Loading...
HomeMy WebLinkAboutSWA000210_email_20230609 Peck, Kaitlin From:Peck, Kaitlin Sent:Friday, June 9, 2023 3:03 PM To:Jeremy Reese; FL@loves.com Cc:Farkas, Jim J; Kay, Lily C Subject:RE: \[External\] RE: Love's Travel Stop; Rural Hall, Forsyth County To my knowledge, it is just in his auto-reply. Take care, Kaitlin Peck Environmental Specialist North Carolina Department of Environmental Quality Office: (919) 707-9209 Kaitlin.peck@deq.nc.gov From: Jeremy Reese <jreese@chipolaeg.com> Sent: Friday, June 9, 2023 2:59 PM To: Peck, Kaitlin <kaitlin.peck@deq.nc.gov>; FL@loves.com Cc: Farkas, Jim J <Jim.Farkas@deq.nc.gov>; Kay, Lily C <lily.kay@deq.nc.gov> Subject: RE: \[External\] RE: Love's Travel Stop; Rural Hall, Forsyth County CAUTION: External email. Do not click links or open attachments unless verified. Report suspicious emails with the Report Message button located on your Outlook menu bar on the Home tab. Kaitlin, I received the a?ached auto-reply from Mr. Farkas this morning that includes the review status for current projects. Is this informa?on also somewhere on the NCDEQ website that I can check periodically or only available on this email auto-reply? Thanks, Jeremy Reese, PE Vice-President Direct: 850-633-2302 Cell: 850-933-1197 1 jreese@chipolaeg.com From: Peck, Kaitlin <kaitlin.peck@deq.nc.gov> Sent: Friday, June 9, 2023 10:57 AM To: Jeremy Reese <jreese@chipolaeg.com>; FL@loves.com Cc: Farkas, Jim J <Jim.Farkas@deq.nc.gov>; Kay, Lily C <lily.kay@deq.nc.gov> Subject: RE: \[External\] RE: Love's Travel Stop; Rural Hall, Forsyth County That is correct. Take care, Kaitlin Peck Environmental Specialist North Carolina Department of Environmental Quality Office: (919) 707-9209 Kaitlin.peck@deq.nc.gov From: Jeremy Reese <jreese@chipolaeg.com> Sent: Friday, June 9, 2023 10:55 AM To: Peck, Kaitlin <kaitlin.peck@deq.nc.gov>; FL@loves.com Cc: Farkas, Jim J <Jim.Farkas@deq.nc.gov>; Kay, Lily C <lily.kay@deq.nc.gov> Subject: RE: \[External\] RE: Love's Travel Stop; Rural Hall, Forsyth County CAUTION: External email. Do not click links or open attachments unless verified. Report suspicious emails with the Report Message button located on your Outlook menu bar on the Home tab. Thanks. Just to confirm, you only need the hard copies right now to finish the completeness review and electronic copies will be uploaded once the applica?on is administra?vely approved? Jeremy Reese, PE Vice-President Direct: 850-633-2302 Cell: 850-933-1197 jreese@chipolaeg.com 2 From: Peck, Kaitlin <kaitlin.peck@deq.nc.gov> Sent: Friday, June 9, 2023 8:55 AM To: Jeremy Reese <jreese@chipolaeg.com>; FL@loves.com Cc: Farkas, Jim J <Jim.Farkas@deq.nc.gov>; Kay, Lily C <lily.kay@deq.nc.gov> Subject: RE: \[External\] RE: Love's Travel Stop; Rural Hall, Forsyth County Hi Jeremy, Once your applica?on is administra?vely approved, we will send you a link to upload it there. Thank you! Take care, Kaitlin Peck Environmental Specialist North Carolina Department of Environmental Quality Office: (919) 707-9209 Kaitlin.peck@deq.nc.gov From: Jeremy Reese <jreese@chipolaeg.com> Sent: Friday, June 9, 2023 8:54 AM To: Peck, Kaitlin <kaitlin.peck@deq.nc.gov>; FL@loves.com Cc: Farkas, Jim J <Jim.Farkas@deq.nc.gov>; Kay, Lily C <lily.kay@deq.nc.gov> Subject: \[External\] RE: Love's Travel Stop; Rural Hall, Forsyth County CAUTION: External email. Do not click links or open attachments unless verified. Report suspicious emails with the Report Message button located on your Outlook menu bar on the Home tab. Good morning Kaitlin, I’ll get this sent out today. Can the electronic copy be emailed or will it need to be on a disc with the hard copies? Thanks, Jeremy Reese, PE Vice-President Direct: 850-633-2302 Cell: 850-933-1197 jreese@chipolaeg.com 3 From: Peck, Kaitlin <kaitlin.peck@deq.nc.gov> Sent: Friday, June 9, 2023 8:50 AM To: FL@loves.com; Jeremy Reese <jreese@chipolaeg.com> Cc: Farkas, Jim J <Jim.Farkas@deq.nc.gov>; Kay, Lily C <lily.kay@deq.nc.gov> Subject: Love's Travel Stop; Rural Hall, Forsyth County Good Morning, We received your application for a new Fast-Track post-construction stormwater permit on 5/26/2023. At this time, the submission is not administratively complete and cannot be accepted for review in its current condition. Please provide the following submittal items within 30 calendar days (by close of business on 7/9/2023) so that we may accept the project and begin the review process, otherwise, the project will be returned as administratively incomplete.  2x original hard copies and 1x electronic copy of a site plan corrected to depict wetland delineation or a note on the plans stating that there are no wetlands located on-site. This item is required per 15A NCAC 02H .1043(3)(f) and per Section F,4 of the Application. NOTE: This is an administrative completeness review, not a detailed engineering review, there may be other issues that may be brought up during the engineering review. If these items are received within the stipulated timeframe, we can accept the project and begin the review process. Once accepted, reviews under the Fast-Track permitting process can take up to 30 calendar days per statute. Hard copies should be mailed to the following address: For FedEx/UPS: Jim Farkas 512 N. Salisbury Street, Office 640E Raleigh, NC 27604 For USPS: Jim Farkas 1612 Mail Service Center Raleigh, NC 27699-1612 If you have any questions, please contact Kaitlin Peck at Kaitlin.peck@deq.nc.gov or at (919) 707-9209. 4 Thank you, Kaitlin Peck Environmental Specialist North Carolina Department of Environmental Quality Office: (919) 707-9209 Kaitlin.peck@deq.nc.gov Email correspondence to and from this address may be subject to the North Carolina Public Records Law and may be disclosed to third parties by an authorized state official. 5