HomeMy WebLinkAboutWQ0031762_Notice of Violation_20230718ROY COOPER
Governor
ELIZABETH S. BISER
Secretary
RICHARD E. ROGERS, JR.
Director
NORTH CAROLINA
Environmental Quality
July 18, 2023
Certified Mail No. 7019 1120 0001 5505 1831
RETURN RECEIPT REQUESTED
JP Woodrum, Operations Manager
Alltech, Inc.
11761 NC 770 East
Eden, NC 27288
SUBJECT: Notice of Violation (NOV-2023-PC-0394)
Compliance Evaluation Inspection and Annual Report Review
Permit No. WQ0031672
Rockingham County
Dear Mr. Woodrum:
On July 17, 2023, Division of Water Resources (DWR) staff Caitlin Caudle completed a routine
compliance inspection and review of the 2022 Residuals Annual Report. You were present during
the entire inspection. A review of records, production facilities, and storage facilities was
completed. This review reflected non-compliance with the subject permit. The following violation
was noted:
1. Per Permit Condition IV.7 an annual report detailing all land application activities must
be submitted by March 1st following the reporting year. At the time of inspection, the 2022
Residual Annual Report had not been submitted. Please submit the annual report
within fifteen (15) days of receipt of this Notice.
The following item of concern was noted:
• DWR contact information was not listed in the Spill Plan. Ms. Caudle recommended
including this information in the Spill Plan for any spills or bypasses related to the
production, distribution, or application of residuals.
Please refer to the enclosed inspection report for additional comments and observations from the
compliance inspection. If you have any questions, please contact me or Caitlin Caudle at the
letterhead address and phone number, or by email at or
Caitlin.caudle(a-)-deg.nc.gov.
Sincerely,
DocuSigned by:
OD2D3CE3F161416...
Jennifer F. Graznak, Assistant Regional Supervisor
Water Quality Regional Operations Section
Division of Water Resources, NCDEQ-WSRO
Enc: Inspection Report
Cc: Rockingham County Environmental Health (electronic copy)
DffNorth Carolina Department of Environmental Quality I Division of Water Resources
oan caaouNn
Winston-Salem Regional Office 1 450 W. Hanes Mill Rd, Suite 300 I Winston-Salem, North Carolina 27105
M336.776.9800
oep.m.m or em�nmen� Qualm
Compliance Inspection Report
Permit: WQ0031672 Effective: 01/31/17 Expiration: 12/31/21 Owner : Alltech Inc
SOC: Effective: Expiration: Facility: Alltech - Eden Facility
County: Rockingham 11761 Hwy 770 E
Region: Winston-Salem
Eden NC 27288
Contact Person: J P Woodrum Title: Phone: 336-635-5190
Directions to Facility:
System Classifications:
Primary ORC:
Secondary ORC(s):
On -Site Representative(s):
Related Permits:
Inspection Date: 07/17/2023 Entry Time 10:OOAM
Primary Inspector: Caitlin C //'±8BV,80C.Signe/d by:
I'�
Secondary Inspector(s): (l�D&968199D49D...
Certification:
Phone:
Exit Time: 10:50AM
Phone: 336-776-9699
Reason for Inspection: Routine Inspection Type: Compliance Evaluation
Permit Inspection Type: Distribution of Residual Solids (503 Exempt)
Facility Status: Compliant ❑ Not Compliant
Question Areas:
Miscellaneous Questions Record Keeping Storage
(See attachment summary)
Page 1 of 3
Permit: WQ0031672 Owner - Facility:Alltech Inc
Inspection Date: 07/17/2023 Inspection Type: Compliance Evaluation Reason for Visit: Routine
Inspection Summary:
On July 17, 2023, Division of Water Resources (DWR) staff Caitlin Caudle conducted a routine compliance inspection. JP
Woodrum, Operations Manager, was present during the entire inspection. A review of records, production facilities, and
storage facilities was completed. This review mostly reflected compliance with the subject permit. The following item of
concern was noted:
• DWR contact information was not listed in the Spill Plan. Ms. Caudle recommended including this information in the
Spill Plan for any spills or bypasses related to the production, distribution, or application of residuals.
Other observations:
• Offloaded ❑ Deactivated ❑ Evaporation ❑ Batch Tank ❑ Drier ❑ Bag House ❑ Bagged final product.
• This facility processes spent brewers yeast into animal feed and ethanol.
• The facility is no longer receiving the material that was creating residuals. This material was screened with a Sweco as
it was offloaded, and screenings were funneled into 55 gallon drums before being spread.
• Mr. Woodrum has sent some information to Hall Environmental for the permit renewal application.
• Zebra is used to dispose of any fouled product.
• The permit, operation and maintenance plan, spill plan, and emergency management plan were on site. Ms. Caudle sent
the most recent requirements for required plans to Mr. Woodrum on 7/17/2023.
• The plant has regular PMs that are completed and recorded by maintenance staff. The plant is automated to a certain
extent and will alarm when needed, such as high levels in storage silos.
• There are currently no storage structures for biosolids as none are being produced. Mr. Woodrum stated that if any
biosolids that are produced, land application equipment can be acquired.
• Current operations have multiple silos and bins with containment areas around them. Mr. Woodrum stated that he does
not foresee land applying from these silos. The containment areas have valves to allow for the release of rainwater to
stormwater ditches or to the city WWTP.
• The bagged product is sold under different product names, but all labels have brewers yeast as the only ingredient with a
minimum of 40% crude protein.
• The 2022 Residuals Annual Report has not been submitted to date. This will be addressed in separate correspondence.
• Please review the permit thoroughly before distributing any residuals.
Page 2 of 3
Permit: WQ0031672 Owner - Facility:Alltech Inc
Inspection Date: 07/17/2023 Inspection Type: Compliance Evaluation
Reason for Visit: Routine
Type
Yes No NA NE
Land Application
❑
Distribution and Marketing
Record Keeping
Yes No NA NE
Is GW monitoring being conducted, if required?
❑
❑ 0 ❑
Are GW samples from all MWs sampled for all required parameters?
❑
❑ 0 ❑
Are there any GW quality violations?
❑
❑ 0 ❑
Is GW-59A certification form completed for facility?
❑
❑ 0 ❑
Is a copy of current permit on -site?
0
❑ ❑ ❑
Are current metals and nutrient analysis available?
❑
❑ 0 ❑
Are nutrient and metal loading calculating most limiting parameters?
❑
❑ 0 ❑
a. TCLP analysis?
❑
❑ 0 ❑
b. SSFA (Standard Soil Fertility Analysis)?
❑
❑ 0 ❑
Are PAN balances being maintained?
❑
❑ 0 ❑
Are PAN balances within permit limits?
❑
❑ 0 ❑
Has land application equipment been calibrated?
❑
❑ 0 ❑
Are there pH records for alkaline stabilization?
❑
❑ 0 ❑
Are there pH records for the land application site?
❑
❑ 0 ❑
Are nutrient/crop removal practices in place?
❑
❑ 0 ❑
Do lab sheets support data reported on Residual Analysis Summary?
❑
❑ 0 ❑
Are hauling records available?
❑
❑ 0 ❑
Are hauling records maintained and up-to-date?
❑
❑ 0 ❑
# Has permittee been free of public complaints in last 12 months?
0
❑ ❑ ❑
Has application occurred during Seasonal Restriction window?
❑
❑ 0 ❑
Comment:
Page 3 of 3