HomeMy WebLinkAboutNCC201590_NOT Closeout Documents_20230713 Sedimentation/Construction Stormwater Inspection Report
North Carolina Department of Environmental Quality
Land Resources: 943 Washington Square Mall,Washington, NC 27889 (252) 946-6481
County: Washington Project: Albemarle Beach Solar Tree Removal River basin: Pasquotank
Person financially responsible:Albemarle Beach Solar,LLC-Kenny Habul, Project#: WASHI-2020-005
Manager
Address: 192 Raceway Drive,Mooresville,NC 28117
1. Project Location: various
Pictures: No
2. Weather and soil conditions: Sunny,warm,wet Initial inspection: No
3. Is site currently under notice of violation? No
4. Is the site in compliance with S.P.C.A.and rules? Yes If no,check violations below:
5. Violations:
6. Is the site in compliance with the NPDES Permit? Yes
Describe:
7. Has sedimentation damage occurred since last inspection? No If Yes,where? (check all that apply)
Degree of damage:
8. Contact made with(name): Derek Ivie Title: Manager
Inspection report: Sent Report Date given/sent: June 28,2023
9. Corrective action needed:
Permanent ground cover sufficient to restrain erosion has been established.No additional self-monitoring or self-
inspections are required.Project is in compliance and released under the SPCA.Termination of coverage under the
10. Comments: NPDES General Stormwater Permit for Construction Activities(NCG01)must be requested by the permittee via a Notice
of Termination(NOT).The NOT is available at:https://edocs.deq.nc.gov/Forms/NCG01-Termination.Please note that
this correspondence must be uploaded as part of completing the NOT process.
Reported by: Bradley West Others present: Mark
Date of inspection: June 27,2023 Time arriving on site: 12:30 PM Time leaving site: 2:00 PM
CC: