Loading...
HomeMy WebLinkAboutSWA000212_email_20230706 Peck, Kaitlin From:Farkas, Jim J Sent:Thursday, July 6, 2023 9:49 AM To:Devin Staley; John Reece; norvelljt@gmail.com Cc:Smith, Mike M; Peck, Kaitlin Subject:RE: SWA000212; Courtyard Marriott at Village of Sugar Mountain (Avery) Please upload the electronic files for this project at the link below. NOTE: We are unable to issue the permit for this project un?l the electronic files for this project have been uploaded to the link provided below. If these items are not provided by 7/14/23 the project may be returned due to inac?vity. Jim Farkas State Stormwater Engineer North Carolina Department of Environmental Quality Office: (919) 707-3646 Jim.farkas@deq.nc.gov From: Farkas, Jim J Sent: Wednesday, June 28, 2023 10:50 AM To: Devin Staley <devin@ridge.blue>; John Reece <john@commercialrealtync.com>; norvelljt@gmail.com Cc: Smith, Mike M <michael.smith@deq.nc.gov>; Peck, Kaitlin <kaitlin.peck@deq.nc.gov> Subject: RE: SWA000212; Courtyard Marriott at Village of Sugar Mountain (Avery) Please upload the electronic files for this project at the link below if you have not already done so. Jim Farkas State Stormwater Engineer North Carolina Department of Environmental Quality Office: (919) 707-3646 Jim.farkas@deq.nc.gov 1 From: Peck, Kaitlin <kaitlin.peck@deq.nc.gov> Sent: Friday, June 16, 2023 9:56 AM To: Devin Staley <devin@ridge.blue>; John Reece <john@commercialrealtync.com>; norvelljt@gmail.com Cc: Farkas, Jim J <Jim.Farkas@deq.nc.gov>; Smith, Mike M <michael.smith@deq.nc.gov> Subject: SWA000212; Courtyard Marriott at Village of Sugar Mountain (Avery) Good Morning, We received your post-construc?on stormwater \[Authoriza?on to Construct (ATC)\] permit applica?on for the subject project on 6/14/2023. Reviews under the Fast-Track permi?ng process can take up to 30 calendar days to complete. You can see where this project stands in the review queue by emailing Jim Farkas (He has an autoreply set up that has the review queue on it). Please upload all documents that you mailed into our office through the link provided below. Be sure to choose the Central Office as the Primary Contact office. h?ps://edocs.deq.nc.gov/Forms/SW-Supplemental-Upload IMPORTANT NOTE: Please ensure that each file is uploaded under its appropriate file type. Addi?onal file types can be entered into the electronic form by clicking on the “Add Another Post-Construc?on File Upload” link directly below the “State Stormwater Informa?on Uploads” sec?on of the form. YOU MUST CLICK ON THE “ADD ANOTHER POST- CONSTRUCTION FILE UPLOAD” TO ADD ADDITIONAL FILE TYPES TO THE SUBMISSION. Merely changing the file type dropdown as you upload the various files (without adding addi?onal file uploads) will upload all of the files as the last file type selected, the submission will get flagged during review, and you will need to resubmit the files. Please do not upload en?re plan sets through this form, but rather upload the relevant individual sheets under the appropriate file type. Selec?ng the correct file type ensures that the files are properly named in the electronic repository and it helps expedite the review process. NOTE: We do not require and we discourage the upload/submission of extraneous plan sheets (such as ligh?ng plans, u?lity plans, striping plans, sight distance plans, etc…) as these files are not needed for review. Please type in permit #: SWA000212 This project will be reviewed by Jim Farkas, if you have any ques?ons, please contact them at jim.farkas@deq.nc.gov or at 919-707-3646. Thank you, Kaitlin Peck Environmental Specialist North Carolina Department of Environmental Quality Office: (919) 707-9209 Kaitlin.peck@deq.nc.gov 2 Email correspondence to and from this address may be subject to the North Carolina Public Records Law and may be disclosed to third parties by an authorized state official. 3