Loading...
HomeMy WebLinkAboutNCS000040_FINAL TSS Abatement and Maint 2Q2023_20230719 :HARUPT� PIPE and FOUNDRY COMPANY P.O. Box 35430 • Telephone 704/332-2647 CHARLOTTE, NORTH CAROLINA 28235 Foundry Fax No. 332-4581 July 13,2023 Jerry Eplin NCDEQ-Mooresville Regional Office 610 East Center Avenue,Suite 301 Mooresville,NC 28115 ierry.eplin@deq.nc.gov RE: Charlotte Pipe and Foundry Company-Cast Iron Division Stormwater Permit: NCS000040 SW TSS Abatement&Maintenance Quarterly Report(April-June 2023) Dear Jerry, In addition to other Best Management Practices (BMPs),Charlotte Pipe continues to maintain the following BMPs specifically for TSS Abatement: • Continuous sweeping of outside areas around the facility; • Operation and collection of dust with 20+baghouses equipped with covered collection boxes; • Operation of water spray on charging system and in scrap yard; • Pumping stormwater sumps from charging area and scrap yard to WWTP for treatment; • Placement of catch pans under hopper bottoms of feldspar delivery truck during raw material unloading;and • Maintaining&replacement of drain/sock inserts in specified drains/culverts around the facility. Please find attached the Filter Insert Maintenance Schedule for CY2023. An'x'represents a filter insert change;yellow highlight indicates when it is scheduled to be changed again. The most recent analytical results available is from sampling conducted in June 2023 (January-June 2023). Follow-up sampling will be conducted during the July-December 2023 timeframe. Please contact Jenny Pappalardo at(704)348-5513 if you have any questions or need any additional information. Sincerely, Jenny L.Pappalardo Charlotte Pipe and Foundry Co. Environmental Compliance Stormwater Insert Schedule Change ID# Location Schedule Jan-23 Feb-23 Mar-23 Apr-23 May-23 Jun-23 Jul-23 Aug-23 Sep-23 Oct-23 Nov-23 Dec-23 SW1 Corner of Office Building 1/yr x SW2 Behind Slag Pile 1/6m x SW3 Water Treatment 1/6m x SW4 Corner of Substation&Rolo Laempe 1/6m x SW5 Corner of Substation&Rolo Electr Rm 1/6m x SW6 Oil House 1/6m x SW7 NPF Baghouse 1/6m x SW8 Sand Lab 1/6m x SW9 Oil House Hill 1/6m x SW10 Middle Oil House Hill 1/6m x SW11 Gas Pump 1/6m x SW12 HWS Baghouse 1/grtr x x SW13 Alley @ HWS&Bath House 1/mo x x x x x x SW14 Alley @ Kitchen 1/mo x x x x x x SW15 Alley @ Cope&Drag 1/mo x x x x x x SW16 Alley @ Pattern Shop 1/mo x x x x x x SW17 Alley @ Laempe Entrance 1/mo x x x x x x SW18 Top Hill 1/yr SW19 E-Coat 1/yr x SW20 Behind Pipe 1/yr SW21 Rolocast Baghouse 1/6m x x Insert Changed Scheduled Change @ Checked, but ok so reviewing schedule for next CY