Loading...
HomeMy WebLinkAboutSWA000182_Application_20230125 DEMLR USE ONLY Date Received Fee Paid Permit Number SA/1-2S- ZoZ3 $&o5 6tck IZ2.94 SW ©©9l 2 SW Program(s): ❑Coastal SA-HQW ❑Coastal SA-ORW ❑Coastal FW-ORW ❑Coastal Other ❑Non-coastal HQW ❑Non-coastal ORW Od Urbanizing Areas ❑USMP NC DEQ Division of Energy, Mineral and Land Resources STATE STORMWATER FAST TRACK PROCESS: "AUTHORIZATION TO CONSTRUCT" (ATC) PERMIT APPLICATION FORM Link to Anolication Instructions A. ELIGIBILITY FOR FAST-TRACK PERMITTING To be considered for a Fast Track ATC Permit, all of the items below must be checked. if any item cannot be checked, then the project must apply under the Standard Permitting Process. ® The project and all SCMs (including existing SCMs associated with the project)will meet all applicable requirements of 15A NCAC 02H .1000- .1062, including the Minimum Design Criteria (MDC), upon project completion. ® The project is not proposing an alternative design. ® The project is not claiming an exemption from the MDC based on vested rights, a waiver or a Director's Certification. ® The project is not out of compliance with an existing stormwater permit or any other environmental permit. ® The project is not applying for an offsite permit, an exemption, or a minor modification (as defined in 15A NCAC 02H .1002(25))to an existing state stormwater permit. ® The project application bears the signature and seal of a professional licensed pursuant to either Chapter 89A or 89C of the NC General Statutes. ® I understand that at project completion, an application with the as-built stormwater plans (as described in 15A NCAC 02H .1044 must be submitted, and DEQ will review the as-built stormwater plans to confirm compliance with the MDC. Approval of the as-built stormwater plans will be required before the Erosion and Sedimentation Control Plan for the project may be closed out. ® I understand that the Fast Track ATC Permit will expire five years after the date of issuance. B. GENERAL INFORMATION 1 Project Name: Steel point 2. Previous Project Name(if applicable): 3. Location of Project(street address): No Current address (Vacant) City:lndian Trail Community County:Union Zip:28079 4. Directions to project(from nearest major intersection): 1/2 mi to service road for HWY 74 bypass 5. Latitude:W7 09' 36" W Long itude:8e12-€6L48LW of the main entrance to the project. zjS�OS �3b N �Oa3C1 S3„VV C. PERMIT INFORMATION 1. Specify whether project is (check one): ® New, no previous application ❑ New, replacing a previous Fast Track ATC Permit--provide previous permit number: SWA By choosing this option, you are also requesting that DEQ rescind the previous Fast Track ATC Permit upon issuance of the new Fast Track ATC Permit. Stormwater Fast Track ATC Application Form Page 1 of 10 Feb. 10.2018 ❑ Major Modification, replacing an existing stormwater permit—provide existing permit number: SW Status of construction? ❑ Not Started ❑ Partially Completed ❑ Completed Maio[modifications must be submitted by the original permittee and are allowed only if the SW permit is not expired. Minor modifications must use Standard Permitting Process. By choosing this option, you are also requesting that DEQ rescind the previous SW Permit upon issuance of the new Fast Track ATC Permit. ❑ Transfer of existing Fast Track ATC Permit—provide existing ATC permit number: SWA 2. Applicable state stormwater program(s) (check all that apply): ❑ Coastal SA-HQW ® Urbanizing Areas (Phase 2) ❑ Coastal SA-ORW ❑ Non-Coastal HQW Is any portion of the project within 575 feet of SA-ORW waters? ❑ Yes ❑ No ❑ Non-Coastal ORW ❑ Coastal Freshwater ORW ❑ USMP ❑ Coastal—Other 3. Other Permits (as applicable; write "NA"for those permit types that are not applicable): Project Name Permit/Appl Issue Date Other Information No. l CAMA Major NA J NA Erosion& Steelpoint union-2023- TBD Disturbed Area 14.0 Sedimentation Control 024 acre NPDES Industrial NA NA Stormwater 404/401 Permit Steelpoint TBD TBD Proposed Impacts 148 If/ac 4. Local jurisdiction for building permits: Union Count Point of Contact:Mark Griffin Phone#: C704 } 283-3643 D. CONTACT INFORMATION 1. Applicant/Financially Responsible Party(may be an Organization):Pri max Properties LLC Signing Official Name &Title:Marie Mclucas Street Address:1100 East Morehead Street City:Charlotte State:NC Zip:28204 _ Mailing Address(if different): City: State: Zip: Phone: 704 954-7256 Fax: 1 Email: MMclucas(a)primaxproperties.com 2. If the Applicant is a Corporation or LLC (Address must match address on file with NC Dept of the Secretary of State): Name of Registered Agent: Marie Mclucas Mailing Address:1100 East Morehead Street City:Charlotte State:NC Zip:28204 Phone: (704) 954-7256 _ Fax: [ } Email:MMclucas(a primaxorooerties.com Stormwater Fast Track ATC Application Form Page 2 of 10 Feb. 10, 2018 3. The Applicant is the(check all that apply): ® Property Owner ❑ Lessee(Attach a copy of the lease agreement&complete Item 4.) ❑ Purchaser(Attach a copy of the pending sales agreement& complete Item 4.) ❑ Developer(Attach a copy of the development agreement&complete Item 4.) 