Loading...
HomeMy WebLinkAboutNC0024112_202306PAI_Cover Letter_20230713ROY COOPER Governor ELIZABETH S. BISER Secretary RICHARD E. ROGERS, JR. Director City of Thomasville Michael Brandt City Manager PO Box 368 Thomasville, NC 27361-0368 NORTH CAROLINA Environmental Quality July 13, 2023 SUBJECT: Pretreatment Audit City of Thomasville Main Program Permit (NPDES) #NC0024112 Davidson County Dear Mr. Brandt: On June 8, 2023, a Pretreatment Audit was performed by Tricia Lowery and Jesse Barnes of the Winston- Salem Regional Office. Misty Conder, Pretreatment Coordinator, assisted staff and was present during the audit. The purpose of this audit was to determine the effectiveness of the Control Authority's pretreatment program regarding SI J inspections., which includes the initial interview, tour of SIU facility, sampling review, and an exit interview. Background The Control Authority has 5 Significant Industrial Users (SIUs), to which all 5 are categorical users (CIU). Control Authority Interview There are no plant problems related to pretreatment issues other than a temporary Barium increase at influent noted under "Action Items". • LTMP was submitted October 2022. PQLs have been updated for Cd, Pb, & Hg (Hg methodl361E). POC's: PFAS, 1,4-Dioxane, Hardness. • Ms. Conder is working to complete revisions to HWA (due 10/17/23). • All SIU permits have been updated (was due 12/31/22). • Historical SNC is incorrect and needs correction/updating. Pretreatment Program Elements Review The Headworks Analysis (HWA) renewal was submitted on 11/22/22. The HWA approval date is pending as revisions are needed. The revisions to HWA are due 10/17/23. The last Industrial Waste Survey (IWS) was submitted on 7/3/15. An extension was granted and the IWS is due 8/1/2023. The next IWS is due date is pending. DffNorth Carolina Department of Environmental Quality I Division of Water Resources oan caaouNn Winston-Salem Regional Office 1 450 W. Hanes Mill Rd, Suite 300 I Winston-Salem, North Carolina 27105 M336.776.9800 oep.m.m or em�nmen� Qualm The Sewer Use Ordinance (SUO) was approved on 3/25/13. The Enforcement Response Plan (ERP) was submitted on 2/11/20 and approved on 2/14/20. The Long -Term Monitoring Plan (LTMP) was submitted on 10/5/22. LTMP File Review The Long -Term Monitoring Plan (LTMP) is being conducted at the proper locations and frequencies. Industrial User Permit (IUP) File Review A review of the file for McIntyre, #IUP 0031 revealed that the monitoring data was organized and compliant. The slug control plan for McIntyre, #IUP 0031 was in order. Action Items The following items of concern were noted: 1. 4 of the 5 CIUs were in SNC, 2 SIUs in SNC for limit violations, and 3 in SNC for reporting (over last 2 semi-annual periods). 2. There was a Barium increase in influent (noted on PAR 2022). Ms. Conder stated it was an isolated incident at HERR. No further issues with Barium reported. Ms. Conder is experiencing difficulties scheduling follow up inspections with HERR. The pretreatment program is considered satisfactory. The Control Authority runs a acceptable pretreatment program. If you have any questions, please contact Tricia Lowery at (336) 776-9691, or me at (336) 776- 9800. Sincerely, Docu S�igTned by: 145B49E225C94EA... Lon T. Snider Regional Supervisor Water Quality Regional Operations Section Division of Water Resources, NCDEQ — WSRO REQ� North Carolina Department ofEnvironmental Quality I Division ofWater Resources Winston-Salem Regional Office 1 450 W. Hanes Mill Rd, Suite 300 1 Winston-Salem, North Carolina 27105 NORTH CAROLINA 336.776.9800 naparMeM of EmironmanW 9uallly