Loading...
HomeMy WebLinkAboutSWA000200_email_20230608 Peck, Kaitlin From:Farkas, Jim J Sent:Thursday, June 8, 2023 2:55 PM To:Will Derrickson Cc:contact@greenmountainengineers.com; Kay, Lily C; planning@cityofws.org; Ogburn, Randall E; keithh1@cityofws.org Subject:RE: SWA000200; Stapleton Subdivision Phases 1 & 2 Attachments:Fast Track ATC Cover Letter & Permit 6-8-23.pdf Good Afternoon, The Division of Energy, Mineral, and Land Resources (DEMLR), received a complete, Stormwater Management Permit Authorization to Construct (ATC) Application for the subject project on May 11, 2023. Staff review of the plans and specifications has determined that the project, as proposed, will comply with the Stormwater Regulations set forth in Title 15A NCAC 2H.1000 - 1062 rules. We are forwarding ATC Permit No. SWA000200, dated June 8, 2023, for the construction of the subject project and the stormwater system. This permit shall be effective from the date of issuance and shall be subject to the conditions and limitations as specified therein, and does not supersede any other agency permits that may be required. The original signed permit package and plans are being mailed to the permittee, Will Derrickson, at the following address (NOTE: An electronic version of this permit can be found in our online repository: https://edocs.deq.nc.gov/WaterResources/Browse.aspx?id=494276&dbid=0&repo=WaterResources): Clayton Properties Group, Inc. Attn: Will Derrickson, Land Development Manager 221 Jonestown Road Winston-Salem, NC 27104 I will hold onto our hard copies of this project for 30 days (in case any issues/typos with the permit are noticed and corrections need to be made) after which point, they will be kept on file at the Winston-Salem Office. If you have any questions, or need additional information concerning this matter, please contact me at jim.farkas@ncdenr.gov. Reminder: Please be aware that per 15A NCAC 02H .1044(2), the Erosion & Sediment Control (E&SC) permit for this site cannot be closed out until the as-built stormwater plans for this project are approved by our office. Jim Farkas State Stormwater Engineer North Carolina Department of Environmental Quality Office: (919) 707-3646 Jim.farkas@deq.nc.gov 1 From: Farkas, Jim J Sent: Monday, April 17, 2023 9:15 AM To: Will Derrickson <wderrickson@mungo.com>; contact@greenmountainengineers.com Cc: Kay, Lily C <lily.kay@ncdenr.gov> Subject: SWA000200; Stapleton Subdivision Phases 1 & 2 Good Morning, We received your post-construction stormwater Authorization to Construct (ATC) permit application for the above mentioned project on 3/28/2023. Reviews under the Fast-Track permitting process can take up to 30 calendar days to complete. You can see where this project stands in the review queue by emailing me (I have an autoreply set up that has the review queue on it). Please upload all documents that you mailed into our office through the link provided below. Be sure to choose the Central Office as the Primary Contact office. https://edocs.deq.nc.gov/Forms/SW-Supplemental-Upload IMPORTANT NOTE: Please ensure that each file is uploaded under its appropriate file type. Additional file types can be entered into the electronic form by clicking on the “Add Another Post-Construction File Upload” link directly below the “State Stormwater Information Uploads” section of the form. YOU MUST CLICK ON THE “ADD ANOTHER POST- CONSTRUCTION FILE UPLOAD” TO ADD ADDITIONAL FILE TYPES TO THE SUBMISSION. Merely changing the file type dropdown as you upload the various files (without adding additional file uploads) will upload all of the files as the last file type selected, the submission will get flagged during review, and you will need to resubmit the files. Please do not upload entire plan sets through this form, but rather upload the relevant individual sheets under the appropriate file type. Selecting the correct file type ensures that the files are properly named in the electronic repository and it helps expedite the review process. NOTE: We do not require and we discourage the upload/submission of extraneous plan sheets (such as lighting plans, utility plans, striping plans, sight distance plans, etc…) as these files are not needed for review. Please type in permit #: SWA000200 If you have any questions, please contact Jim Farkas Jim.Farkas@ncdenr.gov 919-707-3646 (email is preferred). Jim Farkas State Stormwater Engineer North Carolina Department of Environmental Quality Office: (919) 707-3646 Jim.farkas@ncdenr.gov 2 From: Farkas, Jim J Sent: Thursday, March 30, 2023 2:38 PM To: Will Derrickson <wderrickson@mungo.com>; contact@greenmountainengineers.com Cc: Kay, Lily C <lily.kay@ncdenr.gov> Subject: RE: Stapleton Subdivision Phases 1 & 2 in Forsyth County We received additional information for the subject project on 3/28/2023. The following items are still missing from the submission:  Prior Comment – 2x hard copies of official documentation showing the title and position of the signing official for the Applicant and showing that the Applicant organization is in good standing with the Secretary of State. These items are required per Part F7 of the Application and 15A NCAC 02H .1043(3)(b). This item was not provided in the resubmission. The signing official, Mr. Derrickson, is not listed on the provided document showing the tile and position information. The signing official must be at least the rank of Vice President or higher (per 15A NCAC 02H .1040(1)(a)) or must be an authorized representative of someone of rank Vice President or higher (you could, for example, provide a letter signed by someone VP or higher stating that Mr. Derrickson is authorized to sign this permit or change the signing official in the Application to someone VP or higher). Please provide these items by close of business on 4/6/2023 so that we may accept the project and begin the review process, otherwise, the project will be returned as administratively incomplete. Jim Farkas State Stormwater Engineer North Carolina Department of Environmental Quality Office: (919) 707-3646 Jim.farkas@ncdenr.gov From: Farkas, Jim J Sent: Thursday, March 9, 2023 2:30 PM To: Will Derrickson <wderrickson@mungo.com>; contact@greenmountainengineers.com 3 Cc: Kay, Lily C <lily.kay@ncdenr.gov> Subject: RE: Stapleton Subdivision Phases 1 & 2 in Forsyth County We received additional information for the subject project on 3/9/2023. The following items are still missing from the submission:  2x hard copies of the Application Form (or pages) with the following corrections made (A complete application is required per 15A NCAC 02H .1043(3)(a)):  Part E5 – The project density does not appear to be calculated correctly. For a project with existing BUA, the % BUA is calculated as \[New BUA\] / (\[Total Project Area\] – \[Existing BUA\]). Per the information in the table, \[New BUA\] = 611,454 sf, \[Total Project Area\] = 2,577,537 sf, & \[Existing BUA\] = 6,243 sf. This results in a percent BUA of 23.78% (611,454 sf / (2,577,537 sf – 6,243 sf) = 23.78% while 23.96% is shown). Please revise as needed.  