HomeMy WebLinkAboutNC0003417_Installation of SeHawk Bioreactor-Outfall 001_20230718 sti,'11 DUKE H.F.Lee Energy Complex
ENERGY® 1199 BlackJack Road
Goldsboro,NCC 27530
PROGRESS
July 12, 2023RECEN E
D
Dr. Sergei Chernikov
NC Division of Water Resources (`;I_ 1 8 2023
1617 Mail Service Center
Raleigh, NC 27699-1617
tbECONRINPDES
Subject: Duke Energy Progress, Inc.
H.F. Lee Energy Complex NPDES Permit NC0003417
Installation of SeHAWK Bioreactor—Outfall 001
Dear Dr. Chernikov:
Per Condition A (2) 8(c) Duke Energy Progress, LLC. (Duke Energy) is submitting this letter as notification
of the installation of a bioreactor. The bioreactor is to provide treatment for removal of Selenium. The
installation of the system is projected to be completed by mid-August and operational by end of August
2023.
Duke Energy will adhere to the effluent conditions and monitoring requirements in permit Condition A (8) -
Outfall 001 (Ash Pond Dewatering) and requests that submittal of this letter meet the requirement for
notification of installation of a treatment system and update to the permit application file. If there are any
questions regarding this letter, please contact Joyce Dishmon via phone at (336) 394-5524 or via email at
joyce.dishmon@duke-energy.com.
I certify, under penalty of law, that this document and all attachments were prepared under my
direction or supervision in accordance with a system designed to assure that qualified personnel
properly gather and evaluate the information submitted. Based on my inquiry of the person or
persons who manage the system, or those persons directly responsible for gathering the
information, the information submitted is, to the best of my knowledge and belief, true, accurate,
and complete. I am aware that there are significant penalties for submitting false information,
including the possibility of fines and imprisonment for knowing violations.
Sincer-
/r 717
,r
Jeff Ines
GM II— Regulated Stations
cc: David May, NC DEQ—WRO
Mike Graham, Lead EHS
Joyce Dishmon, EHS C&P