Loading...
HomeMy WebLinkAboutSW6221001_email_20230719 Peck, Kaitlin From:Farkas, Jim J Sent:Wednesday, July 19, 2023 3:38 PM To:david.a.heins.civ@army.mil Cc:lee.p.ward.civ@army.mil; hwadsworth@gradientnc.com; Joyner, Melissa Subject:RE: SW6221001 Macridge & Chicken Road Intersection Improvements Attachments:Cover Letter & Permit 7-19-23.pdf Good Afternoon, The Division of Energy, Mineral, and Land Resources (DEMLR), received a complete Stormwater Management Permit Application for the subject project on June 30, 2023. Staff review of the plans and specifications has determined that the project, as proposed, will comply with the Stormwater Regulations set forth in Title 15A NCAC 2H.1000 - 1062 rules. We are forwarding Permit No. SW6221001, dated July 19, 2023, for the construction, operation and maintenance of the subject project and the stormwater system. This permit shall be effective from the date of issuance and shall be subject to the conditions and limitations as specified therein, and does not supersede any other agency permit that may be required. The original signed permit package and approved plans are being mailed to the permittee, David A. Heins, at the following address (NOTE: An electronic version of this permit can be found in our online repository: https://edocs.deq.nc.gov/WaterResources/Browse.aspx?id=494276&dbid=0&repo=WaterResources): Fort Bragg Directorate of Public Works Attn: David A. Heins, Chief of Environmental Services Division 2175 Reilly Road, Stop A Fort Bragg, NC 28310-5000 I will hold onto our hard copy of this project for 30 days (in case any issues/typos with the permit are noticed and corrections need to be made) after which point, it will be kept on file at the Fayetteville Regional Office. If you have any questions, or need additional information concerning this matter, please contact me at jim.farkas@deq.nc.gov. Thank you, Jim Farkas State Stormwater Engineer North Carolina Department of Environmental Quality Office: (919) 707-3646 Jim.farkas@deq.nc.gov 1 From: DeBerry, Margie <Margie.DeBerry@ncdenr.gov> Sent: Tuesday, October 4, 2022 8:13 AM To: david.a.heins.civ@army.mil; lee.p.ward.civ@army.mil; hwadsworth@gradientnc.com Cc: Lawyer, Mike <mike.lawyer@ncdenr.gov>; Farkas, Jim J <Jim.Farkas@ncdenr.gov> Subject: SW6221001 Macridge & Chicken Road Intersection Improvements Good morning, We received your post-construction stormwater permit application for the above mentioned project on 10/3/2022. Reviews under the standard permitting process generally take 75 calendar days, but can take up to 90 calendar days per statute (our other reviewer, Corey Anen, no longer works for the State, so this review may exceed 75 days). Please upload all documents that you mailed into our office through the link provided below. Be sure to choose the Central Office as the Primary Contact office. https://edocs.deq.nc.gov/Forms/SW-Supplemental-Upload IMPORTANT NOTE: Please ensure that each file is uploaded under its appropriate file type. Additional file types can be entered into the electronic form by clicking on the “Add Another Post-Construction File Upload” link directly below the “State Stormwater Information Uploads” section of the form. Please do not upload entire plan sets through this form, but rather upload the relevant individual sheets under the appropriate file type. Selecting the correct file type ensures that the files are properly named in the electronic repository and it helps expedite the review process. Please type in permit #: SW6221001 If you have any questions, please contact Jim Farkas Jim.Farkas@ncdenr.gov 919-707-3646. Thank you, Margie DeBerry Environmental Specialist, Division of Energy, Mineral, and Land Resources North Carolina Department of Environmental Quality Office: (919) 707-9209 margie.deberry@ncdenr.gov 2