HomeMy WebLinkAbout20230981 Ver 1_ePCN Application_20230714DWR
Division of Water Resources
Pre -Construction Notification (PCN) Form
For Nationwide Permits and Regional General Permits
(along with corresponding Water Quality Certifications)
April 13, 2022 Ver 4.3
Initial Review
Has this project met the requirements for acceptance in to the review process?
Yes
No
Is this project a public transportation project?*
Yes No
Change only If needed.
Pre -Filing Meeting Date Request was submitted on:
5/15/2023
BIMS # Assigned
20230981
Is a payment required for this project?*
No payment required
Fee received
Fee needed - send electronic notification
Reviewing Office*
Winston-Salem Regional Office - (336) 776-
9800
Information for Initial Review
la. Name of project:
Town Center Roadway Connection, Davis Creek Greenway
la. Who is the Primary Contact?*
Clay Heath, P.E.
1b. Primary Contact Email: *
cheath@harrisburgnc.org
Date Submitted
7/14/2023
Nearest Body of Water
UT to Rocky River
Basin
Yadkin-PeeDee
Water Classification
C
Site Coordinates
Latitude:
35.324748
A. Processing Information
Is this project connected with ARPA funding?
Yes No
County (or Counties) where the project is located:
Cabarrus
Is this a NCDMS Project
Yes No
Longitude:
-80.642430
Version#*
1
What amout is owed?*
$240.00
$570.00
Select Project Reviewer*
Dave Wanucha:dave.wanucha@ncdenr.gov
Ic. Primary Contact Phone:*
(704)770-6986
O
Is this project a public transportation project?*
Yes No
Is this a NCDOT Project?*
Yes No
1a.Type(s)of approval sought from the Corps:
Section 404 Permit (wetlands, streams and waters, Clean Water Act)
Section 10 Permit (navigable waters, tidal waters, Rivers and Harbors Act)
Has this PCN previously been submitted?*
Yes
No
1b. What type(s) of permit(s) do you wish to seek authorization?
Nationwide Permit (NWP)
Regional General Permit (RGP)
Standard (IP)
1c. Has the NWP or GP number been verified by the Corps?
Yes No
Nationwide Permit (NWP) Number: 14 - Linear transportation
NWP Numbers (for multiple NWPS):
1d. Type(s) of approval sought from the DWR:
401 Water Quality Certification - Regular
Non-404 Jurisdictional General Permit
Individual 401 Water Quality Certification
401 Water Quality Certification - Express
Riparian Buffer Authorization
le. Is this notification solely for the record because written approval is not required?
For the record only for DWR 401 Certification: Yes No
For the record only for Corps Permit: Yes No
1f. Is this an after -the -fact permit application? *
Yes No
1g. Is payment into a mitigation bank or in -lieu fee program proposed for mitigation of impacts?
Yes No
1g. Is payment into a mitigation bank or in -lieu fee program proposed for mitigation of impacts?
Yes No
1h. Is the project located in any of NC's twenty coastal counties?
Yes No
1j. Is the project located in a designated trout watershed?
Yes No
B. Applicant Information
1d. Who is applying for the permit?
Owner Applicant (other than owner)
le. Is there an Agent/Consultant for this project?
Yes No
2. Owner Information
2a. Name(s) on recorded deed:
Multiple parcels are crossed. Town of Harrisburg is acquiring ROW.
2b. Deed book and page no.:
2c. Contact Person:
Clay Heath, P.E.
2d. Address
Street Address
Town of Harrisburg
Address Line 2
4100 Main St.
city
Harrisburg
Postal / Zip Code
28075
2e. Telephone Number:
(704)206-8781
2g. Email Address:*
cheath@harrisburgnc.org
4. Agent/Consultant (if applicable)
4a. Name:
Chris Rivenbark
4b. Business Name:
RK&K
4c.Address
Street Address
8601 Six Forks Rd.
Address Line 2
Forum 1- Suite 700
city
Raleigh
Postal / Zip Code
27615
4d. Telephone Number:
(919)878-9560
4f. Email Address:*
crivenbark@rkk.com
C. Project Information and Prior Project History
1. Project Information
1b. Subdivision name:
(if appropriate)
Adjacent to Davis Creek Subdivision
1c. Nearest municipality / town:
Harrisburg
2. Project Identification
2a. Property Identification Number:
Multiple parcels are crossed
2c. Project Address
Street Address
Carl Parmer Dr./ Hagler St. Intersection
Address Line 2
City
Harrisburg
Postal / Zip Code
28075
3. Surface Waters
3a. Name of the nearest body of water to proposed project:
UT to Rocky River
3b. Water Resources Classification of nearest receiving water:
C
State / Province / Region
NC
Country
USA
2f. Fax Number:
State / Province / Region
NC
Country
USA
4e. Fax Number:
2b. Property size:
State / Province / Region
NC
Country
USA
3c. What river basin(s) is your project located in?*
Yadkin-PeeDee
3d. Please provide the 12-digit HUC in which the project is located.
030401050106
4. Project Description and History
4a. Describe the existing conditions on the site and the general land use in the vicinity of the project at the time of this application: "
The project area is partially wooded with an adjacent subdivision currently under construction. Residential and commercial properties are nearby.
4b. Have Corps permits or DWR certifications been obtained for this project (including all prior phases) in the past?'�
Yes No Unknown
4f. List the total estimated acreage of all existing wetlands on the property:
0.10
4g. List the total estimated linear feet of all existing streams on the property:
407
4h. Explain the purpose of the proposed project:'
The Town of Harrisburg's Town Center Roadway Connection Project includes the construction of a new alignment roadway connecting Hagler Street and Cambridge Drive. This project will
be completed in conjunction with the Davis Creek Greenway project.
4i. Describe the overall project in detail, including indirect impacts and the type of equipment to be used:'
The Town of Harrisburg's Town Center Roadway Connection and Davis Creek Greenway Project includes the construction of a new alignment greenway, approximately 1,500 feet in length
beginning at the intersection of Hagler Street and Financial Way/Carl Parmer Drive. This new greenway will feature a 10-foot width and will tie into a greenway/sidewalk constructed along
Cambridge Drive. This project also includes a new alignment roadway connecting Hagler Street and Cambridge Drive. These new roadway and greenway segments will serve to connect
the Town Center and new residential development for both motorists and pedestrians/bicyclists.
Standard road building equipment such as bulldozers, excavators, and dump trucks will be utilized during construction.
5. Jurisdictional Determinations
5a. Have the wetlands or streams been delineated on the property or proposed impact areas?"
Yes No G Unknown
Comments:
5b. If the Corps made a jurisdictional determination, what type of determination was made?
Preliminary Approved Not Verified Unknown N/A
Corps AID Number:
SAW-2023-00409
5c. If 5a is yes, who delineated the jurisdictional areas?
Name (if known): Hal Bain, Josh Tutt
Agency/Consultant Company: RK&K
Other:
5d. List the dates of the Corp jurisdiction determination or State determination if a determination was made by the Corps or DWR
USACE: 02/21/2023, NCDWR: 02/23/2023
After the PJD and Site Determination were issued, the study area for the project was slightly expanded and as a result, the potential stream limit now includes the small gap between the
two previous sections of the stream (SA). Revised information was submitted to the USACE on 4/25/23.
6. Future Project Plans
6a. Is this a phased project?*
Yes No
Are any other NWP(s), regional general permit(s), or individual permits(s) used, or intended to be used, to authorize any part of the proposed project or related activity?
N/A
D. Proposed Impacts Inventory
1. Impacts Summary
1a. Where are the impacts associated with your project? (check all that apply):
Wetlands Streams -tributaries Buffers
Open Waters Pond Construction
2. Wetland Impacts
2a1 Reason (?)
Fill
2b. Impact type (?)
P
2c. Type of W.
