Loading...
HomeMy WebLinkAbout20071854 Ver 2_Site Plan_20230720Full Pond/ Norma.1 W, ater. Level Sere€ine La ke (At Fuii Pond/ Norma{ Water Level) ,5,5 ` 60 '10W X EGG' I' o..,bov2 X �.,qto house_ h �Ao } r 5 v C-mo v cd 0 CI 5� v fADa ,c e.. +� )b&�Ce r Please approximately sketch the following information on this plan, length of shoreline (provide dimensions for each item, such as 10 ft x 100 ft)*: 1. All proposed vegetation clearing 2. Location of rip rap or fill to be placed above the Full Pond/ Normal Water Level elevation 3. Location of rip rap or fill to be placed below the Full Pond/ Normal Water Level elevation 4. Location of any proposed structures such as buildings, retaining walls, docks, etc. 5. Location of arty excavation or dredging below the Full Pond/ Normal Water Level elevation 6. Location of construction access corridors FORM: SSGP 10-2013 Page 3 of 3