HomeMy WebLinkAbout20230510 Ver 1 Revised Wetland ImpactBaker, Caroline D
From: Jennifer Robertson <jrobertson@atlasenvi.com>
Sent: Wednesday, July 19, 2023 5:42 PM
To: Jennifer.L.Lawrence@usace.army.mil; Hoy, Arnie
Subject: [External] Whitehead Avenue (SAW-2022-01877 / DWR 20230510 Ver 1)
Attachments: 20230719 Revised Wetland Impact Map.pdf
Follow Up Flag: Follow up
Flag Status: Flagged
P
: External email. Do not click links or open attachments unless verified. Report suspicious emails with the Report Message
cated on your Outlook menu bar on the Home tab.
Jenni/Amie,
When I sent the 401 to this developer and their civil engineer yesterday the engineer informed me that instead
of a rip rap ditch a concrete ditch would be necessary where the linear wetland impact is located. Due to the
amount of storm water that flows through the 36" culvert under Whitehead Avenue he had to revise the rip rap
to concrete. The wetland impact amount has not changed just the fact that concrete will be used as opposed
to rip rap. I have informed them that they will need to pipe water around the impact area during construction to
avoid water within the wetland encountering wet concrete. I thought it would be good to send the revised
impact map for your files. Please let me know if you have any questions.
Thank you,
Jennifer L Robertson, President
ATLAS Environmental, Inc.
338 S. Sharon Amity Road #411
Charlotte, NC 28211
(704) 512-1206 office
(828) 712-9205 mobile
www.atiasenvi.com
Offices in Asheville and Charlotte
RONMENTAL