HomeMy WebLinkAbout20201292 Ver 1_Staff Report Maria Polizzi_20230721 (2)Initial Review and Submittal
ID#* 20201292
Mitigation Project Submittal - 6/12/2023
Type of Mitigation Project:*
Stream Wetlands Buffer Nutrient Offset
(Select all that apply)
Is this a Prospectus,Technical Proposal or New Site?*
Project Contact Information
Version* 1
Yes No
........ ......... ......... ......... ......... .............
Contact Name: * Email Address:
Matthew Harrell matthew.harrell@davey.com
Project Information
Existing 1
Existing 20201292 Version: (numbers only)
(DWR)
I D#:
Project Name: Crane Mitigation Site
Project Type: * DMS Mitigation Bank
County: Lee
Document Information
Mitigation Document Type:*
Mitigation As -Built Plans
All attachments have been uploaded into Laserfiche for your review.
Signature
Print Name:* Matthew Harrell
Signature: *
e%wwt/,,,ri -�;/,"?t till
Staff Review
Staff Review by Maria Polizzi
Project Location: WaterResources\DWR - Wetlands Program\Non DOT\20201292\Ver 1
Staff Comments
File Upload Jpg or pdf only
Staff Review 07/21/2023
Completed Date: