Public Works and Utilities
June 28, 2023
Scott Vinson, Raleigh Regional Office Supervisor
Division of Water Resources, Water Quality Regional Operations
3800 Barrett Drive, Raleigh, NC 27609
Re: Request for Extension
EMC SOC WQ S22-003
Siler City WWTP NCO026441
Town of Siler City North Carolina
Dear Mr. Vinson:
On behalf of the Town of Siler City please accept this request for extension of the Special Order by
Consent Milestone for `Complete Construction of WTP Pretreatment Improvements'. We are requesting
extension of the Milestone by 90 days from July 31, 2023 to October 29, 2023.
This delay is caused by a delay in equipment for construction of the Water Treatment Plant Pretreatment
System. The Contractor initially approved the Purchase Order of this equipment on January 26, 2022. The
schedule from the vendor was initially to be 6 to 8 weeks for shop drawings and equipment delivery at 18 to 24
weeks from receipt of approved shop drawings. Accounting for 8 weeks of Engineering review time it was
initially expected that the equipment would be delivered in 2022. Unfortunately, the manufacturer has had
significant delays in the preparation of shop drawings, and production of the equipment. These delays have been
in part attributed to COVID-19 shutdowns as the manufacturing facility was required on two occasions to
completely shut down due to COVID cases at the facility.
The primary tankage associated with the Acti-Flo equipment arrived onsite on June 14, 2023, however
this does not include all electrical control panels that are required for its installation and operation. The partial
shipment was arranged to expedite the schedule as the equipment can be set in place and piping completed as
the Contractor awaits the remaining items. The most communication indicates that the remaining portions of the
equipment will be provided in mid -August however firm dates have not been provided. A copy of the latest
schedule provided by the Contractor is enclosed for reference. The current anticipated startup date is September
29, 2023. We are requesting the full 90 days allowable under the SOC in order to ensure that any issues
discovered during startup can be addressed and the equipment placed in full operation ahead of the revised
milestone.
Chris McCorquodale
Director of Public Utilities
PO Box 769.311 N. Second Avenue
Siler City, NC 27344-0769
cmccorquodale@silercity.org
Phone: 919-742.4732 9 Fax: 919-663.3874
www.silercity.org
To advance a framework for our sircces.i throggh balanced governance, dynamic Partnerships, and an engaged community.
We are reviewing the Contract and have requested additional documentation of the Contractor and
vendor's efforts to meet the Contract schedule. Regardless of these efforts the system cannot be completed until
the remaining equipment is available at the site.
We greatly appreciate your consideration of this request. If any additional information is required, please
contact me at cmccorquodale(a-silercity.orlr or by phone at 919-726-8614.
Sincerely,
TOWN OF SILER CITY
Chris MCCorquodaIV Public Utilities Director
Chris McCorquodale
Director of Public Utilities
PO Box 769.311 N. Second Avenue
Slier City, NC 27344-0769
cmccorquodale@silercity.org
Phone: 919.742.4732•Fax: 919-663-3874
www.silercity.org
To advance a framework for w.r snrcess through balanced gover nancc. d1mamic partnerships, and an engaged c!unruwrity.
8
ask
Mode
ask Name
Duration
Start
Finish
Predecessors
Resource Names
IM, 2e, 23
0
'E%
R
R
R
R
R
��
R
R
R
R
R
Q* R
j R
�* R
CM, W.
S
$ R
Q* R
R
R
R
R
Commercial 403 days?
Constructlon
NTP Date 0 days
Polymer Bldg Paint 10 days
Polymer Bldg. Roo0n;7 days
Polymer Bldg 15 days
Electrical Work
Pretreatment Slab 3days
Piping
Pretreatment Slab 10 days
PretreatmentSlab 7days
Electrical Subs
Blower Piping 10 days
Air Scour Electrical 10 days
Work
Force Main Relocatlo5 days
Install Air Scour Syste32 days
Re -install glower 2days
Control Wires
Air Scour System 1day?
Startup
Original Substantial 0days
Completion
Set ActiFlo System 5days
Yard Piping 35 days
ActlFlo Stalrs/Catwa115 days
ActiFlO Piping 10 days
ActiFin Electrical Wor 30 days
Blower Shelter 10 days
Polymer System Pipir 30 days
Polymer System 7days
Electrical Work
Parking Area 5days
Modifications
Site Cleanup/Punchli!5 days
Install Rapid Mixer 3 days
ActiFlo System Startu5 days
Original Final 0 days
r-1.11nn
Thu 3/17/22
Wed 6/1/22
Mon 4/24/23
Mon 6119/23
Mon 5/8/23
Thu 6/29/23
Tue 7/4/23
Wed 7/5/23
Wed 4/26/23
Thu 3/17/22
Mon 5/15/23
Mon 3/20/23
Thu 6/29/23
Thu 7/6/23
Sun 2/26/23
Thu 7/27/23
Wed 6/7/23
Thu 8/3/23
Thu 8/3/23
Thu 8/10/23
Thu 5/4/23
Tue 8/15/23
Thu 8/17/23
Mon 8/21/23
Mon 8/14/23
Tue 9/19/23
Mon 9/25/23
Tue 3/28/23
Fri 9/29/23
Wed 6/1/22
Fri 5/5/23
Tue 6/27/23
Fri 5/26/23 2
IMon 7/3/23
Mon 7/17/235
Thu 7/13/235,6SS+1 day
Tue S/9/23
Wed
3/30/22
Fri 5/19/23
Tue S/2/23
Fri 6/30/23
Thu 7/6/23
Sun 2/26/23
Wed 8/2/23 6FS+7days
Tue 7/25/23
Wed 8/9/23 15
Wed 8/16/2315
Wed 8/23/2317
Wed 5/17/23
Mon 8/28/23
Fri 8/25/23 215S+2days
Fri 8/25/23 24
Fri 8/18/23
Thu 9/21/23
Fri 9/29/23
Tue 3/28/23
Coating Contriscuni
Electric Contractor
G.C. Labor Crew
G.C. Concrete CreR
ElectricContractor
G.C. Labor Crew
Electric Contractor
Pipe Crew
G.C. Labor Crew
Electric Contractor
G.C. tabor Crew
Pipe Crew
G.C. labor Crew
G.C. Labor Crew
Electric Contractor
G.C. Labor Crew
G.C. Labor Crew
Electric Contractor
G.C. Labor Crew
G.C. Labor Crew
Coating Contractor
Electric Contractor
�•-- G.C. Labor Crew
Izu: Pipe Crew
G.C. Labor Crew
t�
G.C. Labor Crew
1
2
3
a
J12
14
15
16
17
18
19
20
21
22
23
24
25
26
27
Labor Crew
t• G.C. Concrete Crew
ne Electric Contractor
Electric Contractor
11
Sep 17,'23
G.C. Labor Crew
Pipe Crew
G.C. Labor Crew
G.C. Labor Crew
Electric Contractor
Task
Project Summary �1
Manual Task t♦
Start -only C
Decline s
Project Commercial Constructi
spit
���������.���............ leac eTask
Deration-onq
finish -only 7
Progress —
Date: Wed 6/28/23
Milestone
♦ lactive Milestone 9
Manual Summary Rollup
fxtemal Tasks
Manual Progress —
Summary
t1 IiactNe Summary 1-1
Manual Summary r — — —1
External Mllence.
Page 1
G.C. Labor Crew
Electric Contractor
r G.C. Labor Crew
G.C. Labor Crew