: 16:32:51 Date: 08-23-2004 Type.... Individual Outlet Curves Name.... PR 30 Page 6.06 File.... J:\3301 (WILMINGTON)\0305 MASTER DRAINAGE PLAN\AUGUST 20 SOLUTION NORTH.PPW RATING TABLE FOR ONE OUTLET TYPE Structure ID = (Culvert -Circular) -------------------------------------- I Mannings open channel maximum capacity: 32.21 cfs Upstream ID = (Pond Water Surface) DNstream ID = TW (Pond Outfall) WS Elev,Device Q Tail Water Notes ---------------- WS Elev. --------------- -------------------------- Q TW Elev Converge ft -------- cfs ft +/-ft Computation Messages ------- -------- ----- 20.50 -------------------------- .00 Free Outfall Upstream HW & DNstream TW < Inv.El 21.00 .00 Free Outfall Upstream HW & DNstream TW < Inv.El 21.50 .00 Free Outfall Upstream HW & DNstream TW < Inv.El 22.00 .00 Free Outfall Upstream HW & DNstream TW < Inv.El 22.50 .00 Free Outfall Upstream HW & DNstream TW < Inv.El 23.00 .00 Free Outfall Upstream HW & DNstream TW < Inv.El 23.20 .00 Free Outfall Upstream HW & DNstream TW < Inv.El 23.50 .39 Free Outfall CRIT.DEPTH CONTROL Vh= .073ft Dcr= .213ft 24.00 2.59 Free Outfall CRIT.DEPTH CONTROL Vh= .201ft Dcr= .560ft 24.50 6.33 Free Outfall CRIT.DEPTH CONTROL Vh= .340ft Dcr= .891ft 25.00 11.15 Free Outfall CRIT.DEPTH CONTROL Vh= .501ft Dcr= 1.198ft 25.50 16.36 Free Outfall INLET CONTROL... Transition: HW =2.30 26.00 21.31 Free Outfall INLET CONTROL... Submerged: HW =2.80 26.50 24.96 Free Outfall INLET CONTROL... Submerged: HW =3.30 27.00 28.15 Free Outfall INLET CONTROL... Submerged: HW =3.80 27.50 31.00 Free Outfall INLET CONTROL... Submerged: HW =4.30 CRIT.DEPTH CRIT.DEPTH CRIT.DEPTH CRIT.DEPTH S/N: C21705506A87 Talbert & Bright PondPack Ver: 7.0 (325) Compute Time: 16:32:51 Date: 08-23-2004 Type.... Individual Outlet Curves Name.... PR 30 Page 6.07 IFile.... J:\3301 (WILMINGTON)\0305 MASTER DRAINAGE PLAN\AUGUST 20 SOLUTION NORTH.PPW RATING TABLE FOR ONE OUTLET TYPE Structure ID = (Culvert -Circular) -------------------------------------- Mannings open channel maximum capacity: 280.03 cfs Upstream ID = (Pond Water Surface) DNstream ID = TW (Pond Outfall) ' WS Elev,Device Q Tail Water ---------------- Notes WS Elev. --------------- -------------------------- Q TW Elev Converge f ft -------- cfs ft +/-ft Computation Messages ------- -------- 20.50 ----- -------------------------- .00 Free Outfall Upstream HW & DNstream TW < Inv.El 21.00 .00 Free Outfall Upstr-eam--HW & DNstream TW < Inv.El- f 21.50 .00 Free Outfall E Upstream HW & DNstream TW < Inv.El 22.00 .00 Free Outfall Upstream HW & DNstream TW < Inv.El 22.50 .00 Free Outfall Upstream HW & DNstream TW < Inv.El 23.00 .00 Free Outfall Upstream HW & DNstream TW < Inv.El 23.20 .00 Free Outfall Upstream HW & DNstream TW < Inv.El 23.50 .59 Free Outfall CRIT.DEPTH CONTROL Vh= .072ft Dcr= .213ft CRIT.DEPTH 24.00 4.11 Free Outfall CRIT.DEPTH CONTROL Vh= .194ft Dcr= .567ft CRIT.DEPTH 24.50 10.53 Free Outfall CRIT.DEPTH CONTROL Vh= .320ft Dcr= .915ft CRIT.DEPTH 25.00 19.61 Free Outfall CRIT.DEPTH CONTROL Vh= .451ft Dcr= 1.259ft CRIT.DEPTH 25.50 31.03 Free Outfall CRIT.DEPTH CONTROL Vh= .587ft Dcr= 1.596ft CRIT.DEPTH 26.00 44.48 Free Outfall CRIT.DEPTH CONTROL Vh= .729ft Dcr= 1.925ft CRIT.DEPTH 26.50 59.65 Free Outfall CRIT.DEPTH CONTROL Vh= .880ft Dcr= 2.244ft CRIT.DEPTH 27.00 76.14 Free Outfall CRIT.DEPTH CONTROL Vh= 1.042ft Dcr= 2.550ft CRIT.DEPTH 27.50 93.58 Free Outfall CRIT.DEPTH CONTROL Vh= 1.217ft Dcr= 2.839ft CRIT.DEPTH S/N: C21705506A87 Talbert & Bright PondPack Ver: 7.0 (325) Compute Time: 16:32:51 Date: 08-23-2004 Type.... Individual Outlet Curves Name.... PR 30 Page 6.08 File.... J:\3301 (WILMINGTON)\0305 MASTER DRAINAGE PLAN\AUGUST 20 SOLUTION NORTH.PPW RATING TABLE FOR ONE OUTLET TYPE Structure ID = (Orifice -Circular) -------------------------------------- Upstream ID = (Pond Water Surface) DNstream ID = TW (Pond Outfall) NUMBER OF OPENINGS = 2 EACH FLOW = SUM OF OPENINGS x FLOW FOR ONE OPENING WS Elev,Device Q WS Elev. Q ft cfs -------- 20.50 ------- .00 21.00 .78 21.50 1.29 22.00 1.65 22.50 1.94 23.00 2.20 23.20 2.29 23.50 2.42 24.00 2.63 24.50 2.83 25.00 3.01 25.50 3.18 26.00 3.34 26.50 3.49 27.00 3.64 27.50 3.78 Tail Water -------------- TW Elev Converge ft +/-ft Free Outfall Free -Gu-- f-a-11 Free Outfall Free Outfall Free Outfall Free Outfall Free Outfall Free Outfall Free Outfall Free Outfall Free Outfall Free Outfall Free Outfall Free Outfall Free Outfall Free Outfall Notes -------------------------- Computation Messages Upstream HW & DNstream TW < Inv.El H .29-.-. H =.79 H =1.29 H =1.79 H =2.29 H =2.49 H =2.79 H =3.29 H =3.79 H =4.29 H =4.79 H =5.29 H =5.79 H =6.29 H =6.79 S/N: C21705506A87 Talbert & Bright PondPack Ver: 7.0 (325) Compute Time: 16:32:51 Date: 08-23-2004 Type.... Individual Outlet Curves Name.... PR 30 Page 6.09 File.... J:\3301 (WILMINGTON)\0305 MASTER DRAINAGE PLAN\AUGUST 20 SOLUTION NORTH.PPW RATING TABLE FOR ONE OUTLET TYPE Structure ID = (Culvert -Circular) -------------------------------------- Mannings open channel maximum capacity: 58.41 cfs Upstream ID = (Pond Water Surface) DNstream ID = TW (Pond Outfall) WS Elev,Device Q Tail Water Notes ---------------- WS Elev. ----------------------------------------- Q TW Elev Converge ft -------- cfs ft +/-ft Computation Messages ------- -------- ----- -------------------------- 20.50 .00 Free Outfall Upstream HW & DNstream TW < Inv.El 21.00 .00 Free Outfall Upstream HW-=*3N-stream TW < ,Inv.El 21.50 .00 Free Outfall Upstream HW & DNstream TW < Inv.E1 22.00 .00 Free Outfall Upstream HW & DNstream TW < Inv.El 22.50 .00 Free Outfall Upstream HW & DNstream TW < Inv.El 23.00 .00 Free Outfall Upstream HW & DNstream TW < Inv.El ` 23.20 .00 Free Outfall Upstream HW & DNstream TW < Inv.El 23.50 .44 Free Outfall P CRIT.DEPTH CONTROL Vh= .072ft Dcr= .214ft CRIT.DEPTH 24.00 2.94 Free Outfall CRIT.DEPTH CONTROL Vh= .198ft Dcr= .562ft CRIT.DEPTH 24.50 7.37 Free Outfall CRIT.DEPTH CONTROL Vh= .332ft Dcr= .901ft CRIT.DEPTH 25.00 13.29 Free Outfall CRIT.DEPTH CONTROL Vh= .479ft Dcr= 1.226ft CRIT.DEPTH 25.50 20.23 Free Outfall CRIT.DEPTH CONTROL Vh= .644ft Dcr= 1.527ft CRIT.DEPTH 1 26.00 27.04 Free Outfall INLET CONTROL... Equ.1: HW =2.80 do=1.773 Ac=3.7225 26.50 34.93 Free Outfall t INLET CONTROL... Submerged: HW =3.30 4 27.00 40.41 Free Outfall INLET CONTROL... Submerged: HW =3.80 27.50 45.23 Free Outfall INLET CONTROL... Submerged: HW =4.30 S/N: C217055U6A87 Talbert & Bright PondPack Ver: 7.0 (325) Compute Time: 16:32:51 Date: 08-23-2004 Type.... Composite Rating Curve Name.... PR 30 Page 6.10 File.... J:\3301 (WILMINGTON)\0305 MASTER DRAINAGE PLAN\AUGUST 20 SOLUTION NORTH.PPW ***** COMPOSITE OUTFLOW SUMMARY **** WS Elev, Total Q Elev. Q ft cfs 20.50 .00 21.00 .78 21.50 1.29 22.00 1.65 22.50 1.94 23.00 2.20 23.20 2.29 23.50 3.84 24.00 12.27 24.50 27.05 25.00 47.05 25.50 70.80 26.00 96.17 26.50 123.03 27.00 148.34 27.50 173.60 Notes -------- Converge ------------------------- TW Elev Error ft +/-ft Contributing Structures Free Outfall None contributing