4. If the Applicant is NOT the Property Owner(skip to Item 5 if the Applicant IS the Property Owner): Property Owner Name/Organization: Signing Official &Title: Street Address: City:_ State:,_ Zip: Mailing Address (if applicable):_. City:_ State: Zip:_ Phone: Fax: Email: 5. The licensed Design Professional that will be retained for the duration of the project, who may provide information on the Applicant's behalf, and who will prepare and certify the as-built package: Consulting Engineer/Landscape Architect:Kevin Caldwell Consulting Firm:_GeoScience Group. Inc. Mailing Address:500K Clanton Road City:Charlotte State:NC Zip:28217 Phone: (704 ) 525-2003 Fax: (704) 525-2051 Email:kcaldwellCir)_geoscience ry ou com 6. [OPTIONAL] If you would like to designate another person to answer questions about the project: Name&Title:Scott Gregory. Senior Designer Organization: GeoScience Group Mailing Address:Same City: State: Zip: Phone: 704 941-2244 Fax: �_ } Email:sqregory ,geosciencegroup.com E. PROJECT INFORMATION 1. Specify the type of project(check one): ❑ Low Density ® High Density 2. Briefly summarize how the stormwater runoff will be treated/conveyed: Stormwater Fast Track ATC Application Form Page 3 of 10 Feb. 10,2018 Wet:ond SCM 3. Stormwater runoff from this project drains to the Yadkin Pee-Dee River basin(s). 4. Receiving water information (if more than 3 receiving waters,provide additional information on an attached sheet): Receiving Receiving Receiving 1 Water 1 Water 2 Water 3 J Receiving Stream Name North Fork of Crooked Creek Tributary 4 Stream Classification C Stream Index Number 13-17-20-1 Stormwater Fast Track ATC Application Form Page 4 of 10 Feb. 10, 2018 5. Proiect area and density information: Total Property Area 766,656 sf Total Surface Water Area 43,284 sf Considered to include: • the normal pool of impounded structures, • the area between the banks of streams and rivers,and • the area below the Normal High Water(NHWO line or Mean High Water(MHK9 line. Total Coastal Wetlands Area 0 sf Considered to include: coastal wetlands landward from the NHW(or MHVV)line. Total Project Area 723 372 sf Excludes the surface water area and coastal wetland area identified above. May or may not be the same as Property Area. Built-Upon Area(BUA)associated with Existing Development 0 sf Existing development"means those projects that are built or those projects that have established a vested right under North Carolina law as of the effective date of the state stormwater program or applicable local government ordinance to which the project is subject. Proposed New BUA 365,063 sf Includes proposed new BUA that is not associated with existing development. "BUA"is defined in N.C.G.S. 143-214.7(b2). It includes, but is not limited to.buildings,roads,parking areas, sidewalks, and some gravel areas. The design volume of SCMs must take into account the runoff from build out from all surfaces draining to the SCM in accordance with 15A NCAC 02H.1050(1). Project Density w/Existing Development: Project Density=(New BUAj/(Total Project Area—Existing BUAJ x 100 or 50.5% w/o Existing Development: Project Density=(New BUA]/Total Project Area]x 100 6. Anticipated construction start date March-2023 7. Is the project located within 5 miles of a public airport? ® No ❑ Yes If`Yes,'see S.L. 2012-200, Part V1.http://www.ncleg.net/Sessions/2011/Bills/Senate/PDF/S229v6.;)df and DEQ Stormwater Design Manual Chapter E-4 Airports. 