Loading...
HomeMy WebLinkAbout20230635 Ver 1_DCM Permit_20230717Permit Class NEW Permit Number 78-23 STATE OF NORTH CAROLINA Department of Environmental Quality and Coastal Resources Commission r r t nit for X Major Development in an Area of Environmental Concern pursuant to NCGS 113A-118 Excavation and/or filling pursuant to NCGS 113-229 Issued to Billy's Pit Stop, LLC., 4205 NC HWY 751, Apex, NC 27523 Authorizing development in 123 Intracoastal Dr., in Beaufort Carteret County at adj. to Adams Creek Canal/AIWW, at 121 & as requested in the permittee's application submitted electronically on 5/l/23, including attached workplan drawings (2). Sheets 2-3 of 3 dated 4/30/23. This permit, issued on July 14, 2023 , is subject to compliance with the application (where consistent with the permit), all applicable regulations, special conditions and notes set forth below. Any violation of these terms may be subject to civil or criminal penalties; or may cause the permit to be null and void. Docking Facility 1) This permit authorizes only the docks, piers, boatlifts, platforms, and other structures and uses located in or over the water that are expressly and specifically set forth in the permit application. No other structure, whether floating or stationary, shall become a permanent part of this docking facility without permit modification. No non -water dependent uses of structures shall be conducted on, in or over Public Trust waters without permit modification. 2) This permit authorizes a maximum of 5 formalized boat slips. (See attached sheets for Additional Conditions) This permit action may be appealed by the permittee or other qualified persons within twenty (20) days of the issuing date. This permit must be accessible on -site to Department personnel when the project is inspected for compliance. Any maintenance work or project modification not covered hereunder requires further Division approval. All work must cease when the permit expires on July 14, 2028 In issuing this permit, the State of North Carolina agrees that your project is consistent with the North Carolina Coastal Management Program. Signed by the authority of the Secretary of DEQ and the Chair of the Coastal Resources Commission. Braxton C. Davis, Director Division of Coastal Management This permit and its conditions are hereby accepted. Signature of Permittee Billy's Pit Stop, LLC. Permit No. 78-23 Page 2 of 3 ADDITIONAL CONDITIONS 3) All portions of the authorized structure shall have a minimum setback distance of 15 feet between any parts of the structure and the adjacent property owner's area of riparian access. 4) No portion of the authorized docking facility, including tie piles, shall extend more than one quarter of the width of the water body. Measurements to determine width of the water body shall be made from the normal high water line or the waterward edge of any coastal wetland vegetation which borders the water body, whichever is more restrictive. 5) No sewage, whether treated or untreated, shall be discharged at any time from any boats using the mooring. Any sewage discharged at the mooring shall be considered a violation of this permit for which the permittee is responsible. This prohibition shall be applied and enforced throughout the entire existence of the permitted structure. 6) Any portion of the permitted access pier and docking facilities built over wetlands shall not exceed six feet in width and shall be elevated a minimum of three feet above the wetland substrate as measured from the bottom of the decking. 7) The permittee shall install and maintain at his expense any signal lights or signals prescribed by the U.S. Coast Guard, through regulation or otherwise, on the authorized facilities. At minimum, permanent reflectors shall be attached to the structure in order to make it more visible during hours of darkness or inclement weather. 8) No attempt shall be made by the permittee to prevent the full and free use by the public of all navigable waters at or adjacent to the authorized work. 9) The authorized structure and associated activity shall not cause an unacceptable interference with navigation and shall not exceed the dimensions shown on the attached permit drawings. 10) This permit does not authorize the interference with any existing or proposed Federal project, and the permittee shall not be entitled to compensation for damage to the authorized structure or work, or injury which may be caused from existing or future operations undertaken by the United States in the public interest. USACE Conditions 11) In order to further protect the endangered West Indian Manatee, Trichechus manatus, the applicant must implement the U.S. Fish & Wildlife Service's Guidelines, and strictly adhere to all requirements therein. The guidelines can be found at https://www.fws.gov/raleigh/pdfs/ManateeGuidelines20l7.pdf. General 12) This permit shall not be assigned, transferred, sold, or otherwise disposed of to a third party without the written approval of the Division of Coastal Management. 13) All construction debris associated with the removal or construction of the permitted development shall be contained within the authorized project area and disposed of in an approved upland location. Billy's Pit Stop, LLC. ADDITIONAL CONDITIONS Permit No. 78-23 Page 3 of 3 14) The permittee and/or their contractor shall meet with a representative of the Division prior to project initiation. NOTE: This permit does not eliminate the need to obtain any additional state, federal or local permits, approvals or authorizations that may be required. NOTE: The U.S. Army Corps of Engineers authorized the project by way of Regional General Permit 197800056 (Action ID SAW-2023-01013). NOTE: The N.C. Division of Water Resources authorized the proposed project assigned the project DWR Project No/ 2023-0635. NOTE: Future development of the permittee's property may require a modification of this permit. Contact a representative of the Division at (252) 515-5400 prior to the commencement of any such activity for this determination. The permittee is further advised that many non -water dependent activities are not authorized within 30 feet of the normal high-water level. NOTE: An application processing fee of $250 was received by DCM for this project.