Free Outfall Free Outfall Free Outfall Free Outfall. Free Outfall Free Outfall Free Outfall Free Outfall Free Outfal-I Free Outfall Free Outfall Free Outfall. Free Outfall Free Outfall Free Outfall S/N: C217U5506A87 "Culbert & Bright PondPack Ver: 7.0 (325) Compute Time: 16:32:51 Date: 08-23-2004 Type.... Pond E-V-Q Table Page 7.01 Name.... P 30 File.... J:\3301 (WILMINGTON)\0305 MASTER DRAINAGE PLAN\AUGUST 20 SOLUTION NORTH.PPW LEVEL POOL ROUTING DATA HYG Dir = J:\3301 (WILMINGTON)\0305 MASTER DRAINAGE PLAN\ Inflow HYG file = NONE STORED - P 30 IN 100yr Outflow HYG file = NONE STORED - P 30 OUT 100yr Pond Node Data = P 30 Pond Volume Data = P 30 Pond Outlet Data = PR 30 No Infiltration INITIAL CONDITIONS ---------------------------------- Starting WS Elev = 20.50 ft Starting Volume = .000 ac-ft Starting Outflow = .00 cfs { Starting Infiltr. _ .00 cfs Starting Total Qout= .00 cfs Time Increment = .0500 hrs-= Elevation Outflow Storage Area Infilt. Q Total 25/t + 0 ft ----------------------------------------------------------------------- cfs ac-ft sq.ft cfs cfs cfs 20.SQ 00 .000 0 .00 .00 .00 f 21.00 .78 .010 2500 .00 .78 5.41 21.50 1.29 .077 10000 .00 1.29 38.33 22.00 1.G5 .214 14000 .00 1.65 105.04 ` 22.50 1.94 .591 220137 .00 1.94 287.93 23.00 2.20 3.954 372566 .00 2.20 1916.12 23.20 2.29 5.711 392627 .00 2.29 2766.34 23.50 3.84 8.521 423705 .00 3.84 4128.11 24.00 12.27 13.694 478131 .00 12.27 6640.11 24.50 27.05 19.249 489819 .00 27.05 9343.58 25.00 47.05 24.939 501649 .00 47.05 12117.60 25.50 70.80 30.765 513442 .00 70.80 14960.98 26.00 96.17 36.727 525371 .00 96.17 17871.87 26.50 123.03 42.825 537265 .00 123.03 20850.44 27.00 148.34 49.061 549292 .00 148.34 23893.90 ( 27.50 173.60 55.435 561329 .00 173.60 27004.15 S%N: C21705506A87 Talbert & Bright PondPack Ver: 7.0 (325) Compute Time: 16:32:51 Date: 08-23-2004 Type.... Pond Routing Summary Page 7.02 Name.... P 30 OUT Tag: 1" Eq Storm: 1" Eq File.... J:\3301 (WILMINGTON)\0305 MASTER DRAINAGE PLAN\AUGUST 20 SOLUTION NORTH.PPW Storm... TypeIII 24hr Tag: 1" Eq LEVEL POOL ROUTING SUMMARY HYG Dir = J:\3301 (WILMINGTON)\0305 MASTER DRAINAGE PLAN\ Inflow HYG file = NONE STORED - P 30 IN 1" Ea Outflow HYG file = NONE STORED - P 30 OUT 1" Eq Pond Node Data = P 30 Pond Volume Data = P 30 Pond Outlet Data = PR 30 No Infiltration INITIAL CONDITIONS Starting WS Elev = 20.50 ft Starting Volume = .000 ac-ft Starting Outflow = .00 cfs Starting Infiltr. _ .00 cfs Starting Total Qout= .00 cfs Time Increment = .0500 hrs INFLOW/OUTFLOW HYDROGRAPH SUMMARY Peak Inflow = 54.81 cfs at 12.2000Thrs Peak Outflow = 2.29 cfs at 20.2500 hrs ----------------------------------------------------- Peak Elevation = 23.19 ft Peak Storage = 5.614 ac-ft MASS BALANCE (ac-ft) -------------------------- + Initial Vol = .000 + HYG Vol IN = 8.082 - Infiltration = .000 - HYG Vol OUT = 8.082 - Retained Vol = -----_000 Unrouted Vol = -.000 ac-ft (.000% of Inflow Volume) S/N: C2170550GA87 Talbert & Bright r PondPack Ver: 7.0 (325) Compute Time: 16:32:51 Date: 08-23-2004 Type.... Pond Routed HYG (total out) Page 7.03 Name.... P 30 OUT Tag: 1" Eq Storm: 1" Eq File.... J:\3301 (WILMINGTON)\0305 MASTER DRAINAGE PLAN\AUGUST 20 SOLUTION NORTH.PPW Storm... TypeIII 24hr Tag: 1" Eq POND ROUTED TOTAL OUTFLOW HYG... HYG file = HYG ID = P 30 OUT HYG Tag = 1" Eq ----------------------------------- Peak Discharge = 2.28 cfs Time to Peak = 20.2500 hrs HYG Volume = 8.082 ac-ft ----------------------------------- HYDROGRAPH ORDINATES (cfs) Time Output Time increment = .0500 hrs hrs --------- 1-------------------------------------------------------------- Time on left represents time for first value in each row. 8.3500 .00 .00 .00 .00 .01 8.6000 .01 .02 .04 .05 .06 8.8500 .08 .10 .12 .14 .16 9 .18 .21 --:23 .26 .28 4350 .31 .34 .37 .40 .43 00 .46 .49 .53 .56 .59 9.8500 .63 .67 .71 .74 .78 10.1000 .78 .79 .80 .80 .81 10.3500 .83 .84 .85 .87 .89 10.6000 .91 .93 .95 .98 1.00 10.8500 1.03 1.06 1.09 1.13 1.16 11.1000 1.20 1.24 1.28 1.30 1.32 11.3500 1.34 1.36 1.39 1.42 1.45 11.6000 1.48 1.53 1.58 1.65 1.67 11.8500 1.71 1.75 1.80 1.87 1.94 12.1000 1.95 1.97 1.98 2.00 2.02 12.3500 1 2.03 2.05 2.06 2.07 2.08 12.6000 2.09 2.10 2.11 2.12 2.12 12.8500 2.13 2.14 2.14 2.15 2.16 13.1000 2.16 2.17 2.17 2.17 2.18 13.3500 2.18 2.19 2.19 2.19 2.20 13.6000 2.20 2.20 2.20 2.20 2.21 13.8500 2.21 2.21 2.21 2.21 2.22 14.1000 2.22 2.22 2.22 2.22 2.22 14.3500 1 2.23 2.23 2.23 2.23 2.23 14.6000 1 2.23 2.23 2.23 2.24 2.24 14.8500 1 2.24 2.24 2.24 2.24 2.24 15.1000 1 2.24 2.25 2.25 2.25 2.25 15.3500 1 2.25 2.25 2.25 2.25 2.25 15.6000 1 2.25 2.26 2.26 2.26 2.26 15.8500 1 2.26 2.26 2.26 2.26 2.26 16.1000 1 2.26 2.26 2.26 2.26 2.26 16.3500 1 2.27 2.27 2.27 2.27 2.27 S/N: C21705506A87 Talbert & Bright PondPack Ver: 7.0 (325) Compute Time: 16:32:51 Date: 08-23-2004 Type.... Pond Routed HYG (total out) Page 7.04 Name.... P 30 OUT Tag: 1" Eq Storm: 1" Eq File.... J:\3301 (WILMINGTON)\0305 MASTER DRAINAGE PLAN\AUGUST 20 SOLUTION NORTH.PPW Storm... TypeIII 24hr Tag: 1" Eq HYDROGRAPH ORDINATES (cfs) Time Output Time increment = .0500 hrs hrs Time ---------I------------------------------------------------------,-------- on left represents time for first value in each row. 16.6000 2.27 2.27 2.27 2.27 2.27 16.8500 I 2.27 2.27 2.27 2.27 2.27 17.1000 2.27 2.27 2.27 2.27 2.27 17.3500 2.27 2.28 2.28 2.28 2.28 17.6000 2.28 2.28 2.28 2.28 2.28 17.8500 2.28 2.28 2.28 2.28 2.28 18.1000 2.28 2.28 2.28 2.28 2.28 18.35001 2.28 2.28 2.28 2.28 2.28 18.6000 2.28 2.28 2.28 2.28 2.28 18.8500 2.28 2.28 2.28 2.28 2.28 19.1000 2.28 2.28 2.28 2.28 2.28 19.3500 2.28 2.28 2.28 2.28 2.28 19.6000 2.28 2.28 2.28 2.28 2.28 19.8500 2.28 2.28 2.28 2.28 2.28 20.1000 2.28 2.28 2.-2-8 2.28 2.28 20.3500 2.28 2.28 2.28 2.28 2.28 20.6000 2.28 2.29 2.29 2.29 2.29 20.8500 2.29 2.29 2.29 2.29 2.29 21.1000 2.29 2.29 2.29 2.29 2.29 21.3500 2.29 2.29 2.29 2.29 2.29 21.6000 2.29 2.29 2.29 2.29 2.29 21.8500 I 2.29 2.29 2.29 2.29 2.29 22.1000 2.29 2.29 2.29 2.29 2.29 22.3500 2.29 2.28 2.28 2.28 2.28 22.6000 2.28 2.28 2.28 2.28 2.28 22.8500 2.28 2.28 2.28 2.28 2.28 23.1000 j 2.28 2.28 2.28 2.28 2.28 23.3500 2.28 2.28 2.28 2.28 2.28 23.6000 2.28 2.28 2.28 2.28 2.28 23.8500 2.28 2.28 2.28 2.28 2.28 24.1000 2.28 2.28 2.28 2.28 2.28 24.3500 2.28 2.28 2.28 2.28 2.28 24.6000 2.28 2.28 2.28 2.28 2.28 24.8500 2.28 2.28 2.28 2.28 2.27 25.1000 I 2.27 2.27 2.27 2.27 2.27 25.3500 2.27 2.27 2.27 2.27 2.27 25.6000 2.27 2.27 2.27 2.27 2.27 25.8500 2.27 2.27 2.27 2.27 2.27 26.1000 2.26 2.26 2.26 2.26 2.26 26.3500 2.26 2.26 2.26 2.26 2.26 26.6000 2.26 2.26 2.26 2.26 2.26 26.8500 2.26 2.26 2.26 2.26 2.26 27.1000 2.25 2.25 2.25 2.25 2.25 27.3500 2.25 2.25 2.25 2.25 2.25 27.6000 2.25 2.25 2.25 2.25 2.25 27.8500 ! 