8. For projects in Union County: Contact DEMLR Central Office Stormwater staff at 919-707-9200 to determine if the project is located within a Threatened&Endangered Species watershed that may be subject to more stringent stormwater requirements per 15A NCAC 02B.0600. Stormwater Fast Track ATC Application Form Page 5 of 10 Feb. 10, 2018 F. SUBMITTAL REQUIREMENTS Submit the application package to the appropriate DEMLR Regional Office (Coastal, SA Waters)or DEMLR Central Office(Urbanizing Areas Ph 2, USMP, Non-Coastal HQW/ORW). Only application packages that include all required items listed below will be accepted and reviewed. Initial each item below to indicate that the required information is provided in the application package: Initials sq 1. Two original signed hard copies and one electronic copy of this State Stormwater Fast Track Process"Authorization to Construct" (ATC) Permit Application Form. sq 2. Permit application processing fee of$505 payable to NCDEQ. sq 3. Two hard copies and one electronic copy of a USGS map identifying the project location and GPS coordinates for the project. If the receiving water is Class SA or the receiving water drains to Class SA waters within %mile of the project boundary, include the% mile radius on the map. If the project is within 575 feet of Class SA-ORW waters, include the 575-foot radius on the map. s_. 4. Two original signed hard copies and one electronic copy of a site plan depicting the boundary of the project or project phase currently being permitted, including the locations of SCMs, streams,wetlands, and buffers. na 5. Two hard copies and one electronic copy of a construction sequence that discusses how any future development on the project may be phased. sq 6. A copy of the most current property deed. Deed book: 8566 Page No: 0499 sq 7. [IF APPLICABLE]When the applicant is a corporation or a limited liability corporation(LLC): Provide two hard copies and one electronic copy of documentation from the NC Secretary of State, or other official documentation,which supports the titles and positions held by the persons listed in Section C.2 per 15A NCAC 2H. 1043(3)(b).The corporation or LLC must be listed as an active corporation in good standing with the NC Department of the Secretary of State; otherwise, the application will be returned. https://www.sosnc.gov/search/index/corn na 8. [IF APPLICABLE] When the applicant is a Partnership or other person engaging in business under an assumed name, attach a copy of the Certificate of Assumed Name. na 9. [IF APPLICABLE]When the applicant is not the property owner: Provide two hard copies and one electronic copy of lease agreements, affidavits, pending sales agreement, development agreement, or other documents showing that the applicant has obtained legal rights to submit a stormwater permit application within the proposed project area. na 10. [IF APPLICABLE] If modifying an existing permit for completed or partially completed projects, a copy of the designer's certification. Stormwater Fast Track ATC Application Form Page 6 of 10 Feb. 10,2018 G. CERTIFICATION OF APPLICANT/ FINANCIALLY RESPONSIBLE PARTY The Applicant, who is also the Financially Responsible Party, identified in Section D of this form must sign and have notarized the following guaranty: I, (print or type name of Applicant/Financially Responsible Party)Primax Proi)erties. LLC , certify that the information included on this permit application form is, to the best of my knowledge, correct and that: 1. the design has been or will be completed in accordance with the MDC as set forth in Rules 15A NCAC 02H .1050 through .1062, to the best of my knowledge; 2. the completed design meets or will meet the MDC and that the percentage BUA that is the basis for the design shall not be exceeded, to the best of my knowledge; and 3. As the applicant, I shall maintain a licensed professional of record for the duration of the project who will prepare and certify the as-built package. If I retain another licensed professional before the project is complete, then I shall provide an updated guaranty with the current licensed professional's seal. A licensed professional shall inform the Division if he is no longer associated with this project. The above information is true and correct to the best of my knowledge and belief and was provided by me under oath I agree to provide corrected information should there be any change in the information provided herein. Marie Mclucas CFO Type or pr ame l* Title or Authority CGS �c Signature Date ��a3�1Ua3 a Notary Public for the State of /Ve-�LCaA , County o OIJ q , do hereby certify that � i < < U�C personally appeared before me this 2? day of :D P1�, and acknowledge the due execution of the application for a stormwater permit. Witness my hand and official seal, e,,,me�Jet®,6�o�eoso��®o v r SEAL ZZ w �i 67 e i rn e My Commission Expires 7/15/2025 -k, My commission expires �®yes Stormwater Fast Track ATC Application Form Page 7 of 10 Feb. 10,2018 H. DESIGN PROFESSIONAL'S CERTIFICATION To be completed by the Design Professional identified in Section D.5. I, Kevin Caldwell _ _ , attest to the following: 1.This application has been reviewed by me and is accurate and complete, to the best of my knowledge; 2. The design has been completed in accordance with the MDC as set forth in Rules 15A NCAC 02H .1050 through .1062, as applicable; 3. The percentage built-upon area that is the basis for the design will not be exceeded; and 4. 1 have the expertise, education, and experience required to design the SCMs proposed in this application in accordance with the MDC as set forth in Rules 15A NCAC 02H .1050 through .1062. 5. 1 will provide all documents and certified as-built plans in hard copy and electronic format related to this permit to a new Applicant/Property Owner and to DEMLR upon transfer of this permit to a new Applicant/Property Owner. Note: In accordance with N.C.G.S. 143-215.6A and 143-215.613, any person who knowingly makes any false statement, representation, or certification in any application shall be guilty of a Class 2 misdemeanor which may include a fine not to exceed $10,000 as well as civil penalties up to$25,000 per violation. In addition, any person who knowingly makes any false statement, representation, or certification in any application may be reported to the appropriate N professional lic using board. Signature: Date: 00 CA SE/ 1� _AL �•' 0725 - Stormwater Fast Track ATC Application Form Page 8 of 10 Feb. 10, 2018 I. PROPERTY OWNER'S AUTHORIZATION (IF APPLICANT IS NOT THE PROPERTY OWNER) I, (print or type name of the Property Owner) , certify that I own the property identified in this permit application, and thus give permission to (print or type name of Applicant) with (print or type name of Applicant's organization)__ to develop the project as currently proposed. A copy of the lease agreement or pending property sales contract has been provided with the submittal, which indicates the party responsible for the operation and maintenance of the stormwater system. As the legal property owner I acknowledge, understand, and agree by my signature below, that if my designated agent(entity listed in Contact Information, item 1)dissolves their company and/or cancels or defaults on their lease agreement, or pending sale, responsibility for compliance with the DEMLR Stormwater permit reverts back to me, the property owner. As the property owner, it is my responsibility to notify DEMLR immediately and submit a completed Name/Ownership Change Form within 30 days; otherwise I will be operating a stormwater treatment facility without a valid permit. I understand that the operation of a stormwater treatment facility without a valid permit is a violation of NC General Statue 143-215.1 and may result in appropriate enforcement action including the assessment of civil penalties of up to$25,000 per day, pursuant to NCGS 143-215.6. Signature: Date: a Notary Public for the State of , County of , do hereby certify that personally appeared before me this day of , and acknowledge the due execution of the application for a stormwater permit. Witness my hand and official seal, SEAL My commission expires J Stormwater Fast Track ATC Application Form Page 9 of 10 Feb. 10, 2018 J. CERTIFICATION OF CURRENT PERMITTEE (COMPLETE ONLYIF PERMIT TRANSFER IS REQUESTED) I, (print or type name of the Current Permittee) , am submitting this request for a transfer of Fast Track ATC permit#SWA With the submission of this transfer request I am providing a copy of the most recent permit, all related documents and as- built plans certified by my design professional in hard copy and electronic format to the Proposed Permittee/Applicant identified in Section G of this application and to DEMLR . I further attest that this request for a permit transfer is accurate and complete to the best of my knowledge. I assign all rights and obligations as permittee to the proposed permittee named in Section G of this form. Signature: Date: I - , a Notary Public for the State of County of_ do hereby certify that personally appeared before me this day of , and acknowledge the due execution of the application for a stormwater permit. Witness my hand and official seal, SEAL My commission expires Stormwater Fast Track ATC Application Form Page 10 of 10 Feb. 10, 2018