2x hard copies of a construction sequence discussing how any future development on the project may be phased. This item is required per 15A NCAC 02H .1043(3)(g). The construction sequence does not need to be lengthy, just a brief description of how future development on the project (beyond what is shown on the plans) will be phased. If no future development is planned for the project, you can simply state that in the construction sequence. This item is different than the E&SC sequence of construction. This item was not provided in the resubmission.  2x hard copies of official documentation showing the title and position of the signing official for the Applicant and showing that the Applicant organization is in good standing with the Secretary of State. These items are required per Part F7 of the Application and 15A NCAC 02H .1043(3)(b). This item was not provided in the resubmission. Please provide these items by close of business on 4/6/2023 so that we may accept the project and begin the review process, otherwise, the project will be returned as administratively incomplete. Jim Farkas State Stormwater Engineer North Carolina Department of Environmental Quality Office: (919) 707-3646 Jim.farkas@ncdenr.gov From: Farkas, Jim J Sent: Tuesday, March 7, 2023 8:34 AM To: Will Derrickson <wderrickson@mungo.com>; contact@greenmountainengineers.com Cc: Kay, Lily C <lily.kay@ncdenr.gov> Subject: Stapleton Subdivision Phases 1 & 2 in Forsyth County Good Morning, We received your application for a new Fast-Track ATC post-construction stormwater permit on 3/3/2023. At this time, the submission is not administratively complete and cannot be accepted for review in its current condition. Please 4 provide the following submittal items within 30 calendar days (by close of business on 4/6/2023) so that we may accept the project and begin the review process, otherwise, the project will be returned as administratively incomplete.  2x hard copies of the Application Form (or pages) with the following corrections made (A complete application is required per 15A NCAC 02H .1043(3)(a)):  Part D2 – Please complete this information.  Part E4 – The stream index and classification number do not appear to be correct. This information can be found at the following address: https://experience.arcgis.com/experience/7073e9122ab74588b8c48ded34c3df55/ Please revise as needed.  Part E5 – The project density does not appear to be calculated correctly. For a project with existing BUA, the % BUA is calculated as \[New BUA\] / (\[Total Project Area\] – \[Existing BUA\]). Per the information in the table, \[New BUA\] = 624,858 sf, \[Total Project Area\] = 2,577,537 sf, & \[Existing BUA\] = 6,243 sf. This results in a percent BUA of 24.3% (624,858 sf / (2,577,537 sf – 6,243 sf) = 24.3%). NOTE: This is in excess of the maximum allowable %BUA for a low-density project. Please revise as needed.  1x original signed and notarized/sealed hard copy of Parts G & H of the Application. 2x original signed hard copies of this form are required and only one was provided (the other copy appears to be a photocopy).  2x hard copies of a construction sequence discussing how any future development on the project may be phased. This item is required per 15A NCAC 02H .1043(3)(g). The construction sequence does not need to be lengthy, just a brief description of how future development on the project (beyond what is shown on the plans) will be phased. If no future development is planned for the project, you can simply state that in the construction sequence. This item is different than the E&SC sequence of construction.  2x hard copies of official documentation showing the title and position of the signing official for the Applicant and showing that the Applicant organization is in good standing with the Secretary of State. These items are required per Part F7 of the Application and 15A NCAC 02H .1043(3)(b). NOTE: This is an administrative completeness review, not a detailed engineering review, there may be other issues that may be brought up during the engineering review. The following items were noted during the review, but do not need to be addressed for administrative completeness: - Untreated stormwater runoff cannot be directly discharged to a surface water (as appears to be the case with the culvert near Lots 1 & 111) it must be released at the edge of the vegetated setback and allowed to flow through the vegetated setback as dispersed flow (per 15A NCAC 02H .1003(4)(e)). - There appears to be excessive piping for this project to be considered as low-density (notably the pipes located between lots 14 & 15, 19 & 20, and 86 & 87). Per 15A NCAC 02H .1003(2)(c), vegetated conveyances should be used in these locations. If these items are received within the stipulated timeframe, we can accept the project and begin the review process. Once accepted, reviews under the Fast-Track permitting process can take up to 30 calendar days per statute (one of our two reviewer positions is currently vacant). Hard copies should be mailed to the following address: For FedEx/UPS: Jim Farkas 512 N. Salisbury Street, Office 640M Raleigh, NC 27604 For USPS: Jim Farkas 1612 Mail Service Center Raleigh, NC 27699-1612 If you have any questions, please contact Jim Farkas at jim.farkas@ncdenr.gov or 919-707-3646. 5 Thank you, Jim Farkas State Stormwater Engineer North Carolina Department of Environmental Quality Office: (919) 707-3646 Jim.farkas@ncdenr.gov 6