Peck, Kaitlin
From:Farkas, Jim J
Sent:Tuesday, June 6, 2023 11:48 AM
To:Devin Staley
Cc:John Reece; Jack Reece; Peck, Kaitlin
Subject:RE: \[External\] RE: Courtyard Marriott at Village of Sugar Mountain in Elk Banner,
Watauga County
We never received the hard copy of the Fast-Track submission, we are currently processing the Standard Application
that was initially submitted.
If you like, we can hold off on processing the Standard Application while you resubmit the Fast-Track hard copies to our
office.
For FedEx/UPS:
Jim Farkas
512 N. Salisbury Street, Office 640M
Raleigh, NC 27604
For USPS:
Jim Farkas
1612 Mail Service Center
Raleigh, NC 27699-1612
Hand Delivery:
Please reach out to me prior to hand delivering a submission to make sure that I (or someone else in my group)
will be able to receive the submission. Do not leave the package in the foyer with the security guard.
Sorry for the inconvenience.
Jim Farkas
State Stormwater Engineer
North Carolina Department of Environmental Quality
Office: (919) 707-3646
Jim.farkas@deq.nc.gov
From: Devin Staley <devin@ridge.blue>
Sent: Tuesday, June 6, 2023 11:04 AM
To: Farkas, Jim J <Jim.Farkas@deq.nc.gov>
1
Cc: John Reece <john@commercialrealtync.com>; Jack Reece <jack@commercialrealtync.com>
Subject: RE: \[External\] RE: Courtyard Marriott at Village of Sugar Mountain in Elk Banner, Watauga County
CAUTION: External email. Do not click links or open attachments unless verified. Report suspicious emails with the Report Message
button located on your Outlook menu bar on the Home tab.
Jim,
Following up on this fast-track review. We shipped out the executed applications on April 19.
We would appreciate an update at your convenience.
Thanks.
M. Devin Staley, PE
devin@ridge.blue
From: Devin Staley
Sent: Wednesday, April 19, 2023 2:26 PM
To: Farkas, Jim J <Jim.Farkas@ncdenr.gov>
Cc: John Reece <john@commercialrealtync.com>; Jack Reece <jack@commercialrealtync.com>
Subject: RE: \[External\] RE: Courtyard Marriott at Village of Sugar Mountain in Elk Banner, Watauga County
Jim,
We are shipping out two original signed copies of the Fast-Track ATC Form today. I have also attached a digital copy.
Please allow this to replace the previously submitted standard application.
Thanks.
M. Devin Staley, PE
devin@ridge.blue
From: Farkas, Jim J <Jim.Farkas@ncdenr.gov>
Sent: Tuesday, April 4, 2023 1:50 PM
To: Devin Staley <devin@ridge.blue>
Cc: John Reece <john@commercialrealtync.com>
Subject: RE: \[External\] RE: Courtyard Marriott at Village of Sugar Mountain in Elk Banner, Watauga County
We can do that.
Don’t forget that 2x original signed hard copies of the Fast-Track ATC Form are required (it is a fairly common mistake).
Jim Farkas
State Stormwater Engineer
North Carolina Department of Environmental Quality
Office: (919) 707-3646
Jim.farkas@ncdenr.gov
2
From: Devin Staley <devin@ridge.blue>
Sent: Tuesday, April 4, 2023 1:36 PM
To: Farkas, Jim J <Jim.Farkas@ncdenr.gov>
Cc: John Reece <john@commercialrealtync.com>
Subject: RE: \[External\] RE: Courtyard Marriott at Village of Sugar Mountain in Elk Banner, Watauga County
CAUTION: External email. Do not click links or open attachments unless you verify. Send all suspicious email as an attachment to
Report Spam.
We would like to move this to the Fast-Track process. I’ll get started on the Fast-Track application and getting it
executed. Please let me know what else you need from me. We sent a check, plans, calculations, etc. with the original
submittal. I’d rather not resubmit everything if you can retain it until you receive the fast-track application.
Thanks.
