HomeMy WebLinkAbout20230198 Ver 1_RPOT Response_20230717Homewood, Sue
From: Phillips, George L CIV USARMY CESAW (USA) <George.L.Phillips@usace.army.mil>
Sent: Monday, July 17, 2023 7:12 PM
To: Homewood, Sue
Subject: [External] 401 WQC Requirements per 40 CFR Part 121 / SAW-2023-00336 / South
Carter Industrial / Sanford / Lee County / NWP 39
Attachments: SAW-2023-00336_PCN.pdf
CAUTION: External email. Do not click links or open attachments unless verified. Report suspicious emails with the Report Message
button located on your Outlook menu bar on the Home tab.
Dear Sue,
This email is concerning the attached Pre -construction notification (PCN) received by the U.S. Army Corps of Engineers
(USACE) dated 06/02/2023. The Corps Action ID Number associated with this project is: SAW-2023-00336.
Please provide a written response within 14 days from the date of this email, regarding the North Carolina Division of
Water Resources (DWR) receipt date for this project, otherwise, we will consider our receipt date as accurate. Also,
within 14 days, please notify me if the certification request does not contain the nine (9) components listed in Section
121.5(b) of the 2020 Clean Water Act Section 401 Certification Rule.
As specified in the September 16, 2022, Programmatic Agreement (PA) between the USACE, Wilmington District, and the
North Carolina Department of Environmental Quality, Division of Water Resources, the reasonable period of time (RPOT)
for DWR to act on a Section 401 certification request is 120 days unless the RPOT is extended per the terms of this PA.
As such, unless we receive an email request for an extension of the RPOT, the USACE will consider the Section 401
certification for this project to be waived on 10/21/2023.
Please contact me if you have any questions regarding this request.
Lyle Phillips
Regulatory Project Manager
US Army Corps of Engineers
CE-SAW-RG-R
3331 Heritage Trade Drive, Suite 105
Wake Forest, North Carolina 27587
Phone: (919) 588-9200
Fax: (919) 562-0421
Email: George. L.Phil lips@usace.army.miI
We would appreciate your feedback on how we are performing our duties. Our automated Customer Service Survey is
located at https://regulatory.ops.usace.army.mil/customer-service-survey/. Thank you for taking the time to visit this
site and complete the survey.