HomeMy WebLinkAboutSW5221102_Supplement-EZ Form_20230712 LEMENT-EZ COVER PAGE
FORMS LOADED
PROJECT INFORMATION
1 Project Name - --
Bryson's Ridge Subdivision-Phase 2
2 Project Area(ac) 52.10(Phase 2 Only)
3 Coastal Wetland Area(ac) _ 0
4 Surface Water Area(ac) 0
5 Is this project High or Low Density? Both High and Low Density
6 Does this project use an off-site SCM? No
COIN:LJ E W1THIaliiA03(41
7 Width of vegetated setbacks provided(feet) 30
8 Will the vegetated setback remain vegetated? Yes
9 If BUA is proposed in the setback,does it meet NCAC 02H.1003(4)(c-d)? N/A
10 Is streambank stabilization proposed on this project? No
NUMBER AND TYPE OF SCMs:
11 Infiltration System
12 Bioretentlon Cell
13 Wet Pond 2
14 Stormwater Wetland
15 Permeable Pavement
16 Sand Filter
17 Rainwater Harvesting(RWH)
18 Green Roof
19 Level Spreader-Filter Strip(LS-FS)
20 Disconnected Impervious Surface(DIS)
21 Treatment Swale
22 Dry Pond
23 StormFilter
24 Silva Cell
25 Bayfilter
26 Filterra
FORMS LOADED
DESIGNER CERTIFICATION
27 Name and Title: J.Michael Stocks,P.E.CEO
28 Organization: Stocks Engineering
29 Street address: 801 E Washin ton St.
30 City,State,Zip: Nashville,NC 27856
31 Phone number(s): 252-459-8196
32 Email: mstocks@stocksengineering.com
Certification Statement:
I certify,under penalty of law that this Supplement-EZ form and all supporting information were prepared under my direction or supervision;that the
information provided in the form is,to the best of my knowledge and belief,true,accurate,and complete;and that the engineering plans,
specifications,operation and maintenance agreements and other supporting Information are consistent with the information provided here.
Designer
• 9 • Signature of Designer
a¢
SEAL r
•
19843
..... qh/2-Z-'
�.r�yA g(,`�`. Date
DRAINAGE AREAS
1 Is this a high density project? Yes
2 If so,number of drainage areas/SCMs 2
3 Does this project have low density areas? Yes
4 If so,number of low density drainage areas 1
Is all/part of this project subject to previous rule
5 versions? No
FORMS LOADED
DRAINAGE AREA INFORMATION Entire Site 1 2 LD 7
4 Type of SCM Wet Pond Wet Pond None
5 Total drainage area(sq ft) 2,319,778 1187485 260489 871804
6 Onsite drainage area(sq ft) 2,269,515 1187485 210226 871804
7 Offsite drainage area(sq ft) 50263 sf 50263 0
8 Total BUA in project(sq ft) 782338 sf 474804 sf 111514 sf 196020 sf
New BUA on subdivided lots(subject to permitting)
9 (sq ft) 462000 sf 250250 sf 35000 sf 176750 sf
New BUA not on subdivided lots(subject to
10 permitting)(sf) 224554 sf 26251 sf 19270 sf
11 Offsite BUA(sq ft) 50263 sf sf 50263 sf sf
12 Breakdown of new BUA not on subdivided lots:
-Parking(sq ft) sf sf sf sf
-Sidewalk(sq ft) 74533 sf 62277 sf 7286 sf 4970 sf
-Roof(sq ft) sf sf sf sf
-Roadway(sq ft) 195542 sf 162277 sf 18965 sf 14300 sf
-Future(sq ft) sf sf sf sf
-Other,please specify in the comment box
below(sq ft) sf
New infiltrating permeable pavement on
13 subdivided lots(sq ft) sf
New infiltrating permeable pavement not on
14 subdivided lots(sq ft) sf
Existing BUA that will remain(not subject to
15 permitting)(sq ft) sf
16 Existing BUA that is already permitted(sq ft) sf
17 Existing BUA that will be removed(sq ft) sf
18 Percent BUA 32% 40% 43% 22%
19 Design storm(inches) 1.0 in 1.0 in
20 Design volume of SCM(cu ft) 40558 cf 9449 cf
21 Calculation method for design volume Simple Simple
ADDITIONAL INFORMATION
Please use this space to provide any additional information about the
22 drainage area(s):
WET POND
1 Drainage area number 1 I 2 I
2 Minimum required treatment volume(Cu ft) 40558 cf 9449 cf
GENERAL MDC FROM 02H.1050
3 Is the SCM sized to treat the SW from all surfaces at build-out? Yes Yes
4 Is the SCM located away from contaminated soils? Yes Yes
5 What are the side slopes of the SCM(H:V)? 3:1 3:1
6 Does the SCM have retaining walls,gabion walls or other No No
engineered side slopes?
