HomeMy WebLinkAboutNC0088552_NOV2023PC0228_20230629ROY COOPER
Governor
ELIZABETH S. BISER
Secretary
RICHARD E. ROGERS, JR.
Director
Aqua North Carolina, Inc
Attn: Shannon V. Becker, President
762 West Lancaster Ave
Bryn Mawr, PA 19010
NORTH CAROLINA
Environmental Quality
June 29, 2023
SUBJECT: Compliance Evaluation Inspection and Notice of Violation
NOV Tracking #: NOV-2023-PC-0228
Colonial Woods Subdivision — Wells #1 & #2
NPDES Permit #: NCO088552
Surry County
Dear Mr. Becker:
On May 111", 2023, Division of Water Resources staff Ron Boone conducted a routine
compliance inspection at Colonial Woods Subdivision — Wells #1 & #2, wastewater discharge
permit NCG0088552. ORC Billy Young was present during the inspection. A review of records,
data, treatment components, structures, and the outfall was completed. This inspection
reflected non-compliance with the subject permit.
The following violations were noted:
Pursuant to Part I, Paragraph A.(2.) of the permit, Aqua is to begin monitoring of and
achieve compliance with the total zinc limit specified in Part I, Paragraph A.(1.) no later
than January 31st, 2025. In working toward that goal, Aqua was to have developed and
submitted to DWR a corrective action plan no later than February 11t, 2021. In addition,
Aqua should have submitted reports updating DWR on steps taken to achieve this goal by
February 1st, 2022, and February 1st, 2023. To date, DWR/WSRO has not received these
reports.
Please take immediate action to fully resolve each of the violations listed above.
Please be aware that pursuant to North Carolina general statute (NCGS) 143-215.6A, the
Division may assess civil penalties not to exceed $25,000 per day against any person who fails
to fully comply with the requirements of a permit issued pursuant to NC General Statute (NCGS)
143-215.1., as is NC0088552.
DffNorth Carolina Department of Environmental Quality I Division of Water Resources
oan caaouNn
Winston-Salem Regional Office 1 450 W. Hanes Mill Rd, Suite 300 I Winston-Salem, North Carolina 27105
M336.776.9800
oep.m.m or em�nmen� Qualm,
If you have any questions or concerns, please feel free to contact Mr. Boone at any time by
phone at 336-776-9690, or by email at ron.boone@deq.nc.gov. Thank you for your time and
attention to this matter.
Sincerely,
DocuSiTgned by:
%A. l . 5,,. Gf
145B49E225C94EA...
Lon T. Snider, Regional Supervisor
Water Quality Regional Operations Section
Winston-Salem Regional Office
Division of Water Resources, NCDEQ
Attachments:
Water Compliance Inspection Report
REQ� North Carolina Department ofEnvironmental Quality I Division ofWater Resources
Winston-Salem Regional Office 1 450 W. Hanes Mill Rd, Suite 300 1 Winston-Salem, North Carolina 27105
NORTH CAROLINA 336.776.9800
naparMeM of EmironmanW 9uallly
United States Environmental Protection Agency
Form Approved.
EPA Washington, D.C. 20460
OMB No. 2040-0057
Water Compliance Inspection Report
Approval expires 8-31-98
Section A: National Data System Coding (i.e., PCS)
Transaction Code NPDES yr/mo/day Inspection Type Inspector Fac Type
1 IN 1 2 u 3 I NC0088552 111 121 23/05/11 I17 18 LC] I 19 I s I 20L]
21111I I I I I I I II I I I I I I I I I I I I I I I I I I I I I I I II I I I I I r6
Inspection
Work Days Facility Self -Monitoring Evaluation Rating B1 QA ---------------------- Reserved -------------------
67
I 72 I ni I 71 I 74 79 I I I I I I I80
701 I 71 I LL -1 I I
LJ
Section B: Facility Data
Name and Location of Facility Inspected (For Industrial Users discharging to POTW, also include
Entry Time/Date
Permit Effective Date
POTW name and NPDES Dermit Number)
12:OOPM 23/05/11
20/02/01
Colonial Woods Subdivision - Wells #1 & #2
Atkins Ln
Exit Time/Date
Permit Expiration Date
Mount Airy NC 27030
12:30PM 23/05/11
25/01/31
Name(s) of Onsite Representative(s)/Titles(s)/Phone and Fax Number(s)
Other Facility Data
William Tyson Young/ORC/336-406-6224/
Name, Address of Responsible Official/Title/Phone and Fax Number
Contacted
Gary Moseley,4163 Sinclair St Denver NC 280376447//704-489-9404/7044899409
No
Section C: Areas Evaluated During Inspection (Check only those areas evaluated)
Permit 0 Flow Measurement Operations & Maintenar Records/Reports
Self -Monitoring Progran 0 Facility Site Review Compliance Schedules Effluent/Receiving Wate
Laboratory
Section D: Summary of Finding/Comments (Attach additional sheets of narrative and checklists as necessary)
(See attachment summary)
Name(s) and Signature(s) of Inspector(s) Agency/Office/Phone and Fax Numbers Date
Ron Boone Docusigned by: DWR/WSRO WQ/336-776-9690/
osiaecl �oon� 6/13/2023
B20F8DD5F2A3460...
