Loading...
HomeMy WebLinkAboutNC0005363_Discharge from Outfall 001_20221214ties DUKE ENERGY® PROGRESS December 14, 2022 Certified Mail # 7,0,1�9 2280 o00,1 439i7 35-5 (2 copies) NCDEQ-DWR, FRO 225 Green Street, Suite 714 Fayetteville, NC 28301 RECEIVED DEC 19 2022 ):qfi0- DM-FAMMYiLLE Subject: Weatherspoon's December 2022 Discharge from Outfall 001 Dear NCDEQ-DWR Regional Supervisor: W. H. Weatherspoon Plant 491 Power Plant Rd Lumberton, NC 28358. Mailing Address: Kent Tyndall L. V. Sutton Energy Complex 801 Sutton Steam Plant Rd Wilmington, NC,28401 .o: 910.341-4775 f: 910.3414790 In accordance with A. (1) Footnote 1 of National Pollutant Discharge Elimination System (NPDES) Permit No. NC0005363; we are submitting this written information on the December 12, 2022, discharge from Outfall 001 to the Lumber River. This written information is provided within ten (10) days of the discharge: • On December 8, 2022; the Weatherspoon site made verbal and email notification of plans to exercise the Outfall 001 sluice gate. This maintenance activity will result in a discharge from the cooling pond to the Lumber River. • At 8:30 AM on December 12, 2022; NPDES Outfall 001 was opened and started to discharge. • At 9:05 AM on December 12, 2022; verbal notification within.24-hours after discharge event was made to NC DWR-FRO. A voicemail was recorded. • At 9:06 AM on December 12, 2022; verbal notification within 24-hours after discharge event was made to Ms. Brena Jones, NCWRC. A voicemail was recorded. • At 9:12 AM on December 12, 2022; verbal, notification within 24-hours after discharge event was made to NC DEQ Permitting Unit. • At 10:30 AM on December 12, 2022; the NPDES Outfall 001 sampling was performed as required by our NPDES permit and will be reported on the monthly DMR. • At 8:30 AM on December 14, 2022; NPDES Outfall 001 was closed and ceased the discharge. • Instream monitoring of the Lumber River will be conducted upstream and downstream as required by our NPDES permit and will be reported on the monthly DMR. If there are any questions, please contact either: • Mr. Kent Tyndall, EHS Professional for the W. H. Weatherspoon Plant; phone (910) 341- 4775 or e-mail Kent.Tyndall(a)-duke-energy:com; or • Ms. Elizabeth Glenn, Environmental Specialist with our Environmental Permitting and Compliance Group, phone (864) 642-8833 or email Elizabeth.Glenn(a�-duke-energy.com. I ,4 Weatherspoon's December 2022 Discharge from Outfall 001 December 14, 2022 Page 2 I certify, under penalty of law, that this document and all aftachments were prepared under my direction or supervision in accordance with a system designed to assure that qualified personnel properly gather and evaluate the information submitted. Based on my inquiry of the person or persons who manage the system, or those persons directly responsible for gathering the information, the Information submitted is, to the best of. my knowledge and belief, true, accurate, and complete. I am aware that there are significant penalties for submitting false information, including the possibility of tines and imprisonment for knowing violations. Sincerely, Antonio Price Station Manager Q C&IMM d copy) 'NC DEO- DWR;' NPDES Permitting Unit 1617 Mail Service Center Raleigh, North Carolina 27699-1617 + iititiatl Mint M' .¢ i � ,7 it 0 0 COPY) NC WRC 1722 Mail Service Center Raleigh, North Carolina 27699