Loading...
HomeMy WebLinkAboutU-5964 Start of Study PacketSTATF m,'4p Roy COOPER GOVERNOR STATE OF NORTH CAROLINA DEPARTMENT OF TRANSPORTATION July 11, 2023 SUBJECT: STIP Project No. U-5964 WBS Element No. 45978.1.1 Statesville, Iredell County Dear Agency Member, J. ERIC BOYETTE SECRETARY The N.C. Department of Transportation (NCDOT), Division 12 Project Development Unit, is reinitiating the project development, environmental and engineering studies for the subject project. State Transportation Improvement Program (STIP) Project U-5964 proposes to improve the 5-approach intersection at US 21 (Sullivan Road) and US 64 (Davie Avenue) by converting the intersection to a roundabout. This project was previously reviewed through the State Clearinghouse in November 2018 and was designated as File # 19-E-4220-0106. This project is included in NCDOT's 2020-2029 STIP and is scheduled to begin right of way acquisition in Fiscal Year (FY) 2024 with construction beginning in FY 2026. This schedule is subject to change. This project is federally funded, and a Categorical Exclusion (CE) Checklist is anticipated. A scoping meeting is not anticipated at this time. The project team will coordinate with agencies during the planning process. Attached for your review and comments is the scoping information for the proposed project. We would appreciate any information you might have that would be helpful in evaluating potential environmental impacts of the project. If applicable, please identify any permits or approvals that may be required by your agency. Please provide written comments by August 11, 2023. If you have any questions concerning the project, please contact Eanas Alia at (704) 533-8912 or by email at eanas.alia@kimley- hom.com. Please include the Project Number U-5964 in all correspondence and comments. Thank you for your assistance in the project development process. Sincerely, Bryan Sowell, P.E. NCDOT Division 12 Mailing Address: NC DEPARTMENT OF TRANSPORTATION HIGHWAY DIVISION 12 P O BOX 47 SHELBY, NC 28151-0047 Telephone: (980) 552-4200 Fax: (704) 480-5401 Customer Service: 1-877-368-4968 Website: www.ncdot.gov Location: 1710 E. MARION STREET SHELBY, NC 28152 Project Development and Environmental Analysis Branch Project Data Sheets Preliminary TIP No.: U-5964 Sent Date: July 11, 2023 WBS No.: 45978.1.1 Federal Aid No: Division: 12 County: Iredell Project Description: General Project Need: Revision Date: Meeting Date: N/A Convert the 5-approach intersection at US 21 (Sullivan Road) and US 64 (Davie Avenue) to a roundabout. Congestion and traffic flow are issues for the US 21/US 64 intersection. Metropolitan / Rural Planning Charlotte Regional Transportation Planning Organization: Organization CRTPO NEPA/404 Merger Candidate?: ❑ Yes ❑ No M To Be Determined Feasibility Study Completed?: ❑ Date of Yes ❑ No Study: Project Schedule: Environmental Document(s) Right of Way Authorization Date: Let Date: Type of Document: MCDC CE Dates: February 2019 Fall 2023 Winter 2023 FY 2026 Cost Estimate: Construction: Right of Way: Utilities: Total Cost: TIP Estimate: $3,298,000 $11,000,000 1 $700,000 1 $14,998,000 STIP U-5964 July 2023 Project Data Sheets Page 1 Design Criteria: Length of Project: Right of Existing Way: Proposed Type of Access Existing Control: Proposed Roadway Typical Section: Speed: Existing Proposed Approximately 750 feet Variable To be determined None None US 21 (Sullivan Road) — 2 lane, undivided US 64 (Davie Avenue) — 3 lane, undivided Stockton Street — 3 lane, undivided East End Avenue — 2 lane, undivided Sherwood Lane — 2 lane, undivided US 21 (Sullivan Road) — 2 lane, undivided US 64 (Davie Avenue) — 3 lane, undivided Stockton Street — 3 lane, undivided East End Avenue — 2 lane, undivided Sherwood Lane — 2 lane, undivided Existing Posted Speed: Proposed Design Speed: Bridge/ Culvert Inventory: Functional Classification: Strategic Transportation Corridor Information: US 21 (Sullivan Road) — 35 mph US 64 (Davie Avenue) — 35 mph Stockton Street — 