Loading...
HomeMy WebLinkAboutNC0026441_Request for Extension_202307034 81Le , ea�hAP r o+ "Woo C 0 Eolbin of *iter City Public Works and Utilities June 28, 2023 Scott Vinson, Raleigh Regional Office Supervisor Division of Water Resources, Water Quality Regional Operations 3800 Barrett Drive, Raleigh, NC 27609 Re: Request for Extension EMC SOC WQ S22-003 Siler City WWTP NCO026441 Town of Siler City North Carolina Dear Mr. Vinson: On behalf of the Town of Siler City please accept this request for extension of the Special Order by Consent Milestone for `Complete Construction of WTP Pretreatment Improvements'. We are requesting extension of the Milestone by 90 days from July 31, 2023 to October 29, 2023. This delay is caused by a delay in equipment for construction of the Water Treatment Plant Pretreatment System. The Contractor initially approved the Purchase Order of this equipment on January 26, 2022. The schedule from the vendor was initially to be 6 to 8 weeks for shop drawings and equipment delivery at 18 to 24 weeks from receipt of approved shop drawings. Accounting for 8 weeks of Engineering review time it was initially expected that the equipment would be delivered in 2022. Unfortunately, the manufacturer has had significant delays in the preparation of shop drawings, and production of the equipment. These delays have been in part attributed to COVID-19 shutdowns as the manufacturing facility was required on two occasions to completely shut down due to COVID cases at the facility. The primary tankage associated with the Acti-Flo equipment arrived onsite on June 14, 2023, however this does not include all electrical control panels that are required for its installation and operation. The partial shipment was arranged to expedite the schedule as the equipment can be set in place and piping completed as the Contractor awaits the remaining items. The most communication indicates that the remaining portions of the equipment will be provided in mid -August however firm dates have not been provided. A copy of the latest schedule provided by the Contractor is enclosed for reference. The current anticipated startup date is September 29, 2023. We are requesting the full 90 days allowable under the SOC in order to ensure that any issues discovered during startup can be addressed and the equipment placed in full operation ahead of the revised milestone. Chris McCorquodale Director of Public Utilities PO Box 769.311 N. Second Avenue Siler City, NC 27344-0769 cmccorquodale@silercity.org Phone: 919-742.4732 9 Fax: 919-663.3874 www.silercity.org To advance a framework for our sircces.i throggh balanced governance, dynamic Partnerships, and an engaged community. We are reviewing the Contract and have requested additional documentation of the Contractor and vendor's efforts to meet the Contract schedule. Regardless of these efforts the system cannot be completed until the remaining equipment is available at the site. We greatly appreciate your consideration of this request. If any additional information is required, please contact me at cmccorquodale(a-silercity.orlr or by phone at 919-726-8614. Sincerely, TOWN OF SILER CITY Chris MCCorquodaIV Public Utilities Director Chris McCorquodale Director of Public Utilities PO Box 769.311 N. Second Avenue Slier City, NC 27344-0769 cmccorquodale@silercity.org Phone: 919.742.4732•Fax: 919-663-3874 www.silercity.org To advance a framework for w.r snrcess through balanced gover nancc. d1mamic partnerships, and an engaged c!unruwrity. 8 ask Mode ask Name Duration Start Finish Predecessors Resource Names IM, 2e, 23 0 'E% R R R R R �� R R R R R Q* R j R �* R CM, W. S $ R Q* R R R R R Commercial 403 days? Constructlon NTP Date 0 days Polymer Bldg Paint 10 days Polymer Bldg. Roo0n;7 days Polymer Bldg 15 days Electrical Work Pretreatment Slab 3days Piping Pretreatment Slab 10 days PretreatmentSlab 7days Electrical Subs Blower Piping 10 days Air Scour Electrical 10 days Work Force Main Relocatlo5 days Install Air Scour Syste32 days Re -install glower 2days Control Wires Air Scour System 1day? Startup Original Substantial 0days Completion Set ActiFlo System 5days Yard Piping 35 days ActlFlo Stalrs/Catwa115 days ActiFlO Piping 10 days ActiFin Electrical Wor 30 days Blower Shelter 10 days Polymer System Pipir 30 days Polymer System 7days Electrical Work Parking Area 5days Modifications Site Cleanup/Punchli!5 days Install Rapid Mixer 3 days ActiFlo System Startu5 days Original Final 0 days r-1.11nn Thu 3/17/22 Wed 6/1/22 Mon 4/24/23 Mon 6119/23 Mon 5/8/23 Thu 6/29/23 Tue 7/4/23 Wed 7/5/23 Wed 4/26/23 Thu 3/17/22 Mon 5/15/23 Mon 3/20/23 Thu 6/29/23 Thu 7/6/23 Sun 2/26/23 Thu 7/27/23 Wed 6/7/23 Thu 8/3/23 Thu 8/3/23 Thu 8/10/23 Thu 5/4/23 Tue 8/15/23 Thu 8/17/23 Mon 8/21/23 Mon 8/14/23 Tue 9/19/23 Mon 9/25/23 Tue 3/28/23 Fri 9/29/23 Wed 6/1/22 Fri 5/5/23 Tue 6/27/23 Fri 5/26/23 2 IMon 7/3/23 Mon 7/17/235 Thu 7/13/235,6SS+1 day Tue S/9/23 Wed 3/30/22 Fri 5/19/23 Tue S/2/23 Fri 6/30/23 Thu 7/6/23 Sun 2/26/23 Wed 8/2/23 6FS+7days Tue 7/25/23 Wed 8/9/23 15 Wed 8/16/2315 Wed 8/23/2317 Wed 5/17/23 Mon 8/28/23 Fri 8/25/23 215S+2days Fri 8/25/23 24 Fri 8/18/23 Thu 9/21/23 Fri 9/29/23 Tue 3/28/23 Coating Contriscuni Electric Contractor G.C. Labor Crew G.C. Concrete CreR ElectricContractor G.C. Labor Crew Electric Contractor Pipe Crew G.C. Labor Crew Electric Contractor G.C. tabor Crew Pipe Crew G.C. labor Crew G.C. Labor Crew Electric Contractor G.C. Labor Crew G.C. Labor Crew Electric Contractor G.C. Labor Crew G.C. Labor Crew Coating Contractor Electric Contractor �•-- G.C. Labor Crew Izu: Pipe Crew G.C. Labor Crew t� G.C. Labor Crew 1 2 3 a J12 14 15 16 17 18 19 20 21 22 23 24 25 26 27 Labor Crew t• G.C. Concrete Crew ne Electric Contractor Electric Contractor 11 Sep 17,'23 G.C. Labor Crew Pipe Crew G.C. Labor Crew G.C. Labor Crew Electric Contractor Task Project Summary �1 Manual Task t♦ Start -only C Decline s Project Commercial Constructi spit ���������.���............ leac eTask Deration-onq finish -only 7 Progress — Date: Wed 6/28/23 Milestone ♦ lactive Milestone 9 Manual Summary Rollup fxtemal Tasks Manual Progress — Summary t1 IiactNe Summary 1-1 Manual Summary r — — —1 External Mllence. Page 1 G.C. Labor Crew Electric Contractor r G.C. Labor Crew G.C. Labor Crew