Loading...
HomeMy WebLinkAboutSW3220701_email_20230626 Peck, Kaitlin From:Farkas, Jim J Sent:Monday, June 26, 2023 3:46 PM To:Greeson, Mason Cc:brian@broadstreethomes.com Subject:RE: SW3220701 Old Town Village Attachments:Cover Letter & Permit 6-26-23.pdf We are currently having issues with Microsoft Office so we are unable to send out the “typical” email acknowledgement that your project has received approval, but it has (see attached). We will send out the “typical” email acknowledgement once the issues with Microsoft Office have been fixed. Let me know if you have any questions, Jim Farkas State Stormwater Engineer North Carolina Department of Environmental Quality Office: (919) 707-3646 Jim.farkas@deq.nc.gov From: Farkas, Jim J Sent: Tuesday, June 20, 2023 3:39 PM To: 'Greeson, Mason' <mgreeson@cecinc.com> Cc: 'brian@broadstreethomes.com' <brian@broadstreethomes.com> Subject: RE: SW3220701 Old Town Village Mason, I was looking over the additional information you provided on March 23, 2023. Please correct the following: Please correct the following: - Original Comment 1 – There are still issues with the BUA accounting for this project, please revise as needed. o For Wet Pond #1:  BUA Allocated to Individual Lots – The Application indicates that 45,848 sf of BUA will be allocated to the individual lots (On-site Buildings/Lots Line) whereas the Supplement-EZ Form indicates 46,051 sf (Line 9). 1  Common Area BUA (BUA Not Allocated to Individual Lots) – The Application indicates that 78,889 sf of BUA will be allocated to the individual lots (determined by adding up the Street, Parking, and Sidewalk items from the Application) whereas the Supplement-EZ Form indicates 74,989 sf (Line 10). NOTE: The sum of the items listed on Line 12 (Breakdown of new BUA not on subdivided lots) does not, but should, equal Line 10 (New BUA not on subdivided lots). o For Wet Pond #2:  BUA Allocated to Individual Lots – The Application indicates that 21,624 sf of BUA will be allocated to the individual lots (On-site Buildings/Lots Line) whereas the Supplement-EZ Form indicates 21,692 sf (Line 9).  Common Area BUA (BUA Not Allocated to Individual Lots) – The Application indicates that 39,146 sf of BUA will be allocated to the individual lots (determined by adding up the Street, Parking, and Sidewalk items from the Application) whereas the Supplement-EZ Form indicates 43,046 sf (Line 10). NOTE: The sum of the items listed on Line 12 (Breakdown of new BUA not on subdivided lots) does not, but should, equal Line 10 (New BUA not on subdivided lots). - Original Comment 3.c. (Prior Comment 3) – It is noted that the stage-storage for Wet Pond #2 was modified, however these modifications were not implemented on the Supplement-EZ Form. Please revise Lines 26, 27, & 32 of the Wet Pond #2 column on the Wet Pond Page of the Supplement-EZ Form. Please provide the following: - 1x hard copy & 1x electronic copy of the revised pages of the Application (if needed). - 1x hard copy & 1x electronic copy of the revised pages of the Supplement-EZ Form. - 1x hard copy (2x hard copies for plan sheets) & 1x electronic copy of any other items needed to address these issues. Hard copies should be mailed to me at the following address: For FedEx/UPS: Jim Farkas 512 N. Salisbury Street, Office 640M Raleigh, NC 27604 For USPS: Jim Farkas 1612 Mail Service Center Raleigh, NC 27699-1612 Hand Delivery: Please reach out to me prior to hand delivering a submission to make sure that I (or someone else in my group) will be able to receive the submission. Do not leave the package in the foyer with the security guard. NOTE: Hard copies should not be sent to a Regional Office. Doing so will delay the review process and the submission package may be lost while being sent from the Regional Office to me in the Central Office. Electronic copies should be uploaded at the following location: https://edocs.deq.nc.gov/Forms/SW-Supplemental-Upload