35 mph East End Avenue — 35 mph Sherwood Lane — 25 mph US 21 (Sullivan Road) — 35 mph US 64 (Davie Avenue) — 35 mph Stockton Street — 35 mph East End Avenue — 35 mph Sherwood Lane — 25 mph No bridges; No culverts US 21 (Sullivan Road) — Minor Arterial US 64 (Davie Avenue) — Minor Arterial Stockton Street — Local East End Avenue — Local Sherwood Lane — Local N/A STIP U-5964 July 2023 Project Data Sheets Page 2 CTP/Thoroughfare Plan Designation (Facility Type): N/A Air Quality Status: ❑ Non -attainment ® Maintenance ❑ Attainment Horizon Completion Year (Long Range Trans. Plan): N/A Typical Section in Compliance with Conformity Determination? Traffic (AADT): Current Year: Design Year: Year ® Yes ❑ No Range of Traffic 2021 US 21 — 11,000 US 64 — 9,600 (Obtained from NCDOTAADT maps) 2045 US 21 — 13,100 (Annual growth rate US 64 — 11,500 of 0.7% applied) Design Standards Applicable: ® AASHTO ❑ 3R Railroad Involvement: N/A Utility Involvement: To be determined Other STIP Projects in the Area % TTST: % Dual: % DHV: STIP Right of Way Construction Project Nq�llillillillki6mmmpmmiiI& escri tion Scheduled to Begin Scheduled to Begin 1-3819B Modification of 1-40/1-77 Interchange Area Complete �m Underway U-6039 Upgrade E. Broad Street and Implement Complete Underway Access Management Solutions U-6054 Construct Brookdale Drive/US 21 Connector FY 2023 FY 2024 U-5779 Widen NC 115 FY 2020 FY 2024 U-5799 Widen US 21 1 Funded for Preliminary Engineering Only Source: North Carolina Department of Transportation, State Transportation Improvement Program (2020-2029 STIP — Mav 2023) STIP U-5964 July 2023 Project Data Sheets Page 3 Preliminary Study Area Resources Inventory Table Resource/Affected Applicability Environment Measure in Study Area General Project Information Length of project (approximate in miles) Approximately 750 feet Crossing or Intersecting roadways (#) 3 — Intersections: US 21 and Sherwood Lane US 64 and Sherwood Lane US 21, US 64, Stockton Street, East End Avenue, & Sherwood Lane Multiple business driveways Railroad crossings No crossings Cultural Resources NRHP (and eligible sites, districts, other properties) (#) None anticipated Human Environment Community Resources (#) Forest Park Presbyterian Church Oakwood Cemetery Public Parks/Section 4(f) Properties (#) None Greenways, Game Lands, Land and Water Conservation Fund Properties, Bicycle Routes, etc. (#) None Residential Properties (# potentially affected) Eight (8) possible Business Properties (# potentially affected) Six (6) possible High % Special Populations (Low-income, Minority) According to Census Data, minority and low-income populations meeting the criteria for Environmental Justice in the project study area; however, impacts are not anticipated. Also, Spanish language -speaking populations may require language assistance. Natural Environment Streams (# of stream crossings) None Floodplain crossing None Wetlands (est. acres) None Ponds (est. acres connected to jurisdictional waters) None Critical Water Supply Watersheds None Riparian Buffer Rules apply No Outstanding Resource Waters / High Quality Resource Waters None 303(d) Listed Streams None Identified Critical Habitat/ESA Spp. (# known) The United States Fish and Wildlife Service list seven federally protected species including Gray Bat, Northern Long-eared Bat, Tricolor Bat, Dwarf -flowered heartleaf, Michaux's Sumac, Schweinitz's Sunflower, and Smooth Coneflower. Physical Environment Hazardous Materials (# suspected/known sites) Four (4) sites of concern. Low to moderate impacts anticipated. Utilities Coordination underway Active agriculture (Voluntary Agricultural District) No VADs present FEMA Buyout Properties None STIP U-5964 July 2023 Project Data Sheets Page 4 INI N 0 0.25 0.5 Miles ����F NOPiN CA9Ci U-5964 Project Location = Iredell County Figure 1: Vicinity Map g NCDOT Project U-5964 U-5964 Study Area Stream Convert 5-Approach Intersection at US 21 and US 64 to a Roundabout 99���NT OF Ng��e City of Statesville Iredell County