From: Thomson, Nicole J
Sent: Tuesday, July 18, 2023 5:41 PM
To: Alsmeyer, Eric C SAW; Ridings, Rob
Cc: Abi Sheffey; Riffey, Deanna
Subject: R2721A (540) Site 26 permit modification
Attachments: Permit Site 26 Mod request from JV - revised date.pdf
Eric & Rob -
As you are aware, the North Carolina Department of Transportation (NCDOT) applied for a phased Section 404 Individual
Permit, Section 401 Individual Water Quality Certification (WQC), Neuse River Riparian Buffer Authorization, Non-404
Jurisdictional Wetlands and Waters Permit for the subject project in September 2018. The project, also known as
Complete 540, encompasses three NCDOT Transportation Improvement Plan (TIP) projects: R-2721 (NC-55 Bypass to US-
401), R-2828 (east of US-401 to 1-40 Interchange) and R-2829 (east of 1-40 to US 64/264). Revised permit applications
were submitted in February 2019 and the NCDWR 401 and USACE 404 Permits were issued in February and October of
2019. Additionally, NCDOT received a modified 401 WQC for the Complete 540 Project on January 30, 2020, April 23,
2020, June 1, 2020, December 29, 2020, March 9, 2021, April 8, 2021, November 1, 2021, May 18, 2022, July 22, 2022,
February 15, 2023 and June 19, 2023 from the NC Division of Water Resources (NCDWR) and a modified Department of
the Army authorization #SAW-2009-02240 on February 4, 2020 (revision issued on February 7, 2020), April 29, 2020,
January 7, 2021, March 19, 2021, March 3, 2022, July 1, 2022, and September 13, 2022, February 17, 2023 and June 21,
2023.
Previously, you both were made aware of concerns at Permit Site 26 (STA 166+00 to 168+00 -L- Rt) regarding positive
drainage being achieved at the outlet of the 30-inch CSP. Currently, stormwater from this system doesn't flow into the
wetland area offsite, but instead collects along the toe of fill and has caused erosion issues. The long-term stability of
this location was in question and the DBT/JV looked at and redesigned the outlet which has resulted in the conversion of
approximately 0.034-acre of mechanized clearing to rip rap fill (see attached revised drawing). The team has minimized
the area of conversion to about 10-feet beyond the low point of the existing channel to ensure adequate containment
and grading. The remaining area will continue as mechanized clearing.
Per the discussions had in the field from earlier compliance visits, it was determined that you both would be willing to
address the modification request via email.
Please let me know if there is any additional information you need from me/us to process this field change.
Thank you so much for your time and attention!
Nikki
Nicole Thomson, PWS
North Carolina Turnpike Authority
North Carolina Department of Transportation
919-754-7806
1 South Wilmington Street
Raleigh, NC 27601
1578 Mail Service Center
Raleigh, NC 27699-1578
Email correspondence to and from this address is subject to the
North Carolina Public Records Law and may be disclosed to third parties.
Email correspondence to and from this sender is subject to the N.C. Public Records Law and may be disclosed to third parties.