HomeMy WebLinkAbout20230296 Ver 1_DCM Permit_20230710Permit Class
NEW
Permit Number
75-23
STATE OF NORTH CAROLINA
Department of Environmental Quality
and
Coastal Resources Commission
r r t nit
for
X Major Development in an Area of Environmental Concern
pursuant to NCGS 113A-118
X Excavation and/or filling pursuant to NCGS 113-229
Issued to PDM Equity, LLC, 418 Forsyth Street, Raleigh, NC 27609
Authorizing development in
New Hanover
County at adj. to Lee's Cut, at 64 Pelican Dr., in
Wrightsville Beach , as requested in the permittee's submitted electronically 2/16/23, including
work plan drawings (4) Sheets 1-4 of 4 all dated "revised 2/16/23".
This permit, issued on July 5, 2023 , is subject to compliance with the application (where
consistent with the permit), all applicable regulations, special conditions and notes set forth below. Any violation
of these terms may be subject to civil or criminal penalties; or may cause the permit to be null and void.
Docking Facilitv Reconfiguration
1) This permit authorizes the relocation of the floating jet ski lift and access stairs, all as expressly and
specifically set forth in the permit application. No other structure, whether floating or stationary, shall
become a permanent part of this docking facility without permit modification. No non -water
dependent uses of structures shall be conducted on, in or over Public Trust waters without permit
modification.
2) This permit authorizes does not authorize any additional formalized boat slips at this docking facility.
(See attached sheets for Additional Conditions)
This permit action may be appealed by the permittee or other
qualified persons within twenty (20) days of the issuing date.
This permit must be accessible on -site to Department
personnel when the project is inspected for compliance.
Any maintenance work or project modification not covered
hereunder requires further Division approval.
All work must cease when the permit expires on
July 5, 2028
In issuing this permit, the State of North Carolina agrees that
your project is consistent with the North Carolina Coastal
Management Program.
Signed by the authority of the Secretary of DEQ and the Chair
of the Coastal Resources Commission.
For Braxton C. Davis, Director
Division of Coastal Management
This permit and its conditions are hereby accepted.
Signature of Permittee
PDM Equity, LLC
ADDITIONAL CONDITIONS
Permit No. 75-23
Page 2 of 4
3) No sewage, whether treated or untreated, shall be discharged at any time from any boats using the
mooring. Any sewage discharged at the mooring shall be considered a violation of this permit for which
the permittee is responsible. This prohibition shall be applied and enforced throughout the entire
existence of the permitted structure.
4) Should the western adjacent property be sold prior to the initiation of construction of the docking
facility, the permittee shall obtain a written agreement from the new owner(s) waiving the minimum
setback, and authorization to construct the portion of the docking facility within the property owner's
riparian setback, and submit it to the Division of Coastal Management prior to initiating construction of
the docking facility.
5) The permittee shall install and maintain at his expense any signal lights or signals prescribed by the U.S.
Coast Guard, through regulation or otherwise, on the authorized facilities. At minimum, permanent
reflectors shall be attached to the structure in order to make it more visible during hours of darkness or
inclement weather.
6) No attempt shall be made by the permittee to prevent the full and free use by the public of all navigable
waters at or adjacent to the authorized work.
7) The authorized structure and associated activity shall not cause an unacceptable interference with
navigation and shall not exceed the dimensions shown on the attached permit drawings.
Bulkhead Replacement
8) The bulkhead shall be constructed in accordance with the alignment depicted on the attached workplan
drawings.
9) No vegetated wetlands or open water shall be excavated or filled, even temporarily, outside of the
approved bulkhead alignment.
10) The alignment of the authorized bulkhead shall be staked by the permittee and verified by a
representative of the Division of Coastal Management within a maximum of 30 days prior to the start of
construction.
11) The bulkhead shall be solid and constructed of treated wood, concrete slabs, metal or vinyl sheet piles,
or other suitable materials approved by Division personnel.
12) The bulkhead shall be constructed prior to any backfilling activities.
13) The bulkhead shall be structurally tight so as to prevent seepage of backfill materials through the
structure.
14) This permit does not authorize any excavation waterward of the approved alignment.
15) The fill material shall be clean and free of any pollutants except in trace quantities.
PDM Equity, LLC
ADDITIONAL CONDITIONS
Permit No. 75-23
Page 3 of 4
16) Unless altered herein, all backfill material shall be obtained from a high ground source and confined
behind the permitted bulkhead.
17) No backfill material is to be placed within 30 feet of the normal high-water level, except that which will
be used to backfill the area behind the permitted bulkhead.
18) All fill material to be placed below normal high-water level shall be confined behind the permitted
bulkhead.
19) If the crossing of wetlands with mechanized construction equipment is necessary, temporary
construction mats shall be utilized for the areas to be crossed. The temporary mats shall be removed
immediately upon completion of construction.
Sedimentation and Erosion Control
20) In order to protect water quality, runoff from construction shall not visibly increase the amount of
suspended sediments in adjacent waters.
21) Appropriate sedimentation and erosion control devices, measures or structures shall be implemented to
ensure that eroded materials do not enter adjacent wetlands, watercourses or properties.
22) A ground cover sufficient to restrain erosion shall be provided within 30 calendar days of any phase of
grading on cut or filled slopes. At a minimum, a silt fence shall be properly installed immediately
landward of the bulkhead cap immediately following completion of backfilling activities.
General
23) This permit shall not be assigned, transferred, sold, or otherwise disposed of to a third party without the
written approval of the Division of Coastal Management.
24) All construction debris associated with the removal or construction of the permitted development shall
be contained within the authorized project area and disposed of in an approved upland location.
25) The permittee and/or their contractor shall meet with a representative of the Division prior to project
initiation.
NOTE: This permit does not eliminate the need to obtain any additional state, federal or local permits,
approvals or authorizations that may be required.
NOTE: The U.S. Army Corps of Engineers authorized the project by way of Regional General Permit
197800056 and Nationwide Permit 3 (Action ID SAW-2023-00648).
NOTE: The N.C. Division of Water Resources authorized the proposed project by way of Individual
Water Quality Certification 5860 and assigned the project DWR Project No. 20230296.