HomeMy WebLinkAboutNCS000040_FINAL TSS Abatement and Maint 2Q2023_20230719 :HARUPT�
PIPE and FOUNDRY COMPANY
P.O. Box 35430 • Telephone 704/332-2647
CHARLOTTE, NORTH CAROLINA 28235
Foundry Fax No. 332-4581
July 13,2023
Jerry Eplin
NCDEQ-Mooresville Regional Office
610 East Center Avenue,Suite 301
Mooresville,NC 28115
ierry.eplin@deq.nc.gov
RE: Charlotte Pipe and Foundry Company-Cast Iron Division
Stormwater Permit: NCS000040
SW TSS Abatement&Maintenance Quarterly Report(April-June 2023)
Dear Jerry,
In addition to other Best Management Practices (BMPs),Charlotte Pipe continues to maintain the
following BMPs specifically for TSS Abatement:
• Continuous sweeping of outside areas around the facility;
• Operation and collection of dust with 20+baghouses equipped with covered collection boxes;
• Operation of water spray on charging system and in scrap yard;
• Pumping stormwater sumps from charging area and scrap yard to WWTP for treatment;
• Placement of catch pans under hopper bottoms of feldspar delivery truck during raw material
unloading;and
• Maintaining&replacement of drain/sock inserts in specified drains/culverts around the facility.
Please find attached the Filter Insert Maintenance Schedule for CY2023. An'x'represents a filter insert
change;yellow highlight indicates when it is scheduled to be changed again. The most recent analytical
results available is from sampling conducted in June 2023 (January-June 2023). Follow-up sampling will
be conducted during the July-December 2023 timeframe.
Please contact Jenny Pappalardo at(704)348-5513 if you have any questions or need any additional
information.
Sincerely,
Jenny L.Pappalardo
Charlotte Pipe and Foundry Co.
Environmental Compliance
Stormwater Insert Schedule
Change
ID# Location Schedule Jan-23 Feb-23 Mar-23 Apr-23 May-23 Jun-23 Jul-23 Aug-23 Sep-23 Oct-23 Nov-23 Dec-23
SW1 Corner of Office Building 1/yr x
SW2 Behind Slag Pile 1/6m x
SW3 Water Treatment 1/6m x
SW4 Corner of Substation&Rolo Laempe 1/6m x
SW5 Corner of Substation&Rolo Electr Rm 1/6m x
SW6 Oil House 1/6m x
SW7 NPF Baghouse 1/6m x
SW8 Sand Lab 1/6m x
SW9 Oil House Hill 1/6m x
SW10 Middle Oil House Hill 1/6m x
SW11 Gas Pump 1/6m x
SW12 HWS Baghouse 1/grtr x x
SW13 Alley @ HWS&Bath House 1/mo x x x x x x
SW14 Alley @ Kitchen 1/mo x x x x x x
SW15 Alley @ Cope&Drag 1/mo x x x x x x
SW16 Alley @ Pattern Shop 1/mo x x x x x x
SW17 Alley @ Laempe Entrance 1/mo x x x x x x
SW18 Top Hill 1/yr
SW19 E-Coat 1/yr x
SW20 Behind Pipe 1/yr
SW21 Rolocast Baghouse 1/6m x
x Insert Changed
Scheduled Change
@ Checked, but ok so reviewing schedule for next CY