2.25 2.25 2.25 2.25 2.25 28.1000 2.24 2.24 2.24 2.24 2.24 S/N: C21705506A87 Talbert & Bright PondPack Ver: 7.0 (325) Compute Time: 16:32:51 Date: 08-23-2004 Type.... Pond Routed HYG (total out) Page 7.05 Name.... P 30 OUT Tag: 1" Eq Storm: 1" Eq File.... J:\3301 (WILMINGTON)\0305 MASTER DRAINAGE PLAN\AUGUST 20 SOLUTION NORTH.PPW Storm... TypeIII 24hr Tag: 1" Eq HYDROGRAPH ORDINATES (cfs) Time Output Time increment = .0500 hrs hrs Time ---------I-------------------------------------------------------------- on left represents time for first value in each row. 28.3500 2.24 2.24 2.24 2.24 2.24 28.6000 2.24 2.24 2.24 2.24 2.24 28.8500 2.24 2.24 2.24 2.24 2.24 29.1000 2.23 2.23 2.23 2.23 2.23 29.3500 2.23 2.23 2.23 2.23 2.23 29.6000 2.23 2.23 2.23 2.23 2.23 29.8500 2.23 2.23 2.23 2.23 2.23 30.1000 2.22 2.22 2.22 2.22 2.22 30.3500 2.22 2.22 2.22 2.22 2.22 30.6000 2.22 2.22 2.22 2.22 2.22 30.8500 2.22 2.22 2.22 2.22 2.22 31.1000 2.21 2.21 2.21 2.21 2.21 31.3500 ( 2.21 2.21 2.21 2.21 2.21 31.6000 2.21 2.21 2.21 2.21 2.21 31.8500 2.21 2.21 2.21A 2.21 2.21 32.1000 2.21 2.20 2.20 2.20 2.20 32.3500 2.20 2.20 2.20 2.20 2.20 32.6000 2.20 2.20 2.20 2.20 2.20 32.8500 2.20 2.20 2.20 2.20 2.20 33.1000 2.20 2.19 2.19 2.19 2.19 33.3500 2.19 2.19 2.19 2.19 2.19 33.6000 2.19 2.19 2.19 2.19 2.19 33.8500 2.18 2.18 2.18 2.18 2.18 34.1000 2.18 2.18 2.18 2.18 2.18 34.3500 2.18 2.18 2.18 2.18 2.18 34.6000 2.17 2.17 2.17 2.17 2.17 34.8500 2.17 2.17 2.17 2.17 2.17 35.1000 j 2.17 2.17 2.17 2.17 2.17 35.3500 2.16 2.16 2.16 2.16 2.16 35.6000 2.16 2.16 2.16 2.16 2.16 35.8500 2.16 2.16 2.16 2.16 2.15 36.1000 2.15 2.15 2.15 2.15 2.15 36.3500 ( 2.15 2.15 2.15 2.15 2.15 36.6000 2.15 2.15 2.15 2.15 2.14 36.8500 2.14 2.14 2.14 2.14 2.14 37.1000 2.14 2.14 2.14 2.14 2.14 37.3500 2.14 2.14 2.14 2.14 2.13 37.6000 2.13 2.13 2.13 2.13 2.13 37.8500 2.13 2.13 2.13 2.13 2.13 38.1000 2.13 2.13 2.13 2.13 2.12 38.3500 2.12 2.12 2.12 2.12 2.12 38.6000 2.12 2.12 2.12 2.12 2.12 38.8500 2.12 2.12 2.12 2.12 2.11 39.1000 2.11 2.11 2.11 2.11 2.11 39.3500 2.11 2.11 2.11 2.11 2.11 39.6000 2.11 2.11 2.11 2.11 2.10 39.8500 2.10 2.10 2.10 2.10 2.10 S/N: C21705506A87 Talbert & Bright PondPack Ver: 7.0 (325) Compute Time: 16:32:51 Date: 08-23-2004 Type.... Pond Routed HYG (total out) Page 7.06 Name.... P 30 OUT Tag: 1" Eq Storm: 1" Eq File.... J:\3301 (WILMINGTON)\0305 MASTER DRAINAGE PLAN\AUGUST 20 SOLUTION NORTH.PPW Storm... TypeIII 24hr Tag: 1" Eq HYDROGRAPH ORDINATES (cfs) Time Output Time increment = .0500 hrs hrs Time ---------J-------------------------------------------------------------- on left represents time for first value in each row. 40.1000 2.10 2.10 2.10 2.10 2.10 40.3500 2.10 2.10 2.10 2.10 2.10 40.6000 2.09 2.09 2.09 2.09 2.09 40.8500 2.09 2.09 2.09 2.09 2.09 41.1000 2.09 2.09 2.09 2.09 2.09 41.3500 2.08 2.08 2.08 2.08 2.08 41.6000 2.08 2.08 2.08 2.08 2.08 41.8500 2.08 2.08 2.08 2.08 2.08 42.1000 2.07 2.07 2.07 2.07 2.07 42.3500 2.07 2.07 2.07 2.07 2.07 42.6000 2.07 2.07 2.07 2.07 2.07 42.8500 2.07 2.06 2.06 2.06 2.06 43.1000 2.06 2.06 2.06 2.06 2.06 43.3500 2.06 2.06 2.06 2.06 2.06 43.6000 2.06 2.05 2.05 2.05 2.05 43.8500 2.05 2.05 2.05 2.05 2.05 44.1000 2.05 2.05 2.05 2.05 2.05 44.3500 2.05 2.05 2.04 2.04 2.04 44.6000 2.04 2.04 2.04 2.04 2.04 44.8500 2.04 2.04 2.04 2.04 2.04 45.1000 2.04 2.04 2.03 2.03 2.03 45.3500 2.03 2.03 2.03 2.03 2.03 45.6000 2.03 2.03 2.03 2.03 2.03 45.8500 2.03 2.03 2.03 2.02 2.02 46.1000 2.02 2.02 2.02 2.02 2.02 46.3500 2.02 2.02 2.02 2.02 2.02 46.6000 2.02 2.02 2.02 2.02 2.01 46.8500 I 2.01 2.01 2.01 2.01 2.01 47.1000 2.01 2.01 2.01 2.01 2.01 47.3500 2.01 2.01 2.01 2.01 2.01 47.6000 2.00 2.00 2.00 2.00 2.00 47.8500 2.00 2.00 2.00 2.00 2.00 48.1000 2.00 2.00 2.00 2.00 2.00 48.3500 2.00 1.99 1.99 1.99 1.99 48.6000 1.99 1.99 1.99 1.99 1.99 48.8500 1.99 