Loading...
HomeMy WebLinkAboutNCC202730_NOT Closeout Documents_20230710 Sedimentation/Construction Stormwater Inspection Report North Carolina Department of Environmental Quality Land Resources: 610 East Center Avenue, Suite 301, Mooresville,NC 28115 (704) 663-1699 County: Mecklenburg project: Cone Mills Demo&Site Stabilization ECP River basin: Catawba Person financially responsible:Town of Pineville-Ryan Spitzer.Town Manager Project#: MECKL-2020-098 Address: 200 Dover Street, PO Box 249,Pineville,NC 28134 1. Project Location: 436 Cone Avenue,Pineville Pictures: No 2. Weather and soil conditions: Cloudy,Wet Workable Soils Initial inspection: No 3. Is site currently under notice of violation? No 4. Is the site in compliance with S.P.C.A.and rules? Yes If no,check violations below: 5. Violations: 6. Is the site in compliance with NPDES Permit NCG010000 Construction Stormwater requirements? Yes Describe: 7. Has sedimentation damage occurred since last inspection? No If Yes,where? (check all that apply) Degree of damage: 8. Contact made with(name): No One Onsite Title: Inspection report: Sent Report Date given/sent: April 11,2022 9. Corrective action needed: 10. Comments: Permanent ground cover sufficient to restrain erosion has been established. No additional self-monitoring or self-inspections are required. Project is in compliance and released under the SPCA.Termination of coverage under the NPDES General Stormwater Permit for Construction Activities(NCG01)must be requested by the permittee via a Notice of Termination(NOT) unless permit approval date was prior to April 2019. The NOT is available at: https://edocs.deq.nc.gov/Forms/NCG01-Termination. Please note that this correspondence must be uploaded as part of completing the NOT process. Reported by: Jeffrey Chandler Others present: Date of inspection: April 07,2022 Time arriving on site: 10:30 AM Time leaving site: 10:45 AM CC: