Loading...
HomeMy WebLinkAboutNCC215349_NOT Closeout Documents_20230718 Sedimentation/Construction Stormwater Inspection Report North Carolina Department of Environmental Quality Land Resources: 450 W. Hanes Mill Road, Suite 300,Winston-Salem,NC 27105 (336) 776-9800 County: Yadkin Project: Yadkin Valley Sewer Authority Stream River basin: Yadkin-PeeDee Person financially responsible:Yadkin Valley Sewer Authority-Nicole Johnston, Project#: YADKI-2022-002 Executive Director Address: 500 Highway 268 West,Elkin,NC 28621 1. Project Location: Cobb Street,Jonesville Pictures: Yes-Digital 2. Weather and soil conditions: 70s,sunny,workable soil Initial inspection: No 3. Is site currently under notice of violation? No 4. Is the site in compliance with S.P.C.A.and rules? Yes If no,check violations below: 5. Violations: 6. Is the site in compliance with NPDES Permit NCG010000 Construction Stormwater requirements? Yes Describe: 7. Has sedimentation damage occurred since last inspection? No If Yes,where? (check all that apply) Degree of damage: 8. Contact made with(name): Title: Inspection report: Sent Report Date given/sent: June 27,2023 9. Corrective action needed: 10. Comments: Permanent ground cover sufficient to restrain erosion has been established.No additional self-monitoring or self-inspections are required. Project is in compliance and released under the SPCA.Termination of coverage under the NPDES General Stormwater Permit for Construction Activities(NCG01)must be requested by the permittee via a Notice of Termination(NOT).The NOT is available at: https://edocs.deq.nc.gov/Forms/NCG01-Termination. Please note that this correspondence must be uploaded as part of completing the NOT process. If you have any questions,please contact me at Robby.Deans@deq.nc.gov or by phone at(336)776-9658. (Side note:there is a storm water pipe that is being undermined near the entrance to the Cobb Street location that may affect the integrity of Cobb Street.) Reported by: Robby Deans Others present: Date of inspection: June 14,2023 Time arriving on site: 1:15 PM Time leaving site: 1:30 PM CC: