Loading...
HomeMy WebLinkAbout20231005 Ver 1_Shoreline Stabilization_20230717s ROY COOPER Governor MICHAEL S. REGAN Secretary S. DANIEL SMITH Director NORTH CAROLINA Environmental Quality State of North Carolina Department of Environment Quality Division of Water Resources 15A NCAC 02H .0500 —Water Quality Certification, Shoreline Stabilization Shoreline Stabilization Application Form FORM: SSGP 09-2020 Three copies of the application (including attachments) and the application fee should be sent to: If sending via US Postal Service Paul Wojoski DWR —401 & Buffer Permitting Branch 1617 Mail Service Center Raleigh, NC 27699-1617 If sending via delivery service (UPS, FedEx, etc.) Paul Wojoski DWR — 401 & Buffer Permitting Branch 512 N. Salisbury Street Raleigh, NC 27604 NOTE: Before submitting this form, please ensure you have submitted the Pre -Filing Meeting Request Form as we will not be able to accept your application without this important first step. The Pre -Filing Meeting Request Form is used in accordance with 40 C.F.R. Section 121.4(a) which states "At least 30 days prior to submitting a certification request, the project proponent shall request a pre -filing meeting with the certifying agency." In accordance with 40 C.F.R. Section 121.5(b)(7), and (c)(5), all certification requests must include documentation that a pre -filing meeting request was submitted to the certifying authority at least 30 days prior to submitting the certification request. Click here to read more information on when this form is needed prior to application submission or here to view the form. 7 Attach documentation Pre-Fi ' g Meeting Request to this application. Date of Pre -filing Meeti quest: _J_/ (required) RECEIVED DWR ID # ersion (if applicable) ) DEC -WATER RESOURCES A. Applicant Information [15A NCAC 02H .0502(a)] 401 &BUFFER FEAMi'TTiN(3 1. Owner Information Name: Graham & Kimberly Shirley Mailing Address: 206 S. Salem St. Apex, NC 27502 Telephone Number: 919-302-3693 Fax Number: E-mail Address: kimberlvbshirlev@gmail.com DE Q - North Carolina Department of Environmental Quality I Division of Water Resources rq 512 North Salisbury Street 1 1617 Mail Service Center I Raleigh, North Carolina 27699-1617 'v(JRTH QAI )JN'A oaoam�emmEmmmuiu�vnr\ r 919.707.9000 2. Agent/ Contact Person Information A signed and dated copy of the Agent Authorization letter must be attached if the Agent has signed this application form. (A form can be downloaded here: http://www.saw.usace.army.mil/Portals/59/docs/regulatory/regdocs/Permits/SAMPLE AGENT AUTHORIZ ATION FORM.pdf) Name: N/A Company Affiliation: Mailing Address: Telephone Number: E-mail Address: Fax Number: B. Project Information [15A NCAC 02H .0502(a) & (b)] 1. Attach a vicinity map (i.e. street map) clearly showing the location of the property with respect to local landmarks such as towns, rivers, and roads. 2. Provide a detailed site plan showing property boundaries and proposed locations of vegetation clearing, buildings, retaining walls, docks, impervious surfaces, rip rap, excavation or dredging below Full Pond/ Normal Water Level elevations, and construction access corridors. You may use the diagram provided at the end of this application form. 3. Attach a photograph of the shoreline/ buffer proposed to be stabilized. (Include a scale of some sort- a yard stick, shovel handle, etc.) 4. Location of the property (where work is to be conducted) County: Montgomery Nearest Town: New London Lake/ river/ ocean adjacent to property: Badin Lake Property size (acres): 1.09 acres Subdivision name or site address (include phase/lot number): Lot 44, Phase 3, Heron Bay, 586 Pearl Bay Drive, New London Directions to site - please include road names and numbers, landmarks, etc.: NC Hwy 49 to Badin Lake Road, R on Uwharrie Point Parkway, R on Raven Ridge, R on Heron Bay Drive, R on Pearl Bay Drive, property is on right side of road. Latitude (in decimal degrees) 35.28.1362 Longitude (decimal degrees) 80.07.0174 5. Describe the existing land use or condition of the site at the time of this application (residential, undeveloped, etc.): Existing house in subdivision development FORM: SSGP 09-2020 Page 2 of 6 6. Describe proposed work (include discussion as to how hardening of shoreline has been avoided, or why it is necessary): To stabilize an eroding shoreline and protect it from further erosion. 7. Will work be conducted from land? ® From water? ❑ 8. Total amount of impacts below the normal pool lake level / Normal Water Level Permanent impacts (including all excavation, backfill, rip rap, retaining walls, etc.) in square feet: 400 sq. ft. Temporary impacts in square feet: None 9. Total amount of impacts above the normal pool lake level / Normal Water Level and 50 feet land -ward Permanent impacts (including back fill, excavation, rip rap, retaining walls, etc.) in square feet: 1080 sq. ft. Temporary impacts (temporary clearing, construction corridor) in square feet: 1000 sq. ft. 10. Please describe the vegetation above the normal pool lake level/ Normal Water Level and 50 feet landward to be impacted (number of trees, for instance): Numerous trees of varied species and condition will be removed to complete the shoreline stabilization. 