Loading...
HomeMy WebLinkAboutNCC232070_(ARPA) DWI Letter of Intent to Fund_20230718 Ft`STATE ROY COOPER l a Governor V O ELIZABETH S.BISER Secretary *f�`QQ� SHADI ESKAF NORTH CAROLINA Director Environmental Quality January 13, 2022 Mr. John P. Craft, Town Manager Town of LaGrange PO Box 368 La Grange,NC 28551 Subject: Letter of Intent to Fund La Grange Water System Improvements American Rescue Plan-Earmark Project No.: SRP-D-ARP-0005 Dear Mr. Craft: The Division of Water Infrastructure has reviewed your Request for Funding, and determined your project is eligible to receive American Rescue Plan (ARP) funding from the State Fiscal Recovery Fund established in S.L. 2021-180. Projects funded from the State Fiscal Recovery Fund must meet applicable federal law and guidance for the ARP funds. The ARP Project Grant will be one hundred percent of eligible project costs up to a maximum of $1,270,000. The first milestone is the submittal of a Bid and Design Package by August 1, 2022. Please note that this intent to fund is contingent on meeting all of the following milestones: Milestone Date Apply for all Necessary Permits* ASAP Bid and Design Package Submittal obtain allpermits) August 1, 2022 Bid and Design Package Approval December 1, 2022 Advertise Project, Receive Bids, Submit Bid Information, April 3, 2023 and Receive Authority To Award Execute Construction Contracts May 1, 2023 Receive last reimbursement- Statutory December 31, 2026 *An engineering alternatives analysis (EAA) may be required on certain projects. Failure to meet any milestone may result in the forfeiture of funding for the proposed project. Note that the Division will make no reimbursements of ARP funds after December 31, 2026 D E Q�� North Carolina Department of Environmental Quality I Division of Water Infrastructure 512 N.Salisbury Street 11633 Mail Service Center I Raleigh,North Carolina 27699-1633 ` _' Dep m MofEnmm^me^mlQ�al;\ � 919.707.9160 Mr. John P. Craft, Town Manager January 13, 2022 Page 2 of 2 The State Environmental Policy Act exempts projects funded by the State Reserve (such as this project) from state-mandated environmental review. Federal requirements may still apply. [NCGS 113A-12(2)h.] Upon detailed review of the project during the funding process, it may be determined that portions of your project are not eligible for funding. Drought Bill Requirements In accordance with G.S. 143-355.4, a project"for the purpose of extending waterlines or expanding water treatment capacity"must document numerous requirements during the review process. You can find additional information at the following link: http://www.ncleg.net/enactedlegislation/statutes/html/bysection/chapter 143/gs_143-355.4.html If you have any questions, please contact Michelle McKay,by phone at(919) 707-9171 or by email at michelle.mckay@ncdenr.gov. Sincerely, Jon Risgaard, Chief State Revolving Fund Section CC: Jeff Thompson, PE, Black& Veatch, Cary Vincent Jude Tomaino,PE (via email)v Mark Hubbard, PE (via email) ARP Project File (COM LOIF)