Let me know if you have any questions. Jim Farkas State Stormwater Engineer North Carolina Department of Environmental Quality Office: (919) 707-3646 Jim.farkas@deq.nc.gov 2 From: Farkas, Jim J Sent: Monday, February 13, 2023 3:27 PM To: 'brian@broadstreethomes.com' <brian@broadstreethomes.com>; 'Greeson, Mason' <mgreeson@cecinc.com> Cc: Eplin, Jerry W <jerry.eplin@ncdenr.gov> Subject: RE: SW3220701 Old Town Village Good Afternoon, The Division of Energy, Mineral and Land Resources (DEMLR), received additional information for a Stormwater th Management Permit Application for the subject project on November 17, 2022. A review of that information has determined that the application is not complete. Attached is a letter describing the items that need to be submitted. If you have any questions, please feel free to contact me. My contact information is listed below. Thank you, Jim Farkas State Stormwater Engineer North Carolina Department of Environmental Quality Office: (919) 707-3646 Jim.farkas@ncdenr.gov From: Farkas, Jim J Sent: Thursday, October 20, 2022 3:52 PM To: brian@broadstreethomes.com; Greeson, Mason <mgreeson@cecinc.com> Cc: Khan, Zahid <zahid.khan@ncdenr.gov> Subject: RE: SW3220701 Old Town Village Good Afternoon, 3 The Division of Energy, Mineral and Land Resources (DEMLR), received additional information for a Stormwater th Management Permit Application for the subject project on July 25, 2022. A review of that information has determined that the application is not complete. Attached is a letter describing the items that need to be submitted. If you have any questions, please feel free to contact me. My contact information is listed below. Thank you, Jim Farkas State Stormwater Engineer North Carolina Department of Environmental Quality Office: (919) 707-3646 Jim.farkas@ncdenr.gov From: Tran, Kieu M <kieu.tran@ncdenr.gov> Sent: Thursday, August 4, 2022 9:40 AM To: brian@broadstreethomes.com; Mason Greeson <mgreeson@landdesign.com> Cc: Farkas, Jim J <Jim.Farkas@ncdenr.gov>; Khan, Zahid <zahid.khan@ncdenr.gov> Subject: SW3220701 Old Town Village Good morning, We received your post-construction stormwater permit application for the above mentioned project on 7/25/2022. Reviews under the standard permitting process generally take 45 calendar days, but can take up to 90 calendar days per statute (our other reviewer, Corey Anen, no longer works for the State, so this review may exceed 45 days). Please upload all documents that you mailed into our office through the link provided below. Be sure to choose the Central Office as the Primary Contact office. https://edocs.deq.nc.gov/Forms/SW-Supplemental-Upload IMPORTANT NOTE: Please ensure that each file is uploaded under its appropriate file type. Additional file types can be entered into the electronic form by clicking on the “Add Another Post-Construction File Upload” link directly below the “State Stormwater Information Uploads” section of the form. Please do not upload entire plan sets through this form, but rather upload the relevant individual sheets under the appropriate file type. Selecting the correct file type ensures that the files are properly named in the electronic repository and it helps expedite the review process. Please type in permit #: SW3220701 If you have any questions, please contact Jim Farkas Jim.Farkas@ncdenr.gov 919-707-3646. Thank you, Mrs. Kieu Tran 4 Stormwater Program Administrative Assistant Office: (919) 707- 3640 Kieu.Tran@ncdenr.gov North Carolina Department of Environmental Quality Division of Energy, Mineral, and Land Resources Stormwater Program 512 N. Salisbury Street, Raleigh, NC 27604 (location) 1612 Mail Service Center, Raleigh, NC 27699-1612 (mailing) Website: http://deq.nc.gov/about/divisions/energy-mineral-land-resources/stormwater Email correspondence to and from this address is subject to the North Carolina Public Records Law and may be disclosed to third parties 5