Loading...
HomeMy WebLinkAboutNCC202455_NOT Closeout Documents_20230710 Sedimentation/Construction Stormwater Inspection Report North Carolina Department of Environmental Quality Land Resources: 127 Cardinal Drive Extension,Wilmington,NC 28405 (910) 796-7215 County: Onslow Project: Duke Energy Jacksonville Substation River basin: White Oak Person financially responsible:Duke Energy Progress,LLC-Alan Lewis, Project#: ONSLO-2020-030 Manager Address: 410 S Wilmington St,Raleigh,NC 27601 1. Project Location: Gum Branch Road,Jacksonville Pictures: No 2. Weather and soil conditions: Sunny and workable Initial inspection: No 3. Is site currently under notice of violation? No 4. Is the site in compliance with S.P.C.A.and rules? Yes If no,check violations below: 5. Violations: 6. Is the site in compliance with NPDES Permit NCG010000 Construction Stormwater requirements? Yes Describe: 7. Has sedimentation damage occurred since last inspection? No If Yes,where? (check all that apply) Degree of damage: 8. Contact made with(name): None Title: Inspection report: Sent Report Date given/sent: November 19,2021 9. Corrective action needed: 10. Comments: Project appears complete and stabilized.File will be closed.Any further/future development will require a new permit application to be submitted. Permanent ground cover sufficient to restrain erosion has been established.No additional self-monitoring or self-inspections are required.Project is in compliance and released under the SPCA.Termination of coverage under the NPDES General Stormwater Permit for Construction Activities(NCG01)must be requested by the permittee via a Notice of Termination(NOT).The NOT is available at:https://edocs.deq.nc.gov/Forms/NCG01-Termination.Please note that this correspondence must be uploaded as part of completing the NOT process. Reported by: Connor Musial Others present: Date of inspection: November 16,2021 Time arriving on site: 1:45 PM Time leaving site: 2:10 PM CC: