Loading...
HomeMy WebLinkAbout20230119 Ver 1_Skyway Logistics Park - Shopton Rd_20230717ROY COOPER Governor ELIZABETH S. BISER Secretary MARC RECKTENWALD Director Ron Coffey EastGroup Properties 3495 Piedmont Road NE, Bld. 11 Ste. 350 Atlanta, GA 30305 Project: Skyway Logistics Park County: Mecklenburg 401 permit#: 2023-0119 404 permit#: 2019-00292 DIMS ID#: MR-08388 Amount Paid: $459,401.98 Check Number: 016252 d� SU7F a pa . NORTH CAROLINA Environmental Quality RECEIPT July 17, 2023 The NCDEQ Division of Mitigation Services (DMS) has received a check as indicated above as payment for the compensatory mitigation requirements of the 401 Water Quality Certification/Section 404 Permit(s) issued for the above -referenced project. This receipt serves as notification that your compensatory mitigation requirements assigned to DMS associated with the authorized activity as specified below have been satisfied. You must also comply with all other conditions of this certification and any other state, federal or local government permits or authorization associated with this activity including G.S. § 143-214.11. The DMS, by acceptance of this payment, acknowledges that the Division is responsible for the compensatory mitigation requirements indicated below associated with the project permit and agrees to provide the compensatory mitigation as specified in the permit. Mitigation responsibility assigned to the DMS is nontransferable. The mitigation will be performed in accordance with the In -Lieu Fee Program instrument dated July 28, 2010. Mitigation Location Mitigation Type Credits Catawba 03 ESA Warm Stream 660 Catawba 03 ESA Riparian Wetland 0.28 Refunds of payments made to NCDMS are only approved under certain conditions. All refund requests must be submitted in accordance with the Division's refund policy. If you have any questions or need additional information, please contact Kelly.Williams@deq.nc.gov. Sincerely, Aa�du� Kelly Williams ILF Program Coordinator cc: Todd Tugwell, USACE - Raleigh; Bryan Roden -Reynolds, USACE Sheri Montalvo, NCDWR Jennifer Robertson, agent Q.,North Carolina Department of Environmental Quality I Divislon of Mitigation Services �}1Jj 217 West Jones Street 1 1652 Mali Service Center I Ratelgh. North Carolina 27699-1652 /� 919.707.8976 DocuSign Envelope ID: 49B28E55-1017-4E4B-9246-DA7BE700DC26 ROY COOPER Governor ELIZABETH S. BISER Secretary RICHARD E. ROGERS, JR. Director NORTH CAROLINA Environmental Quality COMPENSATORY MITIGATION RESPONSIBILITY TRANSFER FORM June 26, 2023 Permittee: EastGroup Properties DWR Project # 20230119 Project Name: Skyway Logistics Park County: Mecklenburg The Division has received an acceptance letter from the NC Division of Mitigation Services (DMS) to satisfy the mitigation requirements set forth in 401 Individual Certification No. WQC006029 issued to EastGroup Properties, dated June 26, 2023as provided in the table below. Compensatory Mitigation River and 8-digit HUC Number Riparian Wetland 0.241 acres (credits) Catawba / 03050103* *Catawba 03 Expanded Service Area The Permittee must provide a copy of this form to DMS who will then sign the form to verify receipt of payment and the transfer of the mitigation responsibility. Once DMS has signed this form, it is the Permittee's responsibility to ensure that a signed copy of this form is submitted to the Division before conducting any of the authorized impacts. The Division of Mitigation Services verifies that the mitigation requirements (credits) shown above will be debited using approved released or advance credits, and for all stream or wetland credits is in accordance with the signed/approved In -Lieu Fee Instrument dated July 28, 2010. By signing below, DMS is accepting full responsibility for the identified mitigation. As a reminder to the Mitigation Provider, no more than 25 percent of the total mitigation required by Division can be met through preservation, unless requested and approved by the Division Director (15A NCAC 02H. 0506(c)(7)). Signature Authority Name (print): Kelly Williams NCDMS Signature: At�d� Date: 17 July 2023 D � � North Carolina Department of Environmental Quality I Division of Water Resources 512 North Salisbury Street 1 1611 Mail Service Center I Raleigh, North Carolina 27699-1611 NORTH CARCUNq o�.m.m,remn,nmanw0ual\ /"� 919.707.9000 U.S. ARMY CORPS OF ENGINEERS Wilmington District Compensatory Mitigation Responsibility Transfer Form Permittee: EastGroup Properties, Inc., (Attn: Mr. Ron Coffey) Action ID: SAW-2019-00292 Project Name: Skyway Logistics Park County: Mecklenburg Instructions to Permittee: The Permittee must provide a copy of this form to the Mitigation Sponsor, either an approved Mitigation Bank or the North Carolina Division of Mitigation Services (NCDMS), who will then sign the form to verify the transfer of the mitigation responsibility. Once the Sponsor has signed this form, it is the Permittee's responsibility to ensure that to the U.S. Army Corps of Engineers (USACE) Project Manager identified on page two is in receipt of a signed copy of this form before conducting authorized impacts, unless otherwise specified below. If more than one mitigation Sponsor will be used to provide the mitigation associated with the permit, or if the impacts and/or the mitigation will occur in more than one 8-digit Hydrologic Unit Code (HUC), multiple forms will be attached to the permit, and the separate forms for each Sponsor and/or HUC must be provided to the appropriate mitigation Sponsors. Instructions to Sponsor: The Sponsor must verify that the mitigation requirements (credits) shown below are available at the identified site. By signing below, the Sponsor is accepting full responsibility for the identified mitigation, regardless of whether or not they have received payment from the Permittee. Once the form is signed, the Sponsor must update the bank ledger and provide a copy of the signed form and the updated bank ledger to the Permittee, the USACE Project Manager, and the Wilmington District Mitigation Office (see contact information on page 2). The Sponsor must also comply with all reporting requirements established in their authorizing instrument. Permitted Impacts and Compensatory Mitigation Requirements Permitted Impacts Requiring Mitigation*: 8-digit HUC and Basin: 03050103, Catawba River Basin Stream Impacts (linear feet) Wetland Impacts (acres) Warm Cool Cold Riparian Riverine Riparian Non-Riverine Non -Riparian Coastal 588 1 0.241 *If more than one mitigation sponsor will be used for the permit, only include impacts to be mitigated by this sponsor. Compensatory Mitigation Requirements: 8-digit HUC and Basin: 03050103 Expanded Service Area Stream Mitigation (credits) Wetland Mitigation (credits) Warm Cool Cold Riparian Riverine Riparian Non-Riverine Non -Riparian Coastal 660 0.28 Mitigation Site Debited: NCDMS (List the name of the bank to be debited. For umbrella banks, also list the specific site. For NCDMS, list NCDMS. If the NCDMS acceptance letter identifies a specific site, also list the specific site to be debited). Section to be completed by the Mitigation Sponsor Statement of Mitigation Liability Acceptance: I, the undersigned, verify that I am authorized to approve mitigation transactions for the Mitigation Sponsor shown below, and I certify that the Sponsor agrees to accept full responsibility for providing the mitigation identified in this document (see the table above), associated with the USACE Permittee and Action ID number shown. I also verify that released credits (and/or advance credits for NCDMS), as approved by the USACE, are currently available at the mitigation site identified above. Further, I understand that if the Sponsor fails to provide the required compensatory mitigation, the USACE Wilmington District Engineer may pursue measures against the Sponsor to ensure compliance associated with the mitigation requirements. Mitigation Sponsor Name: NCDMS Name of Sponsor'ss14-411�dj� Authorized Representative: Kelly Williams 17 July 2023 Signature of Sponsor's Authorized Representative Date of Signature Page 1 of 2 Form Updated 31 January, 2020 USACE Wilmington District Compensatory Mitigation Responsibility Transfer Form, Page 2 Conditions for Transfer of Compensatory Mitigation Credit: • Once this document has been signed by the Mitigation Sponsor and the USACE is in receipt of the signed form, the Permittee is no longer responsible for providing the mitigation identified in this form, though the Permittee remains responsible for any other mitigation requirements stated in the permit conditions. • Construction within jurisdictional areas authorized by the permit identified on page one of this form can begin only after the USACE is in receipt of a copy of this document signed by the Sponsor, confirming that the Sponsor has accepted responsibility for providing the mitigation requirements listed herein. For authorized impacts conducted by the North Carolina Department of Transportation (NCDOT), construction within jurisdictional areas may proceed upon permit issuance; however, a copy of this form signed by the Sponsor must be provided to the USACE within 30 days of permit issuance. NCDOT remains fully responsible for the mitigation until the USACE has received this form, confirming that the Sponsor has accepted responsibility for providing the mitigation requirements listed herein. • Signed copies of this document must be retained by the Permittee, Mitigation Sponsor, and in the USACE administrative records for both the permit and the Bank/ILF Instrument. It is the Permittee's responsibility to ensure that the USACE Project Manager (address below) is provided with a signed copy of this form. • If changes are proposed to the type, amount, or location of mitigation after this form has been signed and returned to the USACE, the Sponsor must obtain case -by -case approval from the USACE Project Manager and/or North Carolina Interagency Review Team (NCIRT). If approved, higher mitigation ratios maybe applied, as per current District guidance and a new version of this form must be completed and included in the USACE administrative records for both the permit and the Bank/ILF Instrument. Comments/Additional Conditions: This form is not valid unless signed below by the USACE Project Manager and by the Mitigation Sponsor on Page 1. Once signed, the Sponsor should provide copies of this form along with an updated bank ledger to:1) the Permittee, 2) the USACE Project Manager at the address below, and 3) the Wilmington District Mitigation Office, 3331 Heritage Trade Drive, Suite 105, Wake Forest, NC 27587 (or by email to kimberly.d.browning@usace.army.mil or todd.tugwell@usace.army. mii). Questions regarding this form or any of the permit conditions may be directed to the USACE Project Manager below. USACE Project Manager: Samantha Dailey USACE Field Office: Charlotte Regulatory Field Office US Army Corps of Engineers 8430 University Executive Park Drive, Suite 615 Charlotte, North Carolina 28262 Email: Samantha.J.Dailey@usace.army.mil �C�YyL June 27. 2023 USACE Project Manager Si6ature Date of Signature Current Wilmington District mitigation guidance, including information on mitigation ratios, functional assessments, and mitigation bank location and availability, and credit classifications (including stream temperature and wetland groupings) is available at http://ribits.usace.army.mil. Page 2 of 2 The Wilmington District is committed to providing the highest level of support to the public. To help us ensure we continue to do so, please complete the Customer Satisfaction Survey located at our website at http://regulatory.usacesurvey.com/ to complete the survey online.