7 Are the inlets,outlets,and receiving stream protected from erosion Yes Yes
(10-year storm)?
8 Is there an overflow or bypass for inflow volume in excess of the Yes Yes
design volume?
9 What is the method for dewatering the SCM for maintenance? Pump(preferred) Pump(preferred)
10 If applicable,will the SCM be cleaned out after construction? Yes Yes
11 Does the maintenance access comply with General MDC(8)? Yes Yes
12 Does the drainage easement comply with General MDC(9)? Yes Yes
If the SCM is on a single family lot,does(will?)the plat comply with
13 General MDC(10)? N/A N/A
14 Is there an O&M Agreement that complies with General MDC(11)? Yes Yes
15 Is there an O&M Plan that complies with General MDC(12)? Yes Yes
16 Does the SCM follow the device specific MDC? Yes Yes
17 Was the SCM designed by an NC licensed professional? Yes Yes
WET POND MDC FROM 02H.1053 3
18 Sizing method used SA/DA _ SA/DA
19 Has a stage/storage table been provided in the calculations? Yes Yes
20 Elevation of the excavated main pool depth(bottom of sediment 236.00 245.00
removal)(fmsl)
21 Elevation of the main pool bottom(top of sediment removal)(fmsl) 237.00 246.00
22 Elevation of the bottom of the vegetated shelf(fmsl) 243.00 253.00
23 Elevation of the permanent pool(fmsl) 243.50 253.50
24 Elevation of the top of the vegetated shelf(fmsl) 244.00 254.00
25 Elevation of the temporary pool(fmsl) 245.50 255.50
26 Surface area of the main permanent pool(square feet) 20568 5621
27 Volume of the main permanent pool(cubic feet) 87533 cf 24589 cf
28 Average depth of the main pool(feet) 4.30 ft 4.40 ft
29 Average depth equation used Equation 2 Equation 2
30 If using equation 3,main pool perimeter(feet)
31 If using equation 3,width of submerged veg.shelf(feet)
32 Volume of the forebay(cubic feet) 16552 cf 4796 cf
33 Is this 15-20%of the volume in the main pool? Yes Yes
34 Clean-out depth for forebay(inches) 54 in 36 in
35 Design volume of SCM(cu ft) 61872 cf 18953 cf
36 Is the outlet an orifice or a weir? Orifice Orifice
37 If orifice,orifice diameter(inches) 3 in 2 in
38 If weir,weir height(inches)
39 If weir,weir length(inches)
40 Drawdown time for the temporary pool(days) 3.2 4.5
41 Are the inlet(s)and outlet located in a manner that avoids short- Yes Yes
circuiting?
42 Are berms or baffles provided to improve the flow path? No No
43 Depth of forebay at entrance(inches) 66 in 54 in
44 Depth of forebay at exit(inches) 42 in 24 in
45 Does water flow out of the forebay in a non-erosive manner? Yes Yes
46 Width of the vegetated shelf(feet) 6 ft _ 6 ft
47 Slope of vegetated shelf(H:V) 6:1 6:1
48 Does the orifice drawdown from below the top surface of the Yes Yes
permanent pool?
49 Does the pond minimize impacts to the receiving channel from the 1- Yes Yes
yr,24-hr storm?
Are fountains proposed?(If Y,please provide documentation that
50 MDC(9)is met.) No No
51 Is a trash rack or other device provided to protect the outlet system? Yes Yes
52 Are the dam and embankment planted in non-clumping turf grass? Yes Yes
53 Species of turf that will be used on the dam and embankment Centipede Centipede
54 Has a planting plan been provided for the vegetated shelf? Yes Yes
ADDITIONAL INFORMATION
Please use this space to provide any additional information about
55 the wet pond(s):
Orifice Diameter is 3.25"for drainage area 1 pond and 1.5"for drainage area 2
pond.