11. Signature By signing below, I, as the project proponent, certify to the following: • The project proponent hereby certifies that all information contained herein is true, accurate, and complete to the best of my knowledge and belief • The project proponent hereby requests that the certifying authority review and take action on this CWA 401 certification request within the applicable reasonable period of time Owner/Agent's Signature" 1`15A NCAC 02H .0502(f)] Date Agent's signature is valid only if an authorization letter from the owner is provided. 12. Please approximately sketch the following information on this plan and provide dimensions for each item: a. All proposed vegetation clearing FORM: SSGP 09-2020 Page 3 of 6 b. Location of rip rap or fill to be placed above the Full Pond/ Normal Water Level elevation c. Location of rip rap or fill to be placed below the Full Pond/ Normal Water Level elevation d. Location of any proposed structures such as buildings, retaining walls, docks, etc. e. Location of any excavation or dredging below the Full Pond/ Normal Water Level elevation Lake (At Full Pond/ Nonnal Water Level) Full Pond/ Normal Water LE Shoreline Plan View FORM: SSGP 09-2020 Page 4 of 6 Lake i (At Fuli Pond( Normal Water Level) Existing Dock 30 tx7ft 3ftx 150 ft Full Pond/Normal Water Level " ' Wm full pond/ NWL "`` a Srooreiine � t r 4f .150ft Ripra p Above full pond/ NWL 7 ft. x 150 ff. .4vonal cleating if necessary E A P L'E Plan View FORM: SSGP 09-2020 Page 5 of 6 3 ft. below full pond water level 4 ft. above full pond water level 2 ft. additional clearing "if necessary Existing bank 10 ft. bank height Side View R LAI g W-- a 0 FORM: SSGP 09-2020 Page 6 of 6 NCDEQ 401 WATER QUALITY CERTIFICATION SHORELINE IMPACT AREA CALCULATIONS APPLICANT: Graham & Kimberly Shirley Lot 44, Phases 3, Heron Bay STABILIZATION IMPACT AREA CALCULATIONS The attached shoreline site plan shows 200 LF of proposed shoreline stabilization measures. Details 2 & 3 indicate a proposed shoreline slope that is graded at 2:1 and reflects the estimated normal pool level and the estimated height of the subject shoreline above the normal pool level. Calculation 1— Impact Area Below Normal Pool Level (Item 8 on NCDEQ Form SSGP 09-2020) Area of Impact = Shoreline Length x Depth* x Slope _ (200') x (1') x (2) = 400 sq. ft. *For this calculation, an average water depth of 1 ft. has been assumed. This will produce a conservative overestimate of the stabilization impact area. Calculation 2 — Impact Area Above the Normal Pool Level (Item 9 on NCDEQ Form SSGP 09-2020) Permanent Impact From Shoreline Stabilization Measures Height of Bank Above Normal Pool Varies Across the Shoreline Estimate 60 LF of Shoreline = 1 ft. Above Normal Pool Estimate 40 LF of Shoreline = 2 ft. Above Normal Pool Estimate 100 LF of Shoreline = 4 ft. Above Normal Pool Area of Impact = Length x Height x Slope = (60' x 1' x 2) + (40' x 2' x 2) + ( 100' x 4' x 2) = 120 + 160 + 800 = 1080 sq. ft. Impact From Construction Above Shoreline Stabilization Assume 5 ft. Wide Zone Area of Impact = 200' x 5 ft. = 1,000 sq. ft. Total Area of Impact Above Normal Pool Level = 2080 sq. ft. q In '® 3' T' POT SCALE 1 " = 40' ROLL* u r(DEE2 Co-rf-, a TI cvv SITE PLAN -GRAHAM SHIRLEY to VEGETATE DISTURBED AREA ABOVE SLOPE EXISTING GRADE — I // /'l/ � I I Varies 1 to 2 ft. 1 2 I EROSION CONTROL FABRIC —*F- Assume LgKE BOTTOM TYPICAL CONDITIONS 12" TO 36" ERODED CUT WAVE EXPOSURE FOR: GRAHAM SHIRLEY LOCATION: LOT 44, HERON BAY RESERVOIR: BADIN LAKE PROJECT: SHORELINE STABILIZATION PROGRAM PHASE I SITE EVALUATION YADKIN, INC. - BADIN, NORTH CAROLINA DRAWING TITLE: DETAIL MINOR RIP RAP STABILIZATION 1 2 n VEGETATION AND EROSION CONTROL FABRIC 73 rVl[+TI►I^ ^M A nr CLASS 2 RIP RAP EROSION CONTROL FA %'oo LAKE -- - - \,�\, BOTTOM TYPICAL CONDITIONS 36" TO 72" ERODED CUT WAVE EXPOSURE FOR: GRAHAM SHIRLEY LOCATION: LOT 44, HERON BAY RESERVOIR: BADIN LAKE PROJECT: SHORELINE STABILIZATION PROGRAM PHASE I SITE EVALUATION YADKIN, INC. - BADIN, NORTH CAROLINA DRAWING TITLE: DETAIL MODERATE RIP RAP STABILIZATION 1 3 s �� -�'� � •F '!' i Y"^�+- d '.. � 5 '4a'%, �s.`'{' J it f .'C x`. Ile, .ar••,:y y Yf ` S 1t jA t �a r, r -' a :� "��,'� .s r L� . }' T t•� . "' {fir � ,y �::.p ��y�� , a i^ ' •� ,r t ' • -w s � 4 a L z , y yy 7/12/23, 10:40 AM 586 Pearl Bay Dr - Google Maps Go -gle Maps 586 Pearl Bay Dr _] D7D t Uwharrie Badin Shores Resort [ C Owner Association w ing access 0 L-7 Whip-0 1:rill =1 Campground x �•x�x Whitney Uwharrie Electric Q '` F Old North Stater Club Go ie Holt,, I'lenic firma ,A Map data ©2023 Google 2000 ft, https://www.google.com/maps/place/586+Pear!+Bay+Dr,+New+London,+NC+28127/@35.4886744, 80.1213097,14ztdata=!4m6!3m5!lsOx88547fcbc6462ea9:Ox28968eO4f4963b6b!8m2!3d35.470387!4... 1/1