1.99 1.99 1.99 1.99 49.1000 1.99 1.99 1.98 1.98 1.98 49.3500 1.98 1.98 1.98 1.98 1.98 49.6000 1.98 1.98 1.98 1.98 1.98 49.8500 1.98 1.98 1.98 1.97 1.97 50.1000 1.97 1.97 1.97 1.97 1.97 50.3500 1.97 1.97 1.97 1.97 1.97 50.6000 1.97 1.97 1.97 1.97 1.96 50.8500 1.96 1.96 1.96 1.96 1.96 51.1000 1.96 1.96 1.96 1.96 1.96 51.3500 1.96 1.96 1.96 1.96 1.96 51.6000 I 1.95 1.95 1.95 1.95 1.95 S/N: C21705506A87 Talbert & Bright PondPack Ver: 7.0 (325) Compute Time: 16:32:51 Date: 08-23-2004 Type.... Pond Routed HYG (total out) Page 7.07 Name.... P 30 OUT Tag: 1" Eq Storm: 1" Eq File.... J:\3301 (WILMINGTON)\0305 MASTER DRAINAGE PLAN\AUGUST 20 SOLUTION NORTH.PPW Storm... TypeIII 24hr Tag: 1" Eq HYDROGRAPH ORDINATES (cfs) Time Output Time increment = .OSOO hrs hrs ---------I-------------------------------------------------------------- Time on left represents time for first value in each row. 51.8500 1.95 1.95 1.95 1.95 1.95 52.1000 1.95 1.95 1.95 1.95 1.95 52.3500 1.95 1.95 1.94 1.94 1.94 52.6000 1.94 1.94 1.94 1.94 1.93 52.8500 1.92 1.92 1.91 1.90 1.90 53.1000 1.89 1.89 1.88 1.87 1.87 53.3500 1.86 1.86 1.85 1.84 1.84 53.6000 1.83 1.83 1.82 1.81 1.81 53.8500 1.80 1.80 1.79 1.79 1.78 54.1n0n 1.77 1.77 1.76 1.76 1.75 54.3500 1.75 1.74 1.73 1.73 1.72 54.6000 1.72 1.71 1.71 1.70 1.70 54.8500 1.69 1.69 1.68 1.67 1.67 55.1000 1.66 1.66 1.65 1.65 1.63 55.3500 1.61 1.60 1.58 1:•56 1.54- 55.6000 1.53 1.51 1.50 1.48 1.46 55.8500 1.45 1.43 1.42 1.40 1.39 56.1000 1.37 1.36 1.34 1.33 1.31 56.3500 1.30 1.28 1.24 1.20 1.16 56.6000 1.13 1.09 1.06 1.03 .99 56.8500 .96 .93 .90 .88 .85 57 .82 .80 .73 .52 .37 7.350 .27 .19 .13 .10 .07 000 .05 .03 .02 .02 .01 57.8500 .01 .01 .00 .00 .00 0 ;)A4U� r3lL- S/N: C21705506A87 Talbert & Bright PondPack Ver: 7.0 (325) Compute Time: 16:32:51 Date: 08-23-2004 Type.... Pond Routing Summary Page 7.08 Name.... P 30 OUT Tag: 100yr Event: 100 yr File.... J:\3301 (WILMINGTON)\0305 MASTER DRAINAGE PLAN\AUGUST 20 SOLUTION NORTH.PPW Storm... TypeIII 24hr Tag: 100yr LEVEL POOL ROUTING SUMMARY HYG Dir = J:\3301 (WILMINGTON)\0305 MASTER DRAINAGE PLAN\ Inflow HYG file = NONE STORED - P 30 IN 100yr Outflow HYG file = NONE STORED - P 30 OUT 100yr Pond Node Data = P 30 Pond Volume Data = P 30 Pond Outlet Data = PR 30 No Infiltration INITIAL CONDITIONS Starting WS Elev = 20.50 ft Starting Volume = .000 ac-ft Starting Outflow = .00 cfs Starting Infiltr. _ .00 cfs Starting Total Qout= .00 cfs Time Increment = .0500 hrs INFLOW/OUTFLOW HYDROGRAPH SUMMARY Peak Inflow = 670.06 cfs at 12.2000 hrs Peak ----------------------------------------------------- Outflow = 158.82 cfs at 13.4000 hrs Peak Elevation = 27.21 ft Peak Storage = 51.688 ac-ft MASS BALANCE (ac-ft) + Initial Vol = + HYG Vol IN - Infiltration = - HYG Vol OUT = - Retained Vol = Unrouted Vol = .000 101.109 .000 101.108 .000 -.000 ac ft (.000% of Inflow Volume) S/N: C21705506A87 Talbert & Bright PondPack Ver: 7.0 (325) Compute Time: 16:32:51 Date: 08-23-2004 Type.... Pond Routing Summary Page 7.09 Name.... P 30 OUT Tag: 10yr Event: 10 yr File.... J:\3301 (WILMINGTON)\0305 MASTER DRAINAGE PLAN\AUGUST 20 SOLUTION NORTH.PPW Storm... TypeIII 24hr Tag: 10yr i LEVEL POOL ROUTING SUMMARY HYG Dir = J:\3301 (WILMINGTON)\0305 MASTER DRAINAGE PLAN\ Inflow HYG file = NONE STORED - P 30 IN 10yr Outflow HYG file = NONE STORED - P 30 OUT 10yr i Pond Node Data = P 30 Pond Volume Data = P 30 Pond Outlet Data = PR 30 No Infiltration INITIAL CONDITIONS ---------------------------------- Starting WS Elev = 20.50 ft Starting Volume = .000 ac-ft I Starting Outflow = .00 cfs Starting Infiltr. _ .00 cfs Starting Total-'Q-out= .00 cfs Time Increment = .0500 hrs INFLOW/OUTFLOW HYDROGRAPH SUMMARY Peak Inflow = 424.67 cfs at 12.2000 hrs Peak Outflow = 82.57 cfs at 13.6000 hrs ----------------------------------------------------- Peak Elevation = 25.73 ft Peak Storage = 33.515 ac-ft MASS BALANCE -------------------------- (ac-ft) + Initial Vol = .000 + HYG Vol IN = 62.965 Infiltration = .000 - HYG Vol OUT = 62.965 - Retained Vol = .000 Unrouted Vol = -.000 ac-ft (.000% of Inflow Volume) S/N: C21705506A87 Talbert & Bright PondPack Ver: 7.0 (325) Compute Time: 16:32:51 Date: 08-23-2004 r Type.... Pond Routing Summary Page 7.10 Name.... P 30 OUT Tag: 25yr Event: 25 yr File.... J:\3301 (WILMINGTON)\0305 MASTER DRAINAGE PLAN\AUGUST 20 SOLUTION NORTH.PPW + Storm... TypeIII 24hr Tag: 25yr LEVEL POOL ROUTING SUMMARY HYG Dir = J:\3301 (WILMINGTON)\0305 MASTER DRAINAGE PLAN\ Inflow HYG file = NONE STORED - P 30 IN 25yr Outflow HYG file = NONE STORED - P 30 OUT 25yr j I Pond Node Data = P 30 Pond Volume Data = P 30 Pond Outlet Data = PR 30 No Infiltration INITIAL CONDITIONS ---------------------------------- Starting WS Elev = 20.50 ft Starting Volume = .000 ac-ft Starting Outflow = .00 cfs Starting Infiltr. _ .00 cfs Starting Total•aobt= .00 cfs Time Increment = .0500 hrs INFLOW/OUTFLOW HYDROGRAPH SUMMARY Peak Inflow = 510.05 cfs at 12.2000 hrs Peak Outflow = ----------------------------------------------------- 109.70 cfs at 13.5000 hrs Peak Elevation = 26.25 ft Peak Storage = 39.783 ac-ft MASS BALANCE (ac-ft) -------------------------- + Initial Vol = .000 + HYG Vol IN = 76.127 - Infiltration = .000 - HYG Vol OUT = 76.127 - Retained Vol = 000 ---_ - Unrouted Vol = -.000 ac-ft (.000% of Inflow Volume) S/N: C21705506A87 Talbert & Bright PondPack Ver: 7.0 (325) Compute Time: 16:32:51 Date: 08-23-2004 Type.... Pond Routing Summary Page 7.11 Name.... P 30 OUT Tag: 2yr Event: 2 yr File.... J:\3301 (WILMINGTON)\0305 MASTER DRAINAGE PLAN\AUGUST 20 SOLUTION NORTH.PPW Storm... TypeIII 24hr Tag: 2yr LEVEL POOL ROUTING SUMMARY HYG Dir = J:\3301 (WILMINGTON)\0305 MASTER DRAINAGE PLAN\ Inflow HYG file = NONE STORED - P 30 IN 2yr Outflow HYG file = NONE STORED - P 30 OUT 2yr Pond Node Data = P 30 Pond Volume Data = P 30 Pond Outlet Data = PR 30 No Infiltration INITIAL CONDITIONS ---------------------------------- Starting WS Elev = 20.50 ft Starting Volume .000 ac-ft Starting Outflow .00 cfs Starti--ng Infiltr.- - .00 cfs r Starting Total Qout= .00 cfs {j Time Increment .0500 hrs INFLOW/OUTFLOW HYDROGRAPH SUMMARY Peak Inflow = 226.91 cfs at 12 2000 hrs Peak Outflow = ----------------- 27.00 cfs at 14.7000 hrs Peak Elevation = ------------------------------- 24.50 ft Peak Storage = 19.229 ac-ft i MASS BALANCE (ac-ft) + Initial Vol = .000 + HYG Vol IN = 33.072 - Infiltration = .000 - HYG Vol OUT = 33.072 - Retained Vol = .000 Unrouted Vol = -.000 ac-ft (.000% of Inflow Volume) S/N: C21705506A87 Talbert & Bright PondPack Ver: 7.0 (325) Compute Time: 16:32:51 Date: 08-23-2004 Appendix A A-1 a L Index of Starting Page Numbers for ID Names J1... 3.01, 4.01, 4.02, 4.03, 4.04, 4.05 J2... 3.03, d.06, 4.07, 4.08, 4.09, 4.10 J3... 3.05, 4.11, 4.12, 4.13, 4.14, 4.15 NHC... 2.01 ----- P ----- P 30... 5.01, 7.01, 7.02, 7.03, 7.08, 7.09, 7.10, 7.11 PR 30... 6.01, 6.06, 6.10 ----- W ----- Watershed 1" Eq... 1.01, 1.02, 1.03, 1.04, 1.05 S/N: C21705506A87 Talbert & Bright. PondPack Ver: 7.0 (325) Compute Time: 16:32:51 Date: 08-23-2004 1 11 I fl Type.... Executive Summary (Nodes) Page 1.04 Name.... Watershed Event: 25 yr File.... J:\3301 (WILMINGTON)\0305 MASTER DRAINAGE PLAN\AUGUST 2 SOLUTION SOUTH.PPW Storm... TypeIII 24hr Tag: 25yr NETWORK SUMMARY -- NODES (Trun.= HYG Truncation: Blank=None; L=Left; R=Rt; LR=Left & Rt) DEFAULT Design Storm File,ID = NHC.RNQ NHC Storm Tag Name = 25yr Description: New Hanover County Rainfall Curve Data ------------------------------------ Data Type, File, ID = Synthetic Storm SCSTYPES.RNF TypeIII 24hr Storm Frequency = 25 yr Total Rainfall Depth= 8.0500 in Duration Multiplier = 1 Resulting Duration = 24.0000 hrs Resulting Start Time= .0000 hrs Step= .1000 hrs End= 24.0000 hrs HYG Vol Qpeak Node ID Type ac-ft Trun. hrs AREA A AREA 20.840 12.5000 AREA B AREA 5.957 12.4000 AREA C AREA 9.206 12.4500 AREA D AREA 16.192 12.6000 AREA E AREA 23.551 12.5000 AREA F AREA 19.603 12.6500 AREA G AREA 16.190 12.4500 AREA H AREA 34.591 12.5000 AREA I AREA 22.204 12.5000 J 10 JCT 26.796 12.4500 J 20 JCT 20.839 13.9500 J 30 JCT 36.002 12.5500 J 40 JCT 52.194 12.7500 J 50 JCT 43.155 12.5500 Outfall OUT 10 JCT 167.332 R 13.8000 P 10 IN POND 20.840 12.5000 P 10 OUT POND 20.839 13.9500 P 20 IN POND 168.333 12.6000 P 20 OUT POND 167.332 R 13.8000 F-�� 5 e:,-'Z 14-7 )0c-2- S/N: C21705506A87 Talbert & Bright PondPack Ver: 7.0 (325) Compute Time: 14:47:22 Qpeak Max WSEL cfs ft 135.88 41.04 59.41 92.25 143.34 108.11 102.46 T-!� 215.80 133.11, 50.34 -- S- 22.40 106.21 188.09 --rp 249.38 - ,�'_ r cj. 220.21 135.88 2 2.40 ---r-t 24.96 843.86 220.21 16.61 STu� C AD Date: 08-20-2004 1-1 3 Project Title: ILM SWMP Project Engineer: Eric Stumph j:1..\0305 master drainage planUlmswpd.stm Talbert and Bright StormCAD v1.0 08/23/04 05:59:55 PM ®Haestad Methods, Inc. 37 Brookside Road Waterbury, CT 06708 USA (203) 755-1666 Page 1 of 1 Z 0 0 0 0 O O O O 0 0S D0880o0000°0 m Z 00000 O 0 0 0 b Do 000089 o00 b O b b O e b b b b D 0 S o 0 8 g o 0.. Qnd3 Q D w OOPPPPPPP D 0 0000800008 o 0000e00000 0 0 0 0 0 0 0 8 ffg PPPPPPPPb b a 0 0 0 0 O O 0 .0. = .i o o o 0 0 0 e o 0 0 $080000000 n g_ c v m o �i N'N $io 3 N�'N+°NO Nei OCOOOPPPPPP 000000$00$0 J, 3 mi 000o0000000 8 0 0 0 0 0 0bab0 0 00 0 S pp D o 0 0 0 Mill r D0 0 0 0 l 0 c0 0 .00 0 gp 0l� 0l�l 0l�l 0�l N p p p �0l p N�$l QQ p Dcc 0 00 0 00 0 yy p � i S0 p��pp$$gp8SppS8o� �p0 ppq� D O S S O O 8 O 8 8 8 yak N N N A Ap# Y b toll f0 O +; 0 0 p 8 0 0 0 8 8 0 0 6 +�:�b bb8bc3 m s00sl0�eog gop0le�p0 A?q "# A + 1.4 -'am'oyy136-t! CVo O 0 N N 0 0 3 0 b b P b,O o b Doo$00oo000 3 Z o o 0 0 e 0 o e o D 0 0 0 0 0 0 0 0 0 O Ii79191zzI -ri&=Z! � a � &3I;■;�I;; � £| , m�§i/@■�;; � BBseeaaBse B@sease§ee � �#� #gip&#■ � b}1§ k§�B�KkBBk • ®b;■m■;■;■ ■ #a &ss■B�sa � ;;|2�2/■■■ge!| �.I §(§;k■§■�s s 2 � ■ I j.r- CU Sm M BE OtT C Cu Ar I UMM 93 ps I F ta3; e v c c 0 0 N a 0 N T 0 0 3 x fN �xa c• 3 V ..ro -+ao aoo b0 uxx . m t;;R i 3 .N m 'O 7 �N 7 � I i Va ' I I I x J u Z $. a i N O O Lg.d -OC`7'0.'p M<' m << mm� SOON O p00 goo O t O O OD O v D vco ----Q ,Co"gym � :ag -p a N-m(D 1 O 7 can. (D 7 0) a :r O 0 0 r;= t O O U)rpCv W�� a .Oh��N 01 7a�j0 t 7ti�W(il p O� COM C 'O W Oi moo i+0 O� + O O N O CN11 O;p 0 0 O O O O O m o� 0 m m N n 16 d d a to m m n 0 O N OD O n m La O �U CC W 7 V0-0 (a my qi Q �m ~ M c V1 EL `S CL i f (Dr,oc-0 N.D M.0.5. n 3'• W W 00(�0 r;:O;:o f/)roC-o Nj R(Q 0.-L Op—O T• W 4 OHO O O 0 cn;uo T3 3 �! K)rh wok o�m 33CD WOv 'yO W� C CD N� �Cnr •POO �O Orw N��ODON A� 000cc000 000O0OOO m m r+ O� 7 EE I I I i I i i i 'I