Signature of Management Q A Reviewer Agency/Office/Phone and Fax Numbers Date
Docusigned by:
6/29/2023
�ti -T.
14bB4at22bUY4EA...
EPA Form 3560-3 (Rev 9-94) Previous editions are obsolete.
Page#
NPDES yr/mo/day Inspection Type
NCO088552 I11 12I 23/05/11 117 18 i c i
(Cont.)
Section D: Summary of Finding/Comments (Attach additional sheets of narrative and checklists as necessary)
On May 11th, 2023, Division of Water Resources staff Ron Boone conducted a routine compliance
inspection at Colonial Woods Subdivision — Wells #1 & #2, wastewater discharge permit
NCG0088552. ORC Billy Young was present during the inspection. A review of records, data,
treatment components, structures, and the outfall was completed. This inspection reflected
non-compliance with the subject permit.
The following violations were noted:
1. Pursuant to Part I, Paragraph A.(2.) of the permit, Aqua is to begin monitoring of and achieve
compliance with the total zinc limit specified in Part I, Paragraph A.(1.) no later than January 31 st,
2025. In working toward that goal, Aqua was to have developed and submitted to DWR a corrective
action plan no later than February 1st, 2021. In addition, Aqua should have submitted reports
updating DWR on steps taken to achieve this goal by February 1st, 2022, and February 1st, 2023.
To date, DWR/WSRO has not received these reports.
Other observations include:
1. Operator's visitation and operational records are kept in a logbook on -site. The same logbook is
used to record field measurements performed by the Aqua ORC, i.e., total residual chlorine and pH.
All required records were available during the inspection.
2. Mr. Young did not have printed copies of discharge monitoring reports (DMR) or laboratory
reports but was able to send Mr. Boone electronic copies of the laboratory reports through email
immediately following the inspection so he could evaluate transcription accuracy to DMRs. Mr. Boone
evaluated lab reports, DMRs, and chains of custody for January and July of 2022 and found no
discrepancies.
3. The permit was available on site.
4. All components and equipment appeared operational and well kept.
Please take immediate action to fully resolve each of the violations listed above.
Page#
Permit: NCO088552 Owner - Facility: Colonial Woods Subdivision - Wells #1 &
Inspection Date: 05/11/2023 Inspection Type: Compliance Evaluation
Permit
Yes
No
NA NE
(If the present permit expires in 6 months or less). Has the permittee submitted a new
❑
❑
■
❑
application?
Is the facility as described in the permit?
■
❑
❑
❑
# Are there any special conditions for the permit?
■
❑
❑
❑
Is access to the plant site restricted to the general public?
■
❑
❑
❑
Is the inspector granted access to all areas for inspection?
■
❑
❑
❑
Comment: Pursuant to Part I, Paragraph A.(2.) of the permit, Aqua is to beqin monitorinq of and
achieve compliance with the total zinc limit specified in Part I, Paragraph A.(1.) no later
than January 31st, 2025. In working toward that goal, Aqua was to have developed and
submitted to DWR a corrective action plan no later than February 1 st, 2021. In
addition, Aqua should have submitted reports updating DWR on steps taken to achieve
this goal by February 1st, 2022, and February 1st, 2023. To date, DWR/WSRO has not
received these reports.
Compliance Schedules Yes No NA NE
Is there a compliance schedule for this facility? ■ ❑ ❑ ❑
Is the facility compliant with the permit and conditions for the review period? ❑ ■ ❑ ❑
Comment: Permittee has not sent in Corrective Action Report or the annual follow-up reports for
the Total Zinc complaince schedule for outfall 002, as discussed above.
Record Keeping
Yes
No
NA
NE
Are records kept and maintained as required by the permit?
■
❑
❑
❑
Is all required information readily available, complete and current?
■
❑
❑
❑
Are all records maintained for 3 years (lab. reg. required 5 years)?
■
❑
❑
❑
Are analytical results consistent with data reported on DMRs?
■
❑
❑
❑
Is the chain -of -custody complete?
■
❑
❑
❑
Dates, times and location of sampling
■
Name of individual performing the sampling
■
Results of analysis and calibration
■
Dates of analysis
■
Name of person performing analyses
■
Transported COCs
■
Are DMRs complete: do they include all permit parameters?
■
❑
❑
❑
Has the facility submitted its annual compliance report to users and DWQ?
❑
❑
■
❑
(If the facility is = or > 5 MGD permitted flow) Do they operate 24/7 with a certified
❑
❑
■
❑
operator on each shift?
Page# 3
Permit: NCO088552
Inspection Date: 05/11/2023
Record Keeping
Is the ORC visitation log available and current?
Owner - Facility: Colonial Woods Subdivision - Wells #1 &
Inspection Type: Compliance Evaluation
Is the ORC certified at grade equal to or higher than the facility classification?
Is the backup operator certified at one grade less or greater than the facility
classification?
Is a copy of the current NPDES permit available on site?
Facility has copy of previous year's Annual Report on file for review?
Comment: ORC/BORC not required for this facility.
Laboratory
Are field parameters performed by certified personnel or laboratory?
Are all other parameters(excluding field parameters) performed by a certified lab?
# Is the facility using a contract lab?
# Is proper temperature set for sample storage (kept at less than or equal to 6.0
degrees Celsius)?
Incubator (Fecal Coliform) set to 44.5 degrees Celsius+/- 0.2 degrees?
Incubator (BOD) set to 20.0 degrees Celsius +/- 1.0 degrees?
Comment: None
Effluent Sampling
Is composite sampling flow proportional?
Is sample collected below all treatment units?
Is proper volume collected?
Is the tubing clean?
# Is proper temperature set for sample storage (kept at less than or equal to 6.0
degrees Celsius)?
Is the facility sampling performed as required by the permit (frequency, sampling type
representative)?
Comment: Sample analysis done by Water Tech out of Granite Falls, NC.
Flow Measurement - Influent
# Is flow meter used for reporting?
Is flow meter calibrated annually?
Is the flow meter operational?
(If units are separated) Does the chart recorder match the flow meter?
Yes
No
NA
NE
■
❑
❑
❑
❑
❑
■
❑
❑
❑
■
❑
■
❑
❑
❑
❑
❑
■
❑
Yes No NA NE
• ❑ ❑ ❑
• ❑ ❑ ❑
• ❑ ❑ ❑
• ❑ ❑ ❑
Yes No NA NE
❑ ❑ ■ ❑
• ❑ ❑ ❑
• ❑ ❑ ❑
❑ ❑ ■ ❑
❑ ❑ ❑ ■
❑ ❑ ❑ ■
Yes No NA NE
■ ❑ ❑ ❑
❑ ■ ❑ ❑
■ ❑ ❑ ❑
❑ ❑ ■ ❑
Page# 4
Permit: NCO088552
Inspection Date: 05/11/2023
Flow Measurement - Influent
Owner - Facility: Colonial Woods Subdivision - Wells #1 &
Inspection Type: Compliance Evaluation
Yes No NA NE
Comment: Flow meter is a mechanical inline meter and cannot be calibrated. The meter is simply
replaced when it fails.
De -chlorination
Yes
No
NA
NE
Type of system ?
Tablet
Is the feed ratio proportional to chlorine amount (1 to 1)?
❑
0
❑
❑
Is storage appropriate for cylinders?
❑
❑
■
❑
# Is de -chlorination substance stored away from chlorine containers?
0
❑
❑
❑
Are the tablets the proper size and type?
0
❑
❑
❑
Comment: Sodium Bisulfite tablets are used for dechlorination.
Are tablet de -chlorinators operational?
■
❑
❑
❑
Number of tubes in use?
4
Comment: None
Effluent Pipe
Yes
No
NA
NE
Is right of way to the outfall properly maintained?
0
❑
❑
❑
Are the receiving water free of foam other than trace amounts and other debris?
0
❑
❑
❑
If effluent (diffuser pipes are required) are they operating properly?
❑
❑
■
❑
Comment: None
Operations & Maintenance Yes No NA NE
Is the plant generally clean with acceptable housekeeping? 0 ❑ ❑ ❑
Does the facility analyze process control parameters, for ex: MLSS, MCRT, Settleable ❑ ❑ ❑
Solids, pH, DO, Sludge Judge, and other that are applicable?
Comment: None
Page# 5