HomeMy WebLinkAbout20071854 Ver 2_Site Plan_20230720Full Pond/
Norma.1 W, ater. Level
Sere€ine
La ke
(At Fuii Pond/ Norma{ Water Level)
,5,5 ` 60 '10W X EGG'
I' o..,bov2 X �.,qto
house_
h
�Ao } r 5 v C-mo v cd
0 CI 5� v fADa ,c e..
+� )b&�Ce r
Please approximately sketch the following information on this plan, length of shoreline
(provide dimensions for each item, such as 10 ft x 100 ft)*:
1. All proposed vegetation clearing
2. Location of rip rap or fill to be placed above the Full Pond/ Normal Water Level elevation
3. Location of rip rap or fill to be placed below the Full Pond/ Normal Water Level elevation
4. Location of any proposed structures such as buildings, retaining walls, docks, etc.
5. Location of arty excavation or dredging below the Full Pond/ Normal Water Level elevation
6. Location of construction access corridors
FORM: SSGP 10-2013 Page 3 of 3