Loading...
HomeMy WebLinkAboutGW1--04196_Well Construction - GW1_20230706 ..a:.a..,a..vl\rl I xu L.I WIN KECORD (Gan-1) For Internal Use may: 1.Well Contractor Information: Ricky Corriher -• - WellConhactorNa� a:. ;;_ — __ DESCRIPTION 2464-A .0 f° f ft o NC Well Contractor Certification Number Frank A. Corriher& Sons Well Drilling, Inc. •.. ,- "�` �lm r =- _ Company Name ft ft _ ! w MATE[tlpL �a3 ��G 1s a �.' } ,rf. ,t,,. 2.Well Construction Permit#: FROM TO ,r,�,, - � _-MhTE t.--= !) .�arai♦ir rCw.�i��� MATERIAL List all applicable well construction permits(ie.VIC.County,Cr.,te,Variance,etc.) +1 ft il 6 1/8 m• 3.well Use(check well use): SDR-21 P,VC Water Supply Well: - FROM TO 10r1,514.*:A 11 SLOTSIZB -"�� ❑Agricultural 0 >„- ..al/Public (t ft r w..+,�. "= ❑Geothermal(Heating/Cooling Supply) 0'=-identiai Water Supply ❑lndusQia1fCommercial upP Y(single) fL ft _ in — ❑Resid�ntial Water Supply(shared) 0.�-, ,_ . ❑hrigation ❑Wells>100,000 GPD To . ; �+ 1�w:C#s„ta:1+z 14#(O,E7i Non-Water Supply Well: 0 f- 22 ft Bentonite Hole Plug DMonitoiing ❑Recovery ft ft. Injection Well: ❑Aquifer Recharge ❑Groundwater Remediation 0 Aquifer TStorageandRecovery ❑S3linityBarrier FROM EElyMATEttIAL !7Z-'wjra ,a silvra..:(q'a ❑Stormwater Drainage ft. ft. ❑Experimental Technology ❑Subsidence Control' ft ft. ❑Geoihe>mal(Closed Loop) OTracer ❑Geothennal(Heattng/CoolingRetum) pother(explain'under#21Remarks) �i l__C z n ' 4.Date Well(s)Completed: 4 1 v '3 Well TD# .- IMUIVIEMIIIIErtnig=111111111111111 Sa.Well Location: RIM 0 ft 11lWnllnMaIIIIIIIIIIIII Facility/ownerName Facility ID#(if applicable) b ft ft. 5 L- vo Or 1 v e Pu 1inn,n i.l c ft. ft. 111111.11111IMMIIIIIIII ft Ph City,and Zip -e I 1 z: , ,---- -- - - --- — — County Parcel Identification No.(PIN) l.W tQ..t 3'0 t^ Sb.Latitude and longitude in degrees/minutes/seconds or decimal degrees: ' 350 field, h (if well one is sufficient) ,5"1 3 7 N so o —Si /— I '' 22. flow W 6.Is(are)the weIl(s): QPermanent or ❑Temporary Signature of Well Contractor Ofice24/'\44 Date By signing this] ar.Iherebv certify that the well(s)was(were)constructed in accordance with 7.Is this,a repair to an existing well: ❑yes or o ISA NCAC 02C.0100 or ISA NCAC 02C.0200 Well Construction Standards and that a copy Ifthis is a repair.fill out brown well construction information and explain the nature of the of this record hat been provided to the well owner - repair under#21 rrrnarka section or on the back of this form. 23.Site diagram or additional well details: 8.For Geoprobe/DPT or Closed-Loop Geothermal Wells having the same You may use the back of this page to provide additional well const[Uction info construction,only 1 GW-1 is needed. Indicate TOTAL NUMBER of wells ( Over'.in Remarks Box).You may also attach additional drilled P if necessary. � 24.SUBMITTAL INSTRUCTIONS 9.Total well depth below land surface: (/ For multiple wells list all depths ifdii different(example-3@200-and 2@100) ( ) Submit this GW-1 within 30 days of well completion /�t mp per the following: 10.Static water level below top of casing: CJ ( ) 24a. For All Wells: Original form to Division of Water Resources If water level is above casing use +" Information Processing Unit,1617 MSC,Raleigh,NC 27699-1617 (DWR), 11.Borehole diameter: 6" Cm-) Pro 24b. For Injection Wells:Copy to DWR,Underground Injection Control(TUC) 12.Well construction method:Air Drill gram. (ie m cable,(Facet push,etc) 24c.For Water Supply and Open-Loop Geothermal Return Wells:Copy to the county environmental health department of the county where installed FOR WATER SUPPLY WELLS ONLY: 24d.For Water Wells producing over 100,000 GPD:Copy to DWR,CCPCUA 13a.Yed(l;pm) 50 Method of test:Air Permit Program,1611 MSC,Raleigh,NC 27699-1611 I3b.Disinfection type: Sterilene Amount: 3caeS • Fong GW-1 North Carolina Department of Environmental Quality-Division of Water Resources Revised 6-6-2018