Loading...
HomeMy WebLinkAboutNCC201559_NOT Closeout Documents_20230713 Sedimentation/Construction Stormwater Inspection Report North Carolina Department of Environmental Quality Land Resources: 943 Washington Square Mall,Washington, NC 27889 (252) 946-6481 County: Washington Project: Albemarle Beach Solar Staging Areas River basin: Pasquotank Person financially responsible:Albemarle Beach Solar,LLC-Kenny Habul, Project#: WASHI-2020-002 Manager Address: 192 Raceway Drive,Mooresville,NC 28117 1. Project Location: various Pictures: No 2. Weather and soil conditions: Sunny,warm,wet Initial inspection: No 3. Is site currently under notice of violation? No 4. Is the site in compliance with S.P.C.A.and rules? Yes If no,check violations below: 5. Violations: 6. Is the site in compliance with the NPDES Permit? Yes Describe: 7. Has sedimentation damage occurred since last inspection? No If Yes,where? (check all that apply) Degree of damage: 8. Contact made with(name): Derek Ivie Title: Manager Inspection report: Sent Report Date given/sent:June 28,2023 9. Corrective action needed: Permanent ground cover sufficient to restrain erosion has been established.No additional self-monitoring or self- inspections are required.Project is in compliance and released under the SPCA.Termination of coverage under the 10. Comments: NPDES General Stormwater Permit for Construction Activities(NCG01)must be requested by the permittee via a Notice of Termination(NOT).The NOT is available at:https://edocs.deq.nc.gov/Forms/NCG01-Termination.Please note that this correspondence must be uploaded as part of completing the NOT process Reported by: Bradley West Others present: Mark Date of inspection: June 27,2023 Time arriving on site: 12:30 PM Time leaving site: 2:00 PM CC: