HomeMy WebLinkAboutNCC213747_NOT Closeout Documents_20230718 Sedimentation/Construction Stormwater Inspection Report
North Carolina Department of Environmental Quality
Land Resources: 450 W. Hanes Mill Road, Suite 300,Winston-Salem, NC 27105
(336)776-9800
County: Guilford Project:Contract 2019-064,North Elm Street Sidewalk Improvements River basin: Cape Fear
Pe rs on financially responsible:City of Greensboro Project#: GUILF-2021-027
Address: PO Box 3136,Greensboro,NC 27402-3136
1. Project Location: N.Elm Street,Greensboro
Pictures: No
2. Weather and soil conditions: 80's,Clear,Workable Soils Initial inspection: No
3. Is site currently under notice of violation? No
4. Is the site in compliance with S.P.C.A.and rules? Yes If no,check violations below:
5. Violations:
6. Is the site in compliance with NPDES Permit NCG010000 ConstructionStormwaterrequirements? Yes
Describe:
7. Has sedimentation damage occurredsince last inspection? No If Yes, where? (check all that apply)
Degree of damage:
8. Contact made with(name): Title:
Inspection report: Sent Report Dategiven/sent: July 14,2023
9. Corrective action needed:
10. Comments: Permanent ground cover sufficient to restrain erosion has been established.No additional
self-monitoring or self-inspections are required.Project is in compliance and released under
the SPCA.Termination of coverage under the NPDES General Stormwater Permit for
Construction Activities(NCG01)must be requested by the permitteevia a Notice of
Termination(NOT).The NOT is available at:
http s://edocs.deq.nc.gov/Forms/NCG01-Termination.Please note that this correspondence
must be uploaded as part of completing the NOT process.
Reported by: Kimberly Turney
Date of inspection: July 13,2023 Time arriving on site: 3:00 PM Time leaving site: 3:30 PM