M. Devin Staley, PE
devin@ridge.blue
From: Farkas, Jim J <Jim.Farkas@ncdenr.gov>
Sent: Tuesday, April 4, 2023 1:33 PM
To: Devin Staley <devin@ridge.blue>
Cc: John Reece <john@commercialrealtync.com>
Subject: RE: \[External\] RE: Courtyard Marriott at Village of Sugar Mountain in Elk Banner, Watauga County
Yes, we do not cash the check until the project is accepted for review. We can also cannibalize items from the Standard
Application for use in the Fast-Track Application (or you can just resubmit everything, whichever is easiest for you).
Jim Farkas
State Stormwater Engineer
North Carolina Department of Environmental Quality
Office: (919) 707-3646
Jim.farkas@ncdenr.gov
3
From: Devin Staley <devin@ridge.blue>
Sent: Tuesday, April 4, 2023 1:30 PM
To: Farkas, Jim J <Jim.Farkas@ncdenr.gov>
Cc: John Reece <john@commercialrealtync.com>
Subject: \[External\] RE: Courtyard Marriott at Village of Sugar Mountain in Elk Banner, Watauga County
CAUTION: External email. Do not click links or open attachments unless you verify. Send all suspicious email as an attachment to
Report Spam.
Jim,
If we withdraw the standard application and apply through the Fast-Track process, will you apply the $505 check
submitted to the new Fast-Track submittal?
Thanks.
M. Devin Staley, PE
devin@ridge.blue
From: John Reece <john@commercialrealtync.com>
Sent: Tuesday, April 4, 2023 1:15 PM
Cc: Devin Staley <devin@ridge.blue>
Subject: Re: Courtyard Marriott at Village of Sugar Mountain in Elk Banner, Watauga County
Do you think asking the County Manager to get involved will help ?
John E Reece II
Commercial Realty Advisors LLC
336 978 5226
john@commercialrealtync.com
www.commercialrealtync.com
On Tue, Apr 4, 2023, 1:13 PM Farkas, Jim J <Jim.Farkas@ncdenr.gov> wrote:
We have received a new application for the subject project on April 4, 2023. At this time, we are not processing new
Standard Applications. We will hold onto the provided application until we resume processing Standard Applications or
until July 3, 2023 (90 days after receiving the application), whichever comes first.
Your options are as follows:
Withdraw the Standard Application and apply for a permit for this project through the Fast-Track process. NOTE:
Please refer to the eligibility requirements outlined in 15A NCAC 02H .1043
(http://reports.oah.state.nc.us/ncac/title%2015a%20-%20environmental%20quality/chapter%2002%20-
%20environmental%20management/subchapter%20h/15a%20ncac%2002h%20.1043.pdf) and Part A of the
Fast-Track ATC Application Form as not all projects are suited to be permitted through the Fast-Track process.
Wait for us to process the application. If we do not process the application within 90 days of receiving it, it is
assumed that the Division has no issues with what is being proposed and the project is deemed approved (in
accordance with 15A NCAC 02H .1042(3)(c) http://reports.oah.state.nc.us/ncac/title%2015a%20-
4
%20environmental%20quality/chapter%2002%20-
%20environmental%20management/subchapter%20h/15a%20ncac%2002h%20.1042.pdf).
Sorry for the inconvenience, we are working to correct this issue and will do so as soon as we are able to.
Jim Farkas
State Stormwater Engineer
North Carolina Department of Environmental Quality
Office: (919) 707-3646
Jim.farkas@ncdenr.gov
The linked image cannot be displayed. The file may have been moved, renamed, or deleted. Verify that the link points to the correct file and location.
CONFIDENTIALITY NOTE: This e-mail message, including any attachment(s), contains information that may be confidential, protected by the attorney-client or
other legal privileges, and/or proprietary non-public information. If you are not an intended recipient of this message or an authorized assistant to an intended
recipient, please notify the sender by replying to this message and then delete it from your system. Use, dissemination, distribution, or reproduction of this message
and/or any of its attachments (if any) by unintended recipients is not authorized and may be unlawful.
5