HomeMy WebLinkAbout540080_Inspection_20230515• z'} � :. } ,. Y , .. .' __ � �7 M4Kh4..I�,�o���,+e$ •' • . � _ fit 1
810n of �oilUd Water.�onsaoa#*o4 i
Type of Visit: 0 Compliance Inspection 0 Operation Review 0 Structure Evaluation 0 Technical Assistance
Reason for Visit: ® Routine 0 Complaint 0 Follow-up 0 Referral 0 Emergency 0 Other 0 Denied Access
Date of Visit: Arrival Time: p'_ S6' Departure Time: County:
Farm Name:r— Owner Email:
Owner Name: �� 5 r �� Phone:
Mailing Address:
Physical Address:
Facility Contact
�OL7k✓�'� Y Title:
Onsite Representative: �'Y✓ \ h G
Certified Operator: �X `Aeyr) 1" 6
Back-up Operator:
Location of Farm:
' D,,aignureltiS .
l � . ��sne •'.,k• ` .{ , i'apac�t�!' � �o,p
Wean to Finish
Wean to Feeder
Feeder to Finish
Farrow to Wean
Farrow to Feeder
Farrow to Finish
Gilts
Boars
Latitude:
Integrator:
Region: 0q ( 0
Phone: SM T\ "� "
Certification Number: VU "l
Certiflcation Number:
Longitude:
ouLfiy .C�pac" • 'op•. R tlo ,: r ,' G Al
Layer
Non -La er
j P4 ' ' Capacity .,Pop.. -
Layers
Non -Layers
Pullets
Turke s
Turkey Poults
Other
Dairy Cow
Dairy Calf
Dairy Heifer
Dry Cow
Non -Dairy
Beef Stocker
Beef Feeder
Beef Brood Cow
Discharges and Stream Impacts
1. Is any discharge observed from any part of the operation?
❑ Yes
No
❑ NA
❑ NE
Discharge originated at: ❑ Structure ❑ Application Field ❑ Other:
a. Was the conveyance man-made?
❑ Yes
❑ No
❑ NA
❑ NE
b. Did the discharge reach waters of the State? (If yes, notify DWR)
❑ Yes
❑ No
❑ NA
❑ NE
c. What is the estimated volume that reached waters of the State (gallons)?
d. Does the discharge bypass the waste management system? (If yes, notify DWR)
❑ Yes
❑ o
❑ NA
❑ NE
2. Is there evidence of a past discharge from any part of the operation?
❑Yes
❑ NA
❑ NE
3. Were there any observable adverse impacts or potential adverse impacts to the waters
ElYes
VN
❑ NA
❑ NE
of the State other than from a discharge?
Page 1 of 3
517212020 Continued
Facility Number: jDate of Inspection:
Waste Collection & Treatment
4. Is storage capacity (structural plus storm storage plus heavy rainfall) less than adequate? ❑ Yes E�Z No ❑ NA ❑ NE
a. If yes, is waste level into the structural freeboard? ❑ Yes ENo ❑ NA ❑ NE
Structure 1 Structure 2 Structure 3 Structure 4
Identifier:
Spillway?:
Designed Freeboard (in): _
Observed Freeboard (in): _
5. Are there any immediate threats to the integrity of any of the structures observed?
(i.e., large trees, severe erosion, seepage, etc.)
6. Are there structures on -site which are not properly addressed and/or managed through a
waste management or closure plan?
Structure 5 Structure 6
❑ Yes [j No ❑ NA ❑ NE
❑ Yes No ❑ NA ❑ NE
If any of questions 4-6 were answered yes, and the situation poses an immediate public health or env onmental threat, notify DWR
7. Do any of the structures need maintenance or improvement? Yes ❑ No ❑ NA ❑ NE
8. Do any of the structures lack adequate markers as required by the permit? ❑ Yes Nf o ❑ NA ❑ NE
(not applicable to roofed pits, dry stacks, and/or wet stacks)
9. Does any part of the waste management system other than the waste structures require ❑ Yes [3No ❑ NA ❑ NE
maintenance or improvement?
Waste Application
10. Are there any required buffers, setbacks, or compliance alternatives that need ❑ Yes E3/No ❑ NA ❑ NE
maintenance or improvement?
11. Is there evidence of incorrect land application? If yes, check the appropriate box below. ❑ Yes ❑/No ❑ NA ❑ NE
❑ Excessive Ponding ❑ Hydraulic Overload ❑ Frozen Ground ❑ Heavy Metals (Cu, Zn, etc.)
❑ PAN ❑ PAN > 10% or 10 lbs. ❑ Total Phosphorus ❑ Failure to Incorporate Manure/Sludge into Bare Soil
❑ Outside of Acceptable Crop Window ❑ Evidence of Wind Drift ❑ Application Outside of Approved Area
12. Crop Type(s):
13. Soil Type(s)
14. Do the receiving crops differ from those designated in the CAWMP? ❑ Yes 0 No ❑ NA ❑ NE
15. Does the receiving crop and/or land application site need improvement? ❑ Yes E/No ❑ NA ❑ NE
16. Did the facility fail to secure and/or operate per the irrigation design or wettable ❑ Yes dNo ❑ NA ❑ NE
acres determination?
17. Does the facility lack adequate acreage for land application? ❑ Yes dN0 ❑ NA ❑ NE
18. Is there a lack of properly operating waste application equipment? ❑ Yes YNo ❑ NA ❑ NE
Required Records & Documents
19. Did the facility fail to have the Certificate of Coverage & Permit readily available?
❑ Yes
�
El' 0
❑ NA
❑ NE
20. Does the facility fail to have all components of the CAWMP readily available? If yes, check
❑ Yes
❑ No
❑ NA
❑ NE
the appropriate box.
❑ WUP ❑ Checklists ❑ Design ❑ Maps ❑ Lease Agreements
❑ Other:
21. Does record keeping need improvement? If yes, check the appropriate box below.
[IA'es
❑ No
❑ NA
❑ NE
❑ Waste Application ❑ Weekly Freeboard ❑ Waste Analysis ❑ Soil Analysis
❑ Waste Transfers
❑ Weather Code
❑ Rainfall ❑ Stocking F3Crop Yield ❑ 120 Minute Inspections ❑ Monthly and 1" Rainfall Inspections
❑ Sludge Survey
22. Did the facility fail to install and maintain a rain gauge?
❑ Yes
o
❑ NA
❑ NE
23. If selected, did the facility fail to install and maintain rainbreakers on irrigation equipment?
❑ Yes
No
❑ NA
❑ NE
Page 2 of 3 511212020 Continued
Facili Number: �14- Date of Inspection:
24. Did the facility fail to calibrate waste application equipment as required by the permit?
❑ Yes
No ❑ NA ❑ NE
25. Is the facility out of compliance with permit conditions related to sludge? If yes, check
❑ Yes
[l'�o ❑ NA ❑ NE
the appropriate box(es) below.
❑ Failure to complete annual sludge survey ❑ Failure to develop a POA for sludge
levels
❑ Non -compliant sludge levels in any lagoon
List structure(s) and date of first survey indicating non-compliance:
26. Did the facility fail to provide documentation of an actively certified operator in charge?
❑ Yes
14. ❑ NA ❑ NE
27. Did the facility fail to secure a phosphorus loss assessments (PLAT) certification?
❑ Yes
No ❑ NA ❑ NE
Other Issues
28. Did the facility fail to properly dispose of dead animals with 24 hours and/or document
❑ YesWo
❑ NA ❑ NE
and report mortality rates that were higher than normal?
29. At the time of the inspection did the facility pose an odor or air quality concern?
❑ Yes
[�J/No ❑ NA ❑ NE
If yes, contact a regional Air Quality representative immediately.
30. Did the facility fail to notify the Regional Office of emergency situations as required by the
❑ Yes
P - � � ❑ NA ❑ NE
permit? (i.e., discharge, fi-eeboard problems, over -application)
31. Do subsurface tile drains exist at the facility? If yes, check the appropriate box below.
❑ Yes
WN o ❑ NA ❑ NE
❑ Application Field ❑ Lagoon/Storage Pond ❑ Other:
32. Were any additional problems noted which cause non-compliance of the permit or CAWMP?
33. Did the Reviewer/Inspector fail to discuss review/inspection with an on -site representative?
34. Does the facility require a follow-up visit by the same agency?
❑ Yes �o
❑ Yes Zo
❑ Yes No
❑ NA ❑ NE
❑ NA ❑ NE
❑ NA ❑ NE
inor>1t�1$ �1��.'tp c��ieS�tl7i �.ay x.t!� att�ws�[S supEo� �n�' aun�tton��xecommepaactgl�s o��n� �#�' Ga�Ip�4���5�, ,, � ,_
t"ra s "Of JNc l�' yin sifaadons '(ttse a"4otral pages as aecessar')-
�c
1 "1
Ci
U000U-- oy�"F
�U�Ck 6 0-'00
Reviewer/Inspector Name: p__ Phone:
Reviewer/Inspector Signature: Date: _ 23 p!
Page 3 of 3 5/12/2020