Wet Pond 3 2:31 PM 7/11/2023
LOW DENSITY
DESIGN REQUIREMENTS FOR LOW DENSITY PROJECTS FROM 02H.1003
1 Is project below density thresholds set forth in the applicable stormwater rule? Yes
2 Does project maximize dispersed flow and minimize channelization of flow? Yes
3 Has the use of piping been minimized per.1003(2)(c)? Yes
4 Side slopes of the vegetated conveyances(H:V) 3:01
5 Maximum velocity in the vegetated conveyances during the 10-year storm? 2.59
6 Are curb outlet swales proposed? Yes
7 Maximum longitudinal slope of curb outlet swale(s)(%) 2%
8 Bottom width of curb outlet swale(s)(feet) 2 ft
9 Maximum side slope of curb outlet swale(s)(H:V) 3:1
10 Minimum length of curb outlet swale(s)(feet) 110 ft
11 Are treatment swales used instead of curb outlet swales? No
12 Is stormwater released at the edge of the setback as dispersed flow? Yes
13 Have stormwater outlets been designed to prevent downslope erosion? Yes
14 Are variations to rule.1003 proposed? No
ADDITIONAL INFORMATION
15 Please use this space to provide any additional information about this low density project:
The Remaining swale results are in the Swale Calculations package.There are 47 in total.S-47 is the Curb Outlet.The swales
side slopes range from 15:1 to 3:1.
Drainage Pervious
Swale Area BUA area C Q Slope Vanow Vacua! Flow depth
# (ac) (ac) (ac) (cfs) (%) (fps) (fps) (ft)
1 0.21 0.07 0.14 0.58 0.81 0.02 4.50 1.12 0.22
2 0.31 0.07 0.24 0.52 1.08 0.02 4.50 1.69 0.40
3 0.24 0.07 0.17 0.56 0.89 0.05 4.50 2.47 0.30
4 0.21 0.07 0.14 0.58 0.81 0.02 4.50 1.12 0.22
5 0.21 0.07 0.14 0.58 0.81 0.02 4.50 1.12 0.22
6 0.19 0.07 0.12 0.60 0.76 0.05 4.50 1.90 0.20
7 0.31 0.07 0.21 0.49 1.19 0.02 4.50 1.53 0.36
8 0.15 0.07 0.08 0.66 0.65 0.02 4.50 1.08 0.20
9 0.15 0.07 0.08 0.66 0.65 0.03 4.50 1.47 0.21
10 0.16 0.07 0.09 0.64 0.68 0.02 4.50 1.03 0.21
11 0.15 0.07 0.08 0.66 0.65 0.02 4.50 1.22 0.19
12 0.15 0.07 0.08 0.66 0.65 0.04 4.50 1.52 0.17
13 0.15 0.07 0.08 0.66 0.65 0.05 4.50 1.69 0.16
14 0.15 0.07 0.08 0.66 0.65 0.02 4.50 1.13 0.24
15 0.16 0.07 0.09 0.64 0.68 0.02 4.50 1.18 0.24
16 0.17 0.07 0.10 0.63 0.71 0.02 4.50 1.23 0.24
17 0.15 0.07 0.08 0.66 0.65 0.02 4.50 1.13 0.24
18 0.15 0.07 0.08 0.66 0.65 0.02 4.50 1.13 0.24
19 0.13 0.07 0.06 0.70 0.60 0.02 4.50 1.13 0.23
20 0.10 0.07 0.03 0.79 0.52 0.02 4.50 0.96 0.19
21 0.09 0.07 0.02 0.83 0.49 0.02 4.50 1.01 0.18
22 0.10 0.07 0.03 0.79 0.52 0.03 4.50 1.35 0.16
23 0.11 0.07 0.04 0.75 0.55 0.05 4.50 1.63 0.15
24 0.17 0.07 0.10 0.63 0.71 0.02 4.50 1.07 0.21
25 0.15 0.07 0.08 0.66 0.65 0.02 4.50 1.08 0.20
26 0.12 0.07 0.05 0.72 0.57 0.05 4.50 1.76 0.18
27 0.12 0.07 0.05 0.72 0.57 0.02 4.50 0.66 0.24
28 0.13 0.07 0.06 0.70 0.60 0.02 4.50 1.00 0.20
29 0.16 0.07 0.09 0.64 0.68 0.02 4.50 1.07 0.20
30 0.22 0.07 0.15 0.58 0.84 0.02 4.50 1.16 0.84