Headwater Forest
2d. W. name
WA
2e. Forested"
Yes
rf.) Type of Jurisdcition *
Both
area *
0.065
(acres)
Excavation I
Headwater Forest
fA
Yes
Both
0.019
(acres)
2g. Total Temporary Wetland Impact
0.000
2g. Total Wetland Impact
0.084
2g. Total Permanent Wetland Impact
0.084
2i. Comments:
0.009 ac of the excavated wetland will be backfilled to existing grade upon completion of culvert construction.
3. Stream Impacts
3a. Reason for impact (?)
3b.lmpact type "
3c. Type of impact*
3d. S. name *
3e. Stream Type*
3f. Type of
3g. S. width
3h. Impact
❑
(?)
Jurisdiction*
length*
S1
Fill
Permanent
Culvert :]U�R,,ky
River (SA)
Perennial
Both
68
Averege (feet)
(linear feet)
S2
Culvert
Permanent
Bank Stabilization J
UT Rocky River (SA)
Perennial
Both
76
Averege(feeq
(iinearfeet)
S3
Culvert
Temporary
Dewatering
UT Rocky River (SA)
Perennial
Both
67
�_]
Averege (feet)
(linear feet)
31. Total jurisdictional ditch impact in square feet
0
31. Total permanent stream impacts: 31. Total temporary stream impacts:
144 67
3i. Total stream and ditch impacts:
211
3j. Comments:
Temporary stream impacts include temporary stream bypass for proposed culvert construction required for NCG01 permitting.
E. Impact Justification and Mitigation O
1. Avoidance and Minimization
1a. Specifically describe measures taken to avoid or minimize the proposed impacts in designing the project:
The limits of disturbance for the project are limited to the areas necessary for construction/easements. Proposed impacts to Waters of the U.S. are
limited to the smallest footprint practicable.
1b. Specifically describe measures taken to avoid or minimize the proposed impacts through construction techniques:
Silt fencing will be utilized to help prevent sediment from entering the stream and wetland. All staging areas will occur on high ground.
2. Compensatory Mitigation for Impacts to Waters of the U.S. or Waters of the State
2a. Does the project require Compensatory Mitigation for impacts to Waters of the U.S. or Waters of the State?
Yes No
2b. If this project DOES NOT require Compensatory Mitigation, explain why:
The proposed impacts do not exceed the NWP 14 threshold requiring compensatory mitigation.
F. Stormwater Management and Diffuse Flow Plan (required by DWR) O
1. Diffuse Flow Plan
la. Does the project include or is it adjacent to protected riparian buffers identified within one of the NC Riparian Buffer Protection Rules?
Yes No
If no, explain why:
The Yadkin -Pee Dee River Basin is not subject to the NC Riparian Buffer Protection Rules.
2. Stormwater Management Plan
2a. Is this a NC DOT project subject to compliance with NCDOT's Individual NPDES permit NCS000250? *
Yes No
2b. Does this project meet the requirements for low density projects as defined in 15A NCAC 02H .1003(2)?
Yes No
2c. Does this project have a stormwater management plan (SMP) reviewed and approved under a state stormwater program or state -approved local government stormwater program?
Yes No
N/A - project disturbs < 1 acre
3. Stormwater Requirements
3a. Select whether a completed stormwater management plan (SMP) is included for review and approval or if calculations are provided to document the project will not cause degradation of
downstream surface waters.*
Stormwater Management Plan Antidegradation Calculations
Comments:
Neither option above is applicable. This linear transportation is not subject to the Town of Harrisburg's post -construction stormwater ordinance.
G. Supplementary Information
1. Environmental Documentation
la. Does the project involve an expenditure of public (federal/state/local) funds or the use of public (federal/state) land?
Yes No
1b. If you answered "yes" to the above, does the project require preparation of an environmental document pursuant to the requirements of the National or State (North Carolina)
Environmental Policy Act (NEPA/SEPA)?*
Yes No
Comments: *
The project is funded by the Town of Harrisburg.
2. Violations (DWR Requirement)
2a. Is the site in violation of DWR Water Quality Certification Rules (15A NCAC 2H .0500), Isolated Wetland Rules (15A NCAC 2H .1300), or DWR Surface Water or Wetland Standards or
Riparian Buffer Rules (15A NCAC 2B .0200)? *
Yes No
3. Cumulative Impacts (DWR Requirement)
3a. Will this project result in additional development, which could impact nearby downstream water quality?
Yes No
3b. If you answered "no," provide a short narrative description.
Due to the minimal transportation impact resulting from the connection, this project is not expected to influence nearby land uses nor stimulate growth.
Therefore, a detailed indirect or cumulative effects study was not conducted.
4. Sewage Disposal (DWR Requirement)
4a. Is sewage disposal required by DWR for this project?
Yes No N/A
5. Endangered Species and Designated Critical Habitat (Corps Requirement)
5a. Will this project occur in or near an area with federally protected species or habitat?*
Yes No
5b. Have you checked with the USFWS concerning Endangered Species Act impacts?
Yes No
5d. Is another Federal agency involved?*
Yes No Unknown
5e. Is this a DOT project located within Division's 1-8?
Yes No
5f. Will you cut any trees in order to conduct the work in waters of the U.S.?
Yes No
5g. Does this project involve bridge maintenance or removal?
Yes No
5h. Does this project involve the construction/installation of a wind turbine(s)?*
Yes No
5i. Does this project involve (1) blasting, and/or (2) other percussive activities that will be conducted by machines, such as jackhammers, mechanized pile drivers, etc.?
Yes No
5j. What data sources did you use to determine whether your site would impact Endangered Species or Designated Critical Habitat?
Field surveys, NCNHP Data Explorer, USFWS IPaC.
6. Essential Fish Habitat (Corps Requirement)
6a. Will this project occur in or near an area designated as an Essential Fish Habitat?
Yes No
6b. What data sources did you use to determine whether your site would impact an Essential Fish Habitat?
NOAA EFH Mapper
7. Historic or Prehistoric Cultural Resources (Corps Requirement)
7a. Will this project occur in or near an area that the state, federal or tribal governments have designated as having historic or cultural preservation status?"
Yes No
7b. What data sources did you use to determine whether your site would impact historic or archeological resources?"
NC HPOWEB 2.0
8. Flood Zone Designation (Corps Requirement)
8a. Will this project occur in a FEMA-designated 100-year floodplain?"
Yes No
8b. If yes, explain how project meets FEMA requirements:
The maximum change in the 100-year water surface elevation from the Corrected Effective Floodway to Revised Floodway model is-0.40', with a
maximum increase of 0.00'. No upstream structure in place at the time of design will be adversely affected by the 100-year storm.
8c. What source(s) did you use to make the floodplain determination?"
FEMA Flood Map Service Center
Miscellaneous
U
Please use the space below to attach all required documentation or any additional information you feel is helpful for application review. Documents should be combined into one file when
possible, with a Cover Letter, Table of Contents, and a Cover Sheet for each Section preferred.
Click the upload button or drag and drop files here to attach document
Harrisburg PCN attachments.pdf 7.01 MB
File must be PDF or KMZ
Comments
The project proponent hereby certifies that all information contained herein is true, accurate, and complete to the best of my knowledge and belief.
The project proponent hereby requests that the certifying authority review and take action on this Clean Water Act Section 401 certification request within the applicable reasonable period
of time.
Signature
By checking the box and signing below, I certify that:
• The project proponent hereby certifies that all information contained herein is true, accurate, and complete to the best of my knowledge and belief'; and
• The project proponent hereby requests that the certifying authority review and take action on this CWA 401 certification request within the applicable reasonable period of time.
• I have given true, accurate, and complete information on this form;
• I agree that submission of this PCN form is a "transaction' subject to Chapter 66, Article 40 of the NC General Statutes (the "Uniform Electronic Transactions Act");
• I agree to conduct this transaction by electronic means pursuant to Chapter 66, Article 40 of the NC General Statutes (the "Uniform Electronic Transactions Act");
• I understand that an electronic signature has the same legal effect and can be enforced in the same way as a written signature; AND
• I intend to electronically sign and submit the PCN form.
Full Name:
Chris Rivenbark
Signature
A aOaw
Date
7/14/2023
O