Loading...
HomeMy WebLinkAboutNCC232077_ESC Approval Submitted_20230712 WATERSHED PROTECTION DEPARTMENT \ 80 East Street CHATHAM COUNTY Pittsboro,NC 27312 NORTH CAR O L I N A Website:chathamcountync.gov Soil Erosion and Sedimentation Control LETTER OF APPROVAL WITH MODIFICATIONS June 30,2023 Liberty Healthcare Properties of Chatham County,LLC 2334 South 41st Street Wilmington,NC,28403 Project Name: Liberty Commons Skilled Nursing Center Project Number: WP-22-173 Acres Approved: 7.98 Submitted by: McKim&Creed Date Received: 6/21/2023 To The Above Named Person(s) and/or Entity, This office has reviewed the subject erosion and sedimentation control plan. We find the plan to be acceptable with modification and hereby issue this Letter of Approval with Modifications. Erosion and Sedimentation Control Plan: This plan approval shall expire (2) years following the date on this Letter of Approval,unless a Land-Disturbing Permit has been obtained within that initial two-year period and remains in effect as provided in G.S. 164.12 (H). Active sites may have the permit renewed by applying for renewal 30 days prior to expiration. Section 164.10 (L) of the Chatham County Sedimentation and Erosion Control Ordinance requires that a copy of the approved erosion control plan be on file at the job site. North Carolina's Sedimentation Pollution Control Act is performance-oriented, requiring protection of existing natural resources and adjoining properties. If, following the commencement of this project, the erosion and sedimentation control plan is inadequate to meet the requirements of the Chatham County Sedimentation and Erosion Control Ordinance,this office may require revisions to the plan and implementation of the revisions to ensure compliance with the Act. Acceptance and approval of this plan is conditioned upon your compliance with county, state and federal water quality laws, regulations and rules. In addition, local city or county ordinances or rules may also apply to this land-disturbing activity. This approval does not supersede any other permit or approval. Inspections: This letter gives the notice required by G.S. 113A-61.1(a) of our right of periodic inspection to ensure compliance with the approved plan. Section 164.12 (I) of the Chatham County Sedimentation and Erosion Control Ordinance requires self-inspections and monitoring for all sites receiving a Land Disturbing Permit. These inspections can be done by the Financially Responsible Party, or an agent thereof. These inspections must occur at a minimum of once a week and within 24 hours of any rain event of 0.5 inch or greater. Copies of inspection records and reports must be kept on site and produced to Chatham County upon request. Land-Disturbing Permit: A Land-Disturbing Permit will be issued by Chatham County. Construction activities can begin only after the Land Disturbing Permit is issued. Active sites may have the permit renewed by applying for renewal 30 days prior to expiration. Chatham County's Land-Disturbing Permit must be posted at the job site once received. Please note that this approval is based in part on the accuracy of the information provided in the Financial Responsibility Form,which you provided. You are requested to file an amended form if there is any change in the information included on the form. Please notify us when you would like to schedule a preconstruction conference. Notification shall be given at least 7 days prior to initiation of activity. Respectfully, Justin Hasenfus,CPESC Senior Watershed Specialist Chatham County Watershed Protection Department MODIFICATIONS REQUIRED FOR APPROVAL 1. Revise C3.1 and C3.2 to reflect silt fence with silt fence outlet past the rip rap dissipater pad of existing flared end section north of SCM#31 rip rap pad (CWD #202 drains to this pipe system). While it is a clean water ditch draining to this storm system,these erosion control measures are necessary in the interim from ditch construction to vegetative establishment.Additionally,this existing flared end section/headwall should be labeled as was done for existing HW-1 and dimensions for pad added to Standard Pipe Outlet detail on D1.3. 2. Revise D1.1.Replace permanent seeding requirements detail on D1.1 with the detail from Chatham County webpage which has a maintenance requirements box located under Fertilizer paragraph.