Loading...
HomeMy WebLinkAboutSW3230601_email_20230612 Peck, Kaitlin From:Peck, Kaitlin Sent:Monday, June 12, 2023 9:07 AM To:jeff@def.fit; treitzel@denverconstruction.com; jdavidledford@yahoo.com Cc:Farkas, Jim J; Eplin, Jerry W; drudisill@lincolncounty.org Subject:Dever Health & Fitness; Denver, Lincoln County Good Morning, We received your application for a new post-construction stormwater permit on 6/7/23. At this time, the submission is not administratively complete and cannot be accepted for review in its current condition. Please provide the following submittal items within 30 calendar days (by close of business on 7/12/23) so that we may accept the project and begin the review process, otherwise, the project will be returned as administratively incomplete.  2x hard copies of the Application with the following corrections made (These items are required per 15A NCAC 02H .1042(2)(a) and per Section VI, 1 of the Application):  Section I, 1 – The project name listed on the Application “Denver Fitness Facility” does not match the project name as shown on the plans “Denver Health & Fitness”. Please revise either the Application or plans as needed for consistency.  Section IV, 8 – The percent impervious area for the project area does not appear to be calculated correctly. Project density calculation information can be found in 15A NCAC 02H .1003(1). Please note that “existing BUA” refers to BUA that was in-place prior to the rules going into effect in this area, not just what BUA happens to currently be on the site. Please revise and provide a calculation in the calculation booklet showing how the percent BUA for the site is calculated.  2x signed & sealed hard copies of a plan sheet showing the following corrected additions:  Existing site conditions. This item is required per Section VI, 8k & 8n of the Application and 15A NCAC 02H .1042(2)(g)(v).  Wetland delineation or a note on the plans stating that there are no wetlands located on-site. This item is required per 15A NCAC 02H .1042(2)(g)(iii) & Section VI, 8m of the Application. Please also list the name of the individual that made this determination in a note on the plans. NOTE: This site falls in both State and Local (Lincoln Co.) permitting zones. Please reach out to your local stormwater program to ensure you are following both permitting requirements for approval. NOTE: This is an administrative completeness review, not a detailed engineering review, there may be other issues that may be brough up during the engineering review. 1 If these items are received within the stipulated timeframe, we can accept the project and begin the review process. Once accepted, reviews under the standard permitting process can take up to 90 calendar days per statute (one of our two reviewer positions is currently vacant). Hard copies should be mailed to the following address: For FedEx/UPS: Jim Farkas 512 N. Salisbury Street, Office 640E Raleigh, NC 27604 For USPS: Jim Farkas 1612 Mail Service Center Raleigh, NC 27699-1612 If you have any questions, please contact Kaitlin Peck at Kaitlin.peck@deq.nc.gov or at (919) 707-9209. Thank you, Kaitlin Peck Environmental Specialist North Carolina Department of Environmental Quality Office: (919) 707-9209 Kaitlin.